Challenges of Tack Coat

Similar documents
NCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement

Panel Discussion: Tack Coat - Storage and Handling - Sampling and Testing

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

ASPHALT PAVING LEVEL 1

GOOD AFTERNOON!!! 2012 FDOT / FTBA Conference. Dave Drehmer. Mariani Asphalt an Associated Asphalt Company

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

Illinois Center for Transportation

Project Review Committee

TRACKLESS TACK/ SPRAY PAVERS

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

"Emul Asph (SS-1HP) Tack".

Low Traffic Volume LR 159 Low Traffic Preservation

DRAFT WSDOT PAVEMENT POLICY

Update on Performance of Thin Asphalt Overlays

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Forensic Analysis of a 22-Year Old 35% RAP Interstate Project

HIR on Oklahoma Turnpikes

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

BOND EXPECTATIONS FOR ASPHALT CONCRETE LAYERS APPLIED TO MILLED SURFACES IN VIRGINIA

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

Rennick Yard Roller-Compacted Concrete Pavement

Free Floating Screed. Screed Weight Forward Motion. Head of Material. Material Stability. Angle of Attack

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

Stop Chasing & Start Managing Density

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Compaction Theory and Best Practices

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures

T-24. A Practical Approach to Managing Density

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

Burns Cooley Dennis, Inc. Burns Cooley Dennis, Inc.

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

Calibration and Validation of the Shell Fatigue Model Using AC10 and AC14 Dense Graded Hot Mix Asphalt Fatigue Laboratory Data

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

Project Update: Characterization of Alaskan Hot-Mix Asphalt containing RAP

MNDOT PAVEMENT DESIGN MANUAL

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Managing Density For Asphalt Pavement

Geocells. Sundeep Inti Vivek Tandon

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

NOTES FOR FIRST COAT SEALING

Tabulation of Bids. Counties: Project(s):

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Road Quality Working Group. June 11, 2015

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

High Performance Racetracks

Tex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC)

Cc: Bridget Bero, Ph.D., P.E., Wilbert Odem, Ph.D., P.E., and Alarick Reiboldt, EIT, CENE 486 Instructors

Tour de Chip Seal. Tour de Chip Seal Follow- up Report and Conclusions May 16, 2013

Tabulation of Bids. Counties:

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

Separating Load from Moisture Effects in Wet Hamburg Wheel-Track Test

Asphalt Mixture Quality Acceptance

Expansion Joint Filler Evaluation APEL. Nomaflex

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for

Q AGGREGATE / EMULSION MATERIALS for Washington County Departments

Kraton Ultra-thin HMA / WMA Overlay Study

I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION

Binder Modified with a Combination of PPA and SBS: The NCAT Test Track Experience PPA Workshop April 7, 2009

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

CURB RAMP INSPECTION REPORT

TECHNICAL REPORT STANDARD PAGE

Hot Mix Asphalt (HMA) Quality Assurance

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

9 QUALITY ASSURANCE PROCEDURES

Technical Data Megacote

NOTES FOR RESEALING. This specification is produced primarily for works on state highways.

NZQA registered unit standard version 3 Page 1 of 7. Demonstrate knowledge of bitumen gangbar sprayers and operations

Hot Mix Asphalt (HMA) Quality Assurance

Update on Latest Research

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

* Numbers in parentheses refer to the list of references at the end of this paper. 84

Using RAP in Asphalt Mixtures

Appendix B Existing ADOT Data Parameters

Burns Cooley Dennis, Inc. Geotechnical and Materials Engineering Consultants Performance of Permeable Friction Courses NCHRP 9-41

Standard Test Procedures Manual

IMPROVED RICE METHOD FOR DETERMINING THEORETICAL MAXIMUM SPECIFIC GRAVITY OF ASPHALT PAVING MIXTURES

Asphalt Binder Quality Test (ABQT)

WYDOT CONCRETE MIX DESIGN PROCEDURE

INTERNATIONAL SLURRY SURFACING ASSOCIATION TECHNICAL BULLETIN. 800 Roosevelt Road, Building C-312, Glen Ellyn, IL 60137

Downloaded from Downloaded from /1

2018 ROAD MAINTENANCE PROGRAM

Improved Rice Method for Determining Theoretical Maximum Specific Gravity of Asphalt Paving Mixtures

Transcription:

Challenges of Tack Coat Jim Weston Pavement Implementation Engineer Lynn Peterson Secretary of Transportation The 53 rd Idaho Asphalt Conference Moscow, ID October 24, 2013

What is tack coat and why use it? Tack coat ensures a bond between the new surface being placed and the underlying course. Unlike this

What is tack coat? Tack coat is typically an emulsified asphalt, but could be a PG binder as well. Emulsified asphalts can be anionic, cationic, or non-ionic and are classified by their set speed RS (rapid set), MS (medium set), or SS (slow set). At WSDOT, CSS-1, CSS-1h or a STE-1 is used for tack coat. Have used a PG grade binder in certain situations.

