Operating Plan 8a Bruce County Rail Trail Section 8 to Saugeen Concession 6 To develop and open the section of Non-Motorized trail (Part of Section 8) which runs from the South boundary of the (west side of Mill Creek bridge) in the Municipality of Saugeen Shores to Concession 6. This would also be part of the Central Loop outlined in the Town of Saugeen Shores Parks & Trails Master Plan. The following Categories and Activities will need to be completed prior to trail opening. 2 Trail Bed Preparation Removal of refuse from trail bed. Trimming of trees and shrubs (including dead tree removal). Applying 5 of Pit run and pack. Applying 5 Stone dust and pack. Move Trail barriers from end of to Concession 6 entrance... Barriers points. This Section would be funded as an extension to the Saugeen Rail Trail pending Executive, and the Town of Saugeen Shores approval.
Operating Plan 8b Saugeen Concession 6 to Saugeen Concession 4 Concession 6 in the Municipality of Saugeen Shores to Concession 4. The Non- Motorized Trail to follow the Rail Bed as outlined in the BCRTMC Master Plan and will be developed and maintained By the and the CN North Trail Group. The Motorized trail to run parallel East of the Rail Bed near the East Fence line to be developed and maintained by the CN North Trail Group. This would also be part of the Central Loop outlined in the Town of Saugeen shores Parks & Trails Master Plan. The following Categories and Activities will need to be completed prior to trail opening. Applying 5 of Pit run and pack. (future when funds Barriers points. Signalized crossing at Highway 21. (future when funds Final upgrades to the non-motorized Section would be funded as an extension to the pending Saugeen Rail Town of Saugeen Shores
Operating Plan 8c Saugeen Concession 4 to Saugeen Concession 2 Concession 4 in the Municipality of Saugeen Shores to Concession 2. The Non- Motorized Trail to follow the Rail Bed as outlined in the BCRTMC Master Plan and will be developed and maintained By the Group and the CN North Trail Group. The Motorized trail to run parallel East of the Rail Bed near the East Fence line to the point where Keith Snyder Construction driveway starts. At this point the motorized trail will run along the Rail bed. The motorized trail is to be developed and maintained by the CN North Trail Group. This would also be part of the Central Loop outlined in the Town of Saugeen shores Parks & Trails Master Plan. The following Categories and Activities will need to be completed prior to trail opening. Note- The motorized trail will be developed south from Keith Snyder driveway near the east fence over the next five years. Applying 5 of Pit run and pack.(future when funds Barriers Access Road for Snyder Construction points. Access Gates for Snyder Construction 6 User Groups As referred to in the Terms of Reference for the BCRTMC Planning Principles for user Final upgrades to the non-motorized Section would be funded as an extension to the pending Saugeen Rail Snyder Construction Snyder Construction
Operating Plan 8d Saugeen Concession 2 to Saugeen Shores Boundary Concession 2 in the Municipality of Saugeen Shores to the Saugeen shores boundary. The Non-Motorized Trail to follow the Rail Bed as outlined in the BCRTMC Master Plan and will be developed and maintained By the Group and the CN North Group. The Motorized trail to follow the Rail bed as a single trail and be developed and maintained by the CN North Trail Group. This would also be part of the Central Loop outlined in the Town of Saugeen shores Parks & Trails Master Plan. The following Categories and Activities will need to be completed prior to trail opening. Note- The motorized trail will be moved to near the east fence over a five year period. Trail safety checks according to BCRTMC Check sheet. Applying 5 of Pit run and pack. (future when funds Barriers points. Final upgrades of the non-motorized section would be funded as an extension to the pending Saugeen Rail