ClassNK Technical Information No. TEC Required minimum propulsion power In principle, the installed propulsion power (total main engine output

Subject Maintenance, inspection and test of Fire-Protection Systems and Appliances on board the Panama-registered ships To whom it may concern Technic

2. Application This "Guidelines" applies to all ships. 3. General Requirements for the Maintenance and Inspection of Fire-protection Systems and Appli

Technical Information

Technical Information

SLOP RECEPTION AND PROCESSING FACILITIES

IACS History File + TB

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018

Frequently Asked Questions Directive 056 Facilities Technical

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

RULES PUBLICATION NO. 119/P

PROSAVE. Top Reliability, Smart Design, Valuable Product and Better Life. Smart HIGH VELOCITY PRESSURE / VACUUM RELIEF VALVE (with Gas Free Cover)

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

RESOLUTION MSC.236(82) (adopted on 1 December 2006) ADOPTION OF AMENDMENTS TO THE GUIDELINES FOR THE TRANSPORT AND HANDLING OF LIMITED AMOUNTS OF

Installation of Ballast Water Management Systems

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]

Technical Information

M-06 Nitrogen Generator (Nitrogen Making Machine)

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

LPG, LEG, LNG tankers & Chemical and Product tankers

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Technical Information

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

ANNEX 15. RESOLUTION MEPC.158(55) Adopted on 13 October 2006

INTERNATIONAL MARITIME ORGANIZATION

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

ANNEX 5. DRAFT RESOLUTION MSC.[ ](93) (adopted on [ ])

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

CIRCULAR TO MASTER NO. O 9 DATE SUBJECT: Revision to Cargo Operation Manual Oil Tanker & Company Form

SOLAS requirements for nonpassenger ships 300 or above but less than 500 gross tonnage

Type Testing Procedure for Crankcase Explosion Relief Valves

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

The capacity of the cargo tank venting system (46 CFR );

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Cargo Handling Sheet. Propylene Oxide. Document Date: 01 April 2018 Revision 4

F All types of inert gas systems are to comply with the following:

Chapter 2 Preparations for Tank Cleaning Work

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF VESSELS IDENTIFIED BY THEIR MISSION SECTION 6 PIPING CHAPTER SCOPE

Testing Procedures of Watertight Compartments

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

Liquefied gas cargo tanks and process pressure vessels

NEW IGC CODE AND IGF CODE

Attachment 1. to ClassNK Technical Information.TEC-0924 MARINE NOTICE MARINE NOTICE 11/2012 Guidance on ECDIS for ships calling at Australian ports Th

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

DA-SAFE/17/ Nov 2017

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

Recent Topics at IACS

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

PV-ECO SERIES. High velocity pressure/vacuum valves MARINE LIFE WITHOUT FOOTPRINTS

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

LNG Marine Loading Arms and Manifold Draining, Purging and Disconnection Procedure

We re Going Global. Vessel Loss Control. Technical Notes #36

MSC Guidelines for Compressed Air Systems

17. CARGO MEASUREMENT AND CALCULATION

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

ST. VINCENT AND THE GRENADINES

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

TOP VALVE. Pat. #5,857,486 & 5,944,050. High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves. Instruction Manual

Rules for Classification and Construction Ship Technology

Thermocirc Installation and Maintenance Instructions

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

Installation and commissioning instructions 255 series and 256 series

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

OPERATION MANUAL NTF-15

RULES FOR CLASSIFICATION. Ships. Part 5 Ship types Chapter 6 Chemical tankers. Edition January 2017 DNV GL AS

OPERATION MANUAL NTF-60 Plus

TSS21 Sealed Thermostatic Steam Tracer Trap

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

Venting Atmospheric and Low-pressure Storage Tanks API STANDARD 2000 SEVENTH EDITION, MARCH 2014

Pumping Apparatus Driver/Operator Apparatus Testing. Chapter Test. Directions: Write the correct letter on the blank before each question.

