City of Los Angeles CALIFORNIA

Similar documents
City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA. Traffic and Safety Assessment

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

4.3 LAND USE AND PLANNING

PEDESTRIAN ACTION PLAN

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Chapter 8.0 Mitigation Monitoring and Reporting Program

SANTA MONICA BOULEVARD CORRIDOR

Chapter 3 BUS IMPROVEMENT CONCEPTS

PEDESTRIAN ACTION PLAN

IV. Environmental Impact Analysis B.3 Pedestrian Circulation and Bicycle and Pedestrian Safety

RECOMMENDATION REPORT

Metro Bike/Bus Interface Study

5. RUNNINGWAY GUIDELINES

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

Metro Bike Program. Westside/Central Metro Service Council Meeting Wednesday, November 13, :00 7:00 pm

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

C C C

San Jose Transportation Policy

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Addendum to Mitigated Negative Declaration

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Welcome. If you have any questions or comments on the project, please contact:

Polk Streetscape Project

Welcome to the Sellwood Bridge Project Open House!

COMMUNITY MEETING AGENDA

City of Los Angeles CALIFORNIA

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

City of Seattle Edward B. Murray, Mayor

Chapter 3 Transportation

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

CITY OF LOS ANGELES CALIFORNIA

TRANSPORTATION COMMISSION Agenda Staff Report

Richmond-Adelaide Cycle Tracks

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Active Transportation Facility Glossary

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Bay to Bay Boulevard Complete Streets Project

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Central Avenue Bikeway Traffic and Safety Impact Assessment

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

5.13 PEDESTRIAN SAFETY

Non-Motorized Transportation 7-1

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

City of Davis East Covell Corridor Plan

3.0 PROJECT DESCRIPTION

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Feasibility Study. Expo-Downtown Bicycle Connector

Broadway Complete Streets Project

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

ALLEY 24 TRAFFIC STUDY

Chapter 3: Multi-Modal Circulation and Streetscapes

Lincoln Neighborhood Corridor Plan The LiNC

Ocean Park Boulevard Green Street Project Community Workshop

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

CURBSIDE ACTIVITY DESIGN

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Cycle Track Design Best Practices Cycle Track Sections

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

RECOMMENDATION REPORT

St. Francis Drive through the City of Santa Fe Corridor Study

Project Status Update

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

4.2 LAND USE AND PLANNING

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Omaha s Complete Streets Policy

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome! San Jose Avenue Open House August 25, 2015

DISTRICT BICYCLE PROGRAM

BEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018

STONY PLAIN ROAD STREETSCAPE

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

4. Mobility and Transportation Element. Page Bikes and Pedestrians

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

Why invest in the 1 Street S.W. Corridor?

Orange Center Elementary School

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

CITY OF Los ANGELES CALIFORNIA

What Is a Complete Street?

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Broad Street Bicycle Boulevard Design Guidelines

The Traffic Monitoring Guide: Counting Bicyclists and Pedestrians. APBP 2017 June 28: 11:15am-12:45pm

IV. ENVIRONMENTAL IMPACT ANALYSIS K. TRAFFIC AND TRANSPORTATION

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Transcription:

DEPARTMENT OF CITY PLANNING 00 N. SPRING STREET, ROOM 55 LOS ANGELES, CA 9001-4801 AND 66 VAN NUYS BLVD., SUITE 351 VAN NUYS, CA 91401 C CITY PLANNING COMMISSION WILLIAM ROSCHEN PRESIDENT REGINA M. FREER VICE-PRESIDENT SEAN O. BURTON DIEGO CARDOSO GEORGE HOVAGUIMIAN JUSTIN KIM ROBERT LESSIN BARBARA ROMERO MICHAEL K. WOO - JAMES WILLIAMS COMMISSION EXECUTIVE ASSISTANT II (13) 978-1300 City of Los Angeles CALIFORNIA Antonio R. Villaraigosa MAYOR EXECUTIVE OFFICES MICHAEL J. LOGRANDE DIRECTOR (13) 978-171 ALAN BELL, AICP (13) 978-17 LISA WEBBER, AICP (13) 978-174 EVA YUAN-MCDANIEL (13) 978-173 FAX: (13) 978-175 INFORMATION www.planning.lacity.org June 8, 01 Notice of Preparation of an Environmental Impact Report And Public Scoping Meeting EIR Number: ENV-01-1470-EIR Project Name: Notice of Preparation (NOP) of an Environmental Impact Report (EIR) for the 010 Bicycle Plan - First Year of the First Five-Year Implementation Strategy and the Figueroa Streetscape Project Project Location: Citywide (see Figure 1) Council District: Citywide Due Date for Public Comments: July 30, 01 The City of Los Angeles Department of City Planning (Lead Agency) will prepare an EIR for the proposed City of Los Angeles 010 Bicycle Plan-First Year of Five Year Implementation Strategy and the Figueroa Streetscape Project (proposed project). This NOP is being distributed to applicable responsible agencies, trustee agencies, and interested parties as required by the California Environmental Quality Act (CEQA). Comments from interested parties are requested as to the scope and content of the environmental information that is pertinent to each agency s statutory responsibilities in connection with the proposed project. Project Characteristics: The proposed projects consist of the following: 1. First Year of the First Five-Year Implementation Strategy; and. Figueroa Corridor Streetscape Project a project centered around separated bike lane and facilitating pedestrian activity on a three-mile stretch of South Figueroa and adjacent streets around the Staples Center. Both projects are described in more detail below. Bicycle Plan: First Year of the First Five-Year Implementation Strategy This proposed project would include the implementation of over 40 miles of projects (see Table 1 below). Not included in the project are bikeways that are planned to proceed based on the previous Mitigated Negative Declaration i.e. bicycle lanes that are not anticipated to result in any significant adverse impacts. Types of treatments being considered under the proposed project include bicycle lanes (protected bike lanes as part of the My Figueroa project) and reconfiguration of roadway striping as necessary and would in general include the loss of one or more vehicular travel lanes. In addition to, and in some cases as an alternative to the loss of vehicular travel lanes, loss of existing parking lanes could occur where applicable. The proposed project consists of new bicycle lanes that would be striped along existing City of Los Angeles streets within existing rights-of-way as identified in Figure 1. Installation of the bicycle lanes is anticipated to take less than 1 months and would begin sometime in 01 or 013. Implementation of the proposed project would create a greater network of connectivity and would help meet the goals of the 010 Bicycle Plan. Implementation of the proposed project would not change existing access. As described above, some loss of existing street parking lanes could occur.

