UK ASBESTOS TRAINING ASSOCIATION GUIDANCE

Similar documents
Syllabus for Licensable Work with Asbestos (Category C)

Introduction. B1) Initial training with NO previous asbestos awareness training undertaken;

SOUTHBANK PLACE Asbestos Removal (Brief Guide)

New Licensed Asbestos Operative Training

New Licensed Asbestos Manager Training

Refresher Licensed Asbestos Supervisor Training

SYLLABUS RESPIRATORY PROTECTIVE EQUIPMENT COMPETENT PERSON

Estates & Facilities Management - Management and Control of Asbestos Policy and Procedures

Site Details. Comments / Corrective Actions Required. Preliminary Requirements Y N N/A SITE MONITORING PROCEDURE ASBESTOS AUDIT FORM.

Level 4 Certificate in Asbestos Removal for Contract Managers

Rainham Industrial Services Ltd. Plan of Works

Asbestos Management Plan

ARCA Guidance Note. Guidance on Air Management in Asbestos Enclosures

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

PLAN OF WORK. Site Address Block 1 4 to 21 Fountain Place Brixton Lambeth SW9 7RE INDEX

UNIT TITLE: CLEAN PUBLIC AREAS, FACILITIES AND EQUIPMENT NOMINAL HOURS: 60 hours

2.0 Management Systems and Documentation

Unit Title: Health and Safety in a Construction Environment

New Asbestos Analyst Guide

BHC-P-07.2 Health Hazards in Construction

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

OPERATIONAL GUIDELINE P R O C E D U R E

Bitumen Delivery Driver Inductions Eurobitume UK

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

Asbestos Regulation and Compliance

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks

Electrical Safety (Portable Electric Equipment) Policy

Asbestos Management Plan

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

STA Level 2 Award for Pool Lifeguard

Contractor handbook. Purpose

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

ASBESTOS STANDARD SYSTEMS OF WORK

Working with Rolled Lead Sheet in construction. A guide to health, safety and environmental care.

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

Abrasive Blasting Removal Systems

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Safety Office. Reviewed: 17 July 2012

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

FIRST-AID BOX CONTENTS

Page 1 of 5 Issue date: June 2013

Asbestos Operations and Maintenance Plan

SAFETY AND HEALTH IN THE USE OF CHEMICALS AT WORK

Quest Operations 4 Health and Safety Declaration Guidance Notes Issue 10 - October 2016

Qualification Specification. STA Level 2 Award in Safety Award for Teachers Y T. Version 18.1

Material Safety Data Sheet Conforms to ISO 11014: 2009

RYA BERTH HOLDERS CHARTER GUIDANCE NOTES FOR. Marina Berth Holder Associations and Marina Operators

CSU Channel Islands Lead Operations and Maintenance Program

Occupational Health and Safety. Bulletin. Asbestos Containing Materials in Buildings to be Demolished. Superseded

Fire Escape Hood OPERATION AND INSTRUCTIONS

Working safely in an engineering environment

July 2017 Issue 12 Operations 4 Compliance Declaration Guidance Notes Page 1 of 10

Guide Asbestos Regulations 2001

Health, Safety and Welfare Policy

Health and Safety Inspection Procedure

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

SKAPP02. Deal with substances hazardous to health. Overview

Lead Exposure Control Plan

Maintaining electrical equipment/systems

Material Safety Data Sheet

Chapter 2.7 Bylaw sport governance and management

HS26 Working at Height Policy and Procedure

Approved Code of Practice

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

Non-domestic meter installations

1 ASBESTOS CEMENT PIPE CUTTING AND HANDLING

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

(Health, Safety, and Welfare)

IGEM/SR/4 Edition 3 Communication 1752 Variable volume gasholders storing lighter than air gases

Contractor / Exhibitor Handbook

Exposure Control Plan for Drilling/Grinding Concrete

Material Safety Data Sheet

Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels

Health, Safety and Environment Induction. Section 1: Introduction. Section 1: Introduction. Aims & Objectives of the induction MGJV

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

PRODUCT HEALTH AND SAFETY DATA

Health & Safety Product Data Sheet

To comply with the OHS Act, the responsible manager must carry out and document the following:

STA Level 3 Award in Pool Plant Operations

FIRST AID POLICY NOVEMBER 2017

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

In addition to the responsibility for managing the elements of the respiratory protection program, he/she will be responsible for:

ProBor 20 Gel HSE: 6847

Firebreak Flexi-Seal Coating Material Safety Data Sheet

CHAPTER 39: SILICA AWARENESS

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

Laboratory Self Inspection Checklist LAB01

T: E: W: Health Safety Quality Environment. Online training courses

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

SAFETY DATA SHEET COLRON REFINED BEESWAX

CONTENTS INSTRUCTIONS SET SAFETY. Optimum Temperature Dwell Time Re-application Removal + Cleanup

Health & Safety Contractor rules

Palm Beach State College. Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN

Electrical Equipment Protocol

R2D2P. Working group report

Control of Substances Hazardous to Health

Hazardous Materials Spill Response

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING

WILL NOT DISTURB ASBESTOS CONTAINING MATERIAL!

