Viewing SMART SCALE Application

Similar documents
Rio Mills Rd/Berkmar Dr Extended Connection

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

Sliding Hill Road - Widening (UPC )

New Commuter Parking Lot for Route 1 at Commonwealth Drive Scored HB 2 Application

Project Description Form 8EE

Project Description Form 6V

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Public Information Meeting

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Washington DC Section of ITE Project Briefing

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Project Description Form 8AA

Route 15 Congestion Report Findings

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Route 7 Corridor Study

CHAPTER 5 TRANSPORTATION GOAL

Route 29 Solutions Projects

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Access Management Regulations and Standards

Access Management Regulations and Standards

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

The Year Ahead: Virginia Department of Transportation Northern Virginia District

5. RUNNINGWAY GUIDELINES

Basalt Creek Transportation Refinement Plan Recommendations

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Fairfax County Parkway Widening Fairfax County

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

County of Fairfax, Virginia. Department of Transportation

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Frequently Asked Questions

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Executive Summary Route 30 Corridor Master Plan

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Transportation Master Plan Advisory Task Force

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Typical Rush Hour Commute. PennyforTransportation.com

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Long Island Rail Road Expansion Project Floral Park to Hicksville

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

City of Fairfax, Virginia City Council Work Session

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Chapter 5 Future Transportation

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Clackamas County Comprehensive Plan

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

I-395 Express Lanes Northern Extension Project Public Hearings

Chapter 4: Funding and Implementation

C C C

WELCOME TO OPEN HOUSE # 1 June 14, 2017

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Chapter 6 Transportation Plan

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TRASBURG RANSPORTATION

Lynchburg District Update

Regional Transportation Needs Within Southeastern Wisconsin

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Public Opinion about Transportation Issues in Northern Virginia

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Active Transportation Facility Glossary

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

NJDOT Complete Streets Checklist

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

City of Fairfax, Virginia City Council Work Session

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

INDOT Complete Streets Guideline & Policy

Capital Beltway HOT Lanes - Frequently Asked Questions

Transportation Committee Project Priority List

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

Public Information and Participation Comments

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Highway Safety Improvement

This page intentionally left blank.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Transcription:

Viewing SMART SCALE Application Route 15 Whites Ferry Road to Points of Rock Bridge Project Status: Submitted Organization: Loudoun County Project ID: 3593 Submitted: 08/06/2018 @ 3:18PM by Bob Brown Created: 05/08/2018 @ 3:58PM by Bob Brown Last Updated: 08/06/2018 @ 3:18PM by Bob Brown General Point of Contact Information Project Point of Contact Name Bob Brown Project Point of Contact Email bob.brown@loudoun.gov Project Point of Contact Phone (703) 777-0122 Project Information Project Title Route 15 Whites Ferry Road to Points of Rock Bridge Principal Improvement Highway Project Short Description Safety and Operations Improvements on Route 15 Does this project include any improvements to non-vdot maintained roadways? No Application Program Statewide High Priority District Grant VDOT District Northern Virginia https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 1/17

Project Detailed Description The Route 15 Congestion Report focused on the segment of Route 15 between Battlefield Parkway and Whites Ferry Road, and recommended widening of Route 15 to Montresor Road. A follow-up study is underway, known as the Route 15 Safety and Operations Study from Whites Ferry Road to the Maryland State Line. This Safety and Operations Study, although not completed, has indicated the need for further roadway improvements which included roundabouts and limited widening of Route 15. The following description of improvements were included in the previously mentioned studies; however, the Board of Supervisors have not endorsed any concepts in this segment of Route 15 as of the date of this Smart Scale application. The Route 15 Congestion Report identified some locations where lanes improvements and widening may be needed in certain section of this corridor. These are described in the attached conceptual plan, from the soon to be published Safety and Operations Study that shows 12' travel lanes and 8' wide shoulders of which 4' are paved and 4' are gravel. The median would be a grass ditch median which also acts as a location for turn lanes at key intersection and major business entrances. There are over 100 access points along the corridor which, according to the Route 15 Congestion Report would be controlled in some segments by making some driveway entrances right in - right out to reduce left turn conflict onto Route 15. Also shown in the attached concept from the Safety and Operations Study are intersections along Route 15 that would need to receive intersection improvements, primarily roundabouts, and turn lanes along the entire corridor. A 10' wide shared use path, as indicated in the Concept Plan (attached), would be included along the entirety of the corridor on the western side of Route 15 from Leesburg north to Maryland where it can link up with the C&O canal. The State's Understanding of the Scope of Work https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 2/17

