Estimated on-the-ground start and end dates: 1 June October 2018

Similar documents
U.S. Army Corps of Engineers (USACE) P.O. Box 428 Smithville, MO

DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP)

Introduction: JadEco, LLC PO BOX 445 Shannon, IL 61078

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

TABLE ROCK LAKE 2014 ANNUAL LAKE REPORT. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region

Engbretson Underwater Photography Traits of Ineffective Cribs

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

U.S. Army Corps of Engineers

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

2015 Annual Report. February 15, 2016

SKIATOOK LAKE MANAGEMENT PLAN

Ross Barnett Reservoir 2019

Tunica Cutoff 2018 REEL FACTS Keith Meals Fisheries Biologist

SOONER LAKE MANAGEMENT PLAN

Busse Reservoir South Lateral Pool Population Survey

JadEco, LLC PO BOX 445 Shannon, IL 61078

Overview of Recreational Pond Management

Behavior and survival of hatchery reared advanced fingerling largemouth bass using radio telemetry. Brandon Thompson

Ross Barnett Reservoir 2018

Quarry Lakes Fisheries Report EBRPD Fisheries Department. Joe Sullivan Fisheries Resource Analyst Peter Alexander Fisheries Program Manager

Arrowhead Lake Population Survey

Green Lake Population Survey

2014 Island Lake Survey June 13 th, 2014 Andrew Plauck District Fisheries Biologist Report Prepared 4 March 2015

Schiller Pond Population Survey

Tampier Lake Population Survey

Wampum Lake Population Survey

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Rolling Knolls Pond Population Survey

Sag Quarry - West Population Survey

CARL BLACKWELL LAKE MANAGEMENT PLAN

Maple Lake Population Survey

2016 Volunteer Program Annual Report

DEPARTMENT OF THE ARMY SOUTH ATLANTIC DIVISION, CORPS OF ENGINEERS ROOM 9M15, 60 FORSYTH ST., S.W. ATLANTA GA

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

LAKE TANEYCOMO 2011 ANNUAL LAKE REPORT

Big Bend Lake Population Survey

Management Plan for the Obey River Trout Fishery

LAKE DIANE Hillsdale County (T8-9S, R3W, Sections 34, 3, 4) Surveyed May Jeffrey J. Braunscheidel

Pennsylvania Fish & Boat Commission Biologist Report. Wilmore Dam. Cambria County. May 2011 Trap Net, Electrofishing and Hoop Net Survey

Cat Island Chain Restoration

FINAL Caples Lake Fisheries Management Plan. Version 4.0

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

DRIPPING SPRINGS LAKE 5 YEAR LAKE MANAGEMENT PLAN

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Bode Lake - South Population Survey

Upper/Lower Owl Creek Reservoir

The Blue Heron Slough Conservation Bank

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

R & E Grant Application 13 Biennium

Little Calumet River Rapid Response Fish Identification and Enumeration Branch Summary Report

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

Lake Butte des Morts Commercial Seining Project Report

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

Lake Texoma Advisory Committee

FACT SHEET I. LOCATION

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Crawford Reservoir. FISH SURVEY AND MANAGEMENT INFORMATION Eric Gardunio, Fish Biologist Montrose Service Center

Longshore Bar Creation: a viable option for seagrass restoration?

Corps Plays Vital Role in Protecting Pacific Reefs

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Cedar Lake Comprehensive Survey Report Steve Hogler and Steve Surendonk WDNR-Mishicot

Multi jurisdictional Approach to Asian carp in the Upper Illinois River and Chicago Area Waterway System. ICAIS Niagara Falls, ON.

