GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

Proof load is the load applied in performance of a proof test. Proof test is a nondestructive tension test performed by the sling manufacturer or an

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS PART 49. SLINGS

Slings Natural Rope, Synthetic Rope and Synthetic Web

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

SECTION 15 RIGGING. b. Defective rigging shall be removed from service.

References: EM Section 15 OSHA UFGS

Lift-All Wire Rope & Slings

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

SLINGS, HOISTING & RIGGING

PROCEDURES Power Lines

Roughneck TM Mesh Slings

WIRE ROPE AND SLING BASICS. Total. of Wires WIRE ROPE SLINGS. Use of EIP, IWRC rope gives 15% greater capacity than IP, IWRC ropes.

OSHA Standard Slings Compliments of the Columbus McKinnon Corporation

CORPORATE SAFETY MANUAL

Section 15 TABLE OF CONTENTS Rigging. 15.A General B Personnel Qualifications

Premium PowerPoint Presentation. Rigging Review

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Basic Rigging And Wire Rope

Heavy Equipment Technician Rigging

Rigging Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-RIGGING 2014

LiftAlloy TM Chain Slings

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

LiftAlloy Chain Slings

Fall Protection- Part 2

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

This training session focuses on safe rigging for crane and derrick operations at construction sites. A critical job for the safety of any crane or

Welding With Arc Welding Equipment

Crane & Rigging Brain Teasers

Care, Use and Inspection

operation WARNING! Operator must read and understand instructions here and on sling prior to use.

Draft Indian Standard WIRE ROPE SLINGS AND SLING LEGS- SPECIFICATION (Second Revision) ICS ;

WEB SLING BASICS AND HOW TO ORDER WEB SLINGS

Session Objectives. Business & Legal Reports, Inc. 1011

USER S GUIDE LIFTING TERMINOLOGY

Welding and Cutting With Oxygen-Fuel Gas

Summary Report for Individual Task Perform field maintenance on lifting devices Status: Approved

M S I C R A N E S C A L E

Guide to Documentation and Marking Part 5 Lifting Accessories, Slings

Servicing Multi-Piece and Single Piece Rim Wheels Self Inspection Checklist

MECHANICAL POWER-TRANSMISSION APPARATUS SELF INSPECTION CHECKLIST

Winchline n a box WINCH LINE SELECTION GUIDE. Wire Rope Winchlines are superior to most other winchlines found in the market place due to the

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

SECTION 2. Wire Rope Slings & Bridles

steel wire rope slings and fittings

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

Serial Number: Lot Number: Purchase Date: General Factors Accepted / Rejected Supportive Details or Comments. Accepted Rejected.

MoBiLe CrAnes. surelift. B y W i r e r o p e i n d u s t r i e s. tower CrAnes. port CrAnes

USER S GUIDE LIFTING

HOW TO USE THIS CATALOG

Fall Protection Checklist. Guardrail System

Care and inspection of wire rope

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Section 16B. Fall Protection. Falls are the second leading cause of death in the workplace. Factors contributing to falling incidents:

Heavy Equipment & Rigging Specialist Training

GENERAL INFORMATION WIRE ROPE SLINGS

For Review Only No Copying No Saving No Lending No Posting Online

Visit: 27

Dip Tanks Containing Flammable or Combustible Liquids Self-Inspection Checklist

Worker s Safety Handbook for Rigger and Signalman

Fall Protection- Part 1

Safe Schools: A Health and Safety Check

TECH TIPS: ROPE DEFECTS

NEVER EXCEED WORKING LOAD LIMITS PAGE

INSPECTION, CARE AND PROPER USE OF CHAIN SLINGS

LOAD HUGGER CARGO CONTROL

Lifting Slings. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Technical Literature. Plasma. 12x12 Sling Inspection Guidelines

SAMPLE PAGE. Section 2... Wire Rope

Fall Protection PPE Inspection

Dip Tanks Self-Inspection Checklist

CAROLINA S RIGGING & CRANE 1219 Bluff Road, Columbia, SC (803) Toll Free: (800) Fax: (803)

FULCRUM LIFTING. Customized Lifting & Rigging Solutions

steel wire rope for lifting machines

User Instructions 1790 Rail Anchor

Warning CABLE REPLACEMENT INSTRUCTIONS. Questions? - Call Telpro Inc. Customer Service at or

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

TULSA CHAIN.COM, LLC.

