BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

Similar documents
Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Using the Akta Prime plus October 22, 2012

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

SOP for use of the SX19 Stopped-Flow Instrument

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

5890II GC Standard Operating Procedure 9/2/2005

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

[USING THE VITROBOT April 9, Using the Vitrobot

SS32L Dissolved O 2 Probe

NanoSight NS300. NanoSight NS300. Operation instructions. Laser Spectroscopy Labs, UCI

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

Procedures for operation of the TA Instruments DSC

Armfield Distillation Column Operation Guidelines

SEM LEO 1550 MANUAL. I. Introduction. Generality

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Warnings: Notes: Revised: January 8,

1)! DO NOT PROCEED BEYOND THIS MARK

Microfluidic Demonstration

Running the LiCor 6400 Infra Red Gas Analyzer (IRGA) with 4 whole-plant cuvettes attached

The Crease Matic 150 is quiet in operation and the drive motor shuts down if not used for a period of time.

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

OPERATION MANUAL DIVE CALIPER NOT SCALE / IF IN DOUBT ASK* *ALL UNITS IN MM/DEGREES UNLESS SPECIF. Dive Caliper General DC-051

ShellPa. Standard Mechanical Cell Stretch System Model No: NNMS Serial #: User Manual

WELLS JOHNSON HIGH VOLUME CANISTERS

Karl Suss MA6 Mask Aligner SOP

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

RM-80 respiration monitor

Cover Page for Lab Report Group Portion. Boundary Layer Measurements

ELIMINATOR COMPETITION DRAG RACE Program Manual Firm Ver 4.11

Linkam Scientific Instruments USER GUIDE DSC600. Temperature Controlled Stage

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

[MYLAPS INTEGRATION]

ACV-10 Automatic Control Valve

Scanning Electron Microscope JEOL JSM F

M3-LED. Operator s Manual. Operator s Manual MADE IN THE USA USA

Race Screen: Figure 2: Race Screen. Figure 3: Race Screen with Top Bulb Lock

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

CONSUMER MODEL INSTALLATION GUIDE

SENSUS PRO MANAGER (for SENSUS or SENSUS PRO devices) User s Guide -- Windows. Version 2.0 Published October 17, ReefNet Inc.

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

SOP: Buck Scientific BLC-20P HPLC Operation

Hydro user manual. Malvern Instruments Limited

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

ORB-400 BUBBLE/HAZE MACHINE. Item ref: UK User Manual

AKTA pure 25 New Owner s Intro

TrackMan Operator Training

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Wire Buddy Manual IOpath Software

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Shimano Di2 Installation on S5

SOP: Cation Exchange Chromatography of t-pa using AKTA Pure system

OPERATION OF THE DIMPLER

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

AKTA MC SOP Page 1 9/27/04 AKTA METAL CHELATING SOP

Cover Page for Lab Report Group Portion. Head Losses in Pipes

High Pressure Chem-SCAN Operating Manual

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

FOURIER TRANSFORM INFRARED SPECTROSCOPY

User s Booklet for the Wyatt minidawn Light Scattering Instrumentation

Bante821 Portable Dissolved Oxygen Meter Instruction Manual

TYPICAL OPERATION PROCEDURES

Standard Operating Manual

FireHawk M7 Interface Module Software Instructions OPERATION AND INSTRUCTIONS

Technology. In the My Files [My Files] submenu you can store all the programs that you have made on the NXT or downloaded from your computer.

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

BD Cytopeia Fluidic Kit User s Guide

Standard Operating Procedure. For. PVD E-Beam

Tournament Manager: Running a VEX IQ Event - Beginner

50KN stress rig for use on SALSA

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

Quantitative Analysis of Hydrocarbons by Gas Chromatography

ACQUIDATA FAMILY CALIBRATION PROCEDURE CALIBRATION CHECKING

Tru Flight TRUFLIGHT INSTALLATION GUIDE TRUGOLF.COM

XC2 Client/Server Installation & Configuration

Survey Technical Support Notes October 2015

USER MANUAL Onsight Rugged Smart Cameras Software Version 7.1

Glove Box Installation Manual

ASE SOLVENT CONTROLLER INSTALLATION INSTRUCTIONS Dionex Corporation

Vapor Pressure of Liquids

Physics Experiment 17 Ideal Gas Law Qualitative Study

Underwater Fiber-Optic Plane Irradiance Collector

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

IVIS Spectrum Whole Animal Imager

SPUTTER STATION STANDARD OPERATING PROCEDURE

SHIMADZU LC-10/20 PUMP

Installation of Your SprayMaster System

Thank you for purchasing your new Empire Reloader B Sound-Activated 3-Speed Paintball Hopper!