Transcription:

UK ASBESTOS TRAINING ASSOCIATION GUIDANCE MINIMUM STANDARDS FOR TRAINING CENTRES Document No: MG003 Issue Date: 18/09/2017 Issue No: 01 UK Asbestos Training Association Limited / MG003 / Page 1 of 5

MINIMUM STANDARDS FOR TRAINING CENTRES GUIDANCE Contents Title Page No Definitions 3 Introduction 4 Delegate minimum standards 4 5 Practical training area Licensable & Non-Licensable training only 5 Equipment and required standards 5 UK Asbestos Training Association Limited / MG003 / Page 2 of 5

DEFINITIONS In this Guidance, unless the context otherwise requires: Approved Training means the delivery of training by a Tutor who has met the required standards for training; Association means UK Asbestos Training Association Limited; Asbestos Awareness Training means training for those persons who are liable to disturb asbestos whilst carrying out their normal everyday work, or who may influence how work is carried out, or other such similar wording that has the same meaning under current UK legislation; Dedicated Training Centre means the premises owned or leased by a Member to deliver Non- Licensable and/or Licensable training; Guidance means codes of practice or other recommendation made by the Association which are supplemental to the Rules, but in the event of any conflict between the Guidance and the Rules, the Rules take precedence; Licensable Member means a Member approved by UKATA to deliver training for Licensable Work with Asbestos and may also deliver training for Non-Licensable Work with Asbestos and Asbestos Awareness training. Licensable Training means training for those working with asbestos which is Licensable, such as removing asbestos insulation or insulating board, or other such similar wording that has the same meaning under current UK legislation; Member means an organisation, company, individual who has satisfied the criteria of membership; Non-Licensable Member means a Member approved by UKATA to deliver training for Non- Licensable Work with Asbestos and may also deliver Asbestos Awareness training, but not training for Licensable Work with Asbestos; Non-Licensable Training means training for those who undertake planned work with asbestos which is not Licensable, such as refurbishment or demolition work involving Non-Licensable asbestos containing materials or analytical staff and asbestos surveyors, or other such similar wording that has the same meaning under current UK legislation; UKATA means UK Asbestos Training Association Limited; UK Asbestos Training Association Limited / MG003 / Page 3 of 5

INTRODUCTION 1. All UKATA Approved Training must be conducted in a suitable centre that meets the Minimum Standards for Training Centres. 2. Licensable Members and Non-Licensable Members must be able to demonstrate that they have their own Dedicated Training Centre to be able to offer this level of training, specifically for practical work. 3. Sections 6 10 apply to training centre minimum standards for delivering Asbestos Awareness training. 4. Sections 6 14 apply to training centre minimum standards for delivering Non-Licensable training and Licensable training. 5. Members who do not own a Dedicated Training Centre will be required to complete a thirdparty premises agreement which will be sent by UKATA. DELEGATE MINIMUM STANDARDS 6. Physical layout must be comfortable for delegates undertaking training. 7. Presentation equipment include as a minimum expectation: a) Digital projector; b) Screen/integrated systems; c) Flip chart; d) Video delivery media unit (if required). 8. Training facility must comply with all relevant Health and Safety Regulations: a) Building risk assessment; b) Induction material for delegates to include fire evacuation procedures and emergency planning; c) First aid facilities; d) Electrical PAT testing; e) Annual gas installation testing. 9. To provide satisfactory welfare provision that meets legal requirements: a) WC and hand washing facilities; b) Place to consume refreshments; c) Drinking water readily available; d) Adequate heating and ventilation. 10. Training facility to have relevant reference materials, including but not limited to: a) Health and Safety at Work Act 1974 etc; b) Management of Health and Safety Regulations 1999; c) The Control of Asbestos Regulations 2012; d) The Asbestos Licensed Contractors Guide HSG247; UK Asbestos Training Association Limited / MG003 / Page 4 of 5

e) L143 (second edition); f) All other asbestos guidance notes (contained in the HSE reading list); g) Hazardous Waste Regulations 2005. PRACTICAL TRAINING AREA LICENSABLE & NON-LICENSABLE TRAINING ONLY 11. The practical training area must be of a suitable size to allow: a) Construction of enclosures; b) Construction of air locks; c) Construction of bagging locks; d) All associated plant and equipment as necessary; e) Connection of the hygiene unit onto enclosure or transit route detailed (LW); f) Fully operational hygiene units which comply with HSG247 (chapter 8) preferably with viewing panels (LW). 12. Risk assessment for training areas EQUIPMENT & REQUIRED STANDARDS 13. Equipment required: a) Wetting unit with a variety of needles suitable for unit(s) or scope from TNA (LW); b) Spraying (unit) with associated attachments; c) Wetting agents; d) Absorbent and non-absorbent materials; e) Negative pressure units standard with all associated attachments e.g. roving heads, prefillers (DOP); f) A minimum of 2 x H type vacuums (DOP); g) Smoke machine; h) Materials to construct enclosures, airlocks and bag locks in accordance with HSG247; i) Polythene sheeting, adhesive tape, spray adhesive (after risk assessment), viewing windows. 14. Full range of tools to: a) Construct an enclosure, airlocks and bag locks; b) Facilitate removal of absorbent and non-absorbent materials; c) Enable cleaning down process of enclosure, air locks and bag locks; d) Disposable working coveralls range of sizes and colours (requirement to be Cat 5) BS EN 13189-1; e) Primary decontamination equipment buckets for water, sponges, brushes, rags or wipes; f) Decontamination equipment within hygiene unit, including shower gel, shampoo, nail brushes and towels (LW); g) Red, clear labelled asbestos waste bags; h) Electrical supply, cables etc; i) Suitable number of full face respirators (LW), with fully charged batteries, half masks and disposable masks. UK Asbestos Training Association Limited / MG003 / Page 5 of 5