Water Resources Report RKLD Annual Meeting July 30, 2016

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

Current Status and Management Recommendations for the Fishery in the Cloverleaf Chain of Lakes

Lake Seminole. and Waters Bordering Georgia and Alabama

Columbia Lake Dam Removal Project

Moon Lake 2018 REEL FACTS Nathan Aycock - Fisheries Biologist (601)

Warmwater Fisheries Assessments 2014

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania

Oceanic Society Reef Research Team: Nicole Crane, Avigdor Abelson, Peter Nelson, Giacomo Bernardi, Michelle Paddack, Kate Crosman

Fraser River. FISH SURVEY AND MANAGEMENT INFORMATION Jon Ewert - Aquatic Biologist (Hot Sulphur Springs)

O Malley s Ponds Population Survey

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

MIDDLE FORK RESERVOIR Wayne County 2004 Fish Management Report. Christopher C. Long Assistant Fisheries Biologist

CORRESPONDENCE/MEMORANDUM

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

2017 State of the Tidal Potomac River Largemouth Bass Fishery (Maryland) Joe Love

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

PRODUCING A TROPHY LARGEMOUTH BASS FISHERY (CASE STUDY) Greg Grimes President of Aquatic Environmental Services, Inc.

HOT SPRINGS VILLAGE LAKES

U.S. Fish and Wildlife Service Native American Crosscut Funding

Claytor Lake View of the Claytor Lake dam from Claytor Lake State Park s boat ramp.

BASS LAKE PLANNING UNIT Willow Creek Watershed

MISSISSIPPI MAKEOVER A Plan for Restoration, Just Around the Bend

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

GLEN ELDER DISTRICT FISHERIES NEWSLETTER

LITTLE WHITE OAK Knox County 2006 Fish Management Report. Debbie King Assistant Fisheries Biologist

REEL FACTS. Regulations. Limblines Fishing with limblines and set hooks is prohibited at Lake Washington.

Shoreline Studies Program, Department of Physical Sciences, VIMS

Shoalwater Bay Shorline Erosion Dredging

Transcription:

A. Applicant Information Name of Organization: U.S. Army Corps of Engineers, Carlyle Lake 801 Lake Road, Carlyle, IL 62231 Contact Information: Robert Wilkins, Operations Manager, (618) 594-2484, Robert.Wilkins@usace.army.mil Name of Friends of Reservoirs: N/A B. Information: Title: Carlyle Lake Point #1 Fisheries Habitat Improvement Location: Carlyle Lake, Illinois / Temperate Plains Region GPS Coordinates: 38 37 40.43 N 89 21 04.40 W U.S. Congressional District: 15 th Congressional District of Illinois Target species: Largemouth Bass Black and White Crappie White Bass Gizzard Shad Channel Catfish Many other aquatic species will also benefit significantly objective(s): Stabilize the shoreline at a critical area of the reservoir and lessen the impact of siltation cause by shoreline erosion Create a littoral zone to enhance all aquatic species survival Create a vital staging/transition area for all fish species connecting deep water habitat to suitable, shallow spawning areas Create a reef with artificial structure to provide cover and allow for the transition into and from the spawning area Estimated on-the-ground start and end dates: 1 June 2017 1 October 2018 Amount of grant and estimated total cost of project: The Carlyle Lake is requesting $40,000 in grant funding to complement $25,000 from the project and $5,000 from the Illinois Department of Natural Resources Division of Fisheries through in-kind services. Other stakeholders and volunteer groups will provide in-kind services through volunteer work and donation of materials. Total cost of project is estimated to be $86,000. List of partners: Carlyle Lake (USACE) Illinois Department of Natural Resources (IDNR) Fisheries Carlyle Lake Association The City of Carlyle McKendree University Bass Fishing Team Let s Talk Fishin Alan Crocker