Location VTRANS Needs Categories: Regional Network Safety Areas Served Districts Served NOVA PDCs Served Northern Virginia MPOs Served National Capital Region Transportation Planning Board Jurisdictions Served Loudoun County Regional Network NOVA_C Make roadway safety and operational improvements to alleviate bottlenecks and reduce acute congestion, including "hot spots" with frequent but unpredictable (non-recurring) congestion - Corridor Reliability, Network Connectivity Route 15 is a major arterial and serves both local, commuter and through traffic to Maryland, WV and even Penn. The roadway suffers daily from heavy congestion and has one of the highest accident rates in the County if not in Northern VA.. The roadway comes up continuously as one of the most congested in NOVA. Safety James Monroe Hwy PR/NP (Loudoun Cnty), US-15N/S James Monroe Hwy PR/NP (Loudoun Cnty), Stumptown Rd PR/NP (Loudoun Cnty), SC-662E/W (Loudoun Cnty), US- 15N/S James Monroe Hwy PR/NP (Loudoun Cnty), US-15N/S James Monroe Hwy PR/NP (Loudoun Cnty), US-15N/S James Monroe Hwy PR/NP (Loudoun Cnty), US-15N/S James Monroe Hwy PR/NP (Loudoun Cnty), SC-661E/W (Loudoun Cnty), US-15N/S US-15N US-15N US-15N US-15N US-15N High crash rates all throughout the roadway in this diagram High crash rates all throughout the roadway in this diagram High crash rates all throughout the roadway in this diagram High crash rates all throughout the roadway in this diagram The recommended concept proposes a signal to improve operations and safety The recommended improvement proposes a roundabout to improve congestion and safety at Montresor Road The improvement includes median dividing the roadway and adding 8' shoulders to improve safety along the corridor The improvement includes median dividing the roadway and adding 8' shoulders to improve safety along the corridor The improvement includes median dividing the roadway and adding 8' shoulders to improve safety along the corridor The improvement includes median dividing the roadway and adding 8' shoulders to improve safety along the corridor The improvement includes median dividing the roadway and adding 8' shoulders to improve safety along the corridor https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 3/17

Features Highway Improvements Project Features Add New Through Lane(s) Please upload a Planning Study/Safety Study for your project if not done during pre-app Description (type, quantity, location) The Route 15 Congestion Report focused on the segment of Route 15 between Battlefield Parkway and Whites Ferry Road, and recommended widening of Route 15 to Montresor Road. A follow-up study is underway, known as the Route 15 Safety and Operations Study from Whites Ferry Road to the Maryland State Line. This Safety and Operational Study has indicated the need for further roadway improvements that could include more roundabouts and limited widening of Route 15. As of the date of this Application, the Board of Supervisors has not endorsed any concepts in this segment of Route 15. Widen Existing Lane(s) (No New Lanes) The Route 15 Congestion Report focused on the segment of Route 15 between Battlefield Parkway and Whites Ferry Road, and recommended widening of Route 15 to Montresor Road. A follow-up study is underway, known as the Route 15 Safety and Operations Study from Whites Ferry Road to the Maryland State Line. This Safety and Operational Study has indicated the need for further roadway improvements that could include more roundabouts and limited widening of Route 15. As of the date of this Application, the Board of Supervisors has not endorsed any concepts in this segment of Route 15. Managed Lane(s) (HOV/HOT/Shoulder) Shoulder Improvement(s) The conceptual plan for this project would widen and create 8 foot wide shoulders the entirety of the corridor. Currently many locations are missing or have no shoulders along the road. https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 4/17

