ROOF ACCESS AUDIT SPRING 2017

Similar documents
East roof, access via east staircase Risk Assessment Yes Ref no. EFM-RRA Date 04 May 2017

Prevention of Falls and Working at Heights

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Safety Risk Assessment Roofing Works / Surveying / Inspections

Pre-control risk estimate. Likelihood Risk

University College Dublin Machinery/Equipment Risk Assessment Template

TASK DAY RISK ASSESSMENT FORM

WORK METHOD STATEMENT ELECTRICAL

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Health and Safety Policy

S31 Opening Statement Working at Height

FATAL AND SEVERE RISK PROGRAM

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

Important Safety Information Enclosed

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

HS329 Risk Management Procedure

Working at Height Regulation 2005

University of Lincoln Students Union Annual Risk Assessment for Activities

SAFE WORK METHOD STATEMENT SWMS No Version

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

Telco Antennas SWMS Working At Height Above 2m

Unit 302 Health & Safety in ICT. By Josh Gibson

Safe Work Method Statement

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

WORK METHOD STATEMENT STRUCTURAL STEEL

Safety Management Plan

Management of risk. Definition of terms. Managing risks. Risk

(Health, Safety, and Welfare)

Risk Management Guide

Safe Work Method Statement

LONE WORKING HEALTH AND SAFETY GUIDANCE

Hazard Management Making your workplace safer

University Safety Policy Supplement

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

To comply with the OHS Act, the responsible manager must carry out and document the following:

Generic Health and Safety Risk Assessment

Swim Ireland Risk Assessment Guidance Document for Clubs and Regions

Industry Code: Alberta Small Employer OHS Legislated Requirements

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

WORK METHOD STATEMENT CARPET LAYING

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Work Health and Safety Risk Management Procedures

FIRE HYDRANT TESTING METHOD STATEMENT.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

CONTRACTOR SAFETY INDUCTION HANDBOOK

Accident/Incident Reporting and Investigation Procedures

SAFE WORK METHOD STATEMENT Part 1

Employee: Branch Name: 2) Has Jobsite visit been conducted to gather details, and get photos? Yes/No

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

RISK ASSESSMENT RECORD SHEET

STFC QUANTITATIVE RISK ASSESSMENT PRO-FORMA

Accident /Incident/Injury Report & Investigation Form

Building 21 Roof Safety Assessment. Multi Story Building with large metal roof areas Exteral access required for window cleaning UOW01613

Risk assessment (all vessel types)

SAFETY MANAGEMENT SYSTEM

Risk Assessment. Appendix A contains

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

Working Near, On or Above Water

Work at height Policy

SAFETY MANAGEMENT SYSTEM

SOAS LONE WORKING GUIDANCE

Company Name: Address: ABN: Company Contact: Position: Phone No.: Date SWMS provided to Principal Contractor: Principal Contractor Signature: Date:

Risk Assessment Code of Practice

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

Contractor / Exhibitor Handbook

SAFETY MANAGEMENT SYSTEM

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Type: Policy. Working at Heights Policy. Register No: Status: Public. Developed in response to: Work at Height Regs 2007

Work At Heights Toolkit. for Supervisors

Abseiling Risk Management Plan Lutanda Yarramundi

Safety in Precast Erection

Potential hazards People at risk and how? Actions already in place Further action required Action by

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

HS26 Working at Height Policy and Procedure

Health & Safety Plan `

Building 43 Roof Safety Assessment

Risk Assessment Form

Risk Assessment Generic

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

Risk Assessment Examples

Harbour Town Gold Coast Site Induction

Working safely in an engineering environment

RISK ASSESSMENT POLICY

2.0 Management Systems and Documentation

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

How severely could the risk hurt someone? Low/Insignificant First aid

Contractors' Code of Safe Practice

Procedure: Work health and safety hazard management

Rock Climbing Risk Management Plan Lutanda Yarramundi

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

LADDERS FIXED AND PORTABLE

WORKPLACE SAFETY INSPECTIONS TABLE OF CONTENTS INTRODUCTION...2 OBJECTIVE...2 REFERENCES...2 PREREQUISITES...2 PRECAUTIONS...2 CHECKLISTS...

