road, allowing cyclists and pedestrians a safe place to stop clear of the roadway or cycleway to read the information.

Similar documents
SH1/OTAIHANGA ROAD ROUNDABOUT

SH1: MacKays Crossing to Peka Peka, Kapiti Coast Expressway

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Tonight is for you. Learn everything you can. Share all your ideas.

SH1, Karo Drive Wellington Crash Reduction Study

The Leadville Bikeway Design Recommendations DRAFT January 2018

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

Souder, Miller & Associates 401 W. Broadway Farmington, NM

Sets forth Basic Principles and Prescribes

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Transportation Planning Division

Bolton, CT. January 7, 2016

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE:

Observations and Ideas: Toomer s Corner Streetscape Improvements

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Plant City Walk-Bike Plan

Why invest in the 1 Street S.W. Corridor?

Bases, Ballasts, and Paving

Downtown Redevelopment Project Update

Review of Guidelines for Cycleway Safety Fencing

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

C: Course Details. Course Name Circuit of Chelmorton, Flagg & Monyash for the High Peak Road Race

Public Works and Infrastructure Committee. General Manager, Transportation Services

ORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Peka Peka to North Ōtaki Expressway Integrated Transport Assessment

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

Drawing 5269/GA01: A2/A28 Coast bound off-slip - Wincheap Scheme

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

DRAFT. Scholls Ferry Road Conceptual Design Plan Technical Memorandum Multi-Modal Examples. Multnomah County 1600 SE 190th Avenue Portland, OR 97233

MINUTES MEETING HELD ON TIME WAIKANAE COMMUNITY BOARD

MANUAL OF TRAFFIC SIGNS AND MARKINGS SECTION 2

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Forest Grove Neighbourhood Traffic Review Minutes

Orange Center Elementary School

2017 Temporary traffic control guidelines for pedestrians. v.2

Broad Street Bicycle Boulevard Design Guidelines

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Trip Generation Impact Analysis Reporting Form

Regional Cycling Plan

122 Avenue: 107 Street to Fort Road

Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

(This page left intentionally blank)

Hale iwa Improvement District Project

At each type of conflict location, the risk is affected by certain parameters:

Site Improvements

Bar Harbor Route 3 Gateway Project Advisory Committee September 21, 1-3 PM Atlantic Oakes Hotel Minutes

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Design Criteria. Design Criteria

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Design and Installation of Low Level Cycle Signals

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Completing the Street: Denning Drive

Glebe Neighbourhood Cycling Plan

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Work Zone Pedestrian & Cyclist Accommodation in Washington, DC

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.


Blair/Williamson Intersection Expressed Needs

Dowling/Beaty Cycling Route

2016 Neighborhood Street Fund Application

I-10 AT SCENIC LOOP RD. Open House

Meeting Location: Brookings SDDOT Office

Dan Andrews. Expert Advisor to the Ontario Ministry of Tourism, Culture & Sport OPA Ed Conference, Burlington, ON March 1, 2018

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

Miami Health District

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Appendix 5 Traffic Assessment

Bicycle Network Submission

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

2018 Kathmandu Coast to Coast - Race Safety Briefing (Compulsory Section to attend)

DUNBOW ROAD FUNCTIONAL PLANNING

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Functional, Preliminary Design and Detailed Design

Diagonal cycle crossing for signalised intersection. Axel Wilke ViaStrada Matthew Hinton Maunsell Daniel Newcombe Auckland City Council

City of Davis East Covell Corridor Plan

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Highway 56 Traffic Study Rymal Road to Cemetery Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

HINESBURG VT 116 SIDEWALK FEASIBILITY STUDY

19 July 2016 OUR REF:

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Title: Traffic Management Plan Template (TMP)

10.0 CURB EXTENSIONS GUIDELINE

03 Roads, Car Parks and Civil Works

Transcription:

