Second Generation Charging Station

Similar documents
Electronic Automatic Transmission for Bicycle

Differential Pressure Transmiter

ACV-10 Automatic Control Valve

Operating instructions Capacitive sensor KIA (M30) / / 2010

LK-SX VOC. Application. Security Advice Caution. Notes on Disposal. Combined sensor mixed gas. Data sheet

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

Quadair. Air Hockey Table Owners Manual. Assembly operation and care instuctions. Serial # Distributed By. Sales Person. Technical Service #

Retractable Hose Reel with 3/8" x 50' PVC Hose

3 Post Pressure Fit System Owner s Manual

122 Lab 1: Electrostatics

GOLFER. The Golf Putting Robot

REAL. Simple, Intuitive, Powerful Real.

ACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING

Feasibility Testing Report Stair Detection with filtering

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

e.do Gripper Safety requirements, technical features and assembly and integration instructions

unconventional-airsoft.com

espin - Bicycle Generator

RPS900W Redundant Power Supply. Installation Guide.

Second Generation Bicycle Charging Station. Engineering Analysis

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

Trainer overview EN

Read through all the steps first before working on the camera. Make sure you know what to do.

ME 8843-Advanced Mechatronics. Project Proposal-Automatic Bike Transmission

September 10, 2014 Revision 2. Puncher Unit-BE1/BF1/BG1/BH1 Service Manual

Reliability engineering is the study of the causes, distribution and prediction of failure.

Rules for ME 491 Design Competition Fall 2017

Model EXAxt AV550G. Averaging Oxygen Analyzer

National Robotics Competition 2018 NRC WRO Challenge Manual

Circuit breakers PR 60

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

BUILT TO WIN PAINTBALL LOADER SPIRE III MANUAL

Alternative Energy Bicycle System. Choluteca, Honduras. 17 March March 2012

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

CONGRATULATIONS ON YOUR PURCHASE OF YOUR THUNDER COMPRESSOR For your personal safety please read, understand and follow the information provided in

MODEL NUMBER: P PORTABLE COMPRESSOR

Installation, operating and maintenance Instructions for Seemag bypass level indicator

Tips on Permanent Powered Fencing and Temporary Powered Fencing

9A5N Solid State CW Paddle

OPERATION AND INSTALLATION MANUAL

MODEL NUMBER: P PORTABLE COMPRESSOR

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

Product information. Capacitive. Level detection in liquid VEGACAP 62 VEGACAP 63 VEGACAP 64 VEGACAP 66 VEGACAP 69. Document ID: 29983

SCK01 AIR COMPRESSOR KIT WITH QUICK FITTINGS - SPRAY/BLOW/OIL GUN, TYRE INFLATOR & HOSE

2-1- Shipping Receiving Lifting Location on Site Installation Stages 6

SECURITY AND CONFIDENCE AT HEIGHT

Final Report. Remote Fencing Scoreboard Gator FenceBox

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

COMPONENT SPECIFICATION M80-7XX SERIES CONNECTORS - THREE ROW

Universal Valve Company Inc

AUTOMATIC HOSE TEST UNIT, TYPE SPU

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

Universal Valve Company Inc

-Round Down- Description & Overview. VEX Classroom Competition Round Down

P r o j e c t M a n a g e M e n t f o r I n t e r a c t I v e D I g I t a l M e D I a

EX-RECESSED CEILING LIGHT FITTINGS

Smart Bike as the 1 persons car of the future

PTC INSTRUMENTS 2301 Federal Ave Los Angeles CA Phone: Model 500 Automatic Operating Stand Type 3

Datalogging Shirt for Baseball Pitchers

INDOOR CYCLING. FREEMOTION FITNESS toll free or [+1] INDOOR CYCLING FreeMotion Fitness

Instruction and Practice Manual

GAS FUEL VALVE FORM AGV5 OM 8-03

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

Procedure Troubleshooting the Interconnect Cables

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073

AUTO PUMP STATUS CENTER

Operator s Manual. All-Terrain Wheelchair

Series/Parallel Pumps Bench PBSPB

Over 80 years of experience in precision weighing and UniBloc technology

In Ground Buried Uplights

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

DTG - LCD Digital Temperature Gauge USER MANUAL

High-performance submersible pressure transmitter For level measurement Model LH-20

High-performance submersible pressure transmitter For level measurement in hazardous areas Model LH-20

Section Freepoint Service 26.1 FREEPOINT CONTROL PANEL

Inspection Recommendations

Gas Network Craftsperson

TABLE OF CONTENTS INTRODUCTION 3 SAFETY PRECAUTIONS 3 PACKAGE CONTENTS 4 DEVICE OVERVIEW 4 BUTTON OPERATION SUMMARY 5 BASIC OPERATION 6