British Columbia Carpenter Apprenticeship Program

Courtesy of Loos & Co., Inc.

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

WEBMASTER 00 SLINGS master 00 Polyester Slings Hardware Slings (TYPES U, AND ) Standard duty master 00 is designed for less frequent, light duty servi

SYNTHETIC, CHAIN & WIRE ROPE SLINGS

Safety Equipment Manufacturer Committee Consensus Document

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

HAZARD COMMUNICATION SELF INSPECTION CHECKLIST

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

SINGLE BRAID INSPECTION

GAR-BRO BUCKET LIFTING BAIL INSPECTION RECOMMENDATIONS G & R SERIES BUCKETS

INSTRUCTIONS FOR USE

product use, care, & inspection Document Released: January, 10, 2012 Approved By: Bryce Merrick

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

Hoisting Equipment Cable puller & Accessories

Triple Tine Mechanical Grapple

Sling Safety. Construction Safety and Health Outreach Program. U.S. Department of Labor OSHA Office of Training and Education May 1996 INTRODUCTION

Transcription:

Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Slings Steel Chain, Wire Rope and Metal Mesh Self Inspection Checklist Guidelines: This checklist covers part of the regulations issued by the U.S. Department of Labor - OSHA under the General Industry standards 29 CFR 1910.184 and the Construction standards 1926.251. All of these regulations were adopted by reference. It applies to slings used in conjunction with other material handling equipment to move material by lifting or hoisting. Definitions are provided at the end of the checklist to help you understand some of the questions. Questions marked with the symbol ( ) may require the help of an outside expert. Numerous tables are included as part of 29 CFR 1910.184 which relates sling configuration, sling construction, sling diameter and maximum load capacity. These tables have not be included as part of this checklist. For additional information, consult the OSHA regulations. Alloy Steel Chain Slings 1. Do alloy steel chain slings have permanently affixed durable identification stating the size, grade, rated capacity and reach? [29 CFR 1910.184(e) and 1926.251(b)(1)] Please Circle 385

2. Do hooks, rings, oblong links, pear-shaped links, welded or mechanical coupling links or other attachments have rated capacities at least equal to that of the alloy steel chain with which they are used? [29 CFR 1910.184(e)(2) and 1926.251(b)(2)] 3. Is the sling not used in excess of the rated capacity of the weakest component? [29 CFR 1910.184(e)(2)] 4. Is the use of makeshift links or other fasteners formed from bolts or rods prohibited? [29 CFR 1910.184(e)(2)(ii) and 1926.251(b)(3)] 5. Is a thorough inspection made of the alloy steel chain sling at least once every twelve months? [29 CFR 1910.184(e)(3)(i)] 6. Are written records kept of the inspections of alloy steel chain slings? [29 CFR 1910.184(e)(3)(ii)] 7. Are thorough inspections of alloy steel chain slings performed by competent persons? The inspection must include inspection for wear, defective welds, deformation and increase in length. [29 CFR 1910.184(e)(3)(iii)] 8. Have new, repaired or reconditioned alloy steel chain slings been proof tested by the manufacturer and is a certificate of proof test available? [29 CFR 1910.184(e)(4)] 9. Is use of alloy steel chain slings in excess of the rated capacities prohibited? [29 CFR 1910.184(e)(5) and 1926.251(b)(4)] 386

10. Are alloy steel chain slings permanently removed from service if heated above 1000 o F? [29 CFR 1910.184(e)(5)] 11. Are maximum working loads reduced in accordance with the manufacturer's recommendations if the chain or sling is exposed to temperatures in excess of 600 o F? [29 CFR 1910(e)(5)] 12. Have repaired and reconditioned alloy steel chain slings been proof tested by the sling manufacturer or an equivalent entity? [29 CFR 1910.184(e)(7)] 13. Is the use of mechanical coupling links or low carbon steel repair links prohibited? [29 CFR 1910.184(e)(7)(ii)] 14. Are slings removed from service if their hooks are cracked or have opened more than 15 percent of the normal throat opening (measured at the narrowest point)? [29 CFR 1910.184(e)(9)(ii)] 15. Are slings removed from service if their hooks are twisted more than 10 degrees from the plane of the unbent hook? [29 CFR 1910.184(e)(9)(ii)] Wire Rope Slings 16. Are wire rope slings prohibited to be used in excess of their rated capacities? [29 CFR 1910.184(f)(1) and 1926.251(c)(1)] 17. Are fiber core wire rope slings permanently removed from service if they are exposed to temperatures in excess of 200 o F? [29 CFR 1910.184(f)(3)] 387

