FISH PASSES IN THE EXISTING DAMS IN LITHUANIA

Similar documents
Lithuanian National Report on Salmon by Vytautas Kesminas VU Institute of Ecology

SALMONID FISH PASSAGES IN THE RIVERS HELGE, MÖRRUM AND EMÅN IN THE SOUTH OF SWEDEN

Ad Hoc Review Group IP(06)12 FINAL. Implementation Plan. European Union (Denmark)

ATLANTIC SALMON IN RIVERS OF BELARUS

Baltic Salmon protection needs and proper management

Management of wild salmon populations in Denmark

Council CNL(14)21. Annual Progress Report on Actions Taken Under Implementation Plans for the Calendar Year EU Denmark

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

LITHUANIAN STATE ROAD NETWORK: YESTERDAY, TODAY AND TOMORROW

Ecology and control of invasive Northern Pike in the Columbia River, Canada

Okanagan Sockeye Reintroduction

Salmon Five Point Approach restoring salmon in England

Documented impacts of barriers and wetlands on salmonids and how to solve problems

Restoration of rivers in Poland. Examples, possible obstacles

Loss of smolts in reservoirs and the effects of barrier removal in lowland rivers

Don Pedro Project Relicensing

San Joaquin River Chinook Salmon Trap and Haul Donald E. Portz, PhD Bureau of Reclamation Fisheries & Wildlife Resources Group

TAY DISTRICT SALMON FISHERIES BOARD POLICY ON SALMON STOCKING

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Council CNL(11)29. Annual Report on Actions Taken Under Implementation Plans. Russian Federation

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Council CNL(15)42. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany)

Council. CNL(15)42rev. Restoration of upstream and downstream connectivity on the River Rhine (Tabled by EU-Germany)

The Fisheries and Aquaculture Sector in LITHUANIA

Promoting sustainable salmon fishing practices on Lake Saimaa

Council CNL(17)33. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year EU - Denmark

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

MCCAW REACH RESTORATION

Baltic Marine Environment Protection Commission Task Force on migratory fish species Gothenburg, Sweden, 9 May 2016

Big Spring Creek Habitat Enhancement and Fishery Management Plans

IYS(18)06_EU UK (Northern Ireland) Report on Planned Actions to Implement the International Year of the Salmon (IYS) Initiative

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

Wiederherstellung der Durchgangigkeit für Fische in der Maas

California Steelhead: Management, Monitoring and Recovery Efforts

Micro Hydropower and Fish.

Council CNL(13)29. Annual Report on Actions Taken Under Implementation Plans. Russian Federation

Highlights of Native Fish Rehabilitation Activities in the Great Lakes. Presented By: Arunas Liskauskas, Ontario Ministry of Natural Resources

6TH PELLETIER BROOK LAKE T15 R9, Aroostook Co. U.S.G.S. Gardner Pond, Maine (7 1/2 )

Thank you for the opportunity to comment on the Draft Freshwater Fisheries Management Plan on behalf of Victoria s recreational fishing sector.

California Steelhead: Management, Monitoring and Recovery Efforts

Feasibility and Planning Study

2. Scientific investigation of eel in Belarus, achievements

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION. establishing measures for the recovery of the stock of European Eel.

RIVER HERRING PROGRAM

LJUBLJANICA CONNECTS

The. Plain Facts. What s happening on the Deschutes River

Catch and Recapture Rates of Tweed Salmon and the Effect of Recaptures on the Catch Statistics

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

needs and proper management

EELS (ANGUILLA ANGUILLA) IN LITHUANIA: TOWARDS INCREASING ESCAPEMENT. J. Dainys, L. Ložys

Transportation of spawners more effective than multiple fish passage facilities in the river Klaralven, Sweden

Official Journal of the European Union L 248/17

Sebec Lake Fisheries Management Plan 2012

Nechako white sturgeon are an Endangered Species

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

The Blue Heron Slough Conservation Bank

Loughs Agency Freshwater Fisheries Monitoring Programme

Columbia Lake Dam Removal Project

Council CNL(18)22. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year Norway

Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry

Study 9.5 Fish Distribution and Abundance in the Upper Susitna River

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

Newsletter Working together for healthy fish stocks in the North Sea region

CNL(13)52. NASCO Implementation Plan for the period Russian Federation

FISHERY MANAGEMENT ISSUES - LUNAN WATER

COLUMBIA LAKE DAM REMOVAL PROJECT

GRANT F-48-R. Investigations and Management of New Jersey s Freshwater Fisheries Resources FINAL REPORT JOB I-5

Recreational fisheries in the coastal areas of the Baltic Sea

San Joaquin River Restoration Program, 2013 Chinook Salmon Trap and Haul Summary

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

Report No. 27 to the Storting

Little Kern Golden Trout Status:

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

Council CNL(11)35. Annual Report on Actions Taken Under Implementation Plans. EU - France

Session B7: Efficiency and Suitability of the Fish Passage in River Ceyhan, Turkey

Council CNL(14)29. Annual Progress Report on Actions Taken Under Implementation Plans for the Calendar Year Russian Federation

A.23 RIVER LAMPREY (LAMPETRA

The Life History and Management of Alewife (Alosa pseudoharengus)

NATURAL GAS TRANSMISSION SYSTEM OPERATOR'S TEN-YEAR NETWORK DEVELOPMENT PLAN ( )

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

First Nations Fish Habitat Program Discussion Workbook

2016 Brook Trout Survey Project Remote Ponds and Coastal Streams Volunteer Angler Survey Results Report to Public

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

Relation between traffic safety and environmental protection

Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

ESTABLISHING A TROUT FISHERY IN MILL CREEK

COMMENTS Draft Environmental Impact Statement McCloud Pit Hydroelectric Project (FERC No. 2106) P Applicant: Pacific Gas & Electric Company

Cormorants and fish populations

Grey seal management measures in Lithuania Vaida Survilienė Lithuanian Fund for Nature

Ecological gains through EIA in Parks Canada

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Tidal energy is produced by the surge of ocean waters during the rise and fall of tides. Tidal energy is a renewable source of energy.

