Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Similar documents
Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

2018 Annual Inspection Report

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

2017 Annual Inspection Report

2016 Annual Inspection Report

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

2018 INSPECTION REPORT

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

2016 Annual Inspection Report

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

D.B. Wilson Station CCR Landfill

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

CCR Fugitive Dust Control Plan

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

TABLE OF CONTENTS LEGAL NOTICE

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Green CCR Surface Impoundment

Closure Plan for CCR Surface Impoundments

Amended Written Closure Plan

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

Notice of Intent to Close Inactive CCR Surface Impoundments

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Coal Combustion Residuals Closure Plan

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

CCR Closure Plan Ash Impoundment

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

Holding Pond Annual Inspection Report

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Holding Pond Annual Inspection Report

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

HISTORY OF CONSTRUCTION

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Shovelnose Creek Off-Channel Complex Berm Repair

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule

The Corporation of the Town of Bradford West Gwillimbury. By-law Swimming Pool Fence By-law

CCR Fugitive Dust Control Plan

By-Law No BEING A BY-LAW TO PROVIDE FOR THE OWNERS OF PRIVATELY-OWNED OUTDOOR SWIMMING POOLS TO ERECT AND MAINTAIN FENCES

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

Return to: Engineering Department Water Quality Administrator COUNTY OF HENDERSON 100 N. King Street Suite 118 Hendersonville, NC 28792

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

STRUCTURAL STABILITY ASSESSMENT

General Safety and Health Provisions for Construction Self Inspection Checklist

Ninilchik Harbor Page 2 of 11

Ways to Meet OSHA Requirements for Safety Signage

What I ve Learned About Dam Safety Good, Bad and Ugly

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

BP OIL -- TOLEDO REFINERY

Excavations and Trenches

AMMO Field Data Collection Manual

La Crescent Township Zoning Ordinance

Introduction. Geomembrane lining systems are used in a variety of different applications. Landfill Lining Landfill Capping Salt Piles Lagoons / Ponds

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Shoulders. Chapter 4: chapter contents

Swimming Pool Fence By-law

TITLE 11. DEPARTMENT OF JUSTICE NOTICE OF PROPOSED RULEMAKING

As temporary grade control facilities along waterways until final stabilization is established.

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

Transcription:

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS 2830 Dairy Drive Madison, Wisconsin 53718-6751 (608) 224-2830 January 2016 File No. 25215159.00 Offices Nationwide www.scsengineers.com

Initial Annual CCR Landfill Inspection Ottumwa- Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS 2830 Dairy Drive Madison, Wisconsin 53718-6751 (608) 224-2830 January 2016 File No. 25215159.00

Table of Contents Section Page PE Certification... ii 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Background... 1 2.0 Annual Inspection... 2 2.1 Operating Record Review... 2 2.2 Visual Inspection... 2 3.0 Inspection Results... 3 3.1 Changes in Geometry... 3 3.2 CCR Volumes... 3 3.3 Appearance of Structural Weakness... 4 3.3.1 Signs of Surface Movement or Instability... 4 3.3.2 Inappropriate Vegetation Growth... 4 3.3.3 Animal Burrows... 4 3.3.4 Erosion Damage... 4 3.3.5 Unusual Surface Damage Caused by Vehicle Traffic... 5 3.4 Disruptive Existing Conditions... 5 3.5 Other Changes since Previous Annual Inspection... 5 4.0 Future Inspections... 6 4.1 Existing CCR Landfill... 6 4.2 New CCR Landfills and Lateral Expansions... 6 List of Tables No. 1 Operating Record Summary I:\25215159\Reports\OML Initial Annual\OML_Annual CCR LF Inspection PE_Initial_1601.docx i Initial Annual CCR Landfill Inspection Ottumwa, Iowa January 2016

PE CERTIFICATION I, Eric J. Nelson, hereby certify that this Initial Annual CCR Landfill Inspection Report meets the requirements of 40 CFR 257.84(b)(2), was prepared by me or under my direct supervision, and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. (signature) 01/18/2016 (date) Eric J. Nelson (printed or typed name) License number 23136 My license renewal date is December 31,. 2016 Pages or sheets covered by this seal: Initial Annual CCR Landfill Inspection Report text and Table 1 dated January 2016, and delivered January 18, 2016. ii Initial Annual CCR Landfill Inspection