ASG-SD2500 ASG-SD2500

Quick Start Guide. A. Hardware installation B. Software installation C. Start the software for the first time D. Do your first measurement

MJB-3 Mask Aligner Property of TAU MNCF August 2012

Quickstart Installation Checklist (Please refer to operation manual for complete installation instructions)

User Manual for the Mars Calibration Bench

SOP: Anion Exchange Chromatography of Green Fluorescent Protein (GFP) using the AKTA Pure system

CircuFlow Quick Setup Guide

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Transcription:

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1 The front door of the main body of the instrument may be open when you arrive. Take the sample chamber and slide it into position with the hole in the back to receive the objective if using the 20x dipping lens. Push the holder all the way to the back of the chamber and then hand tighten into position with the set screw on the front. NOTE: There is also a 5x air objective that can be used. Please see Imaging Center Manager if you need this option. Attach the two cables with the silver ends to the corresponding position on the right side of the opening with the red dots facing up. These simply push straight in. Fill Port Then attach the two hoses containing blue fluid to the middle two positions by pushing them into place. The order of these two hoses is not important. The clear tubing coming Set Screw from the syringe with the preferred liquid for your sample attaches to the bottom right port of the chamber by pushing it on and rotating ¼ turn to the right. Turn on the system by toggling the three switches on the white control panel to the left of the monitor labeled system, PC, and incubation from the top down. NOTE: Please allow 3-5 seconds between turning on each switch or the system will not initiate properly. Page 1

After the system has initiated and the computer has booted click on the ZEN software icon on the left side of the monitor. NOTE: If you need to adjust the temperature of your media in the sample chamber before starting now is the best time to add your media to it. Even if you only require room temperature for your session, you should use the temperature controller because the laser will heat up the solution in the chamber. Fill the chamber by depressing the syringe and observing the liquid level through the front window of the chamber. The chamber will hold 20 ml. Start the heating or cooling cycle by expanding the Incubation window at the bottom left of the screen. Check the box labeled Peltier Unit to turn on the mechanism and then type in the desired value or use the arrows to set your temperature. You may do the same to adjust for CO2 percentage if needed. Make sure that the sample holder is in the LOAD position by clicking the icon at the bottom left of the software. Load the sample holder into position making sure that it sits flat and the white lines on the holder and the ring surrounding it are aligned. Page 2

Then click LOCATE and LOCATE CAPILLARY at the top left. This turns on the webcam at the front of the chamber and allows you to see a front view of the chamber. This is the best time to fill the chamber if you have not already, because you can see the liquid level increase on screen. Fill the chamber all the way to the top but do not overfill. NOTE: The front door of the system must be closed in order for the webcam to work and other parts of the software to function. There is a holder attached to the right side of the microscope box that is designed to hold your syringe in place. Make sure to feed the tubing underneath the bottom of the door so that it isn t crimped when the door is closed. The sample chamber and Lightsheet Z. 1 system are designed for aqueous media with a refractive index of 1.33 such as water, PBS, cell culture media, etc. Media based on organic solvents can evaporate within the system and cause damage to the optical surfaces as well as the motors of the system. Please do not use anything other than aqueous media in the system without consulting either Dr. Doug Harrison or Jim Begley. Page 3

Move the capillary into position by sliding the blue outlined Z plane forward and the green outlined Y plane down in the specimen navigator window until the bottom of the capillary lines up with the horizontal line on the image of the objective. Open the specimen door at the top of the system and gently push down on the plunger inside the capillary. Check for air bubbles at the bottom of the capillary and remove them by tapping the specimen holder if necessary. While looking at the screen push a small amount of agarose from the end of the capillary using the plunger until your sample is centered in the crosshairs that appear at the center of the objective. Page 4