SECTION P4 SEPARATION SYSTEMS

MSC Guidelines for Pressure Vessels

Guidance on Enclosed Space Entry and Rescue

National Maritime Center

I. CHEM. E. SYMPOSIUM SERIES NO. 85 MULTI-STAGE OVER PRESSURE PROTECTION AND PRODUCT CONTAINMENT ON HIGH PRESSURE POLYMERISATION REACTORS

RESOLUTION MSC.32(63) adopted on 23 May 1994 ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR THE CONSTRUCTION AND EQUIPMENT OF SHIPS CARRYING

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged

RESOLUTION MSC.256(84) (adopted on 16 May 2008) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS

LNG REGASIFICATION VESSELS

PREVENTION OF EXCESSIVE PRESSURE DURING FILLING OF CRYOGENIC VESSELS

September 2018 Pressure Test

Accidents during Tanker Accident in Confined Spaces

Inert Air (N2) Systems Manual

DF1 and DF2 Diffusers

AMENDMENTS TO THE IGF CODE AND DEVELOPMENT OF GUIDELINES FOR LOW-FLASHPOINT FUELS. Report of the working group

Testing Procedures of Watertight Compartments

OVERALL SURVEY: A survey intended to report on the overall condition of the hull structure and determine the extent of additional close-up surveys.

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

Transcription:

Subject: Requirement For Existing Chemical Tankers Under year 2000 Amendments To IBC/BCH Code Technical Information No. TEC-0461 To whom it may concern Date 25 June 2002 2000 Amendments to the IBC/BCH Code will become effective on 1 July 2002. These amendments apply to new chemical tankers as well as existing chemical tankers. The amendments are as follows: 1) Cargo Hoses (IBC Code 5.7/BCH Code Chapter II 2.12.4) The requirement for prototype testing of cargo hoses newly installed on board ships has been added. 2) Tank Venting System(IBC Code 8.3/BCH Code Chapter II 2.14) For when the controlled tank venting systems fail, secondary means for preventing over/under pressure in the cargo tank should be provided. Alternatively, pressure sensors may be provided in each cargo tank. For existing chemical tankers, the compliance should be completed by the date of the first scheduled dry docking after 1 July 2002, but not later than 1 July 2005. Because the requirement for prototype test of cargo hose has been added, cargo hoses newly installed on board ships after 1 July 2002 are required to obtain new type approval according to the new requirements. For all existing chemical tankers, to which the amendments of the Tank Venting System apply, ClassNK will carry out plan reviews in order to check the compliance with the amendments before onboard survey. In this regard, you are requested to prepare the related drawings and send them to ClassNK for approval. Following the plan approval within Head Office, an on-board survey will be carried out to verify the ship s compliance according to the approved plan. For Oil/Chemical Tankers to which the requirements of the tank venting system for oil tankers in 1996 Amendments of SOLAS 74 also applies, ClassNK will re-confirm the approved drawings of those vessels, so please advise if this is required. (To be continued) NOTES: ClassNK Technical Information is provided only for the purpose of supplying current information to its readers. ClassNK, its officers, employees and agents or sub-contractors do not warrant the accuracy of the information contained herein and are not liable for any loss, damage or expense sustained whatsoever by any person caused by use of or reliance on this information. Back numbers are available on ClassNK Internet Homepage (URL: www.classnk.or.jp).

For any questions about the above, please contact: NIPPON KAIJI KYOKAI (ClassNK) Hull Department, Administration Center, Head Office Address: 4-7, Kioi-cho, Chiyoda-ku, Tokyo 102-8567, Japan Tel.: +81-3-5226-2017 Fax: +81-3-5226-2019 E-mail: hld@classnk.or.jp Attachments: A: Prototype-test of cargo hoses for existing chemical tankers B: Controlled tank venting system for existing chemical tankers

Attachment A to ClassNK Technical Information No. TEC-0461 Prototype-test of cargo hoses for existing chemical tankers 1. Application Cargo hoses newly installed on board ships to which the IBC Code/BCH Code applies, on or after 1 July 2002 2. Regulation For cargo hoses installed on board ships on or after 1 July 2002, each new type of cargo hose, complete with end-fittings, should be prototype-tested at a normal ambient temperature with 200 pressure cycles from zero to at least twice the specified maximum working pressure. After this cycle pressure test has been carried out, the prototype test should demonstrate a bursting pressure of at least 5 times its specified maximum working pressure at the extreme service temperature. Hoses used for prototype testing should not be used for cargo service. Thereafter, before being placed in service, each new length of cargo hose produced should be hydrostatically tested at ambient temperature to a pressure not less than 1.5 times its specified maximum working pressure but not more than two-fifths of its bursting pressure. The hoses should be stencilled or otherwise marked with the date of testing, its specified maximum working pressure and, if used in services other than the ambient temperature service, its maximum and minimum service temperature, as applicable. The specified maximum working pressure should not be less than 1MPa gauge. 3. Instruction Even if cargo hoses were prototype-tested according to the previous requirement of IBC/BCH Code and approved by ClassNK, Cargo hoses newly installed on board ships after 1 July 2002 should be prototype-tested according to this amendment. Should you have any questions regarding this prototype-test, please feel free to contact the Material and Equipment Department, Administration Center, Head Office (Tel: +81-3-5226-2020, Fax: +81-3-5226-2057).