24 Nov 15 12:31 PM 23 November 15 TYPICAL SIGN TYPES: SIGN ARRANGEMENT SIGN ARRANGEMENT 2-26 2-26 3 3 AI - ADVANCED INFO SIGNS 7 7 SIGN 2-23SIGN 2-23 AI - Advance Information Signs are not an essential requirement for public access tracks or cycle routes, nor are they standardised in terms of their design and layout. These signs may, if desired and appropriate, AT START OF ROUTE. INCLUDES: be installed at or near the start point of the route to provide detailed SIGN 2-27SIGN 2-27MAP & INFO SIGN 2-29SIGN 2-29 SIGN 2-34 information, SIGN 2-34 such as a map and information about the length and LENGTH & DURATION OF RIDE / WALK 1: duration 1: to ride etc. These signs should be clearly visible from the road, allowing cyclists and pedestrians a safe place to stop clear of the roadway or cycleway to read the information. BE - BEGINNING AND ENDING SIGNS ID - INTERSECTION DIRECTION 433 433 375 375 BE - Begins/Ends Signs are used to indicate the start and/or end point of a cycle route. They will include route specific information. Route Begins Signs should be installed on the left hand side of the CWB immediately beyond or adjacent to any advance information sign or at a logical starting point for the cycle route. ID - The Intersection Direction Sign is located at or as near as possible to the actual intersection. Should include both Information about the destination and the distance. Multiple sighs and destinations to be on one post 4. SIGNS 2-39, SIGNS 2-, 2-39, 2-41, 2-, 2-422-41, 2-42 BEGINS BEGINS ENDS ENDS SIGNS 2-43, SIGNS 2-452-43, 2-45 SIGNS 2-44, SIGNS 2-462-44, 2-46 1: AD01 - ADVANCED DIRECTION SIGN - ON LOCAL ROAD APPROACHING CWB 1: AD - The purpose of the Advance Direction Sign is to give cyclists DRAFT Kapiti DRAFT ONLY prior ONLY warning, to enable them to make decisions and, if necessary, NOT FOR NOT Cycle CONSTRUCTION FOR CONSTRUCTION place themselves in the best position to make any change in direction Route required before they reach the intersection. These signs should be FOR INFORMATION used in any situation where the cyclist could easily miss making a NOT FOR NOT CONSTRUCTION FOR CONSTRUCTION required turn at an approaching intersection. SH1 MACKAYS SH1 MACKAYS TO PEKA TO PEKA PEKA WAIKANAE WAIKANAE RIVER CROSSING RIVER CROSSING To occur -m in advance of an intersection and should only include CWB SIGNAGE CWB SIGNAGE LAYOUT LAYOUT A Kapiti M2PP-47P-D-SKT-0001 Kapiti Information Aabout the destination, not the distance. RP 12/0.00 RP 12/0.00 TO 23/5.00 TO 23/5.00 SKETCH SKETCH Cycle Cycle Route Route M2PP-47P-D-SKT-0001.DWG M2PP-47P-D-SKT-0001.DWG CD - CONFIRMATION DIRECTION CD - The Confirmation Direction Sign is used to confirm the direction/ destination of travel after an intersection it is intended to provide assurance to cyclists. The CD sign features a straight ahead arrow and should include both Information about the destination and the distance. As a general rule of thumb, these signs should be installed; between - m beyond an intersection where an Advance Direction Sign has been used and should generally be visible from that intersection; Cyclists should see a CD sign at least every 15- minutes of typical cyclist travel, or every 5- km. DETAIL DESIGN (DET) AD - ADVANCED DIRECTION - ON CWB LOCAL ROAD INTERSECTION SIGNS AD - The purpose of the Advance Direction Sign is to give cyclists prior warning, to enable them to make decisions and, if necessary, place themselves in the best position to make any change in direction required before they reach the intersection. These signs should be used in any situation where the cyclist could easily miss making a required turn at an approaching intersection. LR + GW - Local road (LR) and Giveway (GW) signs should to be used where the CWB crosses a local road. These are to be located at or as near as possible to the actual intersection. Where possible the LR should be kept to one per intersection and be able to be read by people on either side of the intersection. Both the LR and GW should share the same post and or be incorporateted onto an existing post. To occur -m in advance of an intersection and should only include Information about the destination, not the distance. C A Certified Issue 23.11.15 DRAFT FOR REVIEW 25.09.15 N N * Refer to Revision 1 for Signature Date Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON RP 12/0.00 TO 23/5.00 SHEET CWB SIGN TYPE SUMMARY M2PP-121-D-DWG-8707 C

07 Aug 14 05:01 p.m. B FAULKNER 24.04.14 V BILLETT 24.04.14 N P BRADSHAW 2 REVISED BASED ON GEOTECHNICAL INPUT BF DS 07.08.14 B EVANS 05.05.14 1 FOR CONSTRUCTION GFB DH DC 07.05.14 G F-B 05.05.14 Date 09.05.14 DUNE ROUNDING DETAIL M2PP-23R-D-DWG-8904 2 N * Refer to Revision 1 for Signature RP 12/0.00 TO 23/5.00 STANDARD DETAILS M2PP-23R-D-DWG-8904.DWG

