List of Works. 450 MW Topside 25x40x20 metres, 2500 tonnes Jacket 30x30x55 metres, 1700 tonnes Piles 4 x 63 metres, 1050 tonnes

Similar documents
List of Works. Offshore High Voltage Substation 700 MW (2x350 MW) Topside

TRACK RECORD. First Mover. Burbo Bank Ext. - Tristan Stedman

TRACK RECORD FIRST MOVER. DEME: creating land for the future. Member of the DEME Group

TRACK RECORD SEP. 2018

E&P in the Netherlands: Past, Present and Future. Presentation to SPE NL 16/17 April 2007

A2SEA corporate presentation. Søren Rønnow Poulsen Key Account Manager, Scandinacia & Baltic

Development / installation of. permanent downhole capillary. injection facilities in gas wells with. sub-surface safety valves

Offshore Energy Årsmøde Offshore Wind Energy in Europe

Connecting wind energy THE OFFSHORE GRID IN THE NETHERLANDS

Offshore grid NL. Hollandse Kust (noord) & Hollandse Kust (west Alpha) General project introduction. 14 september 2018

TARPON A Minimal Facilities Platform

OFFSHORE WIND: A CRASH COURSE

Experience with the design, manufacture, test and commercialisation of the REpower 6M turbine

Setting up wind farms out at sea is a formidable

THE HORNS REV WIND FARM AND THE OPERATIONAL EXPERIENCE WITH THE WIND FARM MAIN CONTROLLER

Connecting to the Dutch high-voltage grid. How TenneT can help you

SCOUR AROUND OFFSHORE STRUCTURES - ANALYSIS OF FIELD MEASUREMENTS

REBO. wind terminal. Installation. Edition

L'éolien offshore: caractéristiques et mode de construction

Fleet status report 29 June 2018

Fleet status report 1 December 2017

Wind farm zone Borssele Project and Site Description 15 th December 2014

Dutch offshore wind energy developments:

3PO MECHANICS. There is one game, three referees, but still only one officiating team.

Preliminary Survey Notification and Information for Fisheries Interests.

SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology

Platelets & Plasma The Management of Unplanned Flow

OFFSHORE WIND ACCELERATOR (OWA) Access Competition. Competition Overview and Technical Specification

Kodiak Electric Renewable Energy Implementation. Colin Young System Engineer 4/26/2016

Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011

Offshore wind power in the Baltic sea

Construction. MCP-01: Construction to Decommissioning

Siri Caisson Permanent Support - A Unique Challenge


Barging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab

Elgin G4 Leak. 25 March 16 May 2012

Offshore Decommissioning: An Educational Opportunity

Minimal Structures for Marginal Nova Scotia Developments

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

3.9 MW-30JD Mooring Winch. Technical Parameter

Offshore Wind Energy in Germany Development and Outlook

REPORT DECISION. The scour protection shall be designed to avoid progressive collapse of scour protection edges.

Burbo Bank Extension Offshore Wind Farm

Dutch tender system and future perspectives. Ir. F.C.W. (Frank) van Erp. Roadmap towards 4,500 MW offshore wind power in the Netherlands

VISITORS WELCOME AND SAFETY BOOKLET XYZOIL GENERAL INFORMATION AND SAFETY GUIDELINES FOR VISITORS

OTC Figure 1: Field location map. Figure 2: Q4-C Gas production platform. Copyright 2004, Offshore Technology Conference

ASX Announcement. May 4, Carnegie Wave All Energy Presentation

Improvement in Release Frequencies for Quantitative Risk Assessment

Offshore wind in COWI

Rigless Cutting the Cost of Well Abandonments

SKIFF PS, BRIGANTINE BG & BR SEAFOX 4

/50/100 Pair. Protected Entrance Terminals

The Parliamentary Blades Project Newsletter

Seaflex SeaSerpent Overview Continuous Support for Cables.

22 November 2016 OFFSHORE WIND EUROPE. Offshore wind smashes $100/MWh. Tom Harries

WINDSPEED project: Assessing future offshore grid infrastructure

Alternative Installation Methods for. Offshore Wind Substations

WESTERMOST ROUGH. OffshOre Wind farm.

