Operating Instructions UCA Charging & Gauging Kit. For use with Piston, Bladder & Diaphragm Accumulators. Hydraulics. Effective: 01 July 2001

Similar documents
ASB Accumulator Safety Blocks

High Precision Regulators R210 / R220 / R230 Series

Auxiliary Valve PRS6 Pressure Reducing Valve. Catalogue HY /UK June 2003

Remote Control VP04 Pneumatic Proportional Remote Control Valve zrc02. Catalogue HY /UK December, 2004

NITROGEN CHARGING KIT type PC 11.1 E 01-12

NITROGEN CHARGING KIT type PC 11.1 E 04-11

Universal Charging and Testing Unit FPU-1

Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

Auxiliary Valve QDS6 Sequence Valve, 3-way. Catalogue HY /UK June 2003

Auxiliary Valve QDS6 Sequence Valve, 3-way. Catalogue HY /UK September 2005

TriPod Safety Coupler Installation & Operating Instructions for Models TP4, TP5, TP6, and TP7

Medium-sized vessels water connection. White paper

Installation, Operation, Maintenance Manual For Quick-Jaw Models AL363, L364 & AL366

SERVICING INSTRUCTIONS for PULSATION DAMPERS

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

24 November 2017, Nyon, Switzerland. 2017/18 UEFA European Women s Under-17 and Women s Under-19 Championships. Elite round draws

Hydraulic Accumulators with Back-Up Nitrogen Bottles

BLADDER CARE INSTRUCTIONS

2015/16 UEFA European Women s Under-17 and Women s Under-19 Championships Elite round draws

Training. Testor Training Manual

Pressure Limiting Valve SPVF Operating Instructions

Hydraulic Piston Accumulators

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

11 November 2016, Nyon, Switzerland. 2016/17 UEFA European Women s Under-17 and Women s Under-19 Championships. Elite round draws

Bulletin 2533-M3/USA Service Bulletin. Series PR25MA, PR25P, PR25S, PR32P, PR32S. Effective: July 1, Pilot Operated Pressure Reducing Valves

AREA TOTALS OECD Composite Leading Indicators. OECD Total. OECD + Major 6 Non Member Countries. Major Five Asia. Major Seven.

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

Tech. Services: (800) Fax: (800) Order Entry: (800) Fax: (800) MODEL D INFLATABLE JACKS

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

HPRV Proportional Relief Valve. Catalog 4190-HPRV

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Pressure Regulators. Operating Instructions. Instrumentation

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

13 December 2016, Nyon, Switzerland. 2016/17 UEFA European Under-17 and Under-19 Championships. Elite round draws

Hydraulic Piston Accumulators

Installation, Operating and Maintenance Manual Overflow Regulator Type 94/ 94 E

Diaphragm accumulator type AC

PV4 and PV6 Piston Valves

2014/15 UEFA European Under-17 and Under-19 Championships Elite round draws. 3 December 2014, Nyon, Switzerland

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Regulators repair and maintenance. 1st stage MC5. MC5 INT HZ MC5 DIN 300 bar HZ

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

Service and Repair Operative Manual MC9 1 st STAGE. MC9 1 st Stage. 1 st STAGE MC9. Jannuary Rev. MC9 /B Ed. C/13

List of nationally authorised medicinal products

P5523. Users Manual. Liquid to Gas Separator. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

Diaphragm Accumulators

Instruction Manual. Standard Surge Eliminator. Standard X. Flushable X - X

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

GE Oil & Gas Model. Masoneilan* Air Lock-up Valve Instruction Manual. GE Data Classification : Public

PRS6 Auxiliary Valves

HPB25 Hydraulic Paving Breaker

RG1200 Service and Repair Manual

OECD employment rate increases to 68.4% in the third quarter of 2018

Marsh & McLennan Companies Entities Covered by the BCRs

HYDRAULIC & LUBE OIL UNIT EQUIPMENTS

1. General safety information. 2. General product information. 3. Installation. 4. Commissioning. 5. Operation. 6. Maintenance. 7.

