Triangle Area Rural Planning Organization Rural Technical Coordinating Committee (RTCC)

Similar documents
RTAC Meeting Agenda DECEMBER 10, 2015 Chatham County Agriculture Center, Auditorium 65 E Chatham St Pittsboro, NC

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

Review of DRAFT STIP. January 18, 2017 MPO Meeting

339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway

Basalt Creek Transportation Refinement Plan Recommendations

Highway Project Scoring Worksheet Project Name: Ike Brooks Rd/Rives Chapel Church Rd Improvements (SPOT ID: H090571)

Review of DRAFT STIP. January 5, 2017 TCC Meeting

Project Description Tier Goal Previous SPOT Rank

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

STREET AND HIGHWAY PLAN

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

Lynchburg District Update

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Transportation Improvement Program (TIP) for Fiscal Years Presentation to Chittenden County Regional Planning Commission July 18, 2018

TRASBURG RANSPORTATION

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

Draft Local Input Points for Division Needs Transportation Projects

NORTH HIGHLAND LAKE ROAD PROJECT

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

Chapter 5 Future Transportation

Project Narrative Old Durham Road/Old Chapel Hill Road Complete Streets Project

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Recommendations. Implementation

Route 7 Corridor Study

CHAPTER 5 TRANSPORTATION GOAL

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Non-Motorized Transportation 7-1

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Project Fact Sheet. August 1,

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

2017 (FY 21,22,23) Ohio CMAQ Project Selection

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Section 8. Partnerships and Funding

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

FUNDING SOURCES CHAPTER 6

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

San Jose Transportation Policy

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Complete Streets. Designing Streets for Everyone. Sarnia

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Project Description Form 8EE

APPENDIX D COST SUMMARY TABLES

2017 (FY 21,22,23) Ohio CMAQ Prioritization

EXISTING CONDITIONS. Chapter General Overview

DEKALB COUNTY. 22. Priority Projects for DeKalb County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Welcome to the Sellwood Bridge Project Open House!

2012 PRIORITY TRANSPORTATION PROJECTS

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN

Zebulon Multimodal Transportation Plan Update

ARRENTON RANSPORTATION

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Reams Road RCA Study. Board of County Commissioners Public Hearing

City of Moorhead Committee of the Whole Meeting

CITY OF SPOKANE VALLEY Request for Council Action

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

MINUTES. October 18, 2011 Meeting

Prince George s County plans, policies, and projects

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Solana Beach Comprehensive Active Transportation Strategy (CATS)

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Setting the Stage for Complete Streets

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

CITY OF PORTSMOUTH PLANNING DEPARTMENT

TOWN OF CHAPEL HILL Town Council Special Meeting 405 Martin Luther King Jr Blvd, Chapel Hill, NC :00 P.M., OCTOBER 30, 2014

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

OKI Awards More Than $41 Million to Transportation Projects Across the Region

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

INDOT Complete Streets Guideline & Policy

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

5. RUNNINGWAY GUIDELINES

Transcription:

Triangle Area Rural Planning Organization Rural Technical Coordinating Committee (RTCC) 12 October 2017 10:30 AM to 1:00 PM Chatham County Agriculture & Conference Center 1192 US 64 Business West, Pittsboro, NC RTCC Agenda (begins at 10:30 AM) 1. Welcome and Introductions Chris Kennedy, RTCC Chair 2. Purpose and Agenda for Today s Meeting Matt Day, TARPO Staff 3. Public Comment Chris Kennedy, RTCC Chair 4. August 17, 2017 Meeting Summary Approval Chris Kennedy, RTCC Chair 5. Decision Items Chris Kennedy, RTCC Chair a. CMAQ Project Submittal for FY19 b. Pittsboro Bicycle & Pedestrian Planning Grant Application 6. Discussion Items Chris Kennedy, RTCC Chair a. Prioritization 5.0 Project List b. Comprehensive Transportation Plans in the TARPO Region 7. Member Updates from Around the Region Chris Kennedy, RTCC Chair Joint RTCC/RTAC Agenda (begins at 12:00 PM) 8. NCDOT Transportation Planning Branch Update Julie Bogle, NCDOT TPB 9. NCDOT Division 7 Update Ed Lewis, NCDOT Div. 7 10. NCDOT Division 8 Update Bryan Kluchar, NCDOT Div. 8 11. TARPO Staff Update Matt Day, TARPO Staff 12. RTCC Adjournment & Report to RTAC Chris Kennedy, RTCC Chair Next Meeting: December 14, 2017 at the Lee County Government Center in Sanford Triangle Area Rural Planning Organization Core Duties (G.S. 136-212) To develop, in cooperation with NCDOT, long-range local and regional multimodal transportation plans; provide a forum for public participation in the transportation planning process; develop and prioritize suggestions for transportation projects the organization believes should be included in the State Transportation Improvement Program; and provide transportation-related information to local governments and other interested organizations and persons.

TARPO Rural Technical Coordinating Committee Meeting Agenda Comments October 12, 2017 Item 4: August 17, 2017 Meeting Summary Approval Background The minutes of the August 17, 2017 TARPO RTCC meeting are attached for review. Recommendation Approval of August 17, 2017 TARPO RTCC meeting minutes.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 Triangle Area Rural Planning Organization (TARPO) Rural Transportation Coordinating Committee (RTCC) August 17, 2017 Meeting Minutes Members Present: Matt Day, Triangle J Council of Governments Debra Ensminger, Moore County Bruce Gould, Pinehurst (alternate) Jack Meadows, Siler City Ed Lewis, NCDOT Division 7 Brandon Jones, NCDOT Division 8 Pam Graham, Aberdeen David Montgomery, Sanford/Lee County/Broadway Cara Coppola, Chatham County Abigaile Pittman, Orange County Julie Bogle, NCDOT Transportation Planning Branch Jeff Jones, Pittsboro Chris Kennedy, Southern Pines (chair) Others Present: Bryan Kluchar, NCDOT Division 8 (alternate) Travis Morgan, NCDOT Division 8 Matthew Kitchen, NCDOT Division 8 Item 1 Welcome and Introductions At approximately 10:30 am, Mr. Kennedy noted that a quorum was in attendance and called the meeting to order. Introductions were conducted around the room. Item 2 Purpose & Agenda for Today s Meeting Mr. Day reviewed the agenda for the meeting. There were no amendments to the agenda. Item 3 Public Comment Mr. Kennedy called for any public comments. There were no members of the public who wished to make comments. Item 4 June 8, 2017 Meeting Summary Ms. Graham made a motion to approve the minutes as submitted, which was seconded by Mr. Meadows. The motion passed unanimously. Item 5a Election of RTCC vice chair for FY18 Mr. Day noted that Mr. Bushell had stepped down from his position at Orange County, so the RTCC would need to elect a new vice chair. Ms. Ensminger made a motion to approve Jack Meadows as the RTCC vice chair for the remainder of FY18. The motion was seconded by Ms. Graham, and passed unanimously. Item 5b Approval of Prioritization 5.0 Project Submittal List Mr. Day provided an overview of the activities of the Prioritization Subcommittee, which had met four times to develop a draft list of projects recommended for submittal to the Prioritization 5.0 process. He also discussed the comments that had been received from various local governments and how those comments had been addressed. Mr. Day also noted that several additional requests had been submitted to him since the final subcommittee meeting, as noted in the agenda materials. He added that since the time the agenda materials went out he had received further information on the project request from Moore County Airport such that they wished to combine two projects and add two projects the final project request list from Moore County Airport would be (1) Airfield Stormdrain Rehabilitation Phase II, (2) Master Plan Update, including ALP, (3) Hangar Development and Expand/Improve Airport Utilities, (4) Runway Pavement Strengthening, and (5) Taxiway and Apron Pavement Strengthening. RTCC members confirmed that the project at US 15-501 and Morganton Road should be listed as an interchange project TARPO RTCC August 17, 2017 Meeting Minutes 1

