Asbury Park City Council Candidate Questionnaire: Complete Streets in Asbury Park

Similar documents
Exhibit 1 PLANNING COMMISSION AGENDA ITEM

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Appendix C 3. Bicycle / Pedestrian Planning

Bicycle Master Plan Goals, Strategies, and Policies

STONY PLAIN ROAD STREETSCAPE

North Shore Transportation Improvement Strategy

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

TOWN OF CHAPEL HILL NORTH CAROLINA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

City of Wilsonville 5 th Street to Kinsman Road Extension Project

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

5. Pedestrian System. Accomplishments Over the Past Five Years

Environment and Public Works Committee Presentation

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Non-Motorized Transportation 7-1

Chapter 5. Complete Streets and Walkable Communities.

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

PEDESTRIAN ACTION PLAN

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

APPENDIX A. Outreach Summary

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

PEDESTRIAN ACTION PLAN

Walking & Bicycling Questionnaire for Candidates

PROJECT OVERVIEW. Auburn Station Access Improvements Project

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

PEDESTRIAN ACTION PLAN

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

SAFE ROUTES TO SCHOOL (SR2S)

COMMUNITY PARTICIPATION CHAPTER 8

PETITION AND LETTER WRITING BEST PRACTICES

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

CTDOT Pedestrian and Bicycle Safety Initiatives

Ann Arbor Downtown Street Plan

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

MASTER BICYCLE AND PEDESTRIAN PLAN

Morristown, NJ Complete Streets Policy

Major Bike Routes 102 Avenue Workshop April 21, 2015

The Wiggle Route in Context

Activism for a Healthier Community

San Mateo County Bicycle and Pedestrian Advisory Committee

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

Complete Streets Successes, Opportunities, and Challenges

COMPLETE STREETS PLANNER S PORTFOLIO

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

CHAPTER 3: Vision Statement and Goals

Tonight is for you. Learn everything you can. Share all your ideas.

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit

Welcome! Public Open House on UBC s Transportation Plan

Tri-State Transportation Campaign Greater Newark Conservancy Newark Complete Streets Walking Audit July 2013

Regional Transportation Needs Within Southeastern Wisconsin

Bringing together community and health. Physical Activity and Nutrition Unit Office of Statewide Health Improvement Initiatives

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

C C C

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Walking & Bicycling Questionnaire for Candidates

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

Speed Limits Study and Proposal. Public Input Session: 8/14/13

FONTAINE AVENUE STUDY Final Report

MASTER BICYCLE AND PEDESTRIAN PLAN

West Village Mobility & Integration

City of Davis East Covell Corridor Plan

CHAPTER 7.0 IMPLEMENTATION

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Edgewood Kirkwood Grant Park Glenwood Park Cabbagetown East Lake Oakhurst Reynoldstown East Atlanta

Paxton Timekeeper: Geoffrey Gray-Cornelius Recorder: Maria Connolly 401 Chambers Bridge Road - Brick, NJ Engineering

Safe Routes to School

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

How To Encourage More Efficient Transportation in Brazilian Cities

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Community Transportation Plan Acknowledgements

Dowling/Beaty Cycling Route

Introduction. Who is WILMAPCO. Why are walkable communities important

Monument Elementary School Trenton, NJ School Travel Plan

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

INDOT Complete Streets Guideline & Policy

Transcription:

Asbury Park City Council Candidate Questionnaire: Complete Streets in Asbury Park The following answers were received by the Asbury Park Complete Streets Coalition in response to questions mailed to all Asbury Park City Council candidates. (As of the time of this writing, replies were not received from Yvonne Clayton, Kenneth Saunders Jr. or Stephen Williams.) 1) (Incumbents only) The City Council passed a Complete Streets Policy in October 2015 by Resolution2015-358. What Complete Streets measures have been implemented? EILEEN CHAPMAN: The initiatives that have been implemented since I've been appointed to the Asbury Park City Council this past summer include the addition of new bike racks to further biking as a mode of transportation. We've also been working with Brian Cheripka of IStar to improve the waterfront area in regards to implementing Complete Streets ideas as part of the waterfront amendments. We are awaiting additional data from New Jersey Department of Transportation on Main Street traffic counts. We are also awaiting implementation of our road projects that have been stalled due to Gov. Christie's freeze we have the opportunity to then implement the aspects of the Complete Streets Program. I am personally researching and reviewing other towns that have included Complete Streets design and aspects to their communities. AMY QUINN: Hiring a transportation planner, adding bike racks throughout the downtown and making the process easier to request one, ensuring bike lanes are part of the street repaving program (Sunset and 4th to start), requirements for developers to install bike racks & transit village designation application. Grants: Applied for Bike Lane planning grant; Applied for Safe Routes to School; Applying for Transportation Alternatives Program Page 1 of 7

2) (Incumbents only) In the year since this council passed a Complete Streets policy, which Asbury Park city officials have received specific training or instruction regarding the planning or implementation of Complete Streets? EILEEN CHAPMAN: As I have not had the pleasure to serve the city for an entire year, I've reached out to our City Manager. He stated that the Mayor and a police officer in charge of traffic attended a Department of Transportation training earlier this year. Our City Planner has also undergone training as part of required professional training. AMY QUINN: Mayor John Moor with Officer Joel Fiore went to a workshop in Trenton and received a Certificate. I have not completed a training, however I continue to have conversations regarding complete streets with the Director of Community and Constituent Relations, NJ Department of Transportation; Cyndi Steiner, Executive Director, New Jersey Bike & Walk Coalition, and Elise Bremer- Nei, Bicycle and Pedestrian Program Coordinator. Page 2 of 7

