Recent and Upcoming Developments along the I-70 Mountain Corridor

Similar documents
I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

T R A N S P O R T A T I O N M E M O R A N D U M

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

I-25 South Gap Project Monument to Castle Rock

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Washington DC Section of ITE Project Briefing

Foothill Expressway Improvements Between El Monte and San Antonio

Freeway Improvement Project

State Route 160 (Blue Diamond Highway)

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

City of Fairfax, Virginia City Council Work Session

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Transportation Committee Project Priority List

Transportation and Air Quality Committee GEL Project Briefing and Update

I-70 DENVER - UTAH INCLUDING BERTHOUD AND LOVELAND PASSES

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

A: PLANNED P ROJECTS PROJECTS

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet

Charlottesville Regional Chamber of Commerce. October 28, 2014

I-70 ECO-LOGICAL MONITORING 2009 PROGRESS REPORT July 2010

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

PRESENTATION OUTLINE

East Steamboat Springs US Highway 40 Access Study

TECHNICAL MEMORANDUM

Golden s Plan. For the Highway 6 & 93 Corridor

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

I-66 Corridor Improvements Route 15 to I-495. November 2014

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Legislative Update Williamsburg Residency

Enhancing Connectivity

RIVERSIDE COUNTY TRANSPORTATION COMMISSION - UPDATE

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Truck Climbing Lane Traffic Justification Report

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Cincinnati Dayton Rd Widening

Detailed Description of Work

Table of Contents SR-91 IMPLEMENTATION PLAN i

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

FM #: ETDM #: 11241

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

STATE ROUTE 91 (SR-91) IMPLEMENTATION PLAN KEEPING MOTORISTS MOVING ON THE SR-91 CORRIDOR

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

RECEIVED. Colorado Secretary of State. t iu. Initiative #22 ORIGINAL TEXT. Be it Enacted by the People of the State of Colorado:

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

WDA response to O'Brien summary of recommendations dated 4 September 2017

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

Roundabouts Near At-Grade Railroad Crossings

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Business Access and Associated Benefits Provided by Roundabouts

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

Colorado s elected officials have decreased funding for road and bridge. Revenues that should have gone to roads pursuant to state law have been

3.0 PROJECT DESCRIPTION

Intersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Short and Long Term Needs

Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach

Third Street Bridge & Corridor Project

Technical Working Group November 15, 2017

Motorways (autobahns) Abandoned motorway projects. New roads schemes according to the 2030 Federal Transport Infrastructure Plan

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

VT15 / Allen Martin Drive Intersection Scoping Study

Ch Driving on Expressways. Characteristics of Expressway Driving. Expressway. Types of Expressways. Why do they have fewer collisions?

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

Gandy Connector: Travel Demand. Policy Committee August 2013

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

I-70 ECO-LOGICAL MONITORING and I-70 WILDLIFE WATCH REPORT. September 2011

Appendix D: Concept Screening

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

General References Definitions. (1) Design Guidance. (2) Supporting Information

Road Safety Audit Report: Interstate 516

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Project Budget and Schedule Status

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria:

Access Routes from US 101 to the Richmond San Rafael Bridge

Transportation Element

Design Criteria. Design Criteria

Transcription:

Recent and Upcoming Developments along the I-70 Mountain Corridor CDOT Region 1 I-70 Mountain Corridor Team Benjamin Acimovic April 2013 10th Annual Transportation Symposium

I-70 Corridor Summary I-70 Mountain Corridor Twin Tunnels Project Peak Period Shoulder Lanes US 6/I-70 Auxiliary Lanes Georgetown Hill Rockfall EJMT Suppression System Questions

I-70 Mountain Corridor

Twin Tunnels Widening Project US 6/I-70 Auxiliary Lanes Project consists of an Environmental Assessment, Design, and 5 Construction Packages 0, 1A, 1B, 2, and 3 Packages 0 and 1A are complete. Packages 1B and 2 are under construction. Package 3 construction is scheduled for late 2013/early 2014. Main Widening of roadway and tunnel is underway with Package 2 20 Minute stops for blasting starting April 2013 and going until July 2013. Roadway and tunnel should be open by late 2013. http://www.coloradodot.info/projects/i70twintunnels

Peak Period Shoulder Lanes THE I-70 PEAK PERIOD SHOULDER LANE PROJECT IS LOCATED ON INTERSTATE 70 IN CLEAR CREEK COUNTY. IT BEGINS NEAR MP 230.0 AT THE JUNCTION OF US 40 AND I-70 (EMPIRE JUNCTION) AND EXTENDS TO APPROXIMATELY MP 242.0 WHERE IT WILL TIE IN TO THE THIRD LANE OF THE TWIN TUNNELS PROJECT. MP 232 - BEGIN PPSL MP 241 END PPSL TWIN TUNNELS MP 230 BEGIN PROJECT LIMITS MP 242 END PROJECT LIMITS

Peak Period Shoulder Lanes» This project that will implement a Peak Period Shoulder Lane in the eastbound direction of I-70 between US40/Empire Junction and the Twin Tunnels in Idaho Springs, Colorado.» The project would widen I-70 to allow for a the outside shoulder to be opened during peak times. One of the three lanes would be a managed or tolled lane to retain mobility and reliability on I-70.» Two general purpose lanes will be open at all times.» This project will tie directly into the Twin Tunnels Widening project.» CDOT is forming a Project Leadership Team and has an RFP advertised to select a design consultant for the project.» Project is due to be advertised for bid in 2014 and construction will be completed by late 2015.

US 6/I-70 Auxiliary Lanes and Loveland Chain Station The US 6/I-70 Auxiliary Lanes project will construct a auxiliary lane connecting the US 6 EB I-70 On-Ramp to the Herman's Gulch EB I-70 Off-Ramp located west of Bakerville within Clear Creek County. The project will widen the eastbound side of I-70 between the two interchanges to allow US 6 traffic an extended lane to merge into existing I-70 EB traffic. The objective of this project is to provide enhanced safety and mobility for vehicles at US 6 Loveland Interchange and along this stretch of I-70.

US 6/I-70 Auxiliary Lanes and Loveland Chain Station» This project will construct a chain down station along the US 6 / I-70 EB On-Ramp and a chain up station along the US 6 / I-70 WB Off-ramp.» The objective of this project is to provide truck traffic a location to safely apply or remove chains while Chain Law is in effective that travel the US 6 Loveland Pass stretch between Frisco/Dillon and Loveland Ski Basin. This project will also evaluate existing Chain Stations within the I-70 Corridor in Clear Creek County for possible removal and/or relocation.» Both projects are in preliminary design and have formed a joint PLT and TT for both projects.» CDOT currently plans to advertise and construction both projects in late spring/early summer 2014.

Georgetown Hill Rockfall Mitigation» This project is part of the ongoing effort to improve safety on I-70 in Georgetown.» The current project is schedule to wrap up construction in late summer 2013.» 20 minutes stops for scaling operations will be ongoing and done in coordination with the Twin Tunnels blasting schedules.» This project is being managed out of the region 1 West Program and Foothills Residency led by Russel Cox.» The project engineer is Jim Van Dyne.

EJMT Fire Suppression System» This project that will construct a fire suppression system in the EJMT (Eisenhower Johnson Memorial Tunnels).» It is being delivered as a Design-Build project and a DB firm will selected over the next year to deliver the project.» This project has a lot of challenges with elevation, temperature, existing conditions, and operations.» Project is scheduled for construction in 2015.

Questions and Contact Info» Jim Bemelen I-70 Corridor Manager» Peter Kozinski Region 1 West Program Engineer