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 (there was originally some uncertainty about the intent of that project). There was also discussion about the need for additional information about the Chatham Transit vehicle request in order to submit the project. Committee members noted that both Pinehurst and Pittsboro had requested bicycle/pedestrian projects that could not fit in under the 22- project cap that the Prioritization Subcommittee had worked under, and requested that Division 8 consider submitting these two projects using its submittal slots. Mr. Gould made a motion to recommend that the RTAC approve the draft list recommended by the Prioritization Subcommittee, with the addition of the five Moore County Airport projects as discussed, and with the request that Division 8 consider submitting the US 15-501 sidewalk project in Pittsboro and the Murdocksville Road sidewalk project in Pinehurst. Ms. Ensminger seconded the motion and it passed unanimously. The recommended TARPO project submittal list was as follows: HIGHWAY (22 projects) Chatham County Interchange at US 64 and NC 751 NC 902 modernization (lane width/shoulder/geometry improvements) between US 421 and Chatham Central High School Interchange at US 421 and NC 902 Chatham Parkway, from US 15-501 to the end of the section being built by developer (in the vicinity of Russet Run). Two lanes on 4-lane right-of-way. NC 87 modernization (lane width/shoulder/geometry improvements) between NC 902 and US 64 Bypass Roundabout at S. 2 nd Avenue and Fayetteville Avenue in Siler City Roundabout at S. Chatham Avenue and Fayetteville Avenue in Siler City Lee County Widen Wilson Road from Industrial Drive to Horner Blvd Realign Kelly Drive at Central Carolina Community College Improved access road to airport from Farrell Rd (some on new location), including widening of Rod Sullivan Rd bridge over CSX railroad Improvements at Lee Avenue/Williams St/Fayetteville St, possibly also including Industrial Drive intersection Improvements at US 1 & NC 42 (Wicker St) ramps Commerce Drive extension to Lee Avenue Moore County Interchange at US 15-501 and Morganton Road Widen US 15-501 from Pinehurst Traffic Circle to NC 73, including realignment of McCaskill Road to align with NC 73 Intersection/operational improvements at US 15-501 and NC 24-27 (Monroe St)/Glendon-Carthage Rd/Union Church Rd area Widen NC 211 from Holly Grove School Road to US 220 in Candor (crosses into Montgomery County) Add third lane on NC 24-27 from NC 22 to Plank Road Broad Street-Poplar Street Connection in Southern Pines/Aberdeen NC 5 operational improvements (turn lanes, signal improvements, etc.) from NC 211 to south village limits of Pinehurst Orange County Efland-Cedar Grove Rd modernization (lane width/shoulder/geometry improvements) between Highland Farm Rd and NC 86 Old Greensboro Rd modernization (lane width/shoulder/geometry improvements) between Jones Ferry Rd and NC 87 (crosses into Alamance County) BICYCLE/PEDESTRIAN (22 projects) Chatham County West Street sidewalk in Pittsboro, from NC 87 to Central Carolina Community College, including pedestrian signals at West Street/NC 87 intersection NC 87 sidewalk in Pittsboro, from Pittsboro School Road to Town Lake Park TARPO RTCC August 17, 2017 Meeting Minutes 2

110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 E. Cardinal St/S. 10 th Ave sidewalk in Siler City, from Matthews St to E. Raleigh St W. 3 rd St sidewalk in Siler City, from N. Chatham Ave to N. Garden Ave N. 2 nd Ave sidewalk in Siler City, from E. 5 th St to Hilltop Drive W. Raleigh St sidewalk in Siler City, from George St to Wade Paschal Rd S. 2 nd Ave sidewalk in Siler City, from Greenhill Drive to Alston Bridge Rd Fayetteville Ave sidewalk in Siler City, from S. 2 nd Ave to S. Chatham Ave Lee County Wicker St/McIver St sidewalks, bike lanes, and railroad crossing improvements, from Moore St to Oakwood Ave Charlotte Ave sidewalks and road diet, from Chatham St to 11 th St Vance St sidewalks and bike lanes, from Wicker St to Fields Dr Hawkins Ave sidewalks and bike lanes and/or sidepath, from Carthage St to Burns Dr 3 rd St sidewalks and road diet, from Weatherspoon St to Horner Blvd Spring Lane sidepath, from Weatherspoon St to York Place Little Buffalo Creek Greenway, from Charlotte Ave to City Hall Moore County Downtown Aberdeen sidewalk, curb ramp, and crosswalk improvements Mike Place sidewalks in Aberdeen, from Magnolia Dr to Johnson St Poplar St sidewalk in Aberdeen/Southern Pines, from Johnson St to US 1/Pinehurst Ave Midland Rd greenway in Pinehurst/Southern Pines, from Airport Rd to Dr. Neal Rd Airport Rd greenway in Pinehurst/Southern Pines, from Midland Rd to Forest Creek Greenway/Knoll Rd Greenway Pee Dee Rd greenway in Southern Pines, from Pine St to Central Dr (NC 22) Central Dr greenway in Southern Pines, from Pee Dee Rd to Reservoir Greenway TRANSIT (2 projects) Chatham County Additional demand-response vehicles for Chatham Transit Orange County Two vehicles for deviated fixed route service in rural northern and western Orange County AVIATION (17 projects) Lee County Build airplane run-up lane at both ends of taxiway Replace PAPIs with new LED lights and replace MALSRs/install RDR signs Build new taxi lane connecting south ramp road and all taxi lanes on Ammons Farm Rd side of T-hangars Land acquisition for future airport development Develop new aviation related business areas east of airport New terminal building and improvements Construct new airplane storage box hangar East-west road on airport for on-site accessibility Control tower Extend runway from 6500 feet to 8500 feet Replace existing 8-foot airport perimeter fence with 10-foot perimeter wildlife fence T-hangar taxilane pavement rehabilitation/strengthening Moore County Airfield Stormdrain Rehabilitation Phase II Master Plan Update, including ALP Hangar Development and Expansion/Improvement of Airport Utilities Runway pavement strengthening Taxiway and apron pavement strengthening Item 5c Modification of Carry-over Projects from Prioritization 4.0 to 5.0 Mr. Day stated that he had received a request from the Lumber River RPO and Division 8 regarding the modification of project H090669, which was a carry-over project from P4.0. This project had previously been scored as a multilane TARPO RTCC August 17, 2017 Meeting Minutes 3

