COQUITLAM RIVER WATERSHED: KWIKWETLEM SIDE-CHANNEL HABITAT RESTORATION, PUBLIC AWARENESS, AND REPORT mstory

Similar documents
COA-F17-F-1343 YEAR END REPORT

Okanagan Sockeye Reintroduction

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Watershed Watch Salmon Society 2007 Annual Report

Yakima/Klickitat Fisheries Project

Upper Columbia Salmon Restoration: Breakout session: Columbia River Treaty Review Conference Castlegar, BC March 22 nd, 2013

Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01

Rivers Inlet Salmon Initiative

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Lagoon Spawning Bed Rehabilitation

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Nechako white sturgeon are an Endangered Species

Union Pacific Railroad

Fisheries Sensitive Watersheds (FSWs)

Sub-watershed Summaries

Yakima River Basin Coho Reintroduction Feasibility Study

Ned Currence, Nooksack Indian Tribe

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

Lakelse Sockeye Recovery Program

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

Strategies for mitigating ecological effects of hatchery programs

2012 Bring Back the Natives Awarded Projects

KOOCANUSA KOKANEE ENUMERATION (2003) Prepared by: W. T. Westover Fisheries Biologist

1 INTRODUCTION AND SUMMARY

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Black Sturgeon Regional Plan

Fish and Wildlife Compensation Program Trevor Oussoren, program manager, Columbia region. CRT Workshop, Fauquier, June 15, 2013

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

For next Thurs: Jackson et al Historical overfishing and the recent collapse of coastal ecosystems. Science 293:

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Skeena Salmon. Skeena River Basin. Sockeye Escapement ( ) 1. Average number of spawners. Introduction. Total Accessible Stream Length (km)

Highlights of Native Fish Rehabilitation Activities in the Great Lakes. Presented By: Arunas Liskauskas, Ontario Ministry of Natural Resources

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Salmon and Migratol~Y Trout of the N,anaimo 'River lind Adjacent Streams (Revised 1,973)

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

Coquitlam/Buntzen Project Water Use Plan

Western native Trout Status report

Draft Central Valley Salmon and Steelhead Recovery Plan

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

The Salmonid Species. The Salmonid Species. Definitions of Salmonid Clans. The Salmonid Species

STEELHEAD SURVEYS IN OMAK CREEK

FWCP Coastal Region Project Summary Learn more at fwcp.ca

Koocanusa Reservoir Kokanee Spawner Index

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Concurrent Sessions C: Prioritization - Oregon Fish Passage Priority List - A Statewide Barrier Prioritization Effort

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018

Alouette Water Use Plan

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

July 24, Kalispel Tribe of Indians Update on Efforts to Suppress Northern Pike and Policy Implications

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

The Salmon Circle of Life

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Columbia Lake Dam Removal Project

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Sockeye Reintroduction program. April 12, 2014 BCWF AGA Howie Wright

Prescription to Restore Stream 11 (Orphan Channel) in the Burman River Watershed, March 2007

The Blue Heron Slough Conservation Bank

SALMONID ACTION PLAN FINAL DRAFT

Identifying and Executing Stream Projects Kristin Thomas, Aquatic Ecologist MITU

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Juvenile Salmon Use of Knik Arm Estuaries. Hannah N. Ramage

Southern Oregon Coastal Cutthroat Trout

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Proposed 2018 Fisheries Management Measures to Support Recovery of Interior Fraser River Steelhead

Elkhorn Creek Westslope Cutthroat Restoration Efforts

Climate Warming Rates of Salmon and Trout Rivers in the West

COLUMBIA LAKE DAM REMOVAL PROJECT

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Upper Columbia Redband Trout: Conservation for the Future

Invasive Fish in the Cariboo Region. Russell Bobrowski Fisheries Biologist, BC Gov Cariboo Region Dec 19, 2017

Chinook Salmon. The Yukon River Panel

ADOPT-A-STREAM WATERSHED APPROACH COMMUNITY-BASED STEWARDSHIP. Nova Scotia Salmon Association March 2005

Implementing the New Fisheries Protection Provisions under the Fisheries Act

What was the historic coaster fishery like?

Up Your Creek! The electronic newsletter of the Alameda Creek Alliance

Alouette Project Water Use Plan

Analysis Data Sources

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Firth Creek Habitat Enhancement Project 1993

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

Searsville Dam Removal

Yakima Klickitat Fisheries Project

Maintaining biodiversity in mixed-stock salmon fisheries in the Skeena watershed

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek.

U.S. Fish and Wildlife Service Native American Crosscut Funding

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

Alouette Water Use Plan

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD

Segregation Weir Placement, Monitoring and Objective

Alouette Water Use Plan

Eastern Brook Trout Joint Venture Completed Project Report Form

R & E Grant Application 15 Biennium

Water in the Deschutes Who needs it?