Turn Lane Improvement(s) Turn lanes would be implemented at key businesses and intersections along the corridor to provide safer access to communities and business. Access Management As part of the concept for the corridor improvements a grass median is being proposed from Whites Ferry Road to Potomac Overlook road. This median would control access from driveways and require right in -right out movements along the corridor to increase safety. Road Diet Roadway Reconstruction/Realignment Roadway on New Alignment Please upload a Planning Study/Safety Study for your project if not done during pre-app As part of the concept (attached) a bypass is proposed around the Village of Lucketts to provide congestion relief and remove the heavy volume of traffic which travels through the village daily. The bypass is approximately 4,000 feet long traveling on the west side of Lucketts. Intersection Improvement(s) All of the intersections along the corridor would receive improvements including turn lanes and intersection treatments to make them safer. Innovative Intersection(s) / Roundabout(s) more information Roundabouts are proposed in the conceptual plan at the following locations, Montresor Road, Spinks Ferry Road, and at Stumptown Road with the conceptual bypass west of Lucketts New Intersection A new intersection at the conceptual bypass and stumptown road would be created and a roundabout installed at this location. New Traffic Signal https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 5/17

Traffic Signal Modification ITS Improvement(s) / Adaptive Signal Control Improve Rail Crossing Ramp Improvement(s) Improve Grade-Separated Interchange New Interchange, Non- Limited Access Facility New Interchange, Limited Access Facility Improve/Replace Existing Bridge(s) New Bridge Highway Other Bicycle and Pedestrian Improvements Project Features Description (type, quantity, location) Add/Construct Bike Lane Construct Shared-Use Path The conceptual plan for the Route 15 improvements includes a 10 foot wide shared use path along the west side of Route 15 for the entirety of the corridor. This creates a connection from the W&OD Trail in Leesburg to the C&O canal in Maryland Construct Sidewalk https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 6/17

Improve Bike/Pedestrian Crossing (At Grade) Improve Bike/Pedestrian Crossing (Grade Separated) Bike/Pedestrian Other Bus Transit Improvements Project Features Description (type, quantity, location) New Route/Service Increase Existing Route Service - Additional Vehicle(s) or Increased Frequency Construct or Convert Existing General Purpose or Parking Lane to Bus-only Lane Construct or Improve Bus Stop / Shelter Construct/Expand Bus Facility Other Transit Technology Improvements Rail Transit Improvements (Streetcar, Light Rail, Heavy Rail, Commuter Rail) Project Features Description (type, quantity, location) Rail Service Improvements https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 7/17

New Station or Station Improvements Rail Transit Other Intercity Passenger Rail Project Features Description (type, quantity, location) Intercity Passenger Rail Service Improvements New Intercity Passenger Rail Station or Station Improvements Freight Rail Project Features Description (type, quantity, location) Freight Rail Improvements Travel Demand Management (TDM) Improvement(s) Project Features New Park and Ride Lot Description (type, quantity, location) Loudoun County is coordinating with Frederick County, MD to utilize the existing MARC train station parking lot as a new bus facility and park and ride lot to pickup regional traffic currently commuting on Route 15 Improve Park and Ride Lot New/Expanded Vanpool or On- Demand Transit Service https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 8/17

TDM Other Right-of-Way and Utilities Project Features Right-of- Way/Easements acquisition required Description (type, quantity, location) Right of way needs, based solely on the conceptual plan, would likely be required for widening and shoulder improvements along the corridor. It is likely that ROW will be required in the form of easements along most of the length of the corridor from Whites Ferry Road to the Maryland State Line which currently has approximately 220 parcels fronting Route 15. The impacts will be due to widening along the existing primarily narrow and prescriptive ROW. Includes Utility Relocations As part of the improvements existing utilities would likely need to be relocated to avoid conflict with the new roadway. Includes In-Plan Utility Betterment Factors Accessibility Accessibility Response Supporting Information 1- Project includes transit system improvements or reduces delay on a roadway with scheduled peak service of one transit vehicle per hour. Yes The concept for Route 15 would include new transit service and park and ride lot in Point of Rocks Maryland to various location within Loudoun County https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 9/17