163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 widening project, but staff believed that it would score better as a modernization project with passing lanes and this was the modification that had been requested. Ms. Ensminger made a motion to recommend that the RTAC approve the modification request to project H090669, which was seconded by Ms. Graham. The motion passed unanimously. Item 5d Approval of Alternate Criteria for Division Needs Scoring Mr. Day described the process by which divisions or regions in the state may develop alternate scoring criteria that differ from the default criteria developed by the NCDOT P5.0 Work Group. He noted that in both Division 7 and Division 8, alternate criteria had been developed for use in the Division Needs scoring category for highway projects. The proposed alternate criteria would reduce the freight scoring criterion from 5% to 0% and would increase the safety criterion from 10% to 15%. He noted that in order to implement alternate criteria, the affected MPOs, RPOs, and Divisions would need to agree to the changes. He also noted that the changes were recommended because the majority of Division Needslevel projects in these areas would not benefit from use of the freight criterion. Mr. Meadows made a motion to recommend that the RTAC approve use of the alternate criteria for Divisions 7 and 8. Ms. Ensminger seconded the motion, and it passed unanimously. Item 6a Publication of Final 2018-27 STIP Mr. Day provided an overview of the Final 2018-27 STIP, specifically noting changes between the draft STIP and the final STIP. He noted that the NC 78 widening project in Lee County had been added as a new project (U-6070), that 11 projects had accelerated timelines, and that one project at the Lee County airport (AV-5857) had been removed because it was a duplicate of another funded project. Item 6b Megasite Corridor Mr. Day stated that he had seen a recording of a presentation the Piedmont Triad Regional Partnership had made to the NC Board of Transportation requesting that the US 421 corridor be designated as a Megasite Corridor and a future Interstate. He noted that it had only been a presentation and that the Board of Transportation had not taken action on the request. The committee members asked Mr. Day to keep them abreast of any future developments related to this. Item 6c Draft Changes to NCDOT Sidewalk Policy Mr. Day shared a copy of proposed changes to NCDOT s sidewalk policy. Item 6d Project Updates (R-5821A, C-5618C, R-5709) Mr. Day noted that the project limits of project R-5821A had been expanded to include the Main St/NC 54 intersection in Carrboro (the project previously ended at Old Fayetteville Rd/NC 54). He also noted that the Town of Pittsboro had requested that its CMAQ sidewalk project (C-5618C) be dropped, which meant that approximately 60,000 in CMAQ funding remained available for programming to another eligible project he asked staff in Chatham and Orange Counties to consider whether they had any additional project requests for this CMAQ funding. Mr. Day also provided a detailed description of the alternatives being considered for project R-5709 (widening of NC 211 between Aberdeen and Raeford). Item 6e Bicycle and Pedestrian Planning Grants Mr. Day noted that the window was open for municipalities that wish to apply for NCDOT bicycle and pedestrian planning grants. He asked any interested municipalities to let him know so that they could get on the October agenda for approval. Item 6f Fourth Quarter FY17 Finance Update and FY17 Annual Report Mr. Day provided an overview of the final finances for FY17 and encouraged members to read the annual report. Item 7 Member Updates This item was omitted due to time limitations. At approximately 11:55 am, the RTCC recessed for lunch. The remainder of the meeting was conducted jointly with the RTAC, and can be found in the RTAC minutes. TARPO RTCC August 17, 2017 Meeting Minutes 4

TARPO Rural Technical Coordinating Committee Meeting Agenda Comments October 12, 2017 Item 5a: CMAQ Project Submittal for FY19 Background At the August 2017 RTCC and RTAC meetings, staff noted that the Town of Pittsboro had rescinded its request for CMAQ funding of a sidewalk on West Street, and that as a result approximately 60,000 was available for reprogramming on another project in the CMAQeligible area. Staff asked Orange County, Chatham County, and the Town of Pittsboro to consider whether they had any replacement projects to submit. Orange County Public Transportation has responded with a request to fund the purchase of one light transit vehicle costing 56,500. To add on-board camera and radio would increase the cost to 60,000 (80% CMAQ amount equals 48,000, with the remaining 20% funded locally). This is the only request that staff has received. Recommendation Recommend that the RTAC approve submittal of the CMAQ project request from Orange County Public Transportation.

RESOLUTION IN SUPPORT OF THE CONGESTION MITIGATION AND AIR QUALITY APPLICATION FOR FY2019 FROM ORANGE COUNTY PUBLIC TRANSPORTATION TRIANGLE AREA RURAL PLANNING ORGANIZATION WHEREAS the Fixing America s Surface Transportation (FAST) Act continues the federal Congestion Mitigation and Air Quality Improvement Program (CMAQ); and WHEREAS CMAQ is a federal program that funds transportation projects and programs in air quality nonattainment and maintenance areas to help achieve and maintain national standards for pollutants; and WHEREAS the North Carolina Department of Transportation (NCDOT) administers the CMAQ program on behalf of nonattainment and maintenance areas within North Carolina; and WHEREAS a portion of Chatham County, North Carolina, and all of Orange County, North Carolina, were previously designated as a non-attainment area for the national eight-hour ozone standard; and WHEREAS the Triangle Area Rural Planning Organization (TARPO) has administered a CMAQ project selection process among local jurisdictions in air quality nonattainment and maintenance counties; and WHEREAS the resulting subject candidate project proposal meets the requirements of CMAQ and the guidelines established by the NCDOT to administer the program; and WHEREAS the subject candidate project will allow Orange County Public Transportation to expand its transit services; and WHEREAS a project that was previously programmed for funds has been requested for removal by the project sponsor, freeing those funds for allocation to another project; THEREFORE BE IT RESOLVED that the Rural Transportation Advisory Committee of the Triangle Area Rural Planning Organization endorses the proposal from Orange County Public Transportation to purchase a new light transit vehicle, and selects this project as its replacement project to use the funds previously allocated to the West Street sidewalk project in Pittsboro. ADOPTED, THIS THE 12 th DAY OF OCTOBER, 2017. Renee Price, TARPO RTAC Chair Matthew Day, TARPO Secretary

TARPO Rural Technical Coordinating Committee Meeting Agenda Comments October 12, 2017 Item 5b: Pittsboro Bicycle & Pedestrian Planning Grant Application Background Each Fall, NCDOT accepts applications for state funding from municipalities that wish to develop bicycle and pedestrian plans. As part of the process, the MPO or RPO that the municipality is a member of must also endorse the application and agree to participate in the process. In past years, Aberdeen, Carthage, Pinehurst, Pittsboro, Sanford, Siler City, and Southern Pines have received funds. The Town of Pittsboro last updated its state-funded pedestrian plan in 2009, and has never developed a state-funded bicycle plan. Given the tremendous changes taking place in Pittsboro, the Town plans to apply for grant funding to develop an updated joint bicycle and pedestrian plan. This is the only municipality staff is aware of that is developing an application this year. Recommendation Recommend that the RTAC endorse the Town of Pittsboro s application for an NCDOT Bicycle and Pedestrian Planning Grant.