1.0 INTRODUCTION 1.1 PURPOSE SCS Engineers (SCS) completed an annual inspection of the Interstate Power and Light Company (IPL) Ottumwa-Midland Landfill (OML) in Ottumwa, Iowa. The annual inspection was completed in accordance with the U.S. Environmental Protection Agency (USEPA) Coal Combustion Residuals (CCR) rule, 40 CFR 257 Subpart D, in particular 257.84(b)(1). According to 40 CFR 257.84(b)(1), an annual inspection by a qualified professional engineer is required for all existing and new CCR landfills and any lateral expansion of a CCR landfill. The purpose of the annual inspection is to ensure that the design, construction, operation, and maintenance of the CCR unit is consistent with recognized and generally accepted good engineering standards. The inspection must, at a minimum, include: A review of available information regarding the status and condition of the CCR unit, including, but not limited to, files available in the operating record (e.g., the results of inspections by a qualified person, and results of previous annual inspections); and A visual inspection of the CCR unit to identify signs of distress or malfunction of the CCR unit. This report has been prepared in accordance with 40 CFR 257.84(b)(2) to document the annual inspection. 1.2 BACKGROUND The OML Landfill includes an active CCR landfill, which currently consists of two CCR units: OML Existing Landfill OML Expansion Phase 1 The inspection requirements in 40 CFR 257.84(b)(1) apply to the two existing (active) CCR units listed above. At the time of the inspection, the active CCR units were in various stages of development and use as described in the table below. CCR Unit CCR Rule Status Basis for Status Existing, Accepting CCR OML Existing Landfill Module received CCR before and after the effective date of the CCR Rule. OML Expansion Phase 1 Existing, Not Currently Accepting CCR Liner is constructed and currently awaiting state approval of construction. Consistent construction presence was initiated in May 2014, prior to effective date of CCR Rule. 1 Initial Annual CCR Landfill Inspection

2.0 ANNUAL INSPECTION Mr. Eric Nelson of SCS completed an annual inspection of the active CCR units at OML, including the Existing Landfill and Expansion Phase 1 on December 17, 2015. Mr. Nelson is a licensed professional engineer in Iowa and holds a Bachelor s of Science degree in Geological Engineering. He has over 17 years of experience in the design, construction, and operation of solid waste disposal facilities. This was the initial annual inspection of the Existing Landfill and Expansion Phase 1 at OML. The scope of the annual inspection is described in Sections 2.1 and 2.2. The results of the annual inspection are discussed in Section 3.0. 2.1 OPERATING RECORD REVIEW SCS reviewed the available information in the operating record for OML prior to the visual inspection discussed in Section 2.2. Information reviewed by SCS included operating record materials provided by IPL and the information posted on Alliant Energy s CCR Rule Compliance Data and Information website for the OML facility. These materials reviewed are summarized in Table 1. 2.2 VISUAL INSPECTION SCS completed a visual inspection of the Existing Landfill and Expansion Phase 1 at OML to identify signs of distress or malfunction of the CCR units. SCS also provided oversight of the recent construction activities for Phase 1. The visual inspection included observations of the following: CCR placement areas including active filling areas, intermediate cover areas, and exterior non-ccr berms or slopes. Leachate collection and removal system components including visible leachate drainage layer materials, leachate vaults, cleanouts, and the leachate storage lagoon. Contact water run-off management features including internal contact water drainage features and Temporary Contact Water Basin 1/2. Non-contact storm water run-on and run-off control features including swales and sedimentation basins located adjacent to active fill areas but outside the landfill limits. Groundwater underdrain system components including the visible underdrain discharge pipes. 2 Initial Annual CCR Landfill Inspection