2- Project includes improvements to an existing or proposed park and ride lot (e.g., new lot, more spaces, entrance/exit, technology (payment, traveler information)). YES The concept for Route 15 would include new transit service and park and ride lot in Point of Rocks Maryland to various location within Loudoun County This factor has been pre selected because you selected New Park and Ride Lot or/and Improve Park and Ride Lot 3- Project includes improvements to existing or new HOV/HOT lanes or ramps to HOV/HOT. 4- Project includes construction or replacement of bike facilities. For bicycle projects, off-road or on-road buffered or clearly delineated facilities are required This factor has been pre selected because you selected Add/Construct Bike Lane Feature and/or Construct Shared-Use Path YES A new 10' shared use path would be constructed on the west side of Route 15 along the entirety of the corridor per the conceptual plans identified in the Safety and Operations Study 5- Project includes construction or replacement of pedestrian facilities. For pedestrian projects, sidewalks, pedestrian signals, marked crosswalks, refuge islands, and other treatments are required (as appropriate). This factor has been pre selected because you selected Construct Sidewalk Feature and/or Construct Shared-Use Path YES A new 10' shared use path would be constructed on the west side of Route 15 along the entirety of the corridor per the conceptual plans identified in the Safety and Operations Study. These improvements would also dictate pedestrian crossings and crosswalks at the roadway crossings and intersections along the corridor. https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 10/17

6- Project provides real-time traveler information or wayfinding specifically for intermodal connections (access to transit station or park and ride lot). 7- Provides traveler information or is directly linked to an existing TMC network/its architecture. No No Environment Environment Response Supporting Information 1- Project includes improvements to rail transit or passenger rail facilities? N/A Answers selected in Features tab indicate that this question is not required for this application 2- Project includes construction or replacement of bike facilities. For bicycle projects, off-road or onroad buffered or clearly delineated facilities are required (i.e. Bike Lane or Shared Use Path). This factor has been pre selected because you selected Add/Construct Bike Lane Feature and/or Construct Shared-Use Path YES A new 10' shared use path would be constructed on the west side of Route 15 along the entirety of the corridor per the conceptual plans identified in the Safety and Operations Study 3- Project includes construction or replacement of pedestrian facilities. For pedestrian projects, sidewalks, pedestrian signals, marked crosswalks, refuge islands, and other treatments are required (as appropriate). This factor has been pre selected because you selected Construct Sidewalk Feature and/or Construct Shared-Use Path YES A new 10' shared use path would be constructed on the west side of Route 15 along the entirety of the corridor per the conceptual plans identified in the Safety and Operations Study https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 11/17

4- Project includes improvements to an existing or proposed park-and-ride lot (e.g., new lot, more spaces, entrance/exit, technology (payment, traveler information)). This factor has been pre selected because you selected New Park and Ride Lot or/and Improve Park and Ride Lot YES The existing MARC train facility would be improved to include transit and park and ride lot for a future bus transit route between maryland and virginia. 5- Project includes bus facility improvements or reduces delay on a roadway with scheduled peak service of one transit vehicle per hour. Yes The existing MARC train facility would be improved to include transit and park and ride lot for a future bus transit route between maryland and virginia. 6- Project include special accommodations for hybrid or electric vehicles, or space or infrastructure for electric vehicle parking/charging). 7- Project includes energy efficient infrastructure or fleets, including: hybrid or electric buses, electronic/open road tolling, alternative energy infrastructure (e.g., roadside solar panels). No No Delivery/Funding Project Delivery Information Project Planning Status Transportation Element of Local Comprehensive Plan Planning/Safety Study Project Administered By Locality Project Delivery Method Design-bid-Build VDOT % Locality % Consultant % 100 https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 12/17