Carlyle High School Biology Club and Bass Fishing Team Highland High School Bass Fishing Team C. Description (largest portion of proposal): 1. overview: Carlyle Lake, the largest man-made lake in Illinois, is located in South Central Illinois, approximately 50 miles east of St. Louis, Missouri. Construction of the lake began in 1958 and was completed in 1967. The lake is 12 miles long and 1-3 miles wide with approximately 26,000 acres of surface water. Carlyle Lake is a multipurpose lake, these purposes include downstream flood control, recreation, water supply, environmental stewardship, and downstream navigation. Although flood control is a major purpose of Carlyle Lake, severe impacts of holding pool levels higher than normal (445.0 NGVD summer pool) in the reservoir have resulted in significant shoreline erosion and habitat loss in shallow water spawning area as well as deep water habitat. To help mitigate for poor spawning conditions and fluctuating water levels during the spawn, five brood rearing ponds are managed by the Corps of Engineers and the Illinois Department of Natural Resources (IDNR). These ponds are used primarily to raise crappie (black and white) and largemouth bass. Although significant numbers of fingerling fish are raised in the brood ponds (approximately 20,000 per pond each year) the survival rate of these young fish are low due to lack of suitable habitat and cover in the lake. The project being proposed is to stabilize a main lake point (Point #1) that is located on the southern end of Carlyle Lake and create a reef of artificial structure adjacent to the point giving fish protection during a critical transition from deep to shallow water and vice versa. Not only will this help support recruitment of fingerling fish but it will create another area that is favorable for spawning to occur. Stabilization will be provided by placing 400 pound rip rap (600 ton) as a barrier around the existing clay bank of the point. The stone toe protection will be approximately 600 in length, 10 feet wide at the base, with a top elevation of 450.0 NGVD (five feet above normal summer pool). The toe of the structure will be at elevation 443.0 NGVD (normal winter pool) to allow approximately two feet of rock structure in the water for spawning purposes during a normal pool year. The rip rap will be place with a 20 track hoe and hauled by a tandem dump truck through an existing roadway leading to the point. The reef that will be constructed adjacent to the rip rap area will be made up of artificial fish structures. These structures (approx. 250) will include Honey Hole trees and stumps, spider blocks, and some rough cut oak cribs. Over the past 15 years, these structures have been tested and proven in Carlyle Lake and will remain in place for many years to support algae growth, provide cover, and attract all fish species. The structures will be built and assembled by students from local college and high school bass fishing teams, and employees from the City of Carlyle

Parks and Recreation Department. All structures will be placed in the lake by IDNR Fisheries Staff, COE employees, and other partners in the project. The IDNR will utilize a fisheries habitat barge to ensure that all structures placed will form a reef in water depths ranging from five to 15 feet deep. A side scan sonar with down imaging will also be used to get structure placement precise. This project is designed to stabilize a critical shoreline at Carlyle Lake and to improve and enhance the aquatic habitat simultaneously. By reducing the rapid shoreline erosion and amount of sedimentation in the cove adjacent to the point, it will also improve the water quality in the area. This bank stabilization coupled with the addition of a large reef of artificial structures will not only enhance the area but will also make the area more productive and user friendly. Following completion of the shoreline stabilization, the disturbed area will be seeded with a native grass species and straw placed over the area to prevent erosion and runoff until the grasses are established. 2. Monitoring plan overview: Monitoring the project will be accomplished in two phases. Phase one will be during construction and phase two will monitor the project once the construction is completed. Phase one will be directed by Carlyle Lake team members to ensure that the contractor is following all plans and that work is completed properly. Phase two will continue for several years after completion, although the finished product will be relatively maintenance free and have a long lifespan monitoring for fish productivity and usage. Every year in the spring and fall, the Illinois Department of Natural Resources Division of Fisheries conducts electroshocking surveys to determine the overall health of fish populations in Carlyle Lake. This area will provide biologists an additional site to monitor because large populations of all fish will utilize the area. Other methods of monitoring will include creel surveys, fishing tournament reports, and word of mouth. 3. Outreach plan overview: Interpretive and environmental stewardship outreach and stakeholder involvement is a mission essential duty for the Carlyle Lake. The lake has a significant economic impact to the area year round with an average visitation of approximately 3 million visitors, $580,000 in revenue collected, and $67.6 million in visitor spending within 30 miles of Carlyle Lake. The lake hosts 40 45 fishing tournaments annually solidifying that fishing has a great impact on the lake and surrounding community. The City of Carlyle and Carlyle Lake have been the host site for the Illinois High School Association (IHSA) State Bass Fishing Finals since its inaugural year in 2009 (the contract was recently extended through the year 2021). Other professional fishing tournaments held at Carlyle Lake include:

