MJB-3 Mask Aligner Property of TAU MNCF August 2012

Similar documents
SOP for Karl Suss MJB3 #1 Mask Aligner

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Standard Operating Manual

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

Karl Suss MJB4 Mask Aligner

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

Karl Suss MA6 Mask Aligner SOP

Approved by Principal Investigator Date: Approved by Super User: Date:

Warnings: Notes: Revised: January 8,

Warnings: Notes: Revised: October 5, 2015

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Approved by Principal Investigator Date: Approved by Super User: Date:

Operation of the mask aligner MJB-55

Standard Operating Manual

University of Minnesota Nano Fabrication Center

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

University of Minnesota Nano Fabrication Center

OAI Model 200 Tabletop Mask Aligner Portland State University

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

COBILT CA-800 Mask Aligner Equipment Operation

Quintel Mask Aligner

Karl Suss Contact Aligner Operation

Photolithography. Operating Instructions

Maintenance Manual. Note: This document is broken up into the following 6 sections of prescribed maintenance.

EE 432 Lab 3 PMOS source/drain lithography and diffusion

7130 Lancer Rear Drive Magnetic Commercial Indoor Cycling Bike

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

OPERATING INSTRUCTIONS FOR THE MODEL 85B

Hercules Space Saver Sole Press series

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

SAFETY RULES WARNING: READ THESE SAFETY RULES & OPERATORS MANUAL BEFORE HANDLING YOUR FIREARM

MAINTENANCE PROCEDURE FOR X 650

March CS-1701F Reactive Ion Etcher

Quadair. Air Hockey Table Owners Manual. Assembly operation and care instuctions. Serial # Distributed By. Sales Person. Technical Service #

SPUTTER STATION STANDARD OPERATING PROCEDURE

Read Before Operating!

TECH SHEET ORANGE PIVOT TOOL INSTRUCTIONS

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Oerlikon Sputtering Evaporator SOP

Cryo-Evaporator Operation

Read Before Operating!

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Training. Testor Training Manual

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7


Drive Belt Instructions

University of MN, Minnesota Nano Center Standard Operating Procedure

ATM 322 Basic Pneumatics H.W.6 Modules 5 7

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Santa Fe Cycles Assembly Guide Introduction

SPM INDOOR TRAINING CYCLE ASSEMBLY MANUAL MODEL: SPM

Product Information News September 26, 2003

MAGNETIC CYCLING TRAINER SF-B0419 USER MANUAL

INSTALLATION INSTRUCTIONS

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Arbor Terminator Press Operation Manual For IDT Connectors Order No Engineering No: AM

Squeegee Unit for MRS Multi-Recovery System

Fit Testing. C50 APR New Equipment Training Module March 2010 Rev01

Regulators repair and maintenance. XS Compact 2nd stage. January 2014 Rev XSC /3 Ed. C /14 1

NRF Suss Delta 80 Spinner SOP Revision /14/2016 Page 1 of 11. Suss Delta 80 Spinner SOP

SET-UP INSTRUCTIONS. Includes:» Catapult Pitching Machine» AC Adapter

CONDITIONS OF SALE AND WARRANTY

INSTALLATION INSTRUCTIONS. Parts List. Tools Required. Before You Begin. Installation. Customer Information BICYCLE ATTACHMENT JUL.

Disassembling and assembling APP and APP 16-22

University of MN, Minnesota Nano Center Standard Operating Procedure

WIND CLIPPER KTS ILLUM SCALE INC DEC CLIPPER WIND SYSTEM

bathrooms.com Concentric Thermostatic Shower Mixers Cleaning and Care Installation Manual Contents

Standard Operating Procedure. For. PVD E-Beam

TECHNICAL INFORMATION

BELT DRIVE PREMIUM INDOOR CYCLING BIKE SF-B1509 USER MANUAL

Eco Snow CO2 Clean System Operation

NCTU NFC Lithography-Related Tools Operation. Manual

University of MN, Minnesota Nano Center Standard Operating Procedure

BELT DRIVE INDOOR CYCLING BIKE SF-B1712

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

[USING THE VITROBOT April 9, Using the Vitrobot

EZee Glider Manual. Tools needed for Assembly: Wrench (included) Philips Screwdriver (not included) Assembly Instructions

INFUSION SYSTEM (110V) (220V) USER S MANUAL

Approved by Principal Investigator Date: Approved by Super User: Date:

MUST READ AND FAMILIARIZE YOURSELF WITH THE SAFETY INSTRUCTIONS

SET-UP INSTRUCTIONS. Includes:» Lightning Strike with Ball Shagger Feeder» 6 Lightning Strike Balls» 6 Volt AC Adapter

SUPPORTING THE ART OF PHOTOGRAPHY ORBIT TRIPOD

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

1.0 - OPENING AND CLOSING THE DOOR

Nordiko Metal Sputtering System Standard Operating Procedure

Angstrom Dielectric Sputterer Operation Manual

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

Installation Instructions

3. Align ratchet drive with female insert on assembly, and raise ratchet handle until the ratchet drive is firmly seated into the assembly.