RESOLUTION TO ENDORSE THE NCDOT BICYCLE AND PEDESTRIAN PLANNING GRANT APPLICATION FOR THE TOWN OF PITTSBORO TRIANGLE AREA RURAL PLANNING ORGANIZATION WHEREAS the North Carolina Department of Transportation has established a grant that provides funding to municipalities for the development of Comprehensive Municipal Bicycle and Pedestrian Plans; and WHEREAS the Town of Pittsboro has a desire to provide its citizens with safe, convenient, and more complete bicycle and pedestrian facilities within the community; and WHEREAS the Town of Pittsboro has decided to apply for funding from the Department of Transportation for development of a Comprehensive Bicycle and Pedestrian Plan; and WHEREAS the proposed Comprehensive Bicycle and Pedestrian Plan would complement and coordinate with existing plans in the region; and WHEREAS the Transportation Advisory Committee of the Triangle Area RPO determines it to be in the best interest of the citizens of Pittsboro to endorse said planning project; THEREFORE BE IT RESOLVED that the Rural Transportation Advisory Committee of the Triangle Area Rural Planning Organization hereby endorses the application for a Comprehensive Bicycle and Pedestrian Planning Grant made by the Town of Pittsboro, and if the project is selected, staff will provide technical assistance for the duration of the project. ADOPTED, THIS THE 12 th DAY OF OCTOBER, 2017. Renee Price, TARPO RTAC Chair Matthew Day, TARPO Secretary

TARPO Rural Technical Coordinating Committee Meeting Agenda Comments October 12, 2017 Item 6a: Prioritization 5.0 Project List Background At the August 2017 RTCC/RTAC meeting, TARPO approved its list of projects to submit for scoring in Prioritization 5.0. This included 22 highway projects, 22 bicycle/pedestrian projects, 17 aviation projects, and 2 transit projects (63 total). Following the August meeting, the Raleigh Executive Jetport at Sanford-Lee County clarified that three of its projects should be removed from the list because they had already been funded through alternative means or because the projects were not desired at this time, reducing the number of aviation project submittals to 14 (60 total). In addition to the 60 projects submitted by TARPO, there are 20 additional projects submitted by others (neighboring MPOs/RPOs or NCDOT Divisions) and 5 projects that automatically carried-over for rescoring from Prioritization 4.0, resulting in a total of 85 projects in the area. These additional projects are: Submitted by Durham-Chapel Hill-Carrboro MPO H090555A NC 751 widening between Lewter Shop Rd & O Kelly Chapel Rd Submitted by Burlington-Graham MPO H141391 NC 54 widening between Orange Grove Rd & NC 119 Submitted by Piedmont Triad RPO H170606 NC 24-27 modernization between US 220 & Old Glendon Rd Submitted by NCDOT Division 6 H090760 US 421 modernization between NC 87 & US 401 Submitted by NCDOT Division 8 B171646 Murdocksville Rd sidewalk in Pinehurst B171845 Second Ave road diet in Siler City B171849 Martin Luther King Jr Blvd sidewalk in Siler City

B171852 Alston Bridge Rd sidewalk in Siler City B171857 US 15-501 sidewalk in Pittsboro B172111 Pittsboro Courthouse Circle bike/ped improvements H170949 NC 87 modernization between US 64 & Pete Thomas Rd H170954 Moncure-Pittsboro Rd modernization between US 15-501 & Old US 1 H170955 US 64 synchronized street between Progress Blvd & Silk Hope Rd H170999 Second Ave/Fayetteville Ave road diet in Siler City H171637 Horner Blvd synchronized street from Wilson Rd to Harvey Faulk Rd H171698 US 15-501 synchronized street between US 64 & Smith Level Rd H171718 Airport Rd improvements between Lindbergh Pl & NC 22 roundabout H171724 Midland Rd access management between Airport Rd & Central Dr H171727 US 1 synchronized street between NC 2 & Camp Easter Rd H171781 NC 211-Roseland Rd connector Automatic Carry-over Projects from Priortization 4.0 A130488 Corporate hangar apron phase 2 at Raleigh Executive Jetport H090669 US 15-501 3-lane/passing lanes from US 1 to US 401 H140374A NC 54 widening from Old Fayetteville Rd to Orange Grove Rd H150159 NC 78 widening from US 1 to Lemon Springs Rd H150922 Pinehurst Traffic Circle improvements The following pages show the full list of projects. Recommendation For information only

