(Top) Geotextile breakwater model construction - wave basin; (bottom) Greater Gorgon LNG Development - 3 m flume (left) and wave basin (right).

Similar documents
Update: UNSW s Research Program for Extreme Waves on Fringing Reefs. Matt Blacka,Kristen Splinter, Ron Cox

OECS Regional Engineering Workshop September 29 October 3, 2014

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING

Water Research Laboratory (WRL), School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW 2

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

MODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR RE-DESIGN

NCCOE EA Coastal Adaptation Guidelines. Section I Emerging Technology Novel Alternative Approaches to Coastal Erosion

PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA)

Low-crested offshore breakwaters: a functional tool for beach management

Optimising Ecological and Engineering Values in Coastal Protection via Combined Oyster Shell and Sand Bag Designs

BEACH EROSION COUNTERMEASURE USING NEW ARTIFICIAL REEF BLOCKS

INTRODUCTION TO COASTAL ENGINEERING

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS

Simulating Long Waves in a Coffs Harbour 3D Physical Model Using Short Wave Spectra

Implications of proposed Whanganui Port and lower Whanganui River dredging

Baird. Innovation, Excellence & Service Oceans, Lakes & Rivers

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES

LABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS

COFFS HARBOUR BOAT RAMP LONG WAVE DATA COLLECTION TO EVALUATE PERFORMANCE OF BASIN EXTENSION WORKS

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

Inspection of Clarence City Beaches following Winter 2011 Storm Events

Australian Coastal Councils Conference

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

Appendix M: Durras Lake Tailwater Conditions

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

A process based approach to understand WA s complex coastline Jeff Hansen Ryan Lowe Graham Symonds Laura Segura Gundula Winter

Chapter 10 Lecture Outline. The Restless Oceans

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA)

The Assessment of Harbour Protection Schemes for Long Period Waves

PHYSICAL MODELLING AND DESIGN FOR SHORELINE REDEVELOPMENT ON THE SOUTH COAST OF BARBADOS

OECS Regional Engineering Workshop September 29 October 3, 2014

Appendix E Cat Island Borrow Area Analysis

PHYSICAL MODELLING AND DESIGN FOR A NEW MEGA-YACHT MARINA

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION

Impacts of breakwaters and training walls

Wave Breaking and Wave Setup of Artificial Reef with Inclined Crown Keisuke Murakami 1 and Daisuke Maki 2

CASE STUDIES IN DAMAGE AND REPAIR STRATEGIES FOR TRAINING WALLS AND BREAKWATERS ON THE NSW COASTLINE POST-JUNE 2016 STORM

Absecon Island Shore Protection The planning behind the project

To: William Woods, Jenni Austin Job No: CentrePort Harbour Deepening Project - Comments on community queries

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL

ST LEONARDS COASTAL HAZARD VULNERABILITY ASSESSMENT

Shoreline Evolution Due to Oblique Waves in Presence of Submerged Breakwaters. Nima Zakeri (Corresponding Author), Mojtaba Tajziehchi

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS

Certified Professionals in Hydrographic Solutions

Real Time Surveying GPS and HYDRO Software for Tide and Swell Compensation

EFFECTIVENESS OF ADAPTIVE COASTAL PROTECTION IN MANAGING WAVE OVERTOPPING AND RETAINING BEACH VIEWS AT THE CREST OF SEABEE SEAWALLS

Draft Coastal Zone Management Plan for Byron Shire Coastline

Chapter 11. Beach Fill and Soft Engineering Structures

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

Model Test Setup and Program for Experimental Estimation of Surface Loads of the SSG Kvitsøy Pilot Plant from Extreme Wave Conditions

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

TRANSPORT OF NEARSHORE DREDGE MATERIAL BERMS

Planning of Major Recreational Boating Facilities at Shell Cove Boat Harbour

Available online at ScienceDirect. Procedia Engineering 116 (2015 )

Legal, scientific and engineering aspects of Integrated Coastal Zone Management (ICZM) in Poland

INTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT

Little Beach Boat Ramp Understand the Big Picture, Get the Best Solution

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Environmental Protection on the Gold Coast of Queensland, Australia. 1. What is the appeal of the Gold Coast to tourists?