Phase Estimate and Schedule Phase Milestone PE (Survey, Environmental, Design) Status Not Started Percent Complete Cost Estimate Start Date End Date 0 $8,728,200 2022-03-16 2024-03-04 Phase Milestone Status RW (Right of Way and Easement Acquisition, Utility Relocation) Not Started Percent Complete Cost Estimate Start Date End Date 0 $26,252,723 2024-03-04 2025-01-06 Phase Milestone Status CN (Construction, Oversight, Inspection, Contingencies) Not Started Percent Complete Cost Estimate Start Date End Date 0 $75,700,563 2025-04-07 2027-06-10 Total Cost Estimate $110,681,486 Project Funding Sources SYIP Allocations Provide Existing Project VDOT UPC(s) or DRPT Project Number(s), if applicable Project UPC/DRPT Project ID UPC Type UPC Description VDOT / DRPT ($) Total SYIP $0 https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 13/17

Other Committed Funds Provide Information on Other Committed funds Other Funds Committed Description of Fund Type to Project Local Roadway Tax Fund or GO Bonds County Taxes/ Bond Revenue Amount $20,359,820 Other Funds Committed to Project NVTA Description of Fund Type County proposes to submit funding for the FY 2020-2025 SYP update that will start in July of 2019 and approved in June of 2020. Amount $34,980,923 Total Other Committed Funds $55,340,743 Project Financial Information Total SYIP Allocations $0 Total Other Committed Funds $55,340,743 Total SMART SCALE Requested Funds $55,340,743 Total Project Funding $110,681,486 Total Cost Estimate $110,681,486 Economic Development Sites Is this transportation project referenced in local Comprehensive Plan, local Economic Development Strategy or Regional Economic Development Strategy? Yes Leesburg North Landing https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 14/17

Site Name Building square footage Category of Property Leesburg North Landing 5600 Zoned Only Development project lacks an approved or submitted conceptual or detailed site plan but is consistent with local comprehensive plan's future land use or zoning map and/or zoning code/ordinance. To be eligible, a zoned-only site must have primary access to the project or be directly adjacent to the project. Existing Access Provision Project provides new direct access to the site or improves existing access to the site (site must be physically adjacent to the project). In case of capacity enhancement to limited access facility, new or improved interchange, transit rail capacity improvement, or new transit rail station zoned properties within 0.5 miles of the adjacent interchange(s) or rail station(s) qualify as receiving improved direct access. Driving distance to development project from transportation project User Input Calculated from Map Description Attachment Type File Name Leesburg North Landing Development Project Zoning/Proffer Reference 06-15-18 REZONING and SPEX PLAT FINAL.pdf Download Selected Attachments Download All Attachments Supporting Documents Filter By: Description/File Name: Description/File Name... Attachment Type: https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 15/17

Reset Filters Description Attachment Type File Name Site Name Planning Study Planning Study/Safety Study Route 15 ExistingConditions Summary_2018-02-21.pdf Project limits Project Sketch Project sketch.pdf Cost Estimate Detailed Cost Estimate Route 15 PCES Concept B.XLSX Board Resolution Governing Body Resolution of Support FY20-FY25 Statewide Six Year Improvement Program Smart Scale Submissions_Resolution.pdf MPO Resolution MPO Required Resolution of Support MPO resolution of support (002).pdf Conceptual Plan for Route 15 Project Sketch Modified ConceptB.pdf Maryland Partner Meeting Notes Rail and Transit Project Detail Form 2018-02-05_MeetingSummary.pdf Leesburg North Landing Development Project Zoning/Proffer Reference 06-15-18 REZONING and SPEX PLAT FINAL.pdf Leesburg North Landing Download Selected Attachments Download All Attachments https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 16/17

https://smartportal.virginiahb2.org/#/applications/2020/hb2/view/f15-0000003765-r01/ 17/17