Bicycle Transportation Budget Plan: Lawrence, KS

Similar documents
Bicycle Facilities Planning

Pedestrian-Bicycle Task Force, and 2017 Lawrence Budget Recommendations by Sustainability Action

Broad Street Bicycle Boulevard Design Guidelines

Hennepin County Bicycle and Pedestrian Planning

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Cycle Track Design Best Practices Cycle Track Sections

Living Streets Policy

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

Public Works and Infrastructure Committee. General Manager, Transportation Services

Toronto Complete Streets Guidelines

Tonight is for you. Learn everything you can. Share all your ideas.

Rochester Downtown Bicycle Study 2009

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Bicycle Boulevards and Neighborhood Greenways

Ajax: The Road to Complete Streets

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Small Town & Rural Multimodal Networks

Physical Implications of Complete Streets Policies

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Safe Streets. City of Lake Forest Park. March 21, 2017

LANCASTER CITY BICYCLE NETWORK

Public Information Centre

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

City of Cape Coral Traffic Calming. City Council May 16,

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

MTP BICYCLE ELEMENT UPDATE. November 2017

Planning Guidance in the 2012 AASHTO Bike Guide

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Appendix 3 Roadway and Bike/Ped Design Standards

DRAFT FOR DISCUSSION PURPOSED ONLY, 10/26/13 MOBILITY PLAN UPDATE DESIGN TOOLBOX

On Road Bikeways Part 1: Bicycle Lane Design

Solana Beach Comprehensive Active Transportation Strategy (CATS)

INDEX. Geometric Design Guide for Canadian Roads INDEX

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Dowling/Beaty Cycling Route

CONNECTING PEOPLE TO PLACES

General Design Factors

2.0 LANE WIDTHS GUIDELINE

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

4 Goals, Objectives & Actions

The Wiggle Route in Context

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Active Transportation Infrastructure Investment A Business Case

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

City of Charlottesville Bicycle and Pedestrian Master Plan Update

TRAFFIC CALMING TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Toole Design Group is live tweeting this webinar

New Castle County Bicycle Plan. Heather Dunigan ext

Perryville TOD and Greenway Plan

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Why plan for bicycles?

ACTIVE TRANSPORTATION

Active Transportation Facility Glossary

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

3.1 TRAFFIC CALMING PROCESS SUMMARY

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

City of Waterloo Complete Streets Policy

NJDOT Complete Streets Checklist

PBIC Webinar. How to Create a Bicycle Safety Action Plan: Planning for Safety [IMAGE] Oct. 2, 2014, 2 pm

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bike lanes for. Everyone

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Land Use Bicycle Spaces Required Type Residential

JCE 4600 Transportation Engineering. Traffic Control

Who is Toole Design Group?

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

DRAFT Montgomery County Bicycle Master Plan Design Toolkit

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Update on Regional Bicycle, Pedestrian, & Trail Planning. Presented to TCC November 21, 2014

On-Street Bicycle Facilities

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Health and the Built Environment Presentation to the Childhood Obesity Conference

complete streets design and construction standards public primer City of Edmonton

Off-road Trails. Guidance

The University of Kansas KU Bike Plan Executive Summary and Recommendations LAWRENCE CAMPUS

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Draft North Industrial Area-Wide Traffic Plan

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Evolving Bicycle Infrastructure in City of Philadelphia

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

TOWN OF HALTON HILLS TRAFFIC CALMING PROTOCOL. Page 1 of 25

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

5 CIRCULATION AND STREET DESIGN

Recommended Improvements - Ruby/Banning Neighbourhood Greenway

Pedestrian Safety: A Federal Perspective. Emmett McDevitt Transportation Safety Engineer September 28, 2010

Classification Criteria

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

WELCOME Public Information Centre

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transcription:

Bicycle Transportation Budget Plan: Lawrence, KS

Bicycle Objectives Lawrence Planning Documents Establish a dedicated funding plan to complete the implementation of a bikeway system plan, and for maintenance of the region s bicycle facilities. Prioritize and implement critical bikeway segments that provide continuity for the system and provide connections to major activity centers: shopping areas, schools, KU campus, etc.

Bicycle Accomplishments A soon to be complete circumferential loop

Bicycle Accomplishments Principle bicycle supportive policies Lawrence Complete Streets Policy of 2012 Inclusion of bicycle lanes on all new and reconstructed arterials and collector streets Inclusion of bicycle lanes in certain instances of street mill and overlay Administrative shift in 2000 of bicycle projects from Parks & Rec. to Public Works Dept. Seventeen bicycle planning documents since 1976

Bicycle Accomplishments Bicycle lanes on select segments of the Bicycle Works Program of 2001 9th St, Kentucky to Mississippi St. Mike Yoder: Lawrence J.W. East 15th Street

Bicycle Accomplishments Transportation corridor serving employment and population centers Burroughs Creek Trail

Bicycle Accomplishments Neighborhood intersection calming for bicycle-pedestrian safety Barker & 19th St. Goldfield & Eldridge St.