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % A130488 Aviation Division Lee A170960 Aviation Division Moore A170962 Aviation Division Moore A170963 Aviation Division Moore TTA Raleigh Executive Jetport at Sanford- Lee County - Site development for expansion of the Corporate Hangar Apron Phase II (Partner Connect ID 2401) SOP Moore County Airport - Hangar development and expansion and improvement of airport utilities (Partner Connect ID # 2925 and 2505) SOP Moore County Airport - Strengthen runway pavement (Partner Connect Project # 3229) SOP Moore County Airport - Strengthen taxiway and apron pavement (Partner Connect ID # 2490 and 3396) 3,500,000 3,500,000 P4.0 Carryover 100 2,643,000 2,643,000 TARPO 100 8,275,000 8,275,000 TARPO 100 10,902,000 10,902,000 TARPO 100 A170964 Aviation Division Moore A170965 Aviation Division Moore A172210 Aviation Division Lee A172212 Aviation Division Lee A172214 Aviation Division Lee SOP Moore County Airport - Complete Phase 2 of airfield stormdrain rehabilitation (Partner Connect ID # 2503) SOP Moore County Airport - Conduct master plan update, including ALP update (Partner Connect ID # 2489) TTA Raleigh Executive Jetport at Sanford- Lee County - Build airplane run-up lane at both ends of taxiway (Partner Connect IDs 3687 and 3688). TTA Raleigh Executive Jetport at Sanford- Lee County - Replace PAPIs with new LED lights. Replace MALSRs/install RDR signs. (Partner Connect IDs 3689 and 3690). TTA Raleigh Executive Jetport at Sanford- Lee County - Build new taxi lane connecting south ramp road and all taxi lanes on Ammons Farm Road side of T- hangars (Partner Connect ID 3883). 452,000 452,000 TARPO 100 570,000 570,000 TARPO 100 1,160,000 1,160,000 TARPO 100 1,070,000 1,070,000 TARPO 100 2,500,000 2,500,000 TARPO 100 Page 1 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % TTA Raleigh Executive Jetport at Sanford- A172217 Aviation Division Lee Lee County - Acquire land for future airport development (Partner Connect ID 3878). 450,000 450,000 TARPO 100 A172219 Aviation Division Lee A172222 Aviation Division Lee A172223 Aviation Division Lee A172224 Aviation Division Lee A172226 Aviation Division Lee TTA Raleigh Executive Jetport at Sanford- Lee County - Develop new aviationrelated business areas east of airport (Partner Connect ID 3877). TTA Raleigh Executive Jetport at Sanford- Lee County - Construct control tower (Partner Connect ID 3879). TTA Raleigh Executive Jetport at Sanford- Lee County - Extend runway from 6500 feet to 8500 feet (Partner Connect ID 3880). TTA Raleigh Executive Jetport at Sanford- Lee County - Replace existing 8-foot airport perimeter fence with 10-foot perimeter wildlife fence (Partner Connect ID 3881). TTA Raleigh Executive Jetport at Sanford- Lee County - Rehabilitate/strengthen T- hangar taxi-lane pavement (Partner Connect ID 3882). 5,000,000 5,000,000 TARPO 100 5,000,000 5,000,000 TARPO 100 15,000,000 15,000,000 TARPO 100 1,000,000 1,000,000 TARPO 100 2,000,000 2,000,000 TARPO 100 B150941 Bike-Ped Division Lee Little Buffalo Creek Greenway from SR 1002 (Charlotte Ave) to Sanford City Hall - Construct greenway from downtown Sanford at Charlotte Ave to the vicinity of Sanford City Hall, including tunnel under Weatherspoon Street. 1,176,000 940,800 TARPO 100 Page 2 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % Aberdeen downtown pedestrian improvements - Construct pedestrian improvements at five intersections and B170789 Bike-Ped Division Moore one mid-block location in downtown Aberdeen, including stamped crosswalks, curb ramps, and necessary sidewalk improvements. 213,000 170,400 TARPO 100 B170977 Bike-Ped Division Chatham B170996 Bike-Ped Division Chatham B171007 Bike-Ped Division Chatham B171009 Bike-Ped Division Chatham B171034 Bike-Ped Division Chatham B171037 Bike-Ped Division Chatham B171040 Bike-Ped Division Chatham B171041 Bike-Ped Division Chatham B171446 Bike-Ped Division Lee US 64 Business (West St) from NC 87 to Central Carolina Community College - Construct sidewalk. Provide crosswalks and pedestrian signals at West St/NC 87 intersection. NC 87 from SR 1967 (Pittsboro Elementary School Rd) to Town Lake Park entrance - Construct sidewalk. E Cardinal St/S 10th Ave from SR 2223 (Matthews St) to SR 2103 (E Raleigh St) - Construct sidewalk. SR 1107 (W 3rd St) from SR 1108 (N Chatham Ave) to N Garden Ave - Construct sidewalk. SR 1006 (N 2nd Ave) from SR 2100 (E 5th St) to Hilltop Dr - Construct sidewalk. SR 1006 (W Raleigh St) from George St to SR 1119 (Wade Paschal Rd) - Construct sidewalk. SR 2208 (S 2nd Ave) from Greenhill Dr to SR 2110 (Alston Bridge Rd) - Construct sidewalk. SR 2113 (Fayetteville Ave) from SR 2208 (S 2nd Ave) to SR 1108 (S Chatham Ave) - Construct sidewalk. Wicker St/McIver St from Moore St to Oakwood Ave - Construct sidewalks, add bike lanes, and improve railroad crossing. 149,000 119,200 TARPO 100 511,000 408,800 TARPO 100 902,000 721,600 TARPO 100 834,000 667,200 TARPO 100 853,000 682,400 TARPO 100 666,000 532,800 TARPO 100 517,000 413,600 TARPO 100 234,000 187,200 TARPO 100 992,000 793,600 TARPO 100 Page 3 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % Vance St from Wicker St to SR 1107 B171458 Bike-Ped Division Lee (Fields Dr) - Construct sidewalks and add bike lanes. 358,000 286,400 TARPO 100 B171464 Bike-Ped Division Lee B171472 Bike-Ped Division Lee B171473 Bike-Ped Division Lee B171638 Bike-Ped Division Moore B171644 Bike-Ped Division Moore US 1 Business (Hawkins Ave) from US 1 Business (Carthage St) to SR 1406 (Burns Dr) - Construct sidewalks and bike lanes on a portion of Hawkins Ave. Construct multi-use sidepath on remaining portion. SR 1515 (3rd St) from SR 1560 (Weatherspoon St) to NC 87 (Horner Blvd) - Construct/improve sidewalks, ramps, and railroad crossing. Add bike lanes through road diet. SR 1100 (Spring Lane) from SR 1560 (Weatherspoon St) to York Place - Construct multi-use sidepath. Airport Road Greenway from NC 2 (Midland Rd) to existing Forest Creek Greenway - Construct multi-use greenway path. Midland Road Greenway from SR 1843 (Airport Rd) to SR 1847 (Dr Neal Rd) - Construct multi-use greenway path. 1,765,000 1,412,000 TARPO 100 423,000 338,400 TARPO 100 2,182,000 1,745,600 TARPO 100 1,567,000 1,253,600 TARPO 100 461,000 368,800 TARPO 100 B171646 Bike-Ped Division Moore B171838 Bike-Ped Division Moore B171839 Bike-Ped Division Moore B171841 Bike-Ped Division Moore SR 1209 (Murdocksville Rd) from NC 211 to Centennial Blvd - Construct sidewalk. Pee Dee Road Greenway from Pine St to NC 22 (Central Dr) - Construct multi-use greenway path. Central Drive Greenway from SR 1848 (Pee Dee Rd) to Reservoir Park Greenway - Construct multi-use greenway path SR 2055 (Poplar St) from US 1 (Sandhills Blvd) to Johnson St - Construct sidewalk. 389,000 311,200 Division 8 100 1,634,000 1,307,200 TARPO 100 718,000 574,400 TARPO 100 188,000 150,400 TARPO 100 Page 4 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % SR 1006/2113 (Second Ave) from B171845 Bike-Ped Division Chatham Seventh St to Beaver St - Perform road diet 2,961,000 2,368,800 Division 8 100 B171849 Bike-Ped Division Chatham B171852 Bike-Ped Division Chatham B171857 Bike-Ped Division Chatham B171859 Bike-Ped Division Moore B172057 Bike-Ped Division Lee B172111 Bike-Ped Division Chatham H090158A Highway Regional Moore/Montgomery H090302 Highway Regional Chatham H090555A Highway Regional Chatham SR 1004 (Martin Luther King Jr Blvd) from US 64 (11th St) to 15th St - Construct sidewalk SR 2110 (Alston Bridge Rd) from SR 2208 (S 2nd Ave) to Kent Rd - Construct sidewalk US 15-501 from Powell Place to Northwood High School Rd - Construct sidewalk. SR 1326 (Mike's Place) from SR 1203 (Johnson St) to SR 1311 (Magnolia Dr) - Construct sidewalk. SR 1002 (Charlotte Ave) from Chatham St to SR 1002 (11th St) - Construct sidewalks and add bike lanes. Perform road diet. US 64 and US 15-501 Traffic Circle - Improve bicycle and pedestrian accommodations around the traffic circle in downtown Pittsboro. NC 211 from US 220 east of Candor to SR 1241 near Seven Lakes - Widen to multilanes. NC 87 from NC 902 to US 64 Bypass - Widen to 12ft lanes and 4ft paved shoulders. NC 751 from SR 1740 Lewter Shop Rd to O'Kelly Chapel Rd - Widen road to 4 lanes with bicycle lanes on existing location. 370,000 296,000 Division 8 100 855,000 684,000 Division 8 100 342,000 273,600 Division 8 100 282,000 225,600 TARPO 100 1,476,000 1,180,800 TARPO 100 1,556,000 1,244,800 Division 8 100 59,766,000 59,766,000 TARPO 86 3,375,000 3,375,000 TARPO 100 56,781,000 56,781,000 DCHC MPO 10 H090559 Highway Division Orange SR 1004/1357 (Efland-Cedar Grove Road) from SR 1332 (Highland Farm Rd) to NC 86 - Modernization, including turn lanes where appropriate, and addition of 4-foot paved shoulders. 5,481,000 5,481,000 TARPO 100 Page 5 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % H090669 Highway Regional Moore/Hoke/Scotland US 15-501 from US 401 to US 1 - Widen US 15/501 to three lanes (2+1 passing lanes) from US 401 in Laurinburg to where US 1 becomes four lanes in Aberdeen. 117,342,000 117,342,000 P4.0 Carryover 17 H090760 Highway Regional Lee/Harnett H111162 Highway Division Orange/Alamance H140374A Highway Regional Orange H140385 Highway Regional Moore H141391 Highway Regional Orange/Alamance H150148 Highway Division Lee H150159 Highway Regional Lee H150762 Highway Statewide Chatham US 421 from US 401 to NC 87 - Construct turn lanes, widen and pave shoulders where needed and enhance corridor from Lillington in Harnett County to Sanford in Lee County. SR 1005 (Old Greensboro Rd) from SR 1942 (Jones Ferry Rd) to NC 87 in Alamance County - Modernize and add 4- foot paved shoulders. NC 54 from SR 1006 (Orange Grove Rd) to SR 1937/1107 (Old Fayetteville Rd) - Widen to a four-lane boulevard. US 15-501 from NC 211/NC 2 (Pinehurst Traffic Circle) to NC 73 - Widen to multilane divided facility, including improvements to align offset intersections at NC 73 and McCaskill Road. NC 54 from NC 119 to Orange Grove Rd - Widen roadway from two-lane undivided to four-lane divided roadway. SR 1521 (Kelly Drive) from SR 1519 (Nash St) to northeast of Central Carolina Community College campus - Realign Kelly Drive to bypass Central Carolina Community College campus. NC 78 (Tramway Rd) from US 1 to SR 1001 (Lemon Springs Rd) - widen to multilane divided facility. US 64 at NC 751 - Construct interchange. Include provisions for bicycles on NC 751. 20,957,000 20,957,000 Division 6 26 13,755,000 13,755,000 TARPO 54 70,578,000 70,578,000 P4.0 Carryover 35 36,423,000 36,423,000 TARPO 100 102,693,000 102,693,000 BGMPO 38 7,366,000 7,366,000 TARPO 100 45,346,000 45,346,000 P4.0 Carryover 100 7,360,000 7,360,000 TARPO 98 Page 6 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % H150922 Highway Regional Moore H170185 Highway Division Chatham H170587 Highway Regional Chatham US 15-501 from SR 1208 (Page Rd) to Voit Gilmore Lane - Upgrade the intersection of SR 1208 Page Road at US 15/501 and construct improvements on each approach entering the Pinehurst Traffic Circle, including operational improvements within the Traffic Circle. SR 2113 (Second Ave/Fayetteville Ave) at SR 2208 (Second Ave) - Construct roundabout. NC 902 from US 421 to Chatham Central High School - Modernize roadway. 2,232,000 2,232,000 P4.0 Carryover 100 930,000 930,000 TARPO 100 2,229,000 2,229,000 TARPO 100 H170588 Highway Statewide Chatham US 421 at NC 902 - Construct interchange. 7,360,000 7,360,000 TARPO 100 H170589 Highway Division Chatham H170590 Highway Division Chatham H170591 Highway Division Lee H170606 Highway Regional Moore/Montgomery H170747 Highway Division Lee Chatham Parkway from US 15-501 to end of Chatham Parkway section being built by developer (near Russet Run) - Construct 2-lane road on a 4-lane right-ofway. SR 2113 (Fayetteville Ave/Chatham Ave) at SR 1108 (Chatham Ave) - Construct roundabout. SR 1136/1240 (Wilson Rd) from NC 87 (Horner Blvd) to SR 1239 (Industrial Dr) - Widen to multilanes. NC 24-27 from I-73/I-74/US 220 to SR 1644 (Old Glendon Rd) - Modernize NC 24/27 from I-73/74 to the future Carthage Bypass. SR 1423/1483 (Farrell Rd/Rod Sullivan Rd) from US 1 to Raleigh Executive Jetport entrance - Modernize, and realign intersection at SR 1423 and SR 1483 to provide direction connection between US 1 and the airport. Improve railroad bridge on SR 1483. 8,173,000 8,173,000 TARPO 100 930,000 930,000 TARPO 100 10,728,000 10,728,000 TARPO 100 441,000 441,000 PTRPO 89 2,086,000 2,086,000 TARPO 100 Page 7 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % SR 1133 (Lee Ave) at Williams H170748 Highway Division Lee St/Fayetteville St - Improve intersection. Possibly a roundabout, but open to other possibilities as well. 930,000 930,000 TARPO 100 H170749 Highway Statewide Lee H170750 Highway Division Lee US 1 at NC 42 (Wicker St) - Improve intersections at US 1 on/off ramps terminals for NC 42 (Wicker St). Possibly roundabouts, but open to other possibilities. Commerce Drive Extension from SR 1133 (Lee Ave) to existing Commerce Drive - Construct 2-lane extension of existing Commerce Drive to connect to Lee Ave. 10,230,000 10,230,000 TARPO 100 5,199,000 5,199,000 TARPO 100 H170751 Highway Regional Moore H170752 Highway Regional Moore H170754 Highway Statewide Moore H170755 Highway Division Moore NC 211/US 15-501 at SR 1205/1309 (Morganton Rd) - Construct interchange. US 15-501 at NC 24-27 - Improve intersection. Could also include improvements to nearby intersections at US 15-501 and Glendon-Carthage Rd, NC 24-27 and Glendon-Carthage Rd, and US 15-501 and Union Church Rd. NC 24-27 from NC 22 (western intersection) to SR 1477 (Plank Rd) - Widen to three lanes. Broad-Poplar Connector from SR 2055 (Poplar St) to SR 2080 (Old US 1) - Construct 2-lane road on new location from Poplar St to existing section of Broad St. Upgrade existing narrow section of Broad St from end of road to Old US 1/Morganton Rd. 15,038,000 15,038,000 TARPO 100 1,600,000 1,600,000 TARPO 100 2,226,000 2,226,000 TARPO 100 12,636,000 12,636,000 TARPO 100 Page 8 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % NC 5 (Beulah Hill Rd) from NC 211 to Pinehurst southern village limits H170756 Highway Regional Moore (beginning of U-5756) - Add turn lanes, signal improvements, and other operational improvements throughout corridor as appropriate. 3,976,000 3,976,000 TARPO 100 H170949 Highway Regional Chatham H170954 Highway Division Chatham H170955 Highway Statewide Chatham H170999 Highway Division Chatham H171637 Highway Regional Lee H171698 Highway Statewide Chatham H171718 Highway Division Moore H171724 Highway Regional Moore NC 87 from US 64 Pittsboro Bypass to SR 1553 Pete Thomas Rd - Modernization. Turn lanes and intersection improvements. SR 1012 (Moncure Pittsboro Rd) from 15-501 to Old US 1 - Modernization. Turn lanes and intersection improvements. US 64 from Progress Blvd to SR 1003 (Silk Hope Rd) - Synchronized street connects to U-5737. SR 1006 (Fayetteville Ave/2nd Ave) from SR 1108 (S Chatham Ave) to N Cottage Grove Ave - Road diet and add 3 roundabouts in Siler City. NC 87 (S Horner Blvd) from US 421 Bus (Wilson Rd) to SR 1138 (Harvey Faulk Rd) - Convert 5-lane to synchronized street. US 15-501 from US 64 to SR 1919 (Smith Level Rd) - Synchronized street, missing sections. SR 1843 (Airport Rd) from Lindbergh Pl to Roundabout at NC 22 - Modernization with existing roundabout modification. Turn lanes at Sandhills Horticultural Gardens and add slip lanes - multilane roundabout. NC 2 (Midland Rd) from SR 1843 (Airport Rd) to NC 22 (Central Dr) - Access management. 14,704,000 14,704,000 Division 8 100 9,047,000 9,047,000 Division 8 100 6,119,000 6,119,000 Division 8 100 10,405,000 10,405,000 Division 8 100 6,926,000 6,926,000 Division 8 100 54,331,000 54,331,000 Division 8 57 2,712,000 2,712,000 Division 8 100 26,024,000 26,024,000 Division 8 100 Page 9 10/2/2017