Chinthurst Preparatory School

Transcription:

ROOF ACCESS AUDIT SPRING 2017 The Contractor is to check and verify all information provided and is to undertake their own risk assessment and check building site dimensions etc., before work starts. The Contractor is to comply in all respects with current Health and Safety Legislation, Building Legislation, British Standard Specifications, Building Regulations, Construction (Design & Management) Regulations, Party Wall Act, etc. whether or not specifically noted in any information provided by the University. The information provided in this document must be read with and checked against any safety, structural, geotechnical or other specialist documentation provided. This document is not intended to be used as a risk assessment or any plan of works. Each area where work is to be undertaken must be investigated by the Contractor. A suitable and sufficient risk assessment and plan of works should be produced and communicated to all operatives before work starts. Campus Building Moulsecoomb Campus Advance Engineering Centre Lewis Road, BN2 4GJ Access Point Access is via 1 st floor corridor, and stainless steel vertical ladder Risk Assessment Yes Ref no. EFM-RRA-01-01 Date 28 April 2017 Risk Rating Edge Protection Type Risk of Fall General Works Frequency Fragile Surfaces Key access Access Route Medium Level West lower site: Galvanised steel adjustable handrail West site: Galvanised steel adjustable handrail East site: Wall protection Middle top roof: 400 mm parapet wall & man safe fall arrest system Medium Drain cleaning, minor maintenance works, equipment maintenance Twice a year or when is required Sky lights - toughened glass guardrail installed at smoke vent skylights From the main entry staircase or lift is available to access the 1 st floor where steel stairway in school plant room will lead to the upper floor building services plant room. Access doors to north and south roofs Obvious Hazards Identified 1. Roof surface slippery when wet or covered with frost & ice. 2. Middle roof area protected with only 400 mm wall (man safe fall arrest system in place). 3. High lone working risk suitable control & communications measurements must be in place before work commences. 1

Point of entry: 1.1 Comment West top roof elevation. Door access located inside the main plant room top floor. Step of.mm high Roof area photographs: 2.1 2.2 Comment West top roof Flat roof with galvanised folding guardrail around the edges and skylight smoke vents. 2

3.1 West lower roof no permanent access provided, Ladder need to be provided by the worker accessing the roof. 4.1 4.2 East elevation Access located inside the main plant room top floor (2x access doors available). Roof protected with around 3 000mm wall. Access to the middle roof available via galvanised vertical ladder. 3

5.1 5.2 Middle roof top 400mm parapet wall, man safe fall arrest system provided. Describe the roof area: Floor type. Structural build-up and condition Roof lighting Overhead hazards Trip & Slip hazards Type of plant & equipment Other Hazards Other useful information Rubber roof, single ply membrane( insulation) Designated slip resistant walkways provided. None None identified Might be slippery when wet. Ice formation in winter. Chiller High winds, Seagulls, frost & ice Roofs permit and risk assessment required. Lone working controls required Actions required Item Action required By who By date Access roof sign Signs needs fitting on the access doors to the roof - phone number Neil Hart-White 11 October 2017 need to be written down. 4

5

ROOF ACCESS - GENERIC RISK ASSESSMENT Any work on a roof that gives rise to significant risk must be risk assessed by the respective contractor or line manager. Any person accessing a roof to work must review the roof profile document and ensure that they have the right equipment and processes to work safely on the roof. If in doubt, stop work and contact the FM Site Manager. Their number is included the University Contractor Generic Site Induction. Otherwise contract the FM emergency helpline on Tel: 01273 642222. Risk rating: Likelihood Severity Low = 1 3 Rare 1 Insignificant Moderate = 4 7 Unlikely 2 Minor Significant = 8-14 Possible 3 Moderate High = 15-19 Very likely 4 Major Very High = 20-25 Certain 5 Fatal/Catastrophic Please refer to full risk rating guidance located at the end of risk assessment. State the HAZARD and the harm or loss that could result Lone working - sudden illness, accident Persons at risk Suggested Controls University staff, contractors or any other party who lone works on a roof must have lone working procedure and necessary communication equipment in place. Sign in and sign out with duty caretaker. Inform your supervisor you are lone working and agree a call-back time. Do not undertake heavy lifting or high risk work if alone arrange for a colleague or university staff to assist. Risk Rating after suggested controls applied. Seve rity Likely hood Risk 2 1 2 6