Green Sturgeon Feeding Observations in Humboldt Bay, California

1. LARGE-SCALE DEVELOPMENT OF NEW LANDS 2. CONFLICT OF HUMAN AND NATURE 3. ECOLOGICAL PROBLEMS

Council CNL(14)45 The management approach to salmon fisheries in Norway (Tabled by Norway)

Winter Maintenance in Lithuania

Transcription:

FISH PASSES IN THE EXISTING DAMS IN LITHUANIA 2017, Bredsten, Denmark Justas Poviliūnas, Živilė Vaitiekūnienė

Capital: Vilnius Official language: Lithuanian Area: 65.300 km2 Population: 2.91 mln National currency: Euro Geographical Lithuania is a state situation: in Northern Europe Neighboring Latvia, Poland, countries: Belarus, Russia

Rivers of Lithuania According to the Lithuanian Catalogue of Water Deposits, there are 733 rivers, which are longer then 10 km. There are 98 hydroelectric power plants of various capacities that have been built and are operational in Lithuania. The majority of hydroelectric stations are of small capacity with merely 7 of them featuring a capacity of 1,000 kw or more. Kruonis Pumped Storage Plant Kaunas Hydroelectric Power Plant

25 fish paths have been already installed in the Lithuanian rivers. Those are intended to allow migrating fish to reach their spawning grounds upstream.

The construction of 7 additional fish paths is currently in consideration. 13 other obstacles such as dams and old water mill residues that prevent fish access to spawning grounds are planned to be removed. One of the function of the Fisheries Service is to organise, coordinate and implement tasks in order to improve fish migration conditions, maintain fish migration routes and migration installations, provide methodological assistance on the design, construction and operation of fish migration installations, draw up and implement projects on the improvement of spawning conditions for fish, increasing fish stocks.

Project Fish-passes in the existing dams of the Kražantė and Sausdravas rivers and the pass reconstruction in the Vilnia river In the period from 2010 to 2015, The Fisheries Service implemented the project Fish-passes in the existing dams of the Kražantė and Sausdravas rivers and the pass reconstruction in the Vilnia river. The project was developed in line with the Measures for the protection and development of water fauna and flora of Priority 3 Measures of common interest of the Lithuanian Fisheries Operational Programme for the period of 2007-2013. The goal of the project was to protect and develop fauna and flora of inland waters of Lithuania, to contribute to the improvement of the aquatic environment. A fish pass was installed in 2013 at the dam of the Sausdravas river as well as the reconstructed fish migration path of the Vilnia. In 2014, a new pool-type fish pass was installed in the dam of the Kražantė river.

In October of 2014, scientific monitoring was carried out to evaluate the efficiency of the installation and modernisation works of fish passes. Acoustic telemetry methods were used to assess the effectiveness and attractiveness of fish passages. Acoustic receivers (Vemco VR 2W) were installed in the fish pass in the Vilnia river. 24 sea trouts and two salmons were caught well below fish pass and tagged with acoustic tags (Vemco V13 1L). Telemetric acoustic receivers installed in the river and the fish migration through fish passes was monitored. A month later 17 out of 26 fish were registered close the to fish pass (up to 50 meters away) and 9 fish out of 17 entered fish pass. All 9 fish successfully passed at the first attempt. Based on the estimations of the methodology, the attractiveness of the Rokantiškės (Vilnia river) fish pass was a 53 % and the efficiency of the fish pass was at a rate of 100 %.

In May 2015 study started in 3 rivers: Sausdravas, Vilnia, Kražantė. In the Sausdravas river 30 brown trouts, in the Kražantė river 30 vimbas, Vilnia river 12 graylings, 2 sea trouts and 6 brown trouts were caught and marked with acoustic tags. The fish were tagged with acoustic tags (Vemco V9).

Fish pass on the Sausdravas river Dam before reconstruction After

The efficiency of the Sausdravas and Kražantė fish pass The efficiency of the Sausdravas fish pass in spring and autumn of 2015 was 100 %. Comparing with described in literature artificial fish passes (closest to the natural fish passes) it was found that the efficiency of the Sausdravas fish pass is much higher. The attractiveness of the fish pass was poor due to extremely low water levels, but the rising water level initiated an intensive migration of fish passes. This once again proves that the water level is crucial for the effective functioning of fish passes. The efficiency of the Kražantė fish pass in spring 2015 was 50 %. The attraction of the Kražantė fish pass so far was poor. In order to increase the efficiency of the fish pass in a current dam of the Kražantė riverbed cleaning below the fish pass should be carried out. Moreover, the hydroelectric power plant outlet channel barrier that leads fish into the fish pass should be installed during fish migration period.

Stream restoration in Lithuania Additionally river restoration works have been launched in Lithuania, during which the authorities aim to achieve the restoration of the best environmental conditions of the riverbeds which were straightened and regulated. The first pilot project of a river restoration is underway. Project is administered by the Lithuanian Environmental Protection Agency and implemented under the support of the EEE and Norwegian Financial mechanisms (project leader - public organization Grunto valymo technologijos ). Ten river stretches have been selected for the first phase of this project. The river restoration in the Vašuoka, Viešinta and Vyžuona rivers are currently under surveillance and scientific assessment. If this experiment succeeds, it will be attempted to restore more rivers.