P5.0 TARPO Project Master List SPOT ID Mode Highest Tier County Description Total Cost Cost to NCDOT Submitted By TARPO % H171727 Highway Statewide Moore H171781 Highway Regional Moore T171420 Transit Division Chatham T171425 Transit Division Orange XXX Aviation Division Lee XXX Aviation Division Lee XXX Aviation Division Lee US 1 from NC 2 (Midland Rd) to SR 1853 (Camp Easter Rd) - Synchronized street. NC 211/SR 1112 (Roseland Rd) Connector - New location connection. Chatham Transit - Purchase three new ramp-equipped minivans. Orange Public Transit - Purchase two light transit vehicles. TTA Raleigh Executive Jetport at Sanford- Lee County - New terminal building and improvements. Was not submitted for STI because airport has already received a grant to pay for this. TTA Raleigh Executive Jetport at Sanford- Lee County - Construct new airplane storage box hangar. Was not submitted for STI because airport has already received a grant to pay for this. TTA Raleigh Executive Jetport at Sanford- Lee County - East/west road on airport for on-site accessibility. Was not submitted for STI at airport's request. 29,437,000 29,437,000 Division 8 100 4,319,000 4,319,000 Division 8 100 141,000 126,900 TARPO 91 108,400 97,560 TARPO 51 XXX XXX Not Submitted XXX XXX XXX Not Submitted XXX XXX XXX Not Submitted XXX Page 10 10/2/2017