COFFS HARBOUR NORTHERN BREAKWATER NOT YOUR AVERAGE UPGRADE

Physical Modeling of Nearshore Placed Dredged Material Rusty Permenter, Ernie Smith, Michael C. Mohr, Shanon Chader

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

CHAPTER 68. RANDOM BREAKING WAVES HORIZONTAL SEABED 2 HANS PETER RIEDEl. & ANTHONY PAUL BYRNE

North Shore of Long Island, Feasibility Study

REVISED SILT CURTAIN DEPLOYMENT PLAN

Physical Modelling of A-Jacks Units in Wave Flume Stage 2

PHYSICAL MODELLING INVESTIGATION FOR DIKKOWITA FISHERY HARBOUR

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

MECHANISM AND COUNTERMEASURES OF WAVE OVERTOPPING FOR LONG-PERIOD SWELL IN COMPLEX BATHYMETRY. Hiroaki Kashima 1 and Katsuya Hirayama 1

INVESTIGATING STRATEGIES TO REPAIR HISTORIC TIDE WALLS ON THE CLARENCE RIVER AND ADJACENT BEACH AND RIVER BANK PROTECTION

LABORATORY EXPERIMENTS ON EROSION CONTROL PERFORMANCE OF AN L- SHAPED PERMEABLE STRUCTURE. Abstract

Nearshore Morphodynamics. Bars and Nearshore Bathymetry. Sediment packages parallel to shore, that store beach sediment

What are we adapting to? David Provis Senior Principal, Oceanography, Cardno Member, Victorian Coastal Council

WAVE OVERTOPPING OF RUBBLE MOUND BREAKWATERS

SWASH MODELLING OF A COASTAL PROTECTION SCHEME

SHOALHAVEN COASTAL EROSION REMEDIATION: THE HOLY GRAIL

SEAWALL AND BEACH PROFILE INTERACTION IN RUN-UP REGION

THE INEVITABLE RIPPLE 2ND OF APRIL TSUNAMI

The Failure of the Kamaishi Tsunami Protection Breakwater

Combining Surfing and Coastal Protection What Is The Perfect Surf?

Wave Energy Converters (WECs)

Design Studies for an Artificial Surfing Reef: Cable Station, Western Australia.

Emergency Coastal Protection Works Practical Lessons For The Future From The Past

LABORATORY EXPERIMENTS FOR WAVE RUN-UP ON THE TETRAPOD ARMOURED RUBBLE MOUND STRUCTURE WITH A STEEP FRONT SLOPE

CHAPTER 2. Types and Functions of Coastal Structures TABLE OF CONTENTS. VI-2-1. Applications... VI-2-1

MONITORING SEDIMENT TRANSPORT PROCESSES AT MANAVGAT RIVER MOUTH, ANTALYA TURKEY

Overtopping Breakwater for Wave Energy Conversion at the Port of Naples: Status and Perspectives

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

PHYSICAL AND NUMERICAL MODELING OF THE WAVECAT WAVE ENERGY CONVERTER

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007

A New Strategy for Harbor Planning and Design

CROSS-SHORE SEDIMENT PROCESSES

Hydrodynamic and hydrological modelling to support the operation and design of sea ports

CHAPTER 179. Performance of a Submerged Breakwater for Shore Protection

Prevention of Coastal Erosion

Present Practices in Design of Rubblemound Breakwaters for Coastal Harbours-A Review

Transcription:

