Safe Work Method Statement

SAFE WORK METHOD STATEMENTS

How severely could the risk hurt someone? Low/Insignificant First aid

Safe Work Method Statement (SWMS)

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Safe Work Method Statement

Contractor OHS Induction. AOHS-05-GUI September 2016

SAFE WORK METHOD STATEMENT Part 1

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

How severely could the risk hurt someone?

How severely could the risk hurt someone? Low/Insignificant First aid

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT Part B

How severely could the risk hurt someone? Low/Insignificant First aid

SAFE WORK METHOD STATEMENT

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

SAFE WORK METHOD STATEMENT SWMS No Version

Safety Management Plan Version Sept 06 A

The Sample Company Pty Ltd

Safe Work Method Statement

WORK METHOD STATEMENT STRUCTURAL STEEL

SAFE WORK METHOD STATEMENT (SWMS)

List all key terms and acronyms used in the procedure, and their definitions.

Temporary load-bearing support for structural alterations or repairs

WORK METHOD STATEMENT CARPET LAYING

Safe Work Method Statement

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Safe Work Method Statement

B S Glass Ltd Safety procedures- outsourced Workplaces

Safe Work Method Statement (SWMS)

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

We take safety very personally at Aurecon. Safety is everybody s business, every day. Health and safety incidents are not inevitable, they are

Safe Working at Heights Theory Assessment

SAFE WORK METHOD STATEMENT

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

Telco Antennas SWMS Working At Height Above 2m

SAFE WORK METHOD STATEMENT

Construction & Building Industry Safety Guideline. Electrical Isolations

PRO Lifting Operations

McCain Foods (Aust) CONTRACTOR INDUCTION PROGRAM PENOLA SITE QUICK GUIDE

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Work Activity (e.g. Road Work): Work Location:.

CONTRACTOR SAFETY INDUCTION HANDBOOK

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS CONTRACTOR INFORMATION PACKAGE

WORK METHOD STATEMENT ELECTRICAL

Competency type. positions. All workers (including contractors), higher degree students and volunteers

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

LADDERS FIXED AND PORTABLE

SAFE WORK METHOD STATEMENT Part 1

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

Policy Redesign Project. Plant Safety Policy. Table of Contents

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Harbour Town Gold Coast Site Induction

SAFE WORK METHOD STATEMENT

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

Method Statement Author

Safety Checklist for Events Held at Hillbrook

Procedure: Pressure equipment safety

WORK METHOD STATEMENT TERMITE PROTECTION

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

McCain Foods (Aust) CONTRACTOR INDUCTION PROGRAM SMITHTON SITE QUICK GUIDE

WHSE Management Plan

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Anchor on the Go. Portable Roof Anchor for Metal Roofs. Part Number Patent Number Installation and Operating Instructions

Building 68 Roof Safety Assessment

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

Safe Work Method Statement

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

Safe Work Method Statement Tasks

INDUCTION PROCEDURES FOR CONTRACTORS Page 1 CONTRACTOR INDUCTION PROCEDURES

SAFE WORK METHOD STATEMENT CARPENTER

QUEENSLAND UNIVERSITY OF TECHNOLOGY

PRO MS&L - Safe Work Requirements for Contractors

Contractor handbook. Purpose

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Electrical Safety. Hazard Awareness

SEMEEE3-34 Carrying out functional tests on electrical equipment

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

Welcome to Woolworths LTD

Contractor/Visitor Safety Orientation UNBC

MECHANICAL DEMOLITION SITE WHS MANAGEMENT PLAN

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Contractor Hazard Identification and Control Guide

Original Date of Issue: 04/09

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

Building 43 Roof Safety Assessment

Transcription:

Samark North Qld Pty Ltd SWMS Manual SWMS No 00 Samark North Qld Pty Ltd ABN : 99 082 98 87 Electrical Contractors License C372 Page 2 of Safe Work Method Statement Title: SWMS:00 USING PORTABLE LADDERS Task Description Hazard Identification Level Recommended Actions / Controls for Prevention P.P.E. Residual ) Consultation 2) Select appropriate ladder with regard to compliance with the relevant part of AS 892 and the work to be done. Interference Potential Electric shock Physical. Property Damage Consultation / Administrative Metal or wire reinforced ladders shall not be used for any electrical work 6 3) Inspect the ladder for condition. Inspect ladders. Do not use damaged ladders. ) Position ladder correctly to ensure stability. ) Dropping / falling items Hitting people / equipment / property below Physical injury / damage to equipment / property Position ladders a minimum of metre from edges of slabs or floors. Increase this distance as working heights increases. Straight or extension ladders to be secured at top and bottom. Ladders need to extend metre above landing level and to be long enough to work at least metre from the top Angle of ladder should be nominally in Always face the ladder and keep within styles. When ascending or descending a ladder keep a minimum of three points of contact on the ladder at all times Appropriate Fall protection to be used when working above 2.0m Tools and equipment carried appropriately to the situation to minimize the risk of dropping Barricading / observer may be required to isolate the work area from people / plant / vehicles etc. (if required) Version 2.6: 2/0/207 Review Date: 2/0/208

Samark North Qld Pty Ltd SWMS Manual SWMS No 00 Samark North Qld Pty Ltd ABN : 99 082 98 87 Electrical Contractors License C372 Page 3 of Safe Work Method Statement Title: SWMS:00 USING PORTABLE LADDERS Personnel Qualifications and Experience Required Tradesman and others trained and competent in the use of portable ladders and working around electricity. Appropriate industry and site induction. No previous particular experience required Engineering Details / Certificates / Work Cover Approvals / Australian Standards Ladders to be in accordance with Australian Standard AS 892. Plant / Equipment Required (Mobile or Static) Ladders complying with the relevant part of Australian Standard AS 892. Personnel Duties and Responsibilities Supervisor to carry out daily inspections of work site for hazards. All personnel to maintain tidy work area on site at all times. Personal Protective Equipment (PPE) to be worn at all times on site. Barricading to be used as appropriate to protect others from working below elevated work. Training Required to Complete Work Supervisor to be trained in risk identification, assessment and control e.g., Job Safety Analysis (JSA). Supervisor to be appropriately trained, qualified and competent in OH&S and electrical practices for the task. On the job skills training to be conducted by Supervisor to personnel. Referenced Codes of Practice / Regulations / Legislation Work Health and Safety Act and Regulations 20, Electrical Safety Act 2002 and Regulations 203, Electrical Safety Code of Practice 200, Industry Standard for Electrical Installations on Construction Sites 200. Hazardous Manual Tasks Code of Practice 20, Plant Code of Practice 200 and Mobile Crane COP 2006. Maintenance Checks / Calibration Intervals Ladders to be checked daily. Persons responsible for ensuring compliance with this SWMS. Mark McDonald 2. Austin Wilds P P E 2 3 6 7 8 9 0 2 3 Version 2.6: 2/0/207 Review Date: 2/0/208