Chatham County P5.0 Projects SPOT ID Legend B170977 Highway Projects for P5.0 n o Bike Ped Projects for P5.0 B170996 Transit Projects for P5.0 B171007 Aviation Projects for P5.0 B171009 Previously committed Projects (not in P5.0) B171034 B171037 B171040 B171041 B171845 B171849 B171852 B171857 B172111 H090302 n H090555A H150762 H170185 H170587 H170588 H170589 H170590 H170949 H170954 o o o o H170955 H170999 H171698 T171420 Description US 64 Business (West St) from NC 87 to Central Carolina Community College Construct sidewalk. Provide crosswalks and pedestrian signals at West St/NC 87 intersection. NC 87 from SR 1967 (Pittsboro Elementary School Rd) to Town Lake Park entrance Construct sidewalk. E Cardinal St/S 10th Ave from SR 2223 (Matthews St) to SR 2103 (E Raleigh St) Construct sidewalk. SR 1107 (W 3rd St) from SR 1108 (N Chatham Ave) to N Garden Ave Construct sidewalk. SR 1006 (N 2nd Ave) from SR 2100 (E 5th St) to Hilltop Dr Construct sidewalk. SR 1006 (W Raleigh St) from George St to SR 1119 (Wade Paschal Rd) Construct sidewalk. SR 2208 (S 2nd Ave) from Greenhill Dr to SR 2110 (Alston Bridge Rd) Construct sidewalk. SR 2113 (Fayetteville Ave) from SR 2208 (S 2nd Ave) to SR 1108 (S Chatham Ave) Construct sidewalk. SR 1006/2113 (Second Ave) from Seventh St to Beaver St Perform road diet SR 1004 (Martin Luther King Jr Blvd) from US 64 (11th St) to 15th St Construct sidewalk SR 2110 (Alston Bridge Rd) from SR 2208 (S 2nd Ave) to Kent Rd Construct sidewalk US 15 501 from Powell Place to Northwood High School Rd Construct sidewalk. US 64 and US 15 501 Traffic Circle Improve bicycle and pedestrian accommodations around the traffic circle in downtown Pittsboro. NC 87 from NC 902 to US 64 Bypass Widen to 12ft lanes and 4ft paved shoulders. NC 751 from SR 1740 Lewter Shop Rd to O'Kelly Chapel Rd Widen road to 4 lanes with bicycle lanes on existing location. US 64 at NC 751 Construct interchange. Include provisions for bicycles on NC 751. SR 2113 (Second Ave/Fayetteville Ave) at SR 2208 (Second Ave) Construct roundabout. NC 902 from US 421 to Chatham Central High School Modernize roadway. US 421 at NC 902 Construct interchange. Chatham Parkway from US 15 501 to end of Chatham Parkway section being built by developer (near Russet Run) Construct 2 lane road on a 4 lane right of way. SR 2113 (Fayetteville Ave/Chatham Ave) at SR 1108 (Chatham Ave) Construct roundabout. NC 87 from US 64 Pittsboro Bypass to SR 1553 Pete Thomas Rd Modernization. Turn lanes and intersection improvements. SR 1012 (Moncure Pittsboro Rd) from 15 501 to Old US 1 Modernization. Turn lanes and intersection improvements. US 64 from Progress Blvd to SR 1003 (Silk Hope Rd) Synchronized street connects to U 5737. SR 1006 (Fayetteville Ave/2nd Ave) from SR 1108 (S Chatham Ave) to N Cottage Grove Ave Road diet and add 3 roundabouts in Siler City. US 15 501 from US 64 to SR 1919 (Smith Level Rd) Synchronized street, missing sections. Chatham Transit Purchase three new ramp equipped minivans. Total Cost 149,000 511,000 902,000 834,000 853,000 666,000 517,000 234,000 2,961,000 370,000 855,000 342,000 1,556,000 3,375,000 56,781,000 7,360,000 930,000 2,229,000 7,360,000 8,173,000 930,000 14,704,000 9,047,000 6,119,000 10,405,000 54,331,000 141,000 Chatham County Previously committed Projects for reference only TIP # R 5724 U 5737 B 5738 AV 5736 CHATHAM COUNTY Description US 15 501 from Launis St to Powell Place Ln widen to multilanes US 64 (11th St) from N Glenn Ave to US 421 upgrade roadway to include median for access control, sidewalks, crosswalks, bicycle lanes and/or multiuse sidepath Chatham Church Rd bridge replacement over Rocky River Siler City Municipal Airport acquire navigation easements in Runway 4 and Runway 22 approaches, and remove obstructions in easements EB 5871 Siler City Municipal Airport extend Runway 22 and parallel taxiway by 500 feet, including relocation of Airport Road E 3rd St from N 5th Ave to US 64 construct sidewalk EB 5734 E Raleigh St from S 7th Ave to US 64 construct sidewalk/multiuse path AV 5816 Total Cost 7,100,000 11,100,000 2,200,000 300,000 5,700,000 300,000 900,000