Marsh & McLennan Companies Entities Covered by the BCRs

This document is a preview generated by EVS

BCV31 DN40 - Blowdown Control Valve

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

Diaphragm accumulator type AC

Type BBS-03, BBS-05, BBS-06, BBS-25

Manual Actuated Boiler Blowdown Valves

Training. tm PA90 Series - Lung Demand Valve

64 Series Pressure Reducing Regulators

GESTRA Steam Systems AK 45. Installation Instructions Condensate Drain Valve AK 45

NITROGEN PRE-CHARGING INSTRUCTIONS FOR TOBUL ACCUMULATORS

Section 3- Repair and Calibration Procedures

LRS(H)4 Pressure-Reducing Regulator User Manual

1800C and 1800C-HC Series Service Regulators

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Pressure Regulators. Instructions for Use

Diaphragm Accumulators

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

COSASCO RBS/RBSA RETRIEVER AND SINGLE ISOLATION SERVICE VALVE

Application and Sizing

2016/17 UEFA European Under-17 and Under-19 Championships Qualifying round draws. 3 December 2015, Nyon, Switzerland

49004 Relief Pressure Check Kit for H8508 Series and HW1 Series Impact Wrenches

Bladder Accumulators High pressure

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

Regulators repair and maintenance. XS Compact 2nd stage. January 2014 Rev XSC /3 Ed. C /14 1

H4802, H4802-1, H , and Pole Tampers

The Herzliya Indices. National Security Balance The Civilian Quantitative Dimension. Herzliya Conference Prof. Rafi Melnick, IDC Herzliya

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

Two-stage valve type NE

Anderson Greenwood Series 400 Diaphragm Pilot Operated Safety Relief Valves. Installation and Maintenance Instructions for

23 November 2018, Nyon, Switzerland. 2019/20 UEFA European Women s Under-17 and Women s Under-19 Championships. Qualifying round draws

THE HF-210 SERIES. Operating and Service Manual. Series includes all variants of HF-210/211. Issue A October 2014 *Section 6.

Hydraulic Punch Drivers

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

RHPS Series PRV 6 User Manual

SCA Series Inverted Bucket Steam Traps

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

Diaphragm Accumulators

Transcription:

Operating Instructions Charging & Gauging Kit Effective: 01 July 2001 For use with Piston, Bladder & Diaphragm Accumulators

Warning FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS AND/OR SYSTEMS DESCRIBED HEREIN OR RELATED ITEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from Parker Hannifin Corporation, its subsidiaries and authorized distributors provide product and/or system options for further investigation by users having technical expertise. It is important that all aspects of the application are analysed and the information concerning the product or system in the current product catalogue is reviewed. Due to the variety of operating conditions and applications for these products or systems, the user, through its own analysis and testing, is solely responsible for making the final selection of the products and systems and assuring that all performance, safety and warning requirements of the application are met. The products described herein, including without limitation, product features, specifications, designs, availability and pricing, are subject to change by Parker Hannifin Corporation and its subsidiaries at any time without notice. 2

Introduction Description The universal charging & gauging kit is required to check the precharge pressure of an accumulator and to fill and vent the nitrogen. It is suitable for all Parker piston and bladder accumulators, and other commercially available accumulators with M28 x 1.5, 7/8-14 UNF, 5/8-18 UNF or 0.305-32 UNS (8V1-Vg 8) gas valves, operating up to a maximum working pressure of 340 bar. The assembly is screwed onto the accumulator s gas valve and connected to the nitrogen source with the hose supplied. If the precharge pressure is only to be checked or reduced, the connection hose is not required. The standard charging and gauging kit is supplied in a case containing: a '' universal charging & gauging kit with M28 x 1.5 gas port connection two pressure gauges, 0-25 bar and 0-250 bar * three adapters for connection to the accumulator gas valve (7/8-14 UNF; 5/8-18 UNF; 0.305-32 UNS) a 2.5m long hose, for connection to a nitrogen source a 6mm A/F hexagon wrench a set of spare seals * where a different pressure range is required, a commerciallyavailable pressure gauge may be used. Safety Charging must be carried out by qualified personnel. Before taking any readings or pressurizing with nitrogen, the accumulator must be isolated from the hydraulic system and the fluid side discharged in order to depressurize it. Use only nitrogen (N 2 ) to pressurize the accumulator. Danger of Explosion Never Charge with Oxygen The types of nitrogen permitted are: type S (99.8% pure); type R (99.99% pure); type U (99.993% pure). If the pressure of the gas contained in the nitrogen bottle is greater than the maximum permissible operating pressure of the accumulator, a pressure regulator must be fitted to the nitrogen bottle. Parker recommends that the precharge should be checked during the first week following commissioning of the system. Thereafter, it should be checked after three months and then at intervals of 12 months or less, as considered appropriate by the system builder. The Effect of Temperature on Precharge Pressure In order to compensate for the difference in pressure at ambient and operating temperatures, it is recommended that the precharge pressure p o should be adjusted to reflect the operating temperature of the system, using the correction factor equations and table on page 7. 5/8-18 UNF 7/8-14 UNF 4 0.305-32 UNS (8V1-Vg 8) Figure 1 Universal Charging and Gauging Kit assembly Controls A Inflation valve B Bleed valve Key 5 2 6 1 2 Adapter (long) 3 Adapter (short) 4 Adapter (insert) 5 Pressure gauge 6 Knurled protective cap gauge port 7 Knurled collar gas port 8 Knurled protective cap filling port 9 Filling hose (G1/4 fitting, 60 cone) 10 Filling port valve 1 7 B A M28 x 1.5 10 9 3 8 3

