S-60-TO : 1 ton tower system INSTRUCTION MANUAL

Similar documents
Safety System Installation Guide for ARE Wind Poles

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

KEEP IN MIND THAT YOU ARE THE KEY TO SAFETY

User Manual Important, read before use!

WIRE ROPE PULLING MACHINE

Portable Soccer Goal Safety Program

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

SETTING THE HANDLE HEIGHT ON THE ROLLATOR

POLICY - GOALPOST SAFETY

Name of product: Gripper for vertical façade FTV panels Types: PVF (60, 80, 100, 120, 133, 150, 172, 200 and 240 mm) INSTRUCTIONS FOR USE

MANITOWOC MODEL TON CAPACITY

Assembly Instructions

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A

20 Ton SD Shop Press Operating Instructions

Drive Belt Instructions

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

Handling procedure for Scrubbers and Tanks made of thermoplastics.

Wing assemblyfinal Master 4/29/04 11:20 PM Page 1. Issued January 1, Sabre Aircraft. Assembly Manual. Sabre 16ss Wing

PHOENIX, ARIZONA USA

Pectoral Machine. User manual E S S E N T I A L S T R E N G T H

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

Reel Stands and Spindles

SB18m. rigging manual (EN)

SecureLift Lifting System Use Guide Nemisys

USE AND MAINTENANCE LIGHT TOWER

Ladies Shopper Bike Assembly Manual 28C03

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

30T A/Manual Hydraulic Shop Press

Tower Climber Orientation.

MANITOWOC MODEL TON CAPACITY

75 Ton SD Shop Press Operating Instructions

2012 K9100 COMPACT Worldwide Cycling Solutions Through Creative Innovations.

WINSAFE Corp. Operating Instructions For Outrigger Davit. Winsafe Part # WSOR208

Crane Rental Heavy Machinery Moving Project Management

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

HELMETS SAVE LIVES!!! ALWAYS WEAR A PROPERLY FITTED HELMET WHEN YOU RIDE YOUR SCOOTER. DO NOT RIDE AT NIGHT. AVOID RIDING IN WET CONDITIONS.

Z5160 Load adapter Mounting instructions (1.2 EN)

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

LITERIDER 2&3 IMPORTANT WARNING. 2Bike (1x) Bolt (1x) Nut (1x) Small Hex Wrench (1x)

Assembly Instructions

LINK-BELT MODEL HC-278H TON CAPACITY

Instructions for assembly and use ZAP telescopic platform ladder Z600

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

KWIKGOAL IMPORTANT SAFETY INSTRUCTIONS READ CAREFULLY

OPERATOR S MANUAL. The Will-Burt Company 169 S. Main Street Orrville, OH 44667

ASSEMBLY MANUAL HOBIE CATSY

Scissor Lifts Course Outline

Installation and Training Manual

Charmborough Bells Risk Assessment and Method Statement

LIGHTWEIGHT TRIWALKER OWNER S HANDBOOK

Medium Voltage Switchgear. Installation Manual for Pressure Relief Ducts

EZee Glider Manual. Tools needed for Assembly: Wrench (included) Philips Screwdriver (not included) Assembly Instructions

airplaine kite Model assembly & Operating Instructions Important: If damage is caused due to a crash; your warranty is void.

BICYCLE TO MOTORCYCLE BICYCLE RACK

Heavy Equipment & Rigging Specialist Training

STEEL TRENCH SHIELDS DW MODELS

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

Instant Garage 20' x 12' 3" x 8' 3"

Visit: 45

An introduction to Rigging for Trail Work

8012, 8018 & ,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES

10m-130mm Tubular Tower. Technical Specifications

II-28 STOKES BASKET OPERATIONS

Work Standard CABLE PULLING OPERATIONS

Counter Weight Lifting Gantry Cylinder Operation INDIA CKE2500, CKE2500-2

Please visit our website at and leave your comments.

BEAMGUARD SAFETY POST TM INSTRUCTIONS

GROVE MODEL RT58D - 20 TON CAPACITY

STEEL TRENCH SHIELDS TUFF-LITE MODELS

6000SLX HYDRAULIC CRAWLER CRANE

80 Litre Suction Oil Drainer

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

Premium PowerPoint Presentation. Rigging Review

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Manual winch MANISTOR 100 and 200

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

SET OF EUROLEAGUE BACKSTOP UNITS (Reference PK120)

Santa Fe Cycles Assembly Guide Introduction

AIR STAPLER MODEL: CSG1C Part No

Floor Mount Socket. T: +44 (0) F: +44 (0)

Operation & Maintenance instructions for the Söll Vi-Go type fall protection system with guided type fall arrester