The (WRL) is located at Manly Vale on Sydney s Northern Beaches, and is part of the School of Civil and Environment Engineering at UNSW Australia (UNSW). WRL undertakes coastal engineering activities through a dedicated projects team, where full time project staff undertake studies and offer expert advice to industry and government. Being a part of UNSW ensures a high calibre of personnel and facilities, ensuring our prestigious record of experience built up over 50 years; due to this, WRL's reputation in coastal engineering is highly regarded by our peers both in Australia and internationally. WRL is NATA certified for Quality Assurance and guarantees that commercial activities are executed with strict regard to quality, time, budget, and in accord with authorised contractual agreements. (Top) Geotextile breakwater model construction - wave basin; (bottom) Greater Gorgon LNG Development - 3 m flume (left) and wave basin (right). Wave forces on coastal and marine structures Armour protection of seawalls and breakwaters Bed scour and movement Wave run-up and overtopping Wave reflection and absorption Motion and forces for floating marina units Water circulation and penetration Wave energy device testing Offshore breakwaters Shoreline changes about coastal construction Shoreline and wave climate effects Wave penetration of harbours

Coastal Engineering: Physical Modelling Solutions 2 The hydraulics laboratories at WRL are the largest and most comprehensive in Australia. WRL occupies 3.8 ha of land immediately downstream of Manly Dam, and has 4 fully equipped laboratories for research and specialist consulting studies. The laboratories contain a variety of standard facilities in addition to open space, which is used for project specific construction of large scale physical models. The facilities typically used for coastal physical modelling investigations include: Large-Scale Wave Flume 1.2 m wide x 44 m long x 1.6 m deep May be used as a wind tunnel with and without waves Site specific 2D bathymetries can be modelled using a false timber floor Typical model investigations undertaken in the wave flume include analysis of breakwater/revetment armour stability, run-up and overtopping, wave forces, wave reduction screens, and wind/wave interactions 3 m Wave Flume 3.0 m wide x 32 m long x 1.3 m deep Used for 2D and quasi 3D modelling Site specific 2D bathymetries can be modelled using a false timber or concrete profile Typical model investigations undertaken in the 3 m flume include revetment/breakwater armour stability, run-up and overtopping, and wave forces 0.6 m Wave/Sediment Transport Flume 0.6 m wide x 40 m long x 0.9 m deep Segmented differential tilting floor May be used as a wind tunnel with and without waves and currents Typical investigations undertaken in the 0.6 m flume include wave process studies, floating and screen breakwater studies, and wind/wave interactions Wave Basin 29 m long x 16 m wide x 0.7 m deep Twin 7.25 m long wave paddles, which can be operated simultaneously or independently, and can be used to produce waves from different directions 12 m long segmented wave paddle for directional or focused wave generation Site specific 3D bathymetries are reproduced using concrete Typical investigations undertaken in the wave basin include analysis of breakwater/revetment layout and armouring, wave penetration, sediment transport, and artificial reefs All wave flumes and the wave basin can be operated with monochromatic or irregular waves, defined by spectral or time series wave parameters, or by a pre-recorded wave signal. WRL has instrumentation to measure wave properties such as height and period, and also to measure wave induced force and pressure loading and overtopping. Wave generation, data recording, and data analysis is undertaken using the GEDAP/NDAC software package. WRL has an extensive collection of model concrete armour units that can be used for armour stability testing, and regularly has armour units produced for specific project requirements.