Attachment B to ClassNK Technical Information No. TEC-0461 Controlled tank venting system for existing chemical tankers 1. Application These amendments apply to existing chemical tankers to which the IBC/BCH Code applies. In the case of existing chemical tankers of less than 500 gross tonnage, each ship will be dealt with individually. 2. Regulations and guidance relating to the amendments Regulation Guidance 1. In cases where the venting arrangements for the passage of large volumes of vapor, air or inert gas mixtures during cargo 1. Mal-function or mis-operation of venting pipes as well as shut-off valves to isolate each cargo tank from a common line need not be considered. loading and ballasting, or during The shut-off valve to isolate each cargo tank from discharging fail, the arrangements a common line should be provided with a locking prescribed in (a) and (b) below should be provided in order to prevent over-pressure device and clear visual indication of operational status of the valve. or under-pressure in the cargo tanks. (a) Means of allowing full flow relief of vapor, air or inert gas mixtures during cargo loading and ballasting or during discharging are required. 1. The following means may be accepted. 1) Additional arrangement allowing the passage of large volumes of vapor, air or inert gas mixtures during cargo loading and ballasting, or discharging. 2) Rupture disk 3) PV breaker 2. Example acceptable venting systems are shown in Fig.1. Other proposed arrangements will be reviewed on a case by case basis.

(b) Pressure monitoring systems for the cargo tanks must comply with the following 1) to 3). 1) To be type-approved by ClassNK. 2) Pressure sensors should be fitted in each tank. 3) Monitoring equipment complying with the following i) and ii) should be provided in the ship s cargo control room or the position from which cargo operations are normally carried out: i) Pressure indicator for each cargo tank ii) Visual and audible alarm to be activated by detection of overpressure or under-pressure conditions within a tank. 1. 1. If cargo loading and ballasting or discharging of a cargo tank or cargo tank group, which is isolated from a common venting system is intended, that cargo tank or cargo tank group should be fitted with an arrangement for over-pressure or under pressure protection as required in 1 above. 1. Alarm-setting pressure for over-pressure condition should not in principle be over the test pressure of the cargo tank. 2. Alarm-setting pressure for under-pressure condition should not in principle be under 0.007Mpa. 3. No shut-off valves or closing devices should in principle be fitted between the cargo tank and the pressure sensor. If a shut-off valve has to be fitted, the valve should be provided with a locking device and clear visual indicator. 4. Pressure sensors should be so arranged and constructed as to avoid the clinging of cargo and should be easy to calibrate and maintain. 5. When a change of alarm-setting pressure is needed depending on cargo or loading, procedures for the change should be prescribed in the operating manual of the system.

Existing arrangement for the passage of large volumes of vapor, air or inert gas mixtures during cargo loading and ballasting, or during discharging 3. Submission of drawings Cargo Tank 1) Drawings to be submitted Please submit three copies of each of the following: i) Piping diagram of cargo vent line (with materials, sizes, kinds, design pressures, etc. of pipes, valves, etc.) ii) In the case of providing a pressure monitoring system: a) General arrangement of the system b) Detail of the system c) Operation manual of the system 2) Department to which you send the drawings NIPPON KAIJI KYOKAI (ClassNK) Hull Department, Administration Center, Head Office Address: 4-7, Kioi-cho, Chiyoda-ku, Tokyo 102-8567, Japan Tel.: +81-3-5226-2017 Fax: +81-3-5226-2019 E-mail: hld@classnk.or.jp Additional arrangement to prevent over-pressure or under-pressure in the cargo tanks, when the existing arrangement fails (required by this amendments)