the FLW College Central Conference Championship, the Illinois Bass Federation Northern Divisional Championship, and the 2017 Crappie Masters Tournament Trail just to name a few. Outreach to the public and lake users will be provided through many different sources including: social media, websites, news releases, word of mouth, etc. The Carlyle Lake Facebook page has over 11,000 followers and provides updates on the lake, while the website offers an updated map of fish attractor locations throughout the lake, this area will be added with GPS coordinates to allow anglers an excellent opportunity year round. Interpretive outreach programming on environmental stewardship efforts at Carlyle Lake are popular with local schools throughout the area. Once the project is completed, it will serve as an educational area to offer programs and explain the importance of creating areas of great fisheries habitat. 4. Provisions to protect the restoration project site after project completion The project itself will be basically self-sustaining once everything is completed. The area on the shoreline will be monitored and maintained through regular operation and maintenance. 5. List of required permits The project will require a Nationwide Section 27, Aquatic Habitat Restoration, Establishment, and Enhancement Activities. Arrangements have been made with the Regulatory staff in the St. Louis District Office to issue the necessary permits if the grant funding is received. 6. timeline. June 2017 August 2017: Coordinate with IDNR Fisheries Staff and other partners involved to finalize plan. September 2017 November 2017: Establish and award contracts for equipment contractor and rock contractor. December 2017 February 2018: Begin construction phase of project when lake is at winter pool. This will include shaping of the shoreline area and placement of rip rap structure. March 2018 June 2018: Purchase and construction of aquatic habitat structures. This phase is longer to allow time for volunteer groups to organize times and dates that fit their schedule and maximize group numbers. August 2018 October 2018: Placement of aquatic habitat structures to build the aquatic reef. This phase may be completed earlier, if lake levels are favorable.

D. Budget: 1. Amount requested - $40,000 2. Amount of in-kind contributions $9,840 Categories Partner Contribution Amount Cash or In- Kind Timeline (anticipated date of expenditures) Reservoir Fisheries Habitat Partnership Construction Costs/Materials $40,000 June 2018 Partner B USACE Carlyle Lake $2,000 Throughout Construction Costs/Materials $25,000 June 2018

$2,000 Throughout $720 Throughout Fish Locator Maps $1,000 August 2018 Partner C (name) IDNR Division of Fisheries $5,000 Throughout Construction Costs/Materials

Partner D Carlyle Lake Association Construction Costs/Materials $1,300 June 2018 Partner E City of Carlyle Construction Costs/Materials $1,920 Throughout

Partner F Let s Talk Fishin Al Crocker Construction Costs/Materials $1,920 (80) Throughout Let s Talk Fishin Radio Show $960 (40) Throughout Partner G McKendree University Bass Fishing Team Construction Costs/Materials $1,440 (80) Throughout

Partner H Highland H.S. Bass Team Construction Costs/Materials $1,440 (80) Throughout Partner I Carlyle H.S. Bass Team Construction Costs/Materials $1,440 (80) Throughout Total Direct Costs $76,300 $9,840 Volunteer labor should be calculated at $10/hr. for age 16 and under; 18/hr. other volunteers; agency staff labor rates @ $24/hr.

4. Budget narrative: The grant money requested will be coupled with the funding from the project and will be spent exclusively on equipment (trackhoe, dump truck and dozer), 400 pound rip rap, and materials for fish structures. Contractors from the Carlyle Lake equipment rental and rock contracts will be utilized to maximize available funds. Technical and outreach costs will be covered by the USACE Carlyle Lake. Labor will be provided by the partnering groups through volunteers and members. The Illinois Department of Natural Resources will provide a habitat barge for the placement of fish structures and provide technical expertise. Supporting materials 1. Map of the proposed project site 2. Aerial map of the site location 3. Photos of existing shoreline erosion 4. Letters of support.

Map of the proposed project site

Aerial map of the site location

Photo of existing shoreline erosion (north view)

Photo of existing shoreline erosion (west to east view)

Supporting Letter from IDNR Division of Fisheries