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

GCI CYLINDER INVERTER

Trampoline & Enclosure Assembly Instructions

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

BELT DRIVE INDOOR CYCLING BIKE SF-B1712 USER MANUAL

OPERATORS MANUAL MODEL 365 BACK LAPPING MACHINE WARNING

10.2. Basketball Single Post System

Specifications Testing & Adjusting Disassembly & Assembly

PFC Lightweight Composite Push Up Mast. Operating Manual

SAMPLE PAGE. Section 2... Wire Rope

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

6000SLX SL-N HYDRAULIC CRAWLER CRANE

ASSEMBLY AND OPERATING MANUAL LTW MAXI TRENCH BOX

RATCHET RELEASE SHACKLE

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100 & VB 120

RIDE Inc. Rigscape Drilling Rig Procedures

Quattrocycle BV. Quattrocycle. User Manual. Last update February Quattrocycle BV Bremkant EJ Middelbeers. User Manual Quattrocycle 1

Manual PT1000/1500/2000 personnel/material elevator printdate: versie 1.1 INTRODUCTION... 2

Transcription:

S-60-TO : 1 ton tower system INSTRUCTION MANUAL LIVE SYSTEMS bvba Mandellaan 282 8800 B-Roeselare Tel: +32(0)51 69 38 14 Mobile : +32 (0) 495 24 24 67 e-mail: ricky@livesystems.be BTW : 0859.636.665 1

FOREWORD This manual is intended for sound-, lighting- and rigging technicians. The set-up and operation of the truss tower systems demands reading and complete understanding of the instruction manual. It gives practical directives how to handle the truss products in general in a safe and efficient way because safety is and has to get, in our eyes, the highest priority in the event sector. Only by carefully following the step-by-step actions during preparation, set-up and operation of the tower system, a safe and successful production can be guaranteed. Our intentions are to support productions of the highest quality by developing products of the highest quality to be handled by technicians of the highest quality. TABLE OF CONTENTS page FOREWORD TABLE OF CONTENTS INSTALLATION EQUIPMENT HANDLING 2 2 3 4 GENERAL SAFETY INSTRUCTIONS 6 GENERAL CONDITIONS OF SETUP 7 12 SET-UP OPERATION 8 13 CHECKLIST EXTRA SAFETY FOR PRECAUTIONS SAFE USE 14 15 INVERSE PRODUCT PROCEDURE IDENTIFICATION 15 CONTACT 16 2

INSTALLATION a) Package A complete 10,5m high tower system consists of merely standard Truss products, transported by means of a dolly system, which clicks on the stacked truss sections. The dollies contain the necessary pins and hammers to combine the trussing sections into various applications, as the S-60-TO 1 ton tower system. The system is designed to take a minimum of transport space: in a standard truck the complete package takes approx. 1,5 m² of loading surface (2,45m high). b) Handling and set-up time The tower systems are very easy to set-up by two persons, and will only take about half an hour of work, once familiar with the products. The special design of the connection system and its tools, result in an efficient and fast set-up. c) Contents of package CODE DESCRIPTION # S-60-24 Stackable triangle truss - 60cm x 60cm - 2,4m section 4 S-60-15 Stackable triangle truss - 60cm x 60cm - 1,5m section 3 S-60-TP Truss Pin including safety system 48 S-60-HM HaMmer / Drive-out pin 4 S-60-DL DoLly 4 S-60-6W 6-Way corner block 1 S-60-TB Tower Base truss section 2,4m 1 S-60-TT Tower Top including 2 wheels / 2 truss pins 1 S-60-OR OutRigger spindle holder 4 S-60-SP SPindle 4 S-60-CL CantiLever tool including wheel (+M16) 1 S-60-ST STabilizer 2,4m 3 A-ST-12 STeel 1 Ton / 12,2m 1 A-HS-58 Harp Shackle 3¼ Ton 5/8 4 d) Chain hoist The set-up of the S-60-TO demands the use of a standard electric chain hoist with a capacity of 1 ton. This hoist, with a minimum chain length of 10m, must be conform with the 98/37/EC directives, the specific national regulations for lifting equipments and maintenance procedures. (for extra safety precautions in terms of rigging, see p.14) The chain hoist is not included in the package. 3

EQUIPMENT HANDLING DO S V DON T S X Use the right side of the hammer (S-60-HM) to connect the truss elements. Always assemble from the in- to the outside of a truss. Always use 2 hammers in order to drive out a pin. PIN SAFETY PROCEDURE When connecting two truss elements by a truss pin, make sure the cable (with the safety at the end) is perpendicular to the truss length. This makes the connection of the safety to the pin easier, since the cable length itself is kept at a minimum. 4

In order to separate the truss sections from a package of maximum 5 sections of the same length, first make sure the package is standing upright with its fork-connections pointing downwards. Handling is most easy by two persons, who lift the first section slightly, and then move it out of the package starting at the bottom. The inverse procedure is used for stacking truss sections of the same length. 5