Evolution of Lawrence Bicycle Facilities Beginning in the mid 1970's, Lawrence's bicycle infrastructure progressed through four phases. Initial phase: bicycle route signs on streets, & 5-foot wide asphalt trails through several parks Second phase: bicycle lanes only if they fit in certain street's cross section Third phase: 10 foot wide concrete side paths along major auto projects and in new parks, primarily Federally funded Fourth phase: purposeful projects on selected streets for traffic calming or complete streets

Bicycle Transportation Effectiveness Unfortunately, many of these bicycle facilities are ineffective for transportation purposes. Bicycle route signs generally provide little guidance to a chosen destination. Unprotected bicycle lanes or shared lanes are generally not granny or child friendly. Side paths serve discretionary recreation users in remote circumferential areas or loop parks more often than essential transportation users. Projects are frequently sited because a street is an easy retrofit, physically or financially, instead of by origin-destination needs.

What's needed for a bicycle transportation system build out? Professional design and comprehensive funding Projects initiated by origin-destination indicators Neighborhood flow Feeder routes from neighborhoods Corridors connecting key nodes: schools, commercial areas, parks, medical Circumferential loop

Main Bicycle Transportation Components Right sizing roads Bicycle boulevards

Main Bicycle Transportation Components Two way bicycle tracks Protected bicycle lanes

Main Bicycle Transportation Components Roadway geometrics 95% of cyclists need a dedicated travel space separate from motorists. Efficient travel means few stops. 25% more energy, and 33% more time is required to regain speed from a full stop. Efficient maneuverability requires gentle curves, less than 5% slope, and a debris and defect free surface.

Main Bicycle Transportation Components Intersection management A two-lane by two-lane intersection has 32 motorist conflict points. Include bicycle lanes in all directions, and the conflict points about double. Regardless of how protected are bicycle lanes or tracks, vulnerability and accidents mostly occur at the intersections.

Cyclist-Motorist Shared Space is Unsafe and Intimidating Average person won't consider cycling there Nick Falbo, Alta Planning, Portland OR

Protected Bicycle Lanes Cyclists buffered by green strip or parking Nick Falbo, Alta Planning, Portland OR

Intersection Conflicts are the Crux of the Problem Bicycle lane benefits are negated at intersections Nick Falbo, Alta Planning, Portland OR

Protected Intersection Avoids conflicts using visibility, enhanced reaction time, and predictable movements Nick Falbo, Alta Planning, Portland OR

Protected Intersection: Larger Turn Radius Key element is the large-radius protective barrier extending into the intersection Turning motorist becomes perpendicular to bicycle lane for visibility Nick Falbo, Alta Planning, Portland OR

Bicycle Boulevards: AKA Bike/Walk Streets Shared streets, made safe and convenient for cyclists of all ages and skill levels. Bicycles given priority on streets reconfigured for low speed, low volume, and low stress. Designed with few or no stops for cyclists. Minimum of two miles long, they are trunk lines connecting major destinations.

Bicycle Boulevards: AKA Bike/Walk Streets Key design elements Speed reduction Motorist volume reduction by access control Wayfinding signs

Tools for the Toolbox: Bicycle Engineering Division The main tools currently used by the City Engineer and the Traffic Engineer are: Bike route signs, center islands, painted lanes and sharrows, traffic circles, roundabouts, vertical deflection devices, and multi-use rec paths. A good start, but there are so many more innovative tools that can be used.

Tools for the Toolbox: Bicycle Engineering Division Speed management: Auto Pinch Point

Tools for the Toolbox: Bicycle Engineering Division Speed management: Curb chicanes

Tools for the Toolbox: Bicycle Engineering Division Volume management: Diagonal Diverter

Tools for the Toolbox: Bicycle Engineering Division Volume management: Right-in Right-out

Tools for the Toolbox: Bicycle Engineering Division Volume management: Full Auto Closure

Tools for the Toolbox: Bicycle Engineering Division Volume management: Partial Auto Closure

Bicycle Funding Concerns When faced with bicycle funding needs, Lawrence frequently has chosen low-cost, no-cost options. Motor vehicle needs are given higher priority, because bicycles have been viewed as recreation more than transportation. More substantive bicycle facilities go mostly unfunded, unless piggybacked on auto projects. Near exclusive reliance on bicycle grant funding sets priorities by expediency rather than origindestination transportation needs. In older neighborhoods where there's the highest user rate, bicycle-safe street modifications are avoided because of perceived greater costs.

T2040 Financing Plan Total Transportation System Funding for the 2012-2040 Period by Funding Type $1,577,651,251

Bicycle Funding Analysis T2040 Transportation System Funding projections for 2012-2040: $1,577,651,251 0.82% for bicycles AND pedestrian projects average per annum (T.E.): $463,695 Motorist network construction & maintenance average/annum (excl. transit): $41,157,396 Lawrence funds availability Sales Tax for Transportation, Special Alcohol Tax, Gas Tax, Public Parking Enterprise Fund, approximate per annum: $20,000,000 Politically tough mil levy increase

Bicycle Funding Request Capital Investment Real Estate Capital Reallocate public pavement for bicycle tracks, protected lanes, and bicycle boulevards Creative Staff Capital Create a Bicycle Engineering Division within the Public Works Dept. Hire a Bicycle Division Manager to implement build-out. Financial Capital Create a bicycle line item of $2 million/year or 10% of available motor vehicle funds, and allocate 6% of FHWA project funds to bicycles.

It's not rocket science

Thank you very much Michael Almon