Legend Highway Projects for P5.0 Bike Ped Projects for P5.0 n Transit Projects for P5.0 o Aviation Projects for P5.0 Previously committed Projects (not in P5.0) LEE COUNTY o Lee County P5.0 Projects SPOT ID Description Total Cost A130488 TTA Raleigh Executive Jetport at Sanford Lee County Site development for expansion of the Corporate Hangar Apron Phase II (Partner Connect 3,500,000 ID 2401) A172210 TTA Raleigh Executive Jetport at Sanford Lee County Build airplane run up lane at both ends of taxiway (Partner Connect IDs 3687 and 1,160,000 3688). A172212 TTA Raleigh Executive Jetport at Sanford Lee County Replace PAPIs with new LED lights. Replace MALSRs/install RDR signs. (Partner 1,070,000 Connect IDs 3689 and 3690). A172214 TTA Raleigh Executive Jetport at Sanford Lee County Build new taxi lane connecting south ramp road and all taxi lanes on Ammons Farm 2,500,000 Road side of T hangars (Partner Connect ID 3883). A172217 TTA Raleigh Executive Jetport at Sanford Lee County Acquire land for future airport development (Partner Connect ID 3878). 450,000 A172219 TTA Raleigh Executive Jetport at Sanford Lee County Develop new aviation related business areas east of airport (Partner Connect ID 5,000,000 3877). A172222 TTA Raleigh Executive Jetport at Sanford Lee County Construct control tower (Partner Connect ID 3879). 5,000,000 A172223 TTA Raleigh Executive Jetport at Sanford Lee County Extend runway from 6500 feet to 8500 feet (Partner Connect ID 3880). 15,000,000 A172224 TTA Raleigh Executive Jetport at Sanford Lee County Replace existing 8 foot airport perimeter fence with 10 foot perimeter wildlife fence 1,000,000 (Partner Connect ID 3881). A172226 TTA Raleigh Executive Jetport at Sanford Lee County Rehabilitate/strengthen T hangar taxi lane pavement (Partner Connect ID 3882). 2,000,000 Little Buffalo Creek Greenway from SR 1002 (Charlotte Ave) to Sanford B150941 City Hall Construct greenway from downtown Sanford at Charlotte Ave 1,176,000 to the vicinity of Sanford City Hall, including tunnel under Weatherspoon Street. B171446 Wicker St/McIver St from Moore St to Oakwood Ave Construct sidewalks, add bike lanes, and improve railroad crossing. 992,000 B171458 Vance St from Wicker St to SR 1107 (Fields Dr) Construct sidewalks and add bike lanes. 358,000 B171464 US 1 Business (Hawkins Ave) from US 1 Business (Carthage St) to SR 1406 (Burns Dr) Construct sidewalks and bike lanes on a portion of Hawkins Ave. Construct multi use sidepath on remaining portion. SR 1515 (3rd St) from SR 1560 (Weatherspoon St) to NC 87 (Horner B171472 Blvd) Construct/improve sidewalks, ramps, and railroad crossing. Add bike lanes through road diet. SR 1100 (Spring Lane) from SR 1560 (Weatherspoon St) to York Place B171473 Construct multi use sidepath. SR 1002 (Charlotte Ave) from Chatham St to SR 1002 (11th St) B172057 Construct sidewalks and add bike lanes. Perform road diet. US 421 from US 401 to NC 87 Construct turn lanes, widen and pave H090760 shoulders where needed and enhance corridor from Lillington in Harnett County to Sanford in Lee County. SR 1521 (Kelly Drive) from SR 1519 (Nash St) to northeast of Central H150148 Carolina Community College campus Realign Kelly Drive to bypass Central Carolina Community College campus. NC 78 (Tramway Rd) from US 1 to SR 1001 (Lemon Springs Rd) widen H150159 to multilane divided facility. SR 1136/1240 (Wilson Rd) from NC 87 (Horner Blvd) to SR 1239 H170591 (Industrial Dr) Widen to multilanes. SR 1423/1483 (Farrell Rd/Rod Sullivan Rd) from US 1 to Raleigh Executive Jetport entrance Modernize, and realign intersection at SR H170747 1423 and SR 1483 to provide direction connection between US 1 and the airport. Improve railroad bridge on SR 1483. H170748 SR 1133 (Lee Ave) at Williams St/Fayetteville St Improve intersection. Possibly a roundabout, but open to other possibilities as well. 1,765,000 423,000 2,182,000 1,476,000 20,957,000 7,366,000 45,346,000 10,728,000 2,086,000 930,000 H170749 US 1 at NC 42 (Wicker St) Improve intersections at US 1 on/off ramps terminals for NC 42 (Wicker St). Possibly roundabouts, but open to 10,230,000 other possibilities. H170750 Commerce Drive Extension from SR 1133 (Lee Ave) to existing Commerce Drive Construct 2 lane extension of existing Commerce 5,199,000 Drive to connect to Lee Ave. H171637 NC 87 (S Horner Blvd) from US 421 Bus (Wilson Rd) to SR 1138 (Harvey Faulk Rd) Convert 5 lane to synchronized street. 6,926,000 Lee County Previously committed Projects for reference only TIP # Description Total Cost R 3830 NC 42 and Broadway Rd from Horner Blvd to Harrington Ave widen to multilanes 29,500,000 U 5975 US 1 15 501 from White Hill Rd to Pendergrass Rd upgrade to superstreet 38,500,000 U 5727 US 1 15 501 from south of NC 78 to Pendergrass Rd convert at grade intersection to interchange and realign NC 78 33,000,000 U 5722 Horner Blvd from US 1 15 501 to north of Bragg St reconstruct as a complete street with improvements such as medians, sidewalks, bicycle 32,300,000 facilities, and streetscaping U 5709 Carthage St from Fire Tower Rd to Wicker St widen roadway 13,300,000 B 5976 Cumnock Rd bridge replacements over NS railroad 4,100,000 AV 5762 Raleigh Executive/Sanford Lee County Airport construct corporate area apron phase 1 3,700,000 EB 5863 Carthage St from Wicker St to Chatham St reduce number of lanes and construct bicycle/pedestrian accommodations 1,900,000 EB 5742 Wicker St from West Lee Middle School to Kiwanis Family Park Greenway construct multiuse path 500,000 EB 5867 Fields Dr from Carthage St to Horner Blvd construct sidewalk 900,000 EB 5870 S Main St in Broadway from Mansfield Dr to end of existing sidewalk construct sidewalk 100,000 EB 5868 Woodland St from Evergreen Ln to Globe St construct sidewalk 700,000