Pressure Adjustment To Check and Adjust the Precharge Pressure Warning Stabilization The process of charging or discharging an accumulator with nitrogen causes a temperature change which is transmitted to the surrounding air as the temperature of the accumulator stabilizes. To allow for the effects of temperature transfer, the accumulator should be allowed to stand for a minimum of 15 minutes before a final reading of the precharge pressure is taken. Bladder or Piston Accumulators with Schrader-type Valve Figures 1, 2a & 2b Outer cap 11 Inner cap12 Figure 2a Bladder accumulator with Schrader-type gas valve Gas valve cap 15 Protective cover 14 Gas valve 16 1 Unscrew the caps (11 and 12) from a bladder accumulator or the protective cover and cap (14 and 15) from a piston accumulator, to gain access to the gas valve (13 or 16). 2 Select the appropriate pressure gauge (5) for the pressure to be checked, remove the protective cap (6) and attach the gauge to the (1). 3 Make sure that the bleed valve (B) is fully closed and that the inflation valve (A) is in the fully raisedposition by turning the handwheel in an anti-clockwise direction. 4 Bladder accumulators: Ensure that the o-ring is correctly positioned in the base of the long adapter (2), screw the adapter on to the gas valve (13) and hand tighten. Piston accumulators: Assemble the short adapter and adapter insert (3 and 4), screw onto the gas valve (16) and hand tighten. 5 Screw the onto the adapter. Position the assembly to permit easy reading of the gauge, then hand tighten the knurled collar (7). Gas valve 13 Figure 2b Piston accumulator with Schrader-type gas valve 4 6 Open the inflation valve (A) by screwing the handwheel clockwise until the inflation pressure registers on the gauge. Readings and Results One of three conditions will apply the precharge pressure in the accumulator will be correct, or it will be too high or too low. is Correct 1 Screw the handwheel (A) anti-clockwise to close the accumulator 2 Slacken the bleed valve (B) to release pressure in the. 3 Unscrew the from the adapter. 4 Unscrew the adapter(s) from the accumulator is Too High 1 Slacken the bleed valve (B) to vent nitrogen from the accumulator until, after stabilization, the desired pressure p o is registered. Nitrogen vents into the air. 2 Tighten the bleed valve (B) once the desired filling pressure is reached. 3 Screw the handwheel (A) anti-clockwise to close the accumulator 4 Slacken the bleed valve (B) to release pressure in the. 5 Unscrew the from the adapter. 6 Unscrew the adapter(s) from the accumulator is Too Low 1 Close the inflation valve (A) by screwing the handwheel anti-clockwise. 2 Remove the knurled cap on the filling port (8). 3 Connect the end of the filling hose (9) to the filling port valve (10). 4 Connect the other end of the hose to the nitrogen source. 5 Progressively open the valve on the nitrogen source. 6 Screw the handwheel (A) clockwise to admit the pressurized gas, taking particular care if the accumulator has a small capacity or is of the low pressure type (< 40 bar). 7 When pressure p o is reached, close the valve on the nitrogen source. To allow for the effects of temperature transfer, the accumulator should be allowed to stand for a minimum of 15 minutes to allow the temperature to stabilize before a final reading of the precharge pressure is taken. 8 Screw the handwheel (A) anti-clockwise to close the accumulator 9 Slacken the bleed valve (B) to release pressure in the. 10 Remove the hose carefully, to release internal pressure. 11 Refit the knurled cap (8) to the filling port valve (10). 12 Unscrew the from the adapter(s). 13 Unscrew the adapter(s) from the accumulator After removing the and adapter(s), make sure that the accumulator gas valve (13 or 16) is sealing effectively. Refit the protective cap(s) (11, 12, 15) and cover (14), where applicable.