Hatcheries: Role in Restoration and Enhancement of Salmon Populations

Wednesday, October 02, :26 AM John Thompson FW: Channel Migration Zone (CMZ) information for CAO updates

Transcription:

COQUITLAM RIVER WATERSHED: KWIKWETLEM SIDE-CHANNEL HABITAT RESTORATION, PUBLIC AWARENESS, AND REPORT mstory BRIDGE COASTAL REHABILITATION PROGRAM FINAL REPORT - OCTOBER 2003 O/.J..h1.I? COQUITLAM DAM

TABLE OF CONENTS Executive Summary Acknowledgements 1. Overview 1. 1. Report History of Coquitlam River I.2". The Side Channel Restoration Project Feasibility Study 2. Rep<trt Discussi-on - Red Fish Up The River 3. Proposed Side Channel Rehabilitation Study Area 4. Proposed Methods- for S-ide Channel Rehabilitation 4.1. Water level dynamics monitoring program 4.2. Lowcring the side channel and.bathymetric survcy 4.3. Excavation and connection to stormwater pump station 4.4. Woody debris 4.5. Estimated costs 5. Kwikwetlem Cemetery and Groundwater Mitigation Options 5. 1. Estimated Costs References Figures Location Map 1.1. National Archives Reference Center 1.2. "Residualized Kokanee" 3.1. 1996 aerial photo of study area 3.2. Ortoophoto of side channel area 4.1. Side channel mouth area 5.1. Location of cemetery) options- fdr connectivity) and Pump House Station Appendixes Appendix A: Kerr, Wood, Leidel's Summary ofeost Estimates Appendix B : Financial Statement Appendix C: Newspaper articles?

EXECUTIVES~Y The K wik\vetlem Nation, located near the mouth of the Coquitlam River, was provided a grant by B.C. Hydro' s Bridge Coastal Rehabilitation Program for two interrelated projects: a feasibility study to reactivate a CoquitIam River side channel, located within the boundaries ofkwikwetiem Reserve No.2, for critical salmon habitat~ and for an early report history (1898-1914) on the former Coquitlam River salmon populations, the impacts of the two Coquitlam dams on the salmon, and the relationship between the salmon and the Kwikwetlem Nation. Engineering consultants with Kerr, Wood, Leidel completed a feasibility study report in early December 2001. The study examined options for reactivating approximately 1.2 kilometres ofa fonner Coquitlam River channel that municipal authorities closed off decades ago. The study also included options for mitigating groundwater seepage into a K wikwetlem cemetery site beside the northern end of the side channel. The study recommended that the side channel would provide critical rearing habitat for coho salmon. Proposed side channel reactivation costs were estimated at $150,000, and an additional $75,000 for groundwater contr01s at the cemetery site. A detailed report on the early history of the CoquitIam River, Red Fish Up The River - A Report on the Fon ner.cog uitlaf-r-l Salmon lvligratigns and the Hy dro-eledric Developments at Coquitlam Lake, British Columbia, Pre-1914, was completed on October 1, 200l. TheTeport established that large populations of salmon and steel.hcad trout migrated into and out of the former Coquitiam Lake area that was obstructed by the placement of a second dam structure in 1913. The first small 1905 dam incorporated a fish ladder, designed by the federal Department of Fisheries, which allowed fish pas~age. A former early run of a distinct sockeye species, which the K wikwetlem Nation were named after, became extinct as a result of the later dam. Evidence of fishing camps collected from archeologists along the eastern shorelines of Coquitlam Lake indicates the historic significance of the area for the Kwikwetlem Nation and their dependence on the former runs of salmon. K wi kwetl em Chief Johnny confirmed. this in an 1889 Ietter, where he described that his people and their culture utterly depended on the salmon. Scientists, conducting fish surveys in the Coquitlam Reservoir, recently discovered a direct genetic link t-o this-lost race of salmon described as "residualized sockeye", provided in their March 2003 report to the Bridge Coastal Rehabilitation Program, Feasibility of Reintroducing Sockeye and Other Species of Salmon in the Coquitlam Reservoir, B. C.

ACKNOWLEDGMENTS The Kwikwetlem Nation is indebted to B.C. Hydro' s Bridge Coastal Fish and Wildlife Restoration Program and Management Board for critical project funding for the feasibility and historical reports. In association, many thanks to B.C. Hydro' s Coquitlam Water Use Plan Consultative Committee for addressing many related issues. This report is dedicated to all of the K wikwetlem Nation elders that have passed on. Thanks also to the assistance from Mel Bailey from Katzie First Nation. 4

,-;r' ~ _0//-.0.-.- ---.. --- ", s,--, f J " I \ " ti"'/,. - ;J/ :/./,,.. ' r i Kwikwetlem First Nation lr. #2 \ ",...-. ', -1. I, Legend ~., l f-" \ /' ~/ --=:::11 Core Territory,. 1 StoIo Nation Territory F.its1./llation ComlIlWlities Island Water Bodies. -,.. Slough Rivers and Streams ~:' /"-.-/'-- "-. --;. -,-.. ~ KwJkwetlem First Nation I.. ~ Core Territory -~--------------~--------------~ Date: Feb. 14,2002'. Prepared-by: J.2~:':;;';";O~::';"'2:";';':'Ki':;':;lo;'::m;:et;"e-rs-l Kwikwetlem First Nation.. -GIS Department Location Map of Coquitlam watershed and Kwikwetlem traditional territory. j