ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

Similar documents
BARBUR BOULEVARD ROAD SAFETY AUDIT

Welcome to the Sellwood Bridge Project Open House!

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

July 25 28, 2017 South Lake Tahoe, CA

Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018

Tigard Tigard Transit Center

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Pedestrian Road Safety Audit

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

COMMUNITY MEETING AGENDA

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Freeway ramp intersection study

including shade trees; Recommend minimum 13 ft total sidewalk

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Why invest in the 1 Street S.W. Corridor?

San Pablo High Treatment applied incrementally at each N + ++

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

North Avenue Corridor Study

San Fernando School Route Improvement Program Phase 3 Cycle 2 Federal Grant Application Project List

Bay to Bay Boulevard Complete Streets Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

Duwamish Way-finding and CTR Report

Road Safety Assessment

Recommendations. Central Salem Mobility Study

Military Road Safety Improvements

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Lincoln Neighborhood Corridor Plan The LiNC

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Board of Supervisors February 27, 2017

City of Moorhead Committee of the Whole Meeting

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

PEDESTRIAN / BIKE PROJECTS

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

CTDOT Pedestrian and Bicycle Safety Initiatives

Thank you for attending

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Road Diets FDOT Process

F L E T C H E R A V E N U E

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Road Safety Audit Alameda, Pocatello Creek, Hiline and Jefferson September 28-30, 2015

Overview of Pinellas County Pedestrian Safety Programs and Initiatives

Chicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements

Dr. Rodney P. McClendon, Vice President for Administration. Bike Lane Study for Old Main Drive, Houston, Jones, Asbury, Ireland and

Everyone is a Pedestrian

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

4.1 Evaluation Criteria

42nd Ave N Reconstruction

Transportation Planning Division

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Memorandum. Sunday, July 13, Saturday, July 19, 2014

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Streetscape: Core Shopping District

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

February 11, 2016 TPO Board Presentation

Santa Fe/Kalamath Pedestrian Improvements Study

Welcome to the Quebec Alternatives Analysis Public Meeting

Broadway Complete Streets Project

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Cincinnati Dayton Rd Widening

PISMO BEACH COUNCIL AGENDA REPORT

WELCOME Public Information Centre

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

section 4 Existing Conditions, Issues, and Options

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Edenbrook Hill Drive Traffic Calming Study

RSA Efforts in the Tampa Bay Area

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Station 1: Street & Sidewalk Upgrades

Henderson Ave. Complete Streets Project

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

Chapter 2: Standards for Access, Non-Motorized, and Transit

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Central Avenue Bikeway Traffic and Safety Impact Assessment

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013

North Shore Transportation Improvement Strategy

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

Executive Summary Route 30 Corridor Master Plan

Tonight is for you. Learn everything you can. Share all your ideas.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transcription:

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P. 6.30 to M.P. 1.95) SWNI Meeting November July 18, 2016 19, 2015 Portland, Oregon

BARBUR ROAD SAFETY AUDIT

FHWA RSA Process

Recent Progress Agency s formal response Cost Estimates Feasibility Assessments Implementation Plan www.barbursafety.org

Corridor Wide Improvements: Speed & X- Sections Speed Management Speed feedback sign, Target speed, Speed education Striping Plan Narrow lanes, Consistency, Narrow lane appearance, Modify / remove right turns Bike Lanes Buffered bike lanes, Modify right turns, Green markings, Long intersection markings, Pavement, Level grates Pedestrians No pass striping, Enhanced crossings, Wayfindings, Barbur Transit Center crossings Signing Plan Wayfinding, Sign visibility, Advanced intersection signs, Street name signs, Consistency, Overhead Vegetation Management Sight distance, Illumination, Signs, Pedestrians, Sidewalks

NEAR TERM: SW CAPITOL HWY TO SW 24 TH AVE SW 30 th Ave to SW 24 th Ave: Remove parking buffered bike lane and sight distance, Driveway striping as appropriate, Remove southbound right turn lane, Tighten right turn, Green markings as appropriate Taylors Ferry Area: Pedestrian wayfinding and crosswalk markings, Remove parking buffered bike lanes SW 30 th Ave: Remove parking buffered bike lane and sight distance, Driveway striping as appropriate SW Capitol Hwy: Wayfinding, Widen southbound bike lane, Green markings, Remove bus only lane, Access management, Mark northbound bike lane, Mark shared bus/bike lane

SW 24 th Ave: Wayfinding to I-5, Buffered bike lane, Green markings, Vegetation removal sign visibility and sight distance NEAR TERM: [placeholder: 24 th to Terwilliger Zoom in] SW 24 TH AVE TO SW TERWILLIGER BLVD SW 24 th Ave to SW Multnomah Blvd: Buffered bike lane remove parking and remove right turn lane SW 13 th Ave to SW Bertha Blvd: Shorten bike/car conflict zone, Green markings SW Capitol Hill Rd to 13 th : Buffered bike lane remove parking SW Bertha Blvd to SW Terwilliger Blvd: Shorten bike/car conflict zone, Green markings, Bike box, Bike wayfinding, Bike lane through intersection, Intersection signs SW Bertha Blvd: Vegetation removal pedestrian visibility, Extend bike lane markings, Intersection signs

NEAR TERM: [placeholder: Miles to Naito Zoom-in] SW MILES ST TO SW NAITO PKWY SW Miles St: Bike lane through intersection, Define island tubular markers and reflectors SW Hamilton St: Pedestrian signal timing and signal improvements, Bike lane through intersection, Green markings

Wooded Section Miles to Hamilton: Intermediate Term (Three Option Analysis) Option 1: Maintain Existing Lanes Option 2: Drop Southbound Lane at Capitol North shift road west Five foot shift, Buffered bike lanes, Road widening, Wall, Overhead signs, Actuated bike signal ($4M) Option 3: Drop Southbound Lane at Capitol North do NOT shift road west Buffered bike lane southbound only, Overhead signs, Actuated bike signal ($1.2 M)

Wooded Section Miles to Hamilton: Option 2 Drop Southbound Lane shift road west

Other Proposed Improvements: Intermediate Term - Approved Projects or Redevelopments OR 99W Access to Transit Enhanced bike/pedestrian crossings at Naito; Sidewalk infill w/ driveways defined Metro Project (22 nd to 26 th ) Sidewalk infill w/ driveways defined; Enhanced pedestrian crossings; Install bike lane; ADA; Consolidate/relocate bus stops; Signal, signing and striping Redevelopment (17 th to 19 th ) Widen embankment; Sidewalk infill; Buffered bike lane; Far side bus pullout; Intersection alignment; Access management ARTS Safety Project (Capitol South) Remove left turns (reroute to jughandles); New signal (Taylors Ferry) and improvements; Signal and signing upgrades

Questions/Comments?