BASIC BROEN-LAB UNIFLEX LIFT/TURN VALVES FOR BURNING GASES

Regulations and safety instructions. Code of conduct for a safe passage through windfarms

Strategic Advice about Floating LiDAR Campaigns. Borssele offshore wind farm

Notice of operations at London Array Offshore Wind Farm

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

Offshore Pipeline Installation SEABED INTERVENTION THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING HOW DO YOU MAKE THE SEABED?

NAVAL ENGINEERING TRACK RECORD NAVAL ENGINEERING

OVERVIEW. Capabilities & Services

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Best Materials Durability Portability 15-Minute Set-up Easy Storage

Classic Ketch Shindilla

The WindFloat Project. Hamburg, September 2016

APPLICATION OF DRYACIDE DUST FOR THE STRUCTURAL TREATMENT OF GRAIN SILOS, BINS AND GRAIN STORES

Vattenfall A/S Vind Exnersgade Esbjerg Tlf

This project has been withdrawn by the developer. Atlantic Array Wind Farm

Atlantic Array Wind Farm

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Handbikes and Sports Wheelchairs

START UP MANUAL MADE IN USA REV US and Foreign patents and patents pending see

Vattenfall Wind Power Ltd

Imray Correction Notice 28 March 2018

ACCESSORIES LIFEPAK CR AND LIFEPAK EXPRESS. Plus. for use with. for LIFEPAK CR Plus/LIFEPAK EXPRESS DEFIBRILLATORS

SURFACE JET PUMP TECHNOLOGY TO INCREASE OIL & GAS PRODUCTION.

A DECADE OF EXPERIENCE

Offshore Wind Energy in Germany

GL GH Offshore Wind Measurements

SC100V AIR COMPRESSOR

7. Project summary. Doc. nr file 10/3240 2/13

Sewer. Contents. Stormwater: Box Culverts. Manhole Bases...2 Access Chambers...3 Make Up Rings...4 Covers...6 Septic...10 Sewer Sundries...

REBO terminal. REBO terminal Energy Port Oostende. the ideal hub for offshore wind & heavy lift activities in the North Sea

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Sewer. Contents. Stormwater: Box Culverts. Manhole Bases...2 Access Chambers...3 Make Up Rings...4 Covers...6 Septic...10 Sewer Sundries...

Application of Value Engineering The Crosstown Project

Appendix Norfolk Vanguard Offshore Wind Farm. ADDs as Effective Mitigation for Marine Mammals. Preliminary Environmental Information Report

Safety Zone Application Construction Phase Sheringham Shoal Wind Farm Project

VINTAGE PARTS MARKETING

Offshore // Marine // Subsea Cable solutions that thrive under pressure

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

Product highlights Variable frequency and thrust

35,000 Tax Paid. Beneteau First over 700 boats listed NEWCASTLE OFFICE OFFICES THROUGHOUT THE UK AND EUROPE

Performance Evaluation of the Wavestar Prototype

Transcription:

TenneT TSO BV Borssele Alpha, Dutch High Voltage Substation 700 MW (2x350 MW) Topside 58x32x26 metres, 3700 tonnes 35x29x50 metres, 2900 tonnes including cable deck and J-tubes Piles 61 metres each August 2019 31 EPCIC Dong Energy Windpower A/S Borkum Riffgrund 2, German North High Voltage Substation 450 MW Topside 25x40x20 metres, 2500 tonnes 30x30x55 metres, 1700 tonnes Piles 4 x 63 metres, 1050 tonnes May 2018 24 EPC Nederlandse Aardolie Maatschappij bv (NAM) L13, Dutch Monotower platform L13-FI-1 Topside 13.5x13.5x15 metres, 255 tonnes Monotower dia. 4.5/3.5x50 metres, 312 tonnes Monopile dia 4.5x40metres, 360 tonnes May 2017 17 PC j:\gezamenlijke documenten\verkoop\referenties_let op origineel\referenties_offshore_2017_eng_hsm.docx page 1 of 6