Turn off the Locate Capillary function and then click on LOCATE SAMPLE. This will turn off the webcam Turn to and now Press for rotate you will see Rotation your sample Mode with transmitted light through the objective. You can center your sample with the joystick Press for left-right & up-down and if joystick functions needed rotate the sample by clicking the top button on either side of the joystick and then using the topmost control knob to rotate. Click the bottom button with the arrows designation to return to normal left-right and up-down joystick functions. The wheel at the back of the joystick will move through your sample in the Z plane. When you are satisfied with the position of your sample in the X, Y & Z planes you can turn off the Locate Sample function. Page 5

Next click on the ACQUISTION tab to open up the Experiment Manager window. Click on the file folder icon and select one of the saved Acquisition Configurations. Please do not save any changes you make to these configurations as they are templates needed by all users. You may set up a new Acquisition Configuration if needed. P Click CONTINUOUS to view your image and confirm that it is in the right position. You may now turn off the image by clicking the STOP button, which replaces the continuous button during an active scan. In the Channels window, uncheck the TL channel and all but the lowest wavelength laser. The lowest wavelength laser should be used to adjust the lightsheets if you are using more than one laser line. Page 6 You may adjust the lightsheets by clicking the AUTO-ADJUST button and following the onscreen prompts. Alternatively, you may adjust them manually by pushing the

page up and page down keys on the keyboard during a continuous scan. Change directions of the lightsheets by clicking left or right in the Acquisition window. Make sure the corresponding left or right light sheet is active in the adjustment window as well. You should try to get the image bright and focused well with minimal difference when switching between left and right. NOTE: Some samples may do better with single side illumination from either the left or right if there is a dense area that the laser has to travel through. Under the Experiment Manager section, check the box for Z-STACK. Start a continuous scan and using the wheel on the joystick turn through Z until you reach the desired start point for your scan. Click Set First in the Z- Stack window. Turn the wheel in the opposite direction until you reach the desired endpoint for your scan and click Set Last on the screen. It doesn t matter which order you set the first and last scans in as your scan will be the same either way. Page 7

You will see a range, number of slices, and interval between slices if you select optimal. You can also change the number of slices or the interval keeping in mind that the software is selecting the appropriate number of slices and interval according to the Nyquist theorem to give the best 3D image. In order to do a time series scan make sure that the TIME SERIES box is checked in the Experiment Manager window. You should then see a time series box opened beneath the z- stack window. You can set the duration and interval for your time series by using the sliders or by typing in specific values. You must determine how many cycles you need based on the interval chosen to equal the total amount of time desired. In the example seen here with an interval of 5 min there would be 12 cycles in an hour and 144 cycles would be a 12-hour total scan time. Page 8

Once you have adjusted all of the parameters for your scan click on START EXPERIMENT in the Experiment Manager window to start your scan. You should name the experiment and choose where to save the images when prompted on screen. Choose the SWAP (X:) drive which is networked to the system to save your experiment as it has enough memory to handle the large files and keeps the Lightsheet computer free to operate the software. Each lab should create their own folder in which to save their data as well as individual user folders if desired. Note: All data files should be removed from the SWAP (X:) drive and placed onto your own storage device within 14 days of the experiment or you will risk having your data deleted. Please perform the following functions after your scan is finished: 1. Using the attached syringe remove the liquid that is filling the chamber. 2. Remove your sample and push out any remaining agarose inside the capillary. Rinse the capillary with water and place it in the tray with the other used capillary tubes. 3. Disassemble the sample holder and put the individual pieces back into the case. 4. Replace the syringe and tubing with the one labelled MilliQ H2O and rinse the chamber several times removing as much water as possible on the last rinse. 5. Disconnect all of the hoses and connectors, unscrew the set screw holding the sample chamber in place, and remove the chamber from the machine. Place the chamber on a paper towel and leave it to dry. 6. Clean up any spills inside the machine in the tray that sits underneath the sample chamber. 7. Using a piece of lens paper blot the residual water from the surface of the objective lens in the back of the instrument if you used a dipping lens. 8. Close the software, shut down the computer, and turn off the three switches in the reverse order from how you turned them on. Contact Information: E-mail: jgbegl2@uky.edu Phone: (859) 323-9647 Page 9