Pressure Adjustment Piston Accumulators with Poppet-type Valve Figures 1 & 3 1 Unscrew the protective cover (17), where fitted, and cap (18) from the accumulator gas valve (19). 2 Assemble the short adapter and adapter insert (3 and 4), and screw onto the accumulator 3 Select the appropriate pressure gauge (5) for the pressure to be checked, remove the protective cap (6) and attach the gauge to the (1). Make sure that the bleed valve (B) is fully closed. The position of inflation valve (A) can be ignored, as it does not affect this procedure. 4 Screw the onto the adapter. Position the assembly to permit easy reading of the gauge, then hand tighten the knurled collar (7). 5 Open the accumulator gas valve by turning the hexagonal poppet valve adjuster nut (20) anti-clockwise until the inflation pressure registers on the gauge. Note: for 360mm bore accumulators, a 19mm A/F spanner approximately 120mm long should be used to turn the valve adjuster nut (20). Protective cap 18 Adjuster nut 20 Figure 3 Poppet-type accumulator gas valve Protective cover 17 Gas valve 19 Readings and Results One of three conditions will apply the precharge pressure in the accumulator will be correct, or it will be too high or too low. is Correct 1 Close the accumulator gas valve by turning the poppet valve adjuster nut (20) clockwise. 2 Slacken the bleed valve (B) to release pressure in the. 3 Unscrew the from the adapter. 4 Unscrew the adapter (3) and adapter insert (4) from the accumulator gas valve (19). is Too High 1 Slacken the bleed valve (B) to vent nitrogen from the accumulator until, after stabilization, the desired pressure p o is registered. Nitrogen vents into the air. 2 Tighten the bleed valve (B) once the desired filling pressure is reached. 3 Close the accumulator gas valve by screwing the adjuster nut (20) clockwise. 4 Slacken the bleed valve (B) to release pressure in the. 5 Unscrew the from the adapter. 6 Unscrew the adapter (3) and adapter insert (4) from the accumulator gas valve (19). is Too Low 1 Close the accumulator gas valve by screwing the poppet valve adjuster nut (20) clockwise. 2 Remove the knurled cap on the filling port (8). 3 Connect the end of the filling hose (9) to the filling port valve (10). 4 Connect the other end of the hose to the nitrogen source. 5 Progressively open the valve on the nitrogen source. 6 Open the accumulator gas valve by screwing the adjuster nut (20) anti-clockwise, to admit the pressurized gas, taking particular care if the accumulator has a small capacity or is of the low pressure type (< 40 bar). 7 When pressure p o is reached, close the valve on the nitrogen source. To allow for the effects of temperature transfer, the accumulator should be allowed to stand for a minimum of 15 minutes to allow the temperature to stabilize before a final reading of the precharge pressure is taken. 8 Close the accumulator gas valve by screwing the adjuster nut (20) clockwise. 9 Slacken the bleed valve (B) to release pressure in the. 10 Remove the hose (9) carefully, to release internal pressure. 11 Refit the knurled cap (8) to the filling port valve (10). 12 Unscrew the from the adapter. 13 Unscrew the adapter (3) and adapter insert (4) from the accumulator gas valve (19). After removing the and adapters, make sure that the accumulator gas valve is sealing effectively. Refit the protective cap (18) and protective cover (17) to the accumulator gas valve (19). 5