TABLE 1: BICYCLE PLAN -- FIRST YEAR OF THE FIRST FIVE YEAR IMPLEMENTATION STRATEGY Street Limits Length (miles) Area/Connection Venice Blvd. San Vicente Blvd. to Main St. 3.9 City Center South Lankershim Blvd. Cahuenga Blvd. to Chandler Blvd..4 Universal Cahuenga Blvd. W Lankershim Blvd. to Pilgrimage Bridge.3 Universal Cahuenga Blvd. E Pilgrimage Bridge to Odin St 0.3 Universal Caesar E Chavez Ave. Figueroa St. to Mission Rd. 1.3 Hollywood to Alhambra Mission Rd. Cesar E. Chavez Ave. to Soto St..4 Hollywood to Alhambra 7 th St. Figueroa St. to Soto St..9 City Center South Vermont Ave. Venice Blvd. to Wilshire Blvd. 1. City Center South Martin Luther King Jr. Blvd. Marlton Ave. to Figueroa St. 3. City Center South N. Figueroa St. San Fernando Rd. to Colorado Blvd. 5.1 Northeast S. Figueroa St. 7 th St to Martin Luther King Jr. Blvd. 3.0 Southeast Westwood Blvd. Santa Monica Blvd. to National Blvd. 1.6 Westside Bundy Dr. San Vicente Blvd. to Stanwood Dr. 3. Westside Centinela Ave. Stanwood Dr. to Culver City limit at Washington Pl. 1.3 Westside Sepulveda Blvd. National Blvd. to City/County limit (N/O Ohio Ave.).1 Westside Ave. of the Stars Pico Blvd. to Santa Monica Blvd. 1.0 Westside Colorado Blvd. Glendale City limit (00 e/o Lincoln Ave.) to Ave 64 3.0 Northeast Woodley Ave. Stagg Street to Chase St. 0.8 Valley Devonshire St. Haskell Ave. to Sepulveda Blvd. 0.4 Valley nd St. Beverly Blvd./Glendale Blvd. to Broadway St. 1.0 Central City Grand Ave. Washington Blvd. to 30 th St. 0.7 South Virgil Ave. Santa Monica Blvd. to Melrose Ave 0.5 Hollywood Source: City of Los Angeles, LADOT Figueroa Corridor Streetscape Project ( My Fig ) Total 43.3 The Figueroa Corridor Streetscape Project includes a combination of one way bike paths (in the direction of adjacent traffic) within the existing roadbed and next to the curb, separated from vehicular traffic lanes by physical barriers, and standard bike lanes with painted buffers along a 3-mile stretch of Figueroa Street through Downtown and South Los Angeles from 7th Street to Martin Luther King Jr. Blvd. Vehicular travel lanes would be reduced where necessary to incorporate these facilities within the existing curb-to-curb roadbed, and to maintain safe and efficient operation for all users. This project would also include a one-way westbound bicycle facility (along six blocks of 11th Street in Downtown Los Angeles from Broadway to Figueroa Street). The Downtown LA Streetcar project, as currently envisioned, includes track service on both 11th Street and Figueroa Street. The bicycle and streetscape facilities of My Fig would coexist with the streetcar where applicable. Though the existing vehicular travel lanes would be reduced where necessary to incorporate the bicycle facilities, the existing northbound peak period bus lane would be retained. Where one-way bike paths within the existing roadbed are installed and operation allows for it, outboard bus platforms would be constructed between the bike path and travel lanes to facilitate boarding and alighting of passengers without requiring buses to cross or block the bike path.