ALL CANDIDATES: 3) The Asbury Park Master Plan and all of the City's redevelopment plans make specific reference to the need for streets that better accommodate bikes and pedestrians. If elected, what specific measures will you take to ensure that Asbury Park becomes a safer, more accessible place for pedestrians, bike riders and those without automobiles? EILEEN CHAPMAN: The City has just hired a Transportation Planner who, as part of their job, will ensure all transportation aspects (walking, biking, riding, mass transit, etc.) are met. We will continue to review any and all road plans and improvements to ensure all needs can be met and will continue to work with IStar on their plan amendments to improve the waterfront for those without automobiles. We saw many more visitors using train service to our City and I m grateful for the free shuttle but we also need safer crosswalks and wayfaring signs to make our City more welcoming. I d also like to see us provide walking tour, biking tour, historic tour and church tour pamphlets to residents and visitors to encourage walking and biking. DAN HARRIS: First would be to send City Council members, the Mayor, City Manager, City Planner, the Michaels Group and Interfaith Neighbors with chosen members of the Complete Streets Coalition to Ocean City and Newark. They would meet with their city officials to see how their Complete Streets Programs were implemented. This would eliminate the cost of a consultant. Just look at a program that works in an urban center and one that works in a beachfront community. Then sit down with a qualified engineer and planner to develop a timetable for implementation of the program. If after that we felt that a consultant was needed, we would hire one. I mention interface and the Michaels group because I feel that Springwood Ave corridor is perfect for the Complete Streets Program. AMY QUINN: Better signage, better traffic calming measures, a comprehensive bike plan, better traffic signals and cross walks. Page 3 of 7

4) What does the term complete streets mean to you? EILEEN CHAPMAN: Simply, a complete street that is designed to be safe for all: pedestrians, bikes, vehicles, mass transit, the young and the old, the physically challenged, etc. More broadly, it s not just improvements to a road; it represents commitment and change to an entire community. DAN HARRIS: Complete Streets means that streets that can be used by everyone. Safe corridors for bikes, walkers and cars. It means handicapped accessibility for the handicapped. It means less pollution and stores that will be doing better because people will have time to look at them while driving. It also means less accidents because people will be driving slower. It means more sophisticated in traffic signals to control traffic. But in the end it means a safer city. AMY QUINN: An environment that provides safe, efficient, and healthier transportation for all users. Page 4 of 7

5) If elected, what specifically will you do to work with county and state agencies to ensure that Complete Streets are implemented on state, county and local roads within Asbury Park? EILEEN CHAPMAN: I understand that the State, the County and Asbury Park have adopted Complete Streets Policies. I will network with our fellow elected officials and their staff to ensure that our needs our met. For our local roads that starts at staff and design. I have, and will continue to make clear, that Complete Streets is something that we must continue to incorporate. DAN HARRIS: Meet with these officials on a regular basis. I am retired so it is easy for me to make time. It would definitely mean going to workshops in reference to the implementation of the program. We would also explore the possibility of acquiring grants from the county and state to make it happen. AMY QUINN: Remain in contact with all the State and Local agencies regarding complete streets. Page 5 of 7

6) If elected, what will you do to ensure that community advocacy groups like AARP and the Asbury Park Complete Streets Coalition can participate, both formally and informally, in the process of making Asbury Park's streets safer and more inclusive for all users? EILEEN CHAPMAN: I would like to see a formal presentation prepared by the Complete Streets group to the City Council and the residents and stakeholders of our city. Public comment is extremely important to the implementation of such policies. I implore advocacy groups to review our agendas that are posted on our website and come speak publicly about concerns. Public engagement and transparency are very important to me. DAN HARRIS: First by including members on strategic boards and committees throughout the city. The first two would be the planning and zoning boards. The shade tree commission would be another. We would also create an ad hoc committee to study the condition of streets and sidewalks throughout the city. It is impossible to implement a plan without looking at the locations. We would also lobby residents of the affected neighborhoods to participate. This would give them input and create a bond between the AARP and APCSC members. This is one way of unifying a city without creating animosity or exclusion. AMY QUINN: Increase outreach to interested parties. Page 6 of 7

7) In 2015 the current City Council rejected a NJDOT proposal for a road diet" reconfiguration of Main Street. The design is consistent with the Asbury Park Master Plan [See pages 83, 91, 93, 96 to 104] and 2008 Main Street Redevelopment Plan [See pages 10 and 30]. What is your position on the road diet proposal for Main Street? EILEEN CHAPMAN: I was not on the Council at the time but had spoken to the Mayor who was, as well as our City Manager and City Planner. I was told that the DOT and their consultant did a horrible job of presenting the Road Diet plan to them and that was the reason that it was rejected. I am currently doing my own research and reaching out to do my own fact-finding. I am anxious to make this a priority with our new Transportation Director when they come on board in November. DAN HARRIS: It should be implemented immediately. One only needs to travel to Avon to see the effect of their Complete Streets plan. AMY QUINN: I have an open mind to the Road Diet on Main Street. We are waiting for July Traffic Counts and provided those traffic counts are low I will request DOT provide two plans to the City Council, one that includes a road diet and takes into consideration the concerns addressed with the last plan (turning queues, updated counts and modeling, bus stops). Page 7 of 7