3.0 INSPECTION RESULTS The results of the annual inspection, along with a description of any deficiencies or releases identified during the visual inspection, are summarized in the following sections. 3.1 CHANGES IN GEOMETRY This is the initial annual inspection of the Existing Landfill and Expansion Phase 1 at the OML facility completed under 40 CFR 257.84(b)(1). There are no previous annual inspections to which SCS could compare the current geometry of the landfill structure. At the time of the visual inspection, active CCR placement was evident in the Existing Landfill. Intermediate cover was in place along a portion of the north slope, east slope, most of the south slope, and all but the northwest quadrant of the top of the landfill where active CCR placement was ongoing. As noted in Section 1.2 and in the facility operating records reviewed for this inspection, Expansion Phase 1 is currently awaiting state approval of the liner construction. CCR placed in Expansion Phase 1 as of the date of the visual inspection is limited to bottom ash used to construct a ramp and operating pad above the leachate drainage layer as part of liner construction activities. Changes to geometry of the landfill structure will be assessed at the time of the next annual inspection. 3.2 CCR VOLUMES The approximate volume of CCR contained in each of the active modules at the time of the inspection is summarized below. A description of how the estimate was developed and the sources used are also summarized below. CCR Unit OML Existing Landfill Estimated Volume of CCR in Place 767,000 cubic yards Basis for Estimate and Source Estimated airspace consumed based on 3/4/15 topographic survey compared to as-built top of leachate collection layer grades (699,600 cubic yards) plus estimated disposal from 3/5/15 to 12/17/15 based on IPL-provided actual and forecast disposal rates for this period (67,400 cubic yards). OML Expansion Phase 1 10,000 cubic yards CCR placed in this unit is limited to the ramp and operating pad installed within the cell during construction. The ramp and pad were constructed of bottom ash. 3 Initial Annual CCR Landfill Inspection

3.3 APPEARANCE OF STRUCTURAL WEAKNESS The inspection included a review of the appearance of an actual or potential structural weakness of the CCR unit. The visual inspection included a review of CCR fill areas including the top slopes, internal side slopes, external side slopes, and internal ramps/haul roads for the presence of the following conditions: Signs of surface movement or instability: - Sloughing, slumping, or sliding - Surface cracking - Slopes in excess of 3 horizontal to 1 vertical (3H:1V) - Toe of slope bench movement - Evidence of inadequate compaction of exposed CCR Inappropriate vegetation growth Animal burrows Erosion damage Unusual surface damage caused by vehicle traffic 3.3.1 Signs of Surface Movement or Instability A slope in excess of 3H:1V was noted in one specific location during the inspection of the Existing Landfill. A steep slope (approximately 2H:1V) was observed at the southern edge of the active filling operation in the Existing Landfill. The slope is located where the active filling operation abuts a previously active fill area within the unit that has received intermediate cover. The slope observed is relatively short (vertically only about 5 feet high) and showed no visual signs of structural weakness. The condition noted is not currently considered an operating deficiency since it is unlikely to have significant impact on the function of the CCR unit. However, additional observation of this area is recommended to ensure that the conditions observed during the visual inspection, or similar future conditions, do not have an impact on the overall stability of the CCR unit. No other signs of surface movement or instability were noted during the inspection. 3.3.2 Inappropriate Vegetation Growth No inappropriate vegetation growth was noted during the inspection. 3.3.3 Animal Burrows No animal burrows were noted during the inspection. 3.3.4 Erosion Damage Mild gully erosion of the Existing Landfill intermediate cover materials was noted during the inspection in the following locations: 4 Initial Annual CCR Landfill Inspection