5 5 43R-81 MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE ASS - LOW ASS - SWALE ASS - ROUGH WP WETLAND RP RIPARIAN 1. REFER TO SCHEDULES (8211) 2. REFER TO STANDARD DETAILS (8900 SERIES)FOR DETAIL. 12 Nov 15 11:07 a.m. RP L 2 56R-81 A 2 56R-81 MS C 2 56R-83 MS C 1 56R-81 56R DWG 84 RP L 1 56R-81 CP L 2 56R-81 CV CV CV CV CV A 1 56R-81 A 1 56R-81 56R-81 DOUBLE OFFSET ROWS 5m APART TREES PLANTED @ 5m CENTRES CYCLEWAY WALKWAY BRIDLEWAY A 1 56R-81 ALLOWANCE IN FOR ACCESS CP D 1 56R-81 CP A 1 56R-81 CP L 1 56R-81 CP G 1 56R-81 CP I 2 56R-81 CP J 2 56R-81 CP F 1 56R-81 PAETAWA DRAIN A 3 56R-81 NORTHBOUND SOUTHBOUND A 1 56R-81 CP B 1 56R-81 CP I 1 56R-81 CP J 1 56R-81 CP H 1 56R-81 CP E 1 56R-81 B 1 56R-81 MT C 1 56R-81 CP H 1 56R-81 OFFSET STORAGE AREA 13 ALLOWANCE FOR DRAINAGE MATERIALS B 2 56R-81 1 FOR CONSTRUCTION NAB DH SW 09.11.15 1:0 1:0 * Refer to Revision 1 for Signature 56R DWG 82 RP 12/0.00 TO 23/5.00 5 PLAN SHEET 1 CV M2PP-56R-D-DWG-81 1 M2PP-56R-D-DWG-81.DWG

12 Nov 15 11:07 a.m. OFFSET STORAGE AREA 13 STRIP UNPLANTED (MULCH ONLY) 56R DWG 81 A 1 56R-82 CV CV 43R-81 MT MS MASSED MASSED - LOW MASSED - TREE ENRICHMENT MASSED - SWALE ASS - LOW ASS - SWALE ASS - ROUGH WP WETLAND RP RIPARIAN OVERHEAD WIRES CLEARZONE 1. REFER TO SCHEDULES (8211) 2. REFER TO STANDARD DETAILS (8900 SERIES)FOR DETAIL. 56R-82 MT C 1 56R-82 B 1 56R-82 PEKA PEKA LINK ROAD MT C 2 56R-82 MS A 2 56R-82 RP L 1 56R-82 RP L 2 56R-82 A 2 56R-82 OFFSET STORAGE AREA 13A 56R DWG 85 HADFIELD LINK LINK ROAD 1 FOR CONSTRUCTION NAB DH SW 09.11.15 56R DWG 83 1:0 1:0 * Refer to Revision 1 for Signature PLANT SHRUBS AND ASSES UNDER ELECTRICAL OVERHEAD WIRES MARKED AS ** ON SCHEDULE RP 12/0.00 TO 23/5.00 5 PLAN SHEET 2 M2PP-56R-D-DWG-82 1 M2PP-56R-D-DWG-82.DWG

56R DWG 82 12 Nov 15 11:07 a.m. MS C 1 56R-83 CV CV CV CV B 2 56R-83 CV CV CV CV STRIP UNPLANTED (MULCH ONLY) 56R-83 PEKA PEKA LINK ROAD 43R-81 MASSED MASSED - LOW MT MASSED - TREE ENRICHMENT MS MASSED - SWALE 1 FOR CONSTRUCTION NAB DH SW 09.11.15 1:0 1:0 * Refer to Revision 1 for Signature ASS - LOW ASS - SWALE ASS - ROUGH WP WETLAND RP RIPARIAN 1. REFER TO SCHEDULES (8211) 2. REFER TO STANDARD DETAILS (8900 SERIES)FOR DETAIL. RP 12/0.00 TO 23/5.00 5 PLAN SHEET 3 M2PP-56R-D-DWG-83 1 M2PP-56R-D-DWG-83.DWG