Coastal Engineering: Physical Modelling Solutions 3 RYCV Williamstown Marina Physical Modelling, VIC, 2014: WRL were commissioned by AW Maritime on behalf of the Royal Yacht Club of Victoria to undertake physical modelling of a wave screen breakwater design for a marina at Williamstown in Port Phillip Bay, Victoria. The proposed design for the marina included a breakwater enclosure formed with both full depth and partial depth wave screens constructed out of sheet pile to protect the berths from wave action. WRL designed and constructed a 1:10 scale 2d wave flume model of the proposed breakwater designs, which was configured such that the impacts of both short period wind waves and long period container ship wakes could be investigated. Clump Point Detached Breakwater, QLD, 2014: The Department of State Development, Infrastructure and Planning (DSDIP) has decided to improve protection of a jetty berth at Clump Point from rough seas with construction of an overtopping breakwater at the site. WRL was engaged to undertake three dimensional (3D) physical modelling of the overtopping breakwater and coastal processes within the study area. The overtopping breakwater optimisation testing was targeted at optimising the overall breakwater size (length, crest level, crest width); and shape and position (side slopes, alignment and location). Wave transmission was the main variable measured during the initial modelling phase. Armour stability was investigated on the overtopping breakwater under 200 year ARI wave conditions. Potential changes in the shoreline planform alignment due to the construction of the proposed overtopping breakwater were examined by performing a series of mobile shoreline sediment tracer tests. This allowed assessment of the influence of the overtopping breakwater on shoreline alignment during ambient and extreme environmental conditions. Seawalls Adaptation Reference Group - Craigie Beach, VIC, 2013: WRL was commissioned by the Victorian Department of Environment and Primary Industries (DEPI) to undertake an investigation focused on potential upgrade solutions for the masonry seawall at Craigie Beach. The physical modelling work covered a wide range of structures, including a reinforced concrete pipe wall, a concrete blockwork wall and rock revetment, which required unique armour units specifically developed in-house for this project. The 2D flume model was used to rapidly investigate changes in revetment geometry and type of primary armour as well as provide quantitative measurements of mean overtopping rates. 3D laser scans were performed on the different structures to monitor the deformation of the structures under wave action and identified potential hot-spots in terms of localised armour damage. Toogoom Rockwall Physical Modelling, QLD, 2013: A rock seawall is proposed for a 400 m long section of coastline in Toogoom, QLD. This new coastal protection infrastructure aims to stop the ongoing beach erosion and recession which have been observed in the last years, as well as potentially limit coastal inundation during cyclonic events. WRL was commissioned by the Fraser Coast Regional Council and Aurecon to complete two dimensional (2D) physical modelling of the proposed designs. The 2D flume model was used to investigate changes in revetment geometry and type of primary armour, allowing an optimisation of design primary armour size from 6 t to 3 t. Quantitative measurements of mean overtopping rates were also undertaken.

Coastal Engineering: Physical Modelling Solutions 4 Browse LNG Development, WA, 2011-2012: The proposed Browse LNG Development was to include LNG berthing facilities with shelter provided by an offshore breakwater, an Integrated Marine Facility (IMF) with shelter provided by a smaller, shore-attached breakwater, shipping channels and turning basins. This investigation included initial 2D and quasi-3d flume testing of preliminary structure designs, looking at revetment armour stability (Xbloc and rock), wave runup and overtopping; from which results were used to optimise the design. Additional physical modelling was performed based on an array of vertical concrete monopiles; different configurations were tested in order to investigate the influence on wave transmission of spacing between the piles, to measure wave-induced force and pressure on the monopile structure, as well as a scour hole caused by a storm event about the toe of the monopile structure. Gladstone Tug Berth Marina, NSW, 2012: WRL was commissioned by SMEC on behalf of the Gladstone Ports Corporation, to undertake a physical modelling study of a pontoon design for a proposed tug berth marina at Gladstone. The pontoon model was custom built in-house. Specific attention was given to the modelling of the wear/impact buffers at the pontoon/pile interface in order to allow the pontoon to have the same range of motion as expected in the real world. WRL used a combination of ultra-sonic sensors to track the motion of the pontoon (heave and roll) and submersible load cells for measuring the forces acting on the piles caused by the pontoon motion under wave attack, including analysis of impact and sustained load types. Wave transmission past the pontoon was measured by comparison of incident and transmitted wave conditions using a series of capacitance wave probes. Coffs Harbour Eastern Breakwater, NSW, 2012: WRL was commissioned to undertake 2D physical modelling and quasi 3D physical modelling top investigate upgrade and remediation options for the Coffs Harbour Eastern Breakwater. This modelling targeted the investigation of interfacing new breakwater armouring with existing armour, including consideration of constructability in placement of new armour units. The sensitivity of achievable Hanbar armour unit placement density to the existing breakwater surface was also considered, along with the impact of placement density on average wave overtopping rates. Quasi 3D modelling was used to investigate armour transitions along the trunk of the structure to angled wave attack. Mornington Pier Physical Modelling, VIC, 2010: WRL was engaged by Parks Victoria to undertake 2D physical modelling of the Mornington Pier, located on the eastern side of Port Phillip Bay, in order to improve public safety and provide a new safe harbour behind the Pier during storm events. Results of testing allowed several improvements to the initial desktop-based design and cost-savings to the end client. Possible design limitations were able to be identified and amended. The effect of wind on wave overtopping using several differing wave deflectors was also investigated. Onshore winds were shown to increase overtopping flows, in some cases to levels deemed dangerous to human safety. Using these results, an optimal deflector shape was identified to minimise risk to human safety in all but the most extreme storm conditions.