State the HAZARD and the harm or loss that could result Becoming trapped on roof during emergency e.g. fire Falling from the roof Fragile Surfaces Unguarded edges Fall from height resulting in a fatality, serious or moderate injury. Poor visibility Slips, trips and falls Injuries such as dislocations, bruising, strains and sprains, head injury. State the HAZARD and the harm or loss that could result Persons at risk Suggested Controls accessing the roof area. accessing the roof During noisy work ensure there is a fire watch and the alarm can be heard as you may be wearing hearing protectors. In the event of a fire if it is not possible to re-enter the building then remain on the roof and call the emergency rescue services. For long duration work please ensure you have an emergency evacuation plan. Before you start work on a roof familiarise yourself with the access and egress points and any additional emergency escape routes. Some roofs have vertical escape ladders which are accessible by opening a roof hatch. Review the respective roof profile document desktop study of information provided by EFM. Assess edge protection and fragile surface type and location. If no edge protection (parapet wall or guardrail of sufficient height) then assess suitability of any man-safe system or eye-bolts / Anchor points and ensure you have the right equipment and training to proceed. Inspect the roof surface from a safe distance for hazards prior to commencing works. Keep 3 meters away from any unguarded roof edge if you are not harnessed to a safe working system. No work is to be carried out in low light or in hours of darkness. Provide lighting when required ensuring access and egress points are sufficiently illuminated. The permit issuer is to consider working conditions and agree lighting requirements with the contractor/staff. Persons at risk Suggested Controls Risk Rating after suggested controls applied. Seve rity Likely hood Risk 2 1 2 3 1 3 2 1 2 Risk Rating after suggested controls applied. 7

Seve rity Likely hood Risk High winds Materials blown off roof Persons being struck by flying objects Hypothermia in winter months Work is generally not permitted during adverse weather conditions. Check the weather forecast in advance and plan accordingly. A dynamic risk assessment should be made by the staff / contractor on the day of work taking into the consideration weather conditions and type of work undertaken, especially lifting operations. Sheet materials must be fixed securely or not brought onto the roof during windy conditions they can be blown off roofs and cause fatalities at ground level. 3 1 3 Ice and heavy rainfall Slips on ice or in pooled water Injuries such as dislocations, bruising, strains and sprains, broken bones Work is generally not permitted during adverse weather conditions. Ask the FM Site Manager to de-ice or drain down roof areas before starting work. 2 1 2 Uneven surfaces and changes in level. Trips and falls; Injuries such as dislocations, bruising, strains and sprains, broken bones, head injury Electric shock from coming into contact with live services May cause heart failure and burns A dynamic risk assessment should be made by the contractor for uneven surfaces and changes in level before bringing any heavy equipment and starting the work. Isolate for safe working LOTO applies. Test for dead using HSE recommended methods and suitable equipment. Visually inspect wiring and connectors for obvious defects prior to commencing works. If in doubt seek assistance from site electrician and report to contract manager. Avoid contact with exposed unknown electrical conductors 3 1 3 4 1 4 8

State the HAZARD and the harm or loss that could result Persons at risk Suggested Controls Risk Rating after suggested controls applied. Seve rity Likely hood Risk Bird droppings Slips, Psittacosis, illness Permit issuer is to advise operatives of their responsibility for inspecting the work areas prior to commencing works. Contaminated areas must be reported to the FM Site Manager who shall arrange for cleaning, disinfected with biocide and bird control measures. Do not inhale dust from dry bird droppings wear respiratory protection FFP3 as a minimum. Wear gloves and disinfect affected clothing following contamination. 3 1 3 Attack by Seagulls / Nesting Birds Bites, panic attack, disorientation which may result in a fall from height. It is unlawful to disturb nesting birds without permission from Natural England. Contracted clearance of nesting sites is undertaken where there is a specific identified problem. Roofs near to the sea shore are likely to have nesting seagulls and attacks are likely. Head and eye protection should be worn in such circumstances and consider long sleeved clothing. The presence of food while on the roof as this will increase likelihood of attack. 3 1 3 Fear of Heights Vertigo, Panic attack, fall from a height Failure of fall arrest system or eye bolt. Fatality, broken bones, If you don t have a head for heights then you may not work alone on our roofs. Review the respective roof profile document and plan your work accordingly, avoiding situations that may make you feel unwell. The fall arrest equipment is installed and tested annually by a professional contractor. Operatives must ask to verify the equipment certificate before use. If any item of equipment does not have a current inspection test date on it do not use it. 4 1 4 4 1 4 9

head injury Damaged Guardrails Fatality, broken bones, bruises Before commencing work always check that the guardrail is securely fixed. Report any loose bolts and any failures or damages to guard rails. Do not work against guardrails that are loose, missing or broken. 5 1 5 Algae growth Slips dislocations, bruising, strains and sprains, broken bones, Skylights & North Light Windows Fragile Glazing Falls from height Fatality or significant injury Operatives to inspect the access and egress routes and work areas prior to starting work. Before carrying the works the algae should be reported to the FM Site Manager and be removed from the area prior to work starting Ensure footwear is suitable for slippery surfaces. All Skylights and North Light Windows are to be considered and treated as fragile glazing/surfaces. Working alongside unguarded Skylights an glazing is not permitted keep at least 3 meters away or use a man-safe harness system to safeguard against falling from a height. 5 1 5 5 2 10 10