Babcock Marine Ltd. Rampion, UK 22,5X18X43 metres, 1050 tonnes September 2016 13 PC Energinet.dk Horns Rev C, Danish North High Voltage Substation 400 MW 41x34x25 metres, 1800 tonnes June 2016 20 EPC Engie E&P Nederland bv E17a-A, Compression module 20x10x8 metres, 330 tonnes July 2015 13 PC Aker Partners on behalf of Repsol Sinopec Resources UK Ltd. Clyde, UK Central Two modules M12 and M14 for Flyndre Cawdor over Clyde platform Module M12 29x16x20 metres, 1200 tonnes Module M14 29x13x6 metres, 400 tonnes August 2015 17 PC Petrogas E&P Netherlands BV A18, Platform including living quarter Topside 35x25x20 metres, 950 tonnes 23x26x60 metres, 1250 tonnes August 2015 16 EPCI j:\gezamenlijke documenten\verkoop\referenties_let op origineel\referenties_offshore_2017_eng_hsm.docx page 2 of 6

Shell UK Limited Leman Field, UK, Southern Leman uptime compression, platform, bridge and piles Topside 41x41,5x30 metres, 3570 tonnes 22x22x4 metres, 800 tonnes Bridge 37x4x4 metres, 130 tonnes Piles 755 tonnes August 2014 22 EPC EOG Resources UK Conwy Field, Irish Wellhead platform and reception module Topside 29x24x21 metres, 850 tonnes 18x18x45metres, 690 tonnes Piles 700 tonnes Reception module 270 tonnes September 2013 34 EPCI (platform) PCI (reception module) Repsol Sinopec Resources UK Ltd. Claymore field, UK (Central) Claymore Compression Upgrade (CCU) module 50x17x10 metres, 1628 tonnes August 2013 31 PC j:\gezamenlijke documenten\verkoop\referenties_let op origineel\referenties_offshore_2017_eng_hsm.docx page 3 of 6

Engie E&P Nederland bv L5a-D / D18-A, Well protector platform L5a-D Topside 33x18x20 metres, 1240 tonnes 20x20x55 metres, 850 tonnes Piles 600 tonnes June 2013 13 PC Topside D18-A 33x18x20 metres, 1240 tonnes Total E&P Nederland bv K5A, K4-Z hang-off module and transportable tanks access platform (TTAP) 10x12x2.5 metres, 50 tonnes May 2013 6 C ABB Thornton Bank, Belgian North High Voltage Substation 325 MW 30x20x17 metres, 2200 tonnes March 2012 20 EPC Petrogas E&P Netherlands BV B13, Satellite platform Topside 38x20x20 metres, 1000 tonnes 24x24x68 metres, 1050 tonnes Piles 550 tonnes April 2011 16 EPCI j:\gezamenlijke documenten\verkoop\referenties_let op origineel\referenties_offshore_2017_eng_hsm.docx page 4 of 6

Total E&P Nederland BV K5CU, Satellite platform Topside 30x20x17 metres, 850 tonnes 20x20x50 metres, 670 tonnes Piles 500 tonnes September 2010 18 EPC Engie E&P Nederland bv E17a-A Platform Topside 22x26x30 metres, 1740 tonnes 25x25x55 metres, 860 tonnes Vent stack 30 metres Piles 580 tonnes June 2009 12 C Hertel Defence & MSV Regalia New build accommodation blocks MSV Regalia 5 modules, total weight 730 tonnes January 2009 8 C Ithaca Energy Jacky Development Beatrice Area, UK Central Wellhead platform Tripod 1000 tonnes including suction buckets Topside 20x12x12 metres, 500 tonnes November 2008 12 EPCI j:\gezamenlijke documenten\verkoop\referenties_let op origineel\referenties_offshore_2017_eng_hsm.docx page 5 of 6

Energinet DK Horns Rev B, Danish North High Voltage Substation 250 MW 21x17x27 metres, 1000 tonnes Topside 32x25x13 metres, 1300 tonnes August 2008 14 EPCI j:\gezamenlijke documenten\verkoop\referenties_let op origineel\referenties_offshore_2017_eng_hsm.docx page 6 of 6