Coastal Engineering: Physical Modelling Solutions 5 St Kilda Southern Breakwater 2D Modelling, VIC, 2010: WRL was engaged to undertake 2D physical modelling of several complex wavestructure interactions for an extension of the St Kilda Southern breakwater to provide increased wave protection. The project included the modelling of a rock revetment similar to the existing breakwater and a vertical wave protection panel. The modelling focused on wave transmission through both structures, wave overtopping including the implementation of vertical wave screens and angled wave deflectors above each configuration, and wave breaking characteristics and impact forces on the vertical wave panel. 2D Physical Modelling of Oceanlinx Wave Energy System, 2008: Oceanlinx Australia engaged WRL to undertake 2D physical modelling of its Wave Energy System. The Oceanlinx system converts the flow of air above an oscillating water column (OWC) into electrical energy via a mechanical turbine. Wave flume tests were undertaken independently on two different types of OWC designs in the 3 m wave flume at WRL. Phase 1 of testing involved the construction of a model based on the existing Oceanlinx OWC prototype design at a scale of 1:30. Testing was undertaken to compare the performance of the chamber under real water level time series, recorded onsite at a potential deployment location in Australia; and under synthetic time series. Phase 2 of testing involved the construction of four different model OWC designs tested with up to two orientations of wave attack at a scale of 1:33. Tests were undertaken to compare the performance of the chamber designs under both monochromatic and irregular wave attack. Physical Modelling of Geotextile Breakwaters for a Coastal Resort Development, Abu Dhabi, 2008: WRL was commissioned to undertake 2D and 3D physical modelling of geotextile coastal management systems, which were proposed a resort at an island development in Abu Dhabi. The proposed coastal development scheme consisted of a field of low crested geotextile container breakwaters, utilised in combination with beach nourishment. This investigation included 2D flume testing at a scale of 1:25 investigating wave transmission, wave runup, and overtopping for a range of breakwater designs and recurrence interval events. The 3D wave basin modelling at a scale of 1:40 was primarily undertaken to measure nearshore wave driven currents around the breakwaters, as well as transmitted wave conditions. Greater Gorgon LNG Plant MOF, WA, 2006-2009: A liquefied natural gas (LNG) export facility was proposed to be built on Barrow Island, WA. To allow construction of the LNG plant, a materials offload facility (MOF) was required to be constructed on the island, consisting of several wharves and craft landing facilities, protected by various coastal structures. WRL was engaged to undertake 2D and 3D physical modelling investigations of the perimeter revetment and other coastal structures associated with the project. The initial 2D flume testing of preliminary structure designs, looked at revetment armour stability, wave runup, and overtopping, from which the results were used to optimise the design, prior to undertaking the wave basin modelling. The 3D wave basin modelling further investigated armour stability and overtopping, as well as considered wave penetration associated with the plan layout of the various structures.