GENERAL SAFETY INSTRUCTIONS Please take notice of following safety instructions in order to assure a safe preparation, set-up and operation of the S-60-TO tower system: Always wear the appropriate clothing before handling the tower system: We advise you to wear safety-gloves, -shoes and helmet, which are able to provide you a basic protection against possible occurring injuries. The lifting of persons is prohibited, as well as the climbing of persons on the structure. The only persons allowed to climb the mast or structure are those in charge of the loading and its fixation to the mast, or other actions in terms of the positioning of the loading equipment. This manual states clearly what the possibilities are of the tower system and how it should be handled. No other actions or applications than mentioned in this manual are allowed, since they may result in an unsafe situation of which personal or property damage can result. The installation of the tower system must be executed by two persons in a good physical condition (not under influence of alcohol, drugs, or any other psychedelic products). While installing the tower, always keep your focus on the product, in order to give absolute priority to safety (mobiles turned off, ). Never leave the tower system unguarded while setting it up. So once the set-up has started, the two persons involved should finish the actions till the tower system is ready for lifting the loading, without leaving the structure. After each installation and operation of the S-60-TO tower system, each part of the total structure must be inspected on possible damages. In any case, the rental company does not take responsibility in any way for any of your actions during the preparations, set-up, operation and the lowering and packing of the tower system. 6

GENERAL CONDITIONS OF SETUP Given the above safety instructions, make sure the following both general as environmental conditions are guaranteed: As clearly shown on the product label and noted further in the set-up manual, the allowable vertical load is strictly limited to 1 ton. When used outdoors, wind speeds up to 75 km/h (8 Beaufort 20 m/s) are allowed taking into account following limits to the load dimensions: Max. horizontal projected surfaces: Front: 4,5m² Front horiz. Side: 2,0m² Proj. surf. When operating, wind speeds up to 75 km/h (equals 8 Beaufort 20 m/s) are allowed to guarantee a safe and stable construction. Once wind speeds exceed this value, the load must be brought down. The loading can then be put on the S-60-24 front truss, keeping a minimal tension on the hoist in order to keep the loading stable on the truss. In this way additional ballast is created on the basis of the structure, to ensure a safe and stable situation when wind speeds exceed the max. operation value. During the erection of the tower, at the point where the mast is brought in a vertical position, wind speeds may not exceed 5 Beaufort (40 km/h - 11 m/s) Specific demands in terms of underground/soil surface structure and pressure capacity are to be regarded: When used indoors, wind forces are to be neglected and result in a maximal reaction force in the points of support of 450 kg (15x15 cm² spindle-surface). For outdoor use, the maximal reaction force in the supports is 1200 kg. Special precautions should be taken for example when setting the tower up on sandy undergrounds. The direct local ground pressure should then be divided through for example (metal) distribution plates under the structure feet. Be aware that when setting up the tower system, you need at least a rectangular space of about 4m wide and 12,5m long. During set-up, make sure this space does not block any important passages or so. Once upright, the tower basis takes about 20m² (4m x 5m) of space. It is advisable to restrict an additional area of 20m² around the tower, for example by fences. While preparing and setting up the tower system, make sure only people involved with its set-up are allowed in the neighbourhood of the tower. 7

SET-UP The complete 10,5m high tower system consists of standard trussing sections, and a flight case containing all extra non standard parts. Truck space is brought to a minimum and only takes about 1,5 m² in a standard truck. The click-on dolly systems contain the necessary pins and hammers in order to (dis)assemble the structure, given the above notices concerning the equipment handling and following the step-by-step setup procedure below. Setup is easy and fast by two persons and will take approx. 30min once familiar with the system. S-60-24 S-60-6W S-60-6W PUBLIC S-60-24 S-60-OR Public S-60-SP The basis of the tower consists of a cross-shaped trussing construction. The orientation of the S-60-6W is of high importance. The one open side of the corner block must point upwards. The triangle formed by the 3 lugs on top points backwards, away from the public. 8

Complete the basis by adding a S-60-15 on each of the 3 sides, joined by a S-60-OR (and a S-60-SP spindle) on the outsides. The total basis can now be leveled horizontally by adjusting the 4 S-60-SP spindles. Make sure each spindle is under tension once leveled. By clicking the dolly s on the main tubes of the S-60-15 pieces, you can easily take out the truss pins for the further assembly of the tower, and it offers a basic protection against the possible loss of the dolly s. The mast can now be fixed, starting with the S-60-TB tower base, which looks a lot like a standard S-60-24 truss element, apart from some extra fixation points. Only attach 2 of the 3 pins between the tower base and the corner block. By adding 3 S-60-24 truss elements and the S-60-TT tower top on the tower base, the maximal tower height can be reached. Any other combination of standard S-60 trussing elements (12-15-24 sections) is allowed as long as the total length of the sections does not exceed 7,2m (equals 3 S-60-24 sections). 9