Pressure Adjustment Diaphragm Accumulators Figures 1 & 4 The following instructions apply only to diaphragm accumulators fitted with a socket-headed screw type gas valve, as illustrated in Figure 4. Cap 21 Gas valve socket-headed screw 22 Figure 4 Diaphragm accumulator with socket-headed screw gas valve Danger do not attempt to loosen the gas valve screw with a hexagon wrench, as it could be ejected under extreme pressure 1 Select the appropriate pressure gauge (5) for the pressure to be checked, remove the protective cap (6) and attach the gauge to the (1). Make sure that the bleed valve (B) is fully closed. 2 Unscrew the cap (21) from the accumulator Release, but do not loosen, the socket-headed gas valve screw (22) using the 6mm hexagon wrench supplied. 3 Screw the knurled collar (7) on the base of the (1) onto the accumulator Ensure that the male hexagon in the base of the engages with the female hexagon in the accumulator gas valve (22). 4 Open the inflation valve (A) by screwing the handwheel anti-clockwise until the inflation pressure registers on the gauge. Readings and Results One of three conditions will apply the precharge pressure in the accumulator will be correct, or it will be too high or too low. is Correct 1 Screw the handwheel (A) clockwise to close the accumulator 2 Slacken the bleed valve (B) to release pressure in the. 3 Unscrew the from the accumulator 4 Using the 6mm hexagon wrench supplied, ensure that the hexagon socket-headed gas valve screw (22) is firmly tightened. Refit the protective cap (21) to the accumulator is Too High 1 Slacken the bleed valve (B) to vent nitrogen from the accumulator until, after stabilization, the desired pressure p o is registered. Nitrogen vents into the air. 2 Tighten the bleed valve (B) once the desired filling pressure is reached. 3 Screw the handwheel (A) clockwise to close the accumulator 4 Slacken the bleed valve (B) to release pressure in the. 5 Unscrew the from the accumulator 6 Using the 6mm hexagon wrench supplied, ensure that the hexagon socket-headed gas valve screw (22) is firmly tightened. Refit the protective cap (21) to the accumulator is Too Low 1 Close the inflation valve (A) by screwing the handwheel clockwise. 2 Remove the knurled cap (8) on the filling port. 3 Connect the end of the filling hose (9) to the filling port valve (10). 4 Connect the other end of the hose to the nitrogen source. 5 Progressively open the valve on the nitrogen source. 6 Screw the handwheel (A) anti-clockwise to admit the pressurized gas, taking particular care if the accumulator has a small capacity or is of the low pressure type (< 40 bar). 7 When pressure p o is reached, close the valve on the nitrogen source. To allow for the effects of temperature transfer, the accumulator should be allowed to stand for a minimum of 15 minutes to allow the temperature to stabilize before a final reading of the precharge pressure is taken. 8 Screw the handwheel (A) clockwise to close the accumulator 9 Slacken the bleed valve (B) to release pressure in the. 10 Remove the hose carefully, to release internal pressure. 11 Refit the knurled cap (8) to the filling port valve (10). 12 Unscrew the from the accumulator 13 Using the 6mm hexagon wrench supplied, ensure that the hexagon socket-headed gas valve screw (22) is firmly tightened. Refit the protective cap (21) to the accumulator 6

Correction Factors Calculation of Correction Factors at Full Pressure t 273 273 p t p (t ) 0 0 0 2 p0(t2 0 2 ) K where: 0 (t 2 precharge pressure at working temperature t 2 p 0 (t 0 ) precharge pressure at precharge temperature t 0 K = correction factor Operating Temperature t2 C Table of Correction Factors Precharge Temperature t 0 C -20-10 0 5 10 15 20 25 30 35 40 50 60 70 80 90 100-20 1.00 1.04 1.08 1.10 1.12 1.14 1.16 1.18 1.20 1.22 1.24 1.28 1.32 1.36 1.40 1.43 1.47-10 0.96 1.00 1.04 1.06 1.08 1.10 1.11 1.13 1.15 1.17 1.19 1.23 1.27 1.30 1.34 1.38 1.42 0 0.93 0.96 1.00 1.02 1.04 1.05 1.07 1.09 1.11 1.13 1.15 1.18 1.22 1.26 1.29 1.33 1.37 10 0.89 0.93 0.96 0.98 1.00 1.02 1.04 1.05 1.07 1.09 1.11 1.14 1.18 1.21 1.25 1.28 1.32 20 0.86 0.90 0.93 0.95 0.97 0.98 1.00 1.02 1.03 1.05 1.07 1.10 1.14 1.17 1.20 1.24 1.27 30 0.84 0.87 0.90 0.92 0.93 0.95 0.97 0.98 1.00 1.02 1.03 1.07 1.10 1.13 1.16 1.20 1.23 40 0.81 0.84 0.87 0.89 0.90 0.92 0.94 0.95 0.97 0.98 1.00 1.03 1.06 1.10 1.13 1.16 1.19 50 0.78 0.81 0.85 0.86 0.88 0.89 0.91 0.92 0.94 0.95 0.97 1.00 1.03 1.06 1.09 1.12 1.15 60 0.76 0.79 0.82 0.83 0.85 0.86 0.88 0.89 0.91 0.92 0.94 0.97 1.00 1.03 1.06 1.09 1.12 70 0.74 0.77 0.80 0.81 0.83 0.84 0.85 0.87 0.88 0.90 0.91 0.94 0.97 1.00 1.03 1.06 1.09 80 0.72 0.75 0.77 0.79 0.80 0.82 0.83 0.84 0.86 0.87 0.89 0.92 0.94 0.97 1.00 1.03 1.06 90 0.70 0.72 0.75 0.77 0.78 0.79 0.81 0.82 0.83 0.85 0.86 0.89 0.92 0.94 0.97 1.00 1.03 100 0.68 0.71 0.73 0.75 0.76 0.77 0.79 0.80 0.81 0.83 0.84 0.87 0.89 0.92 0.95 0.97 1.00 110 0.66 0.69 0.71 0.73 0.74 0.75 0.77 0.78 0.79 0.80 0.82 0.84 0.87 0.90 0.92 0.95 0.97 120 0.64 0.67 0.69 0.71 0.72 0.73 0.75 0.76 0.77 0.78 0.80 0.82 0.85 0.87 0.90 0.92 0.95 Example Satisfactory system operation requires a precharge pressure of 100 bar. The operating temperature t 2 is 50 C and the temperature at precharging t 0 is 20 C. From the table, a correction factor of 0.91 should be applied, giving a precharge pressure at 20 C of 91 bar. Gas Bottle Fittings and Part Numbers To meet the requirements of different markets, Parker s Charging and Gauging Kits are supplied with an adapter to suit the appropriate gas bottle fitting. Country G as Bottle Fitting Part No. U K 5/8 BSP (male) 02 F rance W 21.7 x 1/14" (female) 04 G ermany W 24.32 x 1/14" (female) 01 I taly W 21.7 x 1/14" (male) 05 U S 0,960 x 1/14" (male) 03 Warning Stabilization The process of filling or discharging an accumulator with nitrogen causes a temperature change which is transmitted to the surrounding air as the temperature of the accumulator stabilizes. To allow for the effects of temperature transfer, the accumulator should be allowed to stand for a minimum of 15 minutes to allow the temperature to stabilize before a final reading of the precharge pressure is taken. Technical Specification Maximum pressure Accumulator connection nitrogen bottle hose Nitrogen bottle connection Pressure gauges 340 bar 7/8-14 UNF, 5/8-18 UNF, 0.305-32 UNS, M28 x 1.5 2.5m long approx. 5/8" BSP with o-ring seal (UK: part no. 02) Two 63mm dia. glycerine-bath type, 0-25 and 0-250 bar ±1.6% 7