Coastal Engineering: Physical Modelling Solutions 6 Matt Blacka, Principal Coastal Engineer Matt is one of Australia s foremost experts in the application of physical models for analysis of coastal and marine structures, having modelled over 30 coastal structure projects in the past 12 years, and published many papers on coastal structure physical modelling methods and case studies. Matt s expertise is in the application of both 2D and 3D physical models for assessing rock and precast concrete armoured structures as well as the measurement of wave loading on rigid marine structures such as caissons, wharves and jetties and floating structures such as pontoons and breakwaters. Recent coastal structure investigations undertaken by Matt include Gorgon LNG Project WA, Hay Point Coal Terminal QLD, Bounty Bay Pitcairn Island, Penrith Lakes Foreshore Protection NSW, Sir Bani Yas Island Abu Dhabi, Port of Mackay Qld, Abbot Point MCF Qld, Ichthys LNG Project NT, Gladstone Tug Berth Pontoons QLD, Clump Point Overtopping Breakwater Qld, Roy Hill Iron Ore stockpile Revetments WA, and Waitangi Wharf Chatham Islands. Matt holds a Master of Engineering Science degree (Coastal Engineering and Management) and a Bachelor of Engineering (Civil) degree, with honors in Coastal Engineering. He is also a committee member and former secretary of the Engineers Australia, NSW Coastal Ocean and Port Engineering Panel (COPEP). James Carley, Principal Coastal Engineer James holds a Master of Engineering Science degree, majoring in Coastal Engineering. He has over 24 years of experience in coastal engineering; specialising in coastal processes, coastal hazard assessment, sea level rise impacts and coastal structures. He has undertaken coastal projects in all states of Australia, the South Pacific, the Middle-East and South-East Asia. He has designed and/or tested coastal structures ranging from single boatsheds to billion dollar infrastructure ports. These projects have included seawalls, breakwaters, boat ramps and surfing reefs, and have included designs from rock, concrete, geotextiles, car tyres and vegetation. James work has been published in technical reports, conference proceedings and journals. James has served on the Engineers Australia NSW Coastal Ocean and Port Engineering Panel for over 15 years, including two years as Chair. He has also been a surfer, surf-life saver, and an ocean swimmer for over 30 years. Recent physical modelling investigations include Browse LNG Project WA, Craigie Beach Rock Sea Wall VIC, Shell Cove Harbour NSW, Gold Coast Reef QLD, Sydney Airport NSW, Gorgon LNG Project WA, Eua Island Tonga and Bondi Olympic Volleyball Stadium NSW. Ben Modra, Principal Coastal Engineer Ben Modra is a Principal Engineer with the. He holds a Bachelor of Engineering/Arts and a Masters of Engineering Science (Coastal Engineering), and has 10 years experience providing specialist expertise to the coastal and engineering community in NSW and Australia. Ben specialises in studies relating to coastal and hydraulic engineering, and is a leader in physical modelling for these fields. He is experienced in the inspection, design and testing of coastal structures, particularly rubble mound breakwaters. Ben is experienced in the deployment of instrumentation for both laboratory and field investigations, and has a strong reputation for the analysis of environmental data. He has pioneered new approaches to tidal and wave data and is an expert of the application of timeseries and statistical analysis to coastal management.

Coastal Engineering: Physical Modelling Solutions 7 Ian Coghlan, Senior Coastal Engineer Ian has completed a Master of Engineering Science degree, with specialisation in Coastal Engineering and Management, a Bachelor of Engineering (Mechanical) degree with honours, and a Diploma of Engineering Practice. He has worked as a Project Engineer at the Water Research Laboratory since 2005 and is experienced in both physical model and desktop investigations in the fields of coastal engineering and hydraulics. Ian is an Australian expert in two-dimensional and quasi three-dimensional flume physical modelling with expertise in the application of over 20 physical models for assessing coastal and marine structures. Recent physical modelling investigations include Greater Gorgon Development Barrow Island LNG Plant WA, Coffs Harbour Breakwaters NSW, Abbot Point multicargo facility QLD, Hay Point coal terminal, QLD. Chris Drummond, Coastal Engineer Chris is a Project Engineer at the with 4 years of experience. Whilst working at WRL, Chris has completed physical model investigations for a range of coastal structures including breakwaters, groynes and marinas. Recent physical modelling investigations include 3D modelling at Mission Beach (QLD) utilising a mobile sediment bed to assess shoreline response to a detached breakwater as well as complex armour stability and overtopping estimation for Coffs Northern Breakwater (NSW). Recent 2D coastal structure investigations undertaken by Chris include Kingscliff terminal seawall (NSW), Roy Hill Flexmat (WA), Craigie Beach (VIC), Toogoom rockwall (QLD), Avatiu Breakwater (Cook Islands) and Wyndham Harbour Breakwaters (VIC).