At the east end of the diversion berm on the south slope On the access ramp above the west end of the diversion berm on the south slope On the north slope adjacent to the boundary between the Existing Landfill and Expansion Phase 1 The minor gully erosion in these areas is not currently considered an operating deficiency since it is unlikely to have significant impact on the function of the CCR unit. Erosion of the bottom ash ramp into Expansion Phase 1 was noted during the inspection. Bottom ash has eroded along the north side of the ramp and into the culvert that allows the free flow of contact water under the ramp. Currently, the condition is not prohibiting the proper management of contact water because a temporary rain cover is installed over the south end of the culvert, so the culvert serves no current function. Non-contact water generated in the temporary rain cover area is properly managed by facility staff by pumping it to the adjacent sedimentation basin to the north. The site received approximately 1.99 inches of precipitation over the seven days prior to the inspection 1, which may have contributed to the erosion observed. Based on the inspection, the conditions noted are not currently considered an operating deficiency since they are unlikely to have a significant impact on the function of the CCR unit. However, erosion and the resulting deposit of sediment in surface water and contact water management features have the potential to cause ponding of water that may impact the overall stability of the CCR unit. Additional observation of these areas and repair is recommended to ensure that the conditions observed during the visual inspection, or similar future conditions, are addressed and do not have an impact on the overall stability of the CCR unit. No other erosion damage was noted during the inspection. 3.3.5 Unusual Surface Damage Caused by Vehicle Traffic No unusual surface damage caused by vehicle traffic was noted during the inspection. 3.4 DISRUPTIVE EXISTING CONDITIONS No disruptive existing conditions were noted during the inspection. 3.5 OTHER CHANGES SINCE PREVIOUS ANNUAL INSPECTION This is the initial annual inspection of the Existing Landfill and Expansion Phase 1 at the OML facility completed under 40 CFR 257.84(b)(1). There are no previous annual inspections to which SCS could compare the current site conditions of the landfill to fulfill the requirement in 40 CFR 257.84(b)(2)(iv). 1 Source is Weather Underground (http://www.wunderground.com/) for Kirkville, Iowa from 12/10-12/16/15. 5 Initial Annual CCR Landfill Inspection

Changes to site conditions that may have affected the stability or operation of the Existing Landfill and Expansion Phase 1 will be assessed at the time of the next annual inspection. 4.0 FUTURE INSPECTIONS 4.1 EXISTING CCR LANDFILL As stated in 40 CFR 257.84(b)(4), the owner or operator of the CCR unit must conduct the inspection required by paragraphs (b)(1) and (2) of this section on an annual basis. The date of completing the initial inspection report is the basis for establishing the deadline to complete the first subsequent inspection. Any required inspection may be conducted prior to the required deadline provided the owner or operator places the completed inspection report into the facility s operating record within a reasonable amount of time. In all cases, the deadline for completing subsequent inspection reports is based on the date of completing the previous inspection report. The owner or operator has completed an inspection when the inspection report has been placed in the facility s operating record. The next annual inspection of the Existing Landfill and Expansion Phase 1 must be completed within one year of the placement of this inspection report in the operating record for the OML facility. 4.2 NEW CCR LANDFILLS AND LATERAL EXPANSIONS As discussed above, all of the CCR units at the OML facility are considered existing CCR units. The initial annual inspection for CCR units constructed in the future must be completed within 14 months of the initial receipt of CCR in the module per 40 CFR 257.84(b)(4). 6 Initial Annual CCR Landfill Inspection

TABLE 1 Operating Record Summary

Table 1. Operating Record Summary / Ottumwa, Iowa SCS Engineers Project #25215159.00 Record Date Source Operating Criteria CCR Fugitive Dust Control Plan 9/23/2015 Website 7-Day Inspection 10/15/2015 IPL 7-Day Inspection 10/22/2015 IPL 7-Day Inspection 10/29/2015 IPL 7-Day Inspection 11/5/2015 IPL 7-Day Inspection 11/12/2015 IPL 7-Day Inspection 11/18/2015 IPL 7-Day Inspection 11/25/2015 IPL 7-Day Inspection 12/2/2015 IPL 7-Day Inspection 12/9/2015 IPL 7-Day Inspection 12/16/2015 IPL Notes: 1) Items sourced to the Website are from Alliant Energy's CCR Rule Compliance Data and Information website as of 1/05/16. See http://ccr.alliantenergy.com/ottumwa/landfills/index.htm 2) Items sourced to IPL are from the facility Operating Record as of the date of inspection. I:\25215159\Reports\OML Initial Annual\[Table 1 Operating Record Summary_OML.xlsx]Summary Table 1, Page 1 of 1