Attach the cantilever system, which consists out of 3 S-60-ST stabilizers and the S-60-CL cantilever tool, to the S-60-TB tower base. Use the second connection on the apex of the tower base starting at the corner block. In order to bring the mast vertical, now attach the hoist and the 12,5m steel cable, as described below: 2 1 3 1 2 3 1: The 1 ton hoist is attached to the rear outrigger, by using 2 shackles that connect the hoist hook to the upper hole at the rear of the outrigger. 2: The chain then passes the cantilever tool (make sure to secure the chain with a truss pin) and reaches the 12,5m steel cable. The cable passes through the S-60-TT tower top (guided by the 2 black wheels). The upper wheel must be removed from its position before you can let the cable pass. 2 options are allowable : see next page! 3: The steel cable can now be attached to the S-60-TB tower base center fork (in the middle of the truss), and secured with a truss pin.

When guiding the steel cable through the S-60-TT tower top, 2 options are allowable, which will determine the later position of the load: 85 cm FRONT REAR 1 ton 45 cm S-60-TT OR FRONT REAR S-60-TT 1 ton The first option gives the opportunity to bring your load approx. 85 cm in front of the center of the vertical main tubes (diam.48mm) of the mast, where the other keeps it at 45cm. By shortening the remaining cable length, the tower mast can be brought in a vertical position. Take care the cable does not hitch behind for example a truss-end or pin safety while bringing it on tension. When erecting the mast, never stop in the middle of its process! Once the mast is in its vertical position, stop controlling the hoist, and attach the remaining pin at the S-60-TB tower base, in order to secure the mast! You might need to lift the mast slightly, by handling the cantilever end, to do so.

The cantilever system, which was firstly used to erect the mast, will now be used as a stabilizer system. Therefore free the chain from the cantilever tool (S-60-CL) and place the 3 stabilizer tubes S-60-ST at each side of the structure. Secure them by attaching 3 times 2 pins, so one pin at each end of the stabilizer tube. The cantilever tool is of no further use to the tower system. If the tower is not leveled properly, the attachment of the stabilizer tubes might be difficult! In all cases make sure each spindle is under pressure and cannot be twisted by hand. The tower system is now ready to fly your equipment. When you free the steel cable from the tower base section (in order to use it as your rigging point), notice that you need to hold it under tension, otherwise the weight of the hoist chain makes the steel cable go up. CHECKLIST FOR SAFE USE Please take your time first to run through this checklist, in order to guarantee the safety and stability of the construction. Check if All the safety-clips secure a trussing pin, so no single pin can create an unsafe connection. Each of the 4 spindles is brought under pressure by turning the handle against the outrigger S-60-OR. The 3 stabilizers are all in place The mast should be in a vertical position, so no inclination in any direction is allowed.

OPERATION The S-60-TO tower system is now ready to lift your equipment hereby you will find some pictures of recent applications. A standard application of the tower at its maximum height of 10,5m. From a closer look you can see the fixation of the speaker system to the mast, in order to keep it steady in case of wind, and thus to create a safe and highquality application. A more difficult and surprising application with roof connection system at 8m height in the center of the mast.

EXTRA SAFETY PRECAUTIONS Different safety regulations throughout the countries, sometimes result in the need for extra safety precautions, especially when the system is used for lifting equipment above or near persons. Hereby you will find some guidelines to fulfill these demands: Severe safety precautions sometimes state that the lifting equipment should be able to lift the double of the loading. In this case, using a standard 1 ton electric chain hoist, loads up to 500kg can be lifted without any problems. When loads should exceed 500kg - and still using the 1 ton chain hoist - an additional safety, like the fixation of an extra steel cable or safety sling between the structure and the load, is required. The tower system gives easy possibilities to realize this: Therefore use an additional pin to fix the safety-line to the spare hole at the S-60-TT tower top piece, like shown below. Front Rear 1 ton S-60-TT safety line (steel cable) LOAD Front Rear 1 ton S-60-TT safety line (steel cable) LOAD

INVERSE PROCEDURE In order to bring down your tower system, follow the steps above in the opposite direction. Or follow the summarized instructions below Attach the steel cable end to the front fork in the center of the S-60-TB tower base section. Rebuild the stabilizer tubes into the cantilever system, together with the cantilever tool S- 60-CL. Don t forget to insert the pin behind the chain. Bring the chain hoist slightly under tension. It is now safe to release the rear pin of the S-60-TB tower base. Tip the mast by manually lifting the cantilever system. If this is not possible, it means there is too much tension on the chain hoist. Once the mast is in balance, the chain hoists can now bring down the tower mast and disconnection of the tower parts can start.