18. Are recommendations of the sling manufacturer followed when nonfiber core wire rope slings are used at temperatures above 400 o F or below minus 60 o F? [29 CFR 1910.184(f)(3)] 19. Is welding of end attachments performed prior to the assembly of the sling? [29 CFR 1910.184(f)(4)(i)] 20. Are all welded end attachments proof tested by the manufacturer or equivalent entity at twice their rated capacity prior to their initial use and is a certificate of proof test available? [29 CFR 1910.184(f)(4)(ii)] 21. Are wire rope slings immediately removed from service if any of the following conditions are present: [29 CFR 1910.184(f)(5) and 1926.251(c)(4)(iv)] (i) (ii) (iii) Ten randomly distributed broken wires in one rope lay, or five broken wires in one strand in one rope lay? Wear or scraping of one-third the original diameter of outside individual wires? Kinking, crushing, bird caging or other damage resulting in distortion of the wire rope structure? (iv) Evidence of heat damage? (v) End attachments that are cracked, deformed or worn? 388

(vi) Hooks that have been opened more than 15 percent of the normal throat opening measured at the narrowest point or hooks twisted more than 10 degrees from the plane of the unbent hook? (vii) Corrosion of the rope or end attachments? 22. Are protruding ends of strands in splices covered or blunted? [29 CFR 1926.251(c)(2)] Metal Mesh Slings 23. Does each metal mesh sling have a permanently affixed durable marking that states the rated capacity for vertical basket hitch and choker hitch loading? [29 CFR 1910.184(g)(1)] 24. Do handles have a rated capacity at least equal to the metal fabric and exhibit no deformation after proof testing? [29 CFR 1910.184(g)(2)] 25. Are fabric and handles joined so that: [29 CFR 1910.184(g)(3)] (i) The rated capacity of the sling is not reduced? (ii) The load is evenly distributed across the width of the fabric? (iii) Sharp edges will not damage the fabric? 389

26. Is the use of coatings which diminish the rated capacity of the sling prohibited? [29 CFR 1910.184(g)(4)] 27. Are all new and repaired metal mesh slings and handles proof tested by the manufacturer or equivalent entity at a minimum of one and a half times their rated capacity and is a certificate of proof test available? [29 CFR 1910.184(g)(5)] 28. Are metal mesh slings permitted to be used in excess of their rated capacities? [29 CFR 1910.184(g)(6)] 29. Are the sling manufacturer's recommendations followed concerning safe operating temperatures? [29 CFR 1910.184(g)(7) 30. Are all repairs to metal mesh slings performed by the manufacturer or equivalent entity? [29 CFR 1910.184(g)(8)(i)] 31. Once repaired, are metal mesh slings marked or tagged, or are written records maintained, to indicate the date and nature of the repair and the person or organization that performed the repairs? [29 CFR 1910.184(g)(8)(ii)] 32. Are metal mesh slings immediately removed from service if any of the following conditions are present: [29 CFR 1910.184(g)(9)] (i) (ii) The weld or brazed joint is broken along the sling edge? Reduction in wire diameter of 25 percent due to abrasion or 15 percent due to corrosion? 390

(iii) Lack of flexibility due to distortion of the fabric? (iv) (v) (vi) Distortion of the female handle so that the depth of the slot is increased more than 10 percent? Distortion of either handle so that the width of the eye is decreased more than 10 percent? A 15 percent reduction of the original cross sectional areas of metal at any point around the handle eye? (vii) Distortion of either handle out of its plane? Definitions: Handle is a terminal fitting to which metal mesh fabric is attached. Proof Test means a nondestructive tension test performed by the sling manufacturer or an equivalent entity to verify construction and workmanship of a sling. Sling means an assembly which connects the load to the material handling equipment. 391