Sales Offices Need a Parker part? Call Parker's European Product Information Centre on 00800 27 27 5374 Visit us at www.parker.com Austria Marchtrenk Parker Hannifin GmbH Tel: (7242) 56921 Fax: (7242) 5692120 Belgium Brussels Parker Hannifin SA NV Tel: 67 280 900 Fax: 67 280 999 Czech Republic Prague Parker Hannifin Corporation Tel: (02) 830 85 221 Fax: (02) 830 85 360 Denmark Ishøj Parker Hannifin Danmark A/S Tel: 43 56 04 00 Fax: 43 73 31 07 Finland Vantaa Parker Hannifin Oy Tel: 9 476 731 Fax: 9 476 73200 France Contamine-sur-Arve Parker Hannifin SA Tel: 4 50 25.80.25 Fax: 4 50 03.67.37 Germany Cologne Parker Hannifin GmbH Tel: (221) 71720 Fax: (221) 7172219 Hungary Budapest Parker Hannifin Corp. Tel + Fax: 1 252 2539 Italy Arsago-Seprio Parker Hannifin S.p.A. Tel: (0331) 765611 Fax: (0331) 765612 Netherlands Oldenzaal Parker Hannifin B.V. Tel: (0541) 585000 Fax: (0541) 585459 Norway Langhus Parker Hannifin A/S Tel: 64 91 10 00 Fax: 64 91 10 90 Poland Warsaw Parker Hannifin Corp. Tel: (22) 863 49 42 Fax: (22) 863 49 44 Portugal Leca da Palmeira Parker Hannifin Portugal Lda. Tel: (22) 999 7360 Fax: (22) 996 1527 Slovakia Ref. Czech Republic Spain Madrid Parker Hannifin Espana S.A. Tel: (91) 675 73 00 Fax: (91) 675 77 11 Sweden Spånga Parker Hannifin AB. Tel: 08 5979 50 00 Fax: 08 5979 51 20 Switzerland Romanshorn Hydrel A.G. Romanshorn Tel: (714) 66 66 66 Fax: (714) 66 63 33 Turkey Istanbul Hidroser Hidrolik - Pnömatik Tel: (212) 886 72 70 Fax: (212) 886 69 35 United Kingdom Watford Parker Hannifin Plc Tel: (01923) 492000 Fax: (01923) 248557 1244-T1/UK 2M CP 0701