Severity 1 Insignificant 2 Minor 3 Moderate 4 Major 5 Fatal Catastrophic Likelihood 1 Rare 2 Unlikely 3 Possible 4 Very Likely 5 Certain Identifiable. No Injury. Only one person affected. No disruption to University. Financial cost less than 100. It is unlikely that any injury or loss will be realised but should it be then then the impact shall be minor and perhaps First Aid treatment may be required. No permanent Injury. Less than 3 people affected. Student concern. Litigation unlikely. Financial cost less than 1,000. Minor Injury, illness or loss: Injuries that require no first aid or treated by a first aider: i.e. Cuts- Bruising, Scalds, Skin Irritations, Headaches etc. Minor damage to premises, equipment or machinery. Semi-permanent. Over 5 day injury. Greater than 3 but less than 50 people affected. Local adverse publicity for the University. Student complaint. Litigation possible. Financial cost less than 10,000. Fracture of Digits, Ribs, Wrist, Ankle, Arm, Leg etc. Puncture Wounds to Eyes. Dislocations. Severe Burns. Moderate damage to premises equipment or machinery requiring extensive repair. Long Term Injury or ill health. Greater than 50 people affected. National adverse publicity. Litigation highly probably. Temporary closure of University services. Financial cost less than 100,000. Life Changing Injury or major injury, illness or loss. I.e. Fracture of Pelvis, Hip, Tibia, Spine - Poisonings - Amputation of Leg or Arm - Permanent Loss of Sight or Hearing etc. Major repair or demolition of premises required. Replacement of equipment or machinery required at significant expense. Death in the workplace. Greater than 200 people affected. International adverse publicity. Multiple student complaints/demonstrations. Extended closure of University services. Financial cost more than 100,000. Cannot believe this type of event will happen again in the foreseeable future. Not expected to occur given existing controls. This type of event is unlikely to happen again, remote chance. Not expected to occur, except in exceptional circumstance given existing controls. This type of event may happen again occasionally. Could occur given existing controls. This type of event may happen again (50/50 chance). Will probably occur given existing controls. This type of event will happen again (an everyday occurrence). Will occur given existing controls. 11

Risk Matrix Rare 1 Severity of Potential Harm Insignificant Minor Moderate Major Fatal/ Catastrophic 1 2 3 4 5 1 2 3 4 5 Unlikely 2 2 4 6 8 Likely 3 3 6 9 12 10 15 Likelihood Very likely 4 4 8 12 16 Certain 5 5 10 15 20 Risk Rating Management Actions This is a tolerable risk. However, prescribed control measures must be implemented and these should normally incur minimal cost, time or 1, 2 & 3 effort. 4, 5 & 6 8, 9, 10 & 12 15 & 16 20 & 25 This is a tolerable risk but additional control measures may be introduced according to the priorities of the tasks being undertaken/in hand. This risk is generally intolerable. Efforts must be made to reduce the risk so far as is reasonably practicable. Where the risk is associated with extremely harmful consequences, further assessment may be necessary to establish more precisely the likelihood of harm as a basis for determining the need for improved control measures. This type of work generally requires a Permit to Work. THIS RISK IS INTOLERABLE. Only in exceptional circumstances under a Permit to Work and with additional written permission of Senior Management may work commence or continue. The risk should, if possible, be reduced to at least a tolerable level. Where such unforeseen risk arises whilst work is underway, urgent action needs to be taken. Stop work if safe to do so and refer to Senior Management. Revise control measures and methods of working to reduce the risk to a tolerable level. Commence again with caution. THIS RISK IS INTOLERABLE AND SUCH WORK IS GENERALLY PROHIBITED. If it is not possible to reduce the risk then special controls and supervision must be introduced. Specialist advise, equipment and supervision is required. The EFM Director and the contractors Managing Director must agree in writing to the work being undertaken. 20 25 Audited by Aneta Knap EFM Safety Assistant Accompanied by Campus EFM staff: Edwin Underwood (H&S Manager) & Neil Heard-White (contractor) Date: 15 April 2017 12