Challenges of tack coat? When do I need to use tack? How much tack is needed? Do I dilute it or not? How do I calculate the application rate? How long do I have to wait before paving? How do I keep tack off the tires and equipment? What type of material do I use? What about the underlying pavement does it have to be dry? Clean? Can I pave right after tack is placed or do I need to wait? How long? Does the tack need to cover the entire lane I m paving?

Goals: NCHRP 9-40 Optimization of Tack Coat for HMA Placement Report 712 Develop a procedure to evaluate the tack coat quality in the field Testing for the bonding characteristics Objectives: Determine optimum application methods and rates Equipment type and calibration procedures Asphalt binder materials

NCHRP 9-40 Test Matrix Variable Tack Coat Material Content CRS-1, SS-1h, SS-1, PG64-22, Trackless Residual Application Rate (gal/sy) 0.00, 0.031, 0.062, 0.155 Pavement Surface Surface Coverage 50%, 100% Surface Condition Wet/Dry Condition Specimen Preparation Method Testing Temperature Testing Confinement Pressure New, Old, Milled HMA and PCCP Clean, Dirty Wet, Dry LL, PF 25C 0, 20 psi

NCHRP 9-40 Effect of Clean/Dirty Pavement The shear strength for the clean and dry pavement was significantly greater than the dirty and dry pavement.

Recommended Application Rates Surface Type Residual Application Rate (gal/sy) New Asphalt 0.035 Old Asphalt 0.055 Milled Asphalt 0.055 Portland Cement Concrete 0.046

What type of material do I use for tack? At WSDOT, CSS-1, CSS-1h or a STE-1 is used for tack coat. Have used a PG grade of binder in certain situations.

What product is best for MY project? There may be certain conditions that require an agency to spec a certain type of tack coat. In general, let the Contractor decide which product to use. An agency should be more concerned about correct application.

When do I need to use tack? Everytime! Between each layer of pavement. At vertical faces. Cheap insurance to ensure bond between layers.

How much tack is needed? Typically use an application rate, but the residual rate is the critical factor. Surface Type Residual Application Rate (gal/sy) New Asphalt 0.035 Old Asphalt 0.055 Milled Asphalt 0.055 Portland Cement Concrete 0.046

How much tack is needed? Too much Not enough

How much tack is needed? Just right!

How much tack is needed?

How do I calculate the application rate? Emulsions are about 2/3 asphalt and 1/3 water. CSS-1 minimum asphalt content is 57%. Generally, this is a decent ratio to calculate the application rate from the residual you want on the pavement. Based on this ratio of a non-diluted emulsion, the required application rate will be 1.5 times greater than the residual. Application rate = 1.5 x Desired Residual Rate

How do I calculate the application rate? Application rate = 1.5 x Desired Residual Rate If placing on a existing or millied asphalt pavement, the recommended residual rate is 0.055 gal/sy. 1.50 x 0.055gal/sy = 0.083 gal/sy application rate

Should the emulsion be diluted? That depends Diluted emulsions can provide better coverage Undiluted emulsions will break and set/cure faster Remember: never dilute a STE-1, Trackless tack, or PG binder

How is an emulsion diluted? To dilute an emulsion, water is ALWAYS added to emulsion, not the other way around. Best if it is warm water. Always make sure you know how much water is being added so that you can correctly calculate the application rate. Never dilute a STE-1, Trackless tack, or PG asphalt.

Application rate for a diluted emulsion? Common dilution rate is 1:1 emulsion:water. This means 50% emulsion (which already has about 1/3 water) and 50% water. Based on this ratio of a diluted emulsion, the required application rate will be 3 times greater than the residual. Application rate = 3.0 x Desired Residual Rate

Application rate for a diluted emulsion? Application rate = 3.0 x Desired Residual Rate If placing on a existing asphalt pavement, the recommended residual rate is still 0.055 gal/sy. 3.0 x 0.055gal/sy = 0.165 gal/sy application rate for a 1:1 diluted emulsion

How clean does my pavement have to be?

How uniform should the application be? Needs to be better than this

How uniform should the application be? And this

How uniform should the application be? And this

How uniform should the application be?

How uniform should the application be?

How uniform should the application be?

Define broken tack, please When tack comes out of the distributor truck, it is unbroken (BROWN) and is still in the emulsified form. Broken tack turns BLACK which means that the asphalt and water have separated. Once all the water has evaporated, we refer to this as set or cured.

Cured or not? Not yet

Do I have to wait until it s cured?

Do I have to wait until it s cured?

How long do I have to wait? Well, that depends on: Air temperature Relative humidity Wind speed Pavement temperature Temperature of tack Application rate and dilution amount Type of emulsifying agent

Any way to speed it up? Maybe

What happens if I don t use tack? There are 3 primary tack coat failures: Inadequate bond Delamination Slippage cracks According to a study, if there is not full bond between layers, the strain in the upper layer is about 12.5 times higher

Use tack don t let this happen to your pavement!

Conclusions ALWAYS use tack coat Use recommended residual application rates Know dilution rate Ensure a clean and dry pavement Achieve full coverage Let tack break AND cure

Questions? NCHRP Report 712, Optimization of Tack Coat for HMA Placement http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_712.pdf Jim Weston Pavement Implementation 360-709-5496 westonj@wsdot.wa.gov