200 PSI COMPRESSORS - MODEL NUMBERS

Model PSI Compressor with 3-Gallon Air Tank 12VDC

References 6 k thermal overload relays, adjustable from 0.11 to 16 A

Maintaining electrical equipment/systems

Motorola Industrial Products-The Benchmark of Ruggedness

Fiber Cable Puller with Tuf-Lugger lite

IMPORTANT SAFETY INSTRUCTIONS

Pressure Dump Valve Service Kit for Series 3000 Units

siot-shoe: A Smart IoT-shoe for Gait Assistance (Miami University)

Easy to operate even for biginners. Set up the number of test. Possible to select from 1 to times

Safety Meeting Topic #6 Working Around /On Energized Equipment

CT433 - Machine Safety

User s Manual EJX/EJA-E Series NEPSI Certification [Option code: /NF2, /NS21, /NS24 and /NS25] IM 01C25A00-12E

Rules and Discipline of the Playing Field of the Smart Car Race

Pressure is our Business

100C Air Compressor Kit

-SWEPT AWAY- Description & Overview. VEX Classroom Competition Swept Away

MWR - MWF Metallized polyester film capacitor MKT - High performance

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

accidents which arise due to non-observance of these instructions and the safety information herein.

Two-Wire In Situ Oxygen Analyzer (550 to 1400 C)

SAPCON. User Manual. Capacitance Continuous Level Indicator. . Introduction. . General Description. . Principle of Operation. .

Transcription:

Second Generation Charging Station Progress Report Presentation J. Alhabshy, R. Alzahrani, B. Gabrelcik, R. Murphy, R. Villezcas January 21, 2015 1

Project Summary This year s team was assigned the project of completing and improving last year s design of the 2 nd Generation Charging Station. The station must Be mobile and therefore lightweight Charge the majority of small electronic devices Display the data of the power output in an interactive manner Villezcas 2

Overview Already Completed Bike status Ordered parts In Progress Hardware testing Programming Bike stand and alternator mount To be Completed Enclosure Display screen mount Aesthetics Timeline Villezcas 3

Completed So Far The previous year s bike has been disassembled of the gearing system and bike stand Parts for the new design have been selected and ordered Future parts for the build have been researched and selected Villezcas 4

Bike Disassembly Most of the undesired components have been detached from the bicycle The DC motor and mount will also be removed Villezcas 5

Parts Ordered Alternator One Wire, Self Exciting, New, Aftermarket Product - $64.93 Capacitor Power Acoustik 2.0 Farad Digital Power Capacitor - $45.13 Bike Stand - RAD Portable Magnetic Work Put Bicycle Trainer - $69.88 Terminal Block Isolated, Electric Barrier Terminal Block (Qty:4) - $6.81 Villezcas 6

Tasks In Progress Alternator and capacitor are going to be set up for experimentation and testing An Interactive Display Screen will be designed/programmed using an Arduino microcontroller A mount on the bike stand for the alternator will be designed and built Electric Control System will be mapped out to properly fit the enclosure size Villezcas 7

Alternator and Capacitor Testing The alternator will be analyzed to find its average power output, minimum required speed for start up and regular use The capacitor will be tested for how well it conditions the oscillating voltage from the alternator It will also be tested for how much power is stored inside after the alternator has been disconnected Both devices will be tested for fail safe procedures in the event of overcurrent output. Alzahrani 8

Interactive Display Screen The previous idea of using the Android LabVIEW software has been proven to be impossible to do with out its own server The new design will use an Arduino microcontroller with voltage and current sensors attached We aim to make a simple design with buttons used to interact with the screen We will display a type of dashboard view on the initial start up and will have live graphs and charts on additional pages. Alzahrani 9

Bike Stand and Alternator Mount The mount will be permanently attached to the bike stand for durability and simplicity The mount will first be built out of wood as a prototype and later from aluminum or another light weight metal. The mount will also have a feature (swivel, locking mechanism, etc.) that will allow the alternator to be engaged and disengaged Alzahrani 10

Electric Control System The Electric Control System has been designed with simplicity and safety as top priorities. Alzahrani 11

To Be Completed In the Future Build and assemble the enclosure for the Electric Control System Design and build the mounting system for the display screen Carry out tasks that will make the charging station much more aesthetically pleasing Test the design and fix any bugs or problems that may arise Murphy 12

Build and Install both Enclosures The ECS (Electric Control System) enclosure has already been designed and only needs to the dimensions finalized in order to be built The Display Screen mount and enclosure still need to be designed before it can be built Both components will be built of the same material and with similar protective coatings to make them weather resistant Murphy 13

Make Project Aesthetically Pleasing The bike and enclosures need to be painted to improve looks as well as weather resistance The handle bars on the bike need to be re-wrapped and with tape that will hold up to the elements and continuous wear and tear Both tire treads need to be replaced to increase reliability of the bike The bike stand needs to be painted to match the color scheme of the rest of the bike Murphy 14

Project Build Timeline Murphy 15

Conclusion Currently Bike is disassembled Parts are ordered (alternator, bike stand, capacitor, etc.) Moving Forward Work on alternator mount design Design enclosure after all parts have been ordered Order Arduino microcontroller Research C++ programming language for the Arduino Work on the bike s aesthetics Murphy 16

Questions or Comments Murphy 17