The one way separated bike path facilities as part of My Fig would also include modified traffic signals to provide separate bike signal heads combined with two-stage left turn queuing space at signalized intersections to allow bicyclists to safely turn left from Figueroa onto perpendicular streets. Demarcations, using colored paint and signage, will be provided through intersections and conflict zones, such as driveways or at other potential bicycle/vehicle and bicycle/pedestrian mixing areas. Bill Robertson Lane, from Exposition Boulevard to Martin Luther King Jr. Boulevard will remain two way, with one travel lane in each direction. Bike lanes with a painted, striped buffer will be provided northbound and southbound on Bill Robertson Lane. On-street parking on the west side of Bill Robertson opposite the Roy A. Anderson Recreation Center between Leighton Avenue and Martin Luther King Jr. Boulevard would be retained. Where possible, a sidewalk extension on the east side of the street is proposed to create the more generous pedestrian promenade imagined in the Exposition Park Master Plan. Streetscape Improvements: The project proposes streetscape improvements, including pedestrian scale street lighting, street trees and planting areas (which could manage and cleanse stormwater from the roadway), repaired sidewalk paving and enhanced paving at transit stops, enhanced crosswalk treatments (using materials such as Streetprint), transit furniture, and public art. The proposed project is intended to provide similar pedestrian scale improvements such as lighting, street trees, enhanced crosswalks, and art on 11th Street, Bill Robertson Lane and Martin Luther King Jr. Boulevard. Access: Access to transit vehicles would be provided by curb ramps from the sidewalk to ADA accessible bus platforms outboard of the bicycle lanes in the street. Transit waiting areas would be accommodated at existing bus stops on the sidewalks, with the bus platforms primarily for passenger boarding and alighting from transit vehicles. In constrained areas of the corridor, where on street parking cannot be accommodated, or does not exist now, busses would load from the curb, as usual. Issues to Be Addressed In the EIR: Based on the project description, Initial Study, and the Lead Agency s understanding of the environmental issues associated with the proposed project, the following topics have tentatively been identified to be analyzed in detail in the EIR: Air Quality Land Use and Planning Noise Traffic and Parking Alternatives to be analyzed in the EIR will be defined based on their potential to reduce or eliminate significant environmental impacts associated with the proposed project. The specific alternatives to be evaluated in the EIR may include, but are not limited to, the No Project alternative as required by CEQA and alternative land use configurations. Submittal of Written Comments: The Lead Agency solicits comments regarding the scope, content and specificity of the EIR from all interested parties requesting notice, responsible agencies, agencies with jurisdiction by law, trustee agencies, and involved agencies. Please send your written/typed comments (including a name, telephone number, and contact information) to the following: David Somers, Citywide Section Department of City Planning 00 N. Spring Street, Room 667 Los Angeles, CA 9001 Phone: (13) 978-3307 Fax: (13) 978-1477 E-Mail: david.somers@lacity.org Because of time limits mandated by state law, written comments must be provided to the City of Los Angeles at the earliest possible date, but no later than 5:00 p.m. on July 30th. 3

STAGG ST CHANDLER BLVD RIVERSIDE DR COLORADO ST PILGRIMAGE BRIDGE ODIN ST MELROSE AVE WASHINGTON BLVD PICO BLVD CRENSHAW BLVD MARLTON AVE ADAMS BLVD EXPOSITION BLVD FIGUEROA ST BROADWAY SOTO ST 118 DEVONSHIRE ST 10 HASKELL AVE SEPULVEDA BLVD WOODLEY AVE CHASE ST 170 710 BARHAM BLVD LANKERSHIM BLVD 101 134 5 CAHUENGA BLVD W SAN FERNANDO RD VENTURA BLVD COLORADO BLVD 101 CAHUENGA BLVD E 405 N FIGUEROA ST 110 VIRGIL AVE BEVERLY BLVD AVENUE OF THE STARS VERMONT AVE CESAR E CHAVEZ AVE ND ST MISSION RD GLENDALE BLVD SANTAMONICA BLVD SOTO ST WILSHIRE BLVD SEPULVEDA BLVD WESTWOOD BLVD PICO BLVD VENICE BUNDY DR 10 7TH ST S FIGUEROA ST GRAND AVE 10 60 SAN VICENTE BLVD OHIO AVE SAN VICENTE BLVD NATIONAL BLVD SANTA MONICA BLVD 30TH ST VENICE BLVD STANWOOD DR CENTINELA AVE MARTIN LUTHER KING JR BLVD 710 110 LEGEND: Approx. Scale Bicycle Lane My Figueroa Streetscape Project City of Los Angeles N WASHINGTON PL SOURCE: ESRI and TAHA, 01. taha 011-068 First Year of the First Five-Year Implementation Strategy and Figueroa Streetscape Project Notice of Preparation CITY OF LOS ANGELES DEPARTMENT OF CITY PLANNING 0 1.7 3.4 Miles FIGURE 1 PROJECT LOCATIONS