SCUBAPRO Repair Guide. S600-S550 Second Stages


CART FOR CENTURION 1500+

RB70 Automatic Diluent Valve Maintenance Manual. Version 1.1 November 2006 Written by Tino de Rijk. Page 1 of 23

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

RG1200 Service and Repair Manual

APP pumps APP and APP Disassembling and assembling

Basic Pneumatics. Module 7: Time delay valve and sequence control systems. Academic Services PREPARED BY. January 2013

OPERATION OF THE DIMPLER

Transcription:

MJB-3 Mask Aligner

I. Power Up Sequence 1 LOG IN. Turn on Nitrogen & compressed air lines on the back wall. 2 Turn on the vacuum pump.

3 Flip the COMPRESSED AIR toggle on (up) Compressed air is used to control the Karl Suss via pneumatics. Flip the NITROGEN toggle on (up) The nitrogen gas is used to cool the UV lamp. 4 Turn on the lamp source toggle switch and press START on the lamp source. 5 Turn on the Karl Suss via pressing the POWER button (it will light). Turn on the microscope light (at the back of the microscope light source).

II. Work Sequence 6 Load the mask in to the mask holder: Ensure your mask is clean. The mask holder should be placed face up on the table (you should see the vacuum groove) Place your mask (chrome side up) on the mask holder. You can play with the location of the mask on the holder (to ensure an exposure of the desired area) as long as your mask is not out of the mask holder s bounds and covering the vacuum grooves. 7 Press VACUUM MASK button (it will light) to establish a vacuum between your mask and the mask holder.

8 Slide the Mask Holder face down (!) onto the Karl Suss. Keep a finger on the mask in case the vacuum fails. 9 Secure the Mask Holder by tightening MASK HOLDER SCREWS. 10 Select the proper VACUUM CHUCK for your sample and place it on the slider (mind the groove!). Center your sample on the vacuum chuck. Check that your sample covers all the vacuum holes. Slide the VACUUM CHUCK into the Karl Suss.

11 Select exposure type: The 3 types are: -Soft contact (2 & 3 will light). -Standard contact (2 will light) -Vacuum contact (1 & 4 will light just as on the picture) 12 Bring wafer in contact: Make sure to leave a safety gap (between the mask and the wafer) by turning the Z- micrometer 4 times clockwise. Bring the wafer in to contact with the mask using the STAGE LEVER. Bring the STAGE LEVER to contact position. If you feel resistance STOP! And turn the Z- micrometer few more times. When the stage level is at the contact position, push the SEPARATION LEVER from yourself (all the way to the back), start turning the Z- micrometer counter clockwise, until the SEPARATION LEVER JUMPS (or look for fringes using the microscope for small samples). If you feel resistance STOP! Repeat the same procedure while looking via the microscope to see what s wrong.

13 Align your sample: Pull the SEPARATION LEVER towards yourself to separate the wafer from the mask. Turn the Z-micrometer clockwise by 1-2 turns (or until you can move the sample but still in focus). 14 Adjust the microscope magnification lenses, focus and other knobs to view your sample.

15 Use the joystic to change your viewing field. - The top button allows movement in the Y direction. - The top button allows movement in the X direction. - Press both buttons for free movement. 16 Move your sample using the X, Y and theta micrometers to align your wafer to your mask.

17 Once aligned, move the SEPERATION LEVEL back into the contact position. Adjust the Z-micrometer up (counter-clockwise) until the SEPARATION LEVEL jumps. 18 Expose the resist: Set the timer to desired exposure. Select the units (seconds, minutes, hours) using the buttons. The black digits are the major units. The red digits are the tens of the major units. When ready press the EXPOSURE button, to expose your resist. DO NOT LOOK AT THE UV!!!

III. Power Down Sequence 19 Use the STAGE LEVER to lower the wafer from the mask. Bring the STAGE LEVER to separation position. 20 Slide out the vacuum chuck and remove your sample. 21 Remove mask: -Unscrew mask holder screws. -Place hands underneath mask holder. -Carefully slide out the mask holder and place it (mask side up) on the table.

22 Press the vacuum mask button and remove your mask. Turn off the microscope light. 23 If you want to turn off the machine completely, turn off the lamp power supply (using the power toggle), wait 10 minutes and execute the next steps

24 Press the power button on the Karl Suss. The Karl Suss has a nitrogen loss indicator. The nitrogen cools down the UV lamp. It is essential to cool the lamp and to monitor the nitrogen flow via the Karl Suss nitrogen loss indicator 25 Flip the nitrogen and the air toggles off (down) 26 Close Nitrogen and compress air lines at the wall.

27 Turn off the vacuum pump.