Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

Similar documents
AHO s experience on HD bathymetric ENCs

Paper for Consideration by HSSC8 Development of an Additional Bathymetry Layer standard based on S-57/S-52

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014

EMPA 2017 How can the S-102 Bathymetric Surface Product improve safety in navigation and pilotage?

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office

Nautical sub-committee

THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route

Underkeel Clearance Management Systems. Captain Jonathon Pearce Senior Pilotage Advisor

Activities of KHOA on creation of S-10X test data sets and S-100 sea trial

TIME VARYING OBJECTS IN ECDIS Today, tomorrow and soon after

NEED FOR SUPPLEMENTAL BATHYMETRIC SURVEY DATA COLLECTION

DISCUSSION PAPER: NEW GENERALISATION POLICY FOR SMALL SCALE ADMIRALTY CHARTS.

Wheatstone Marine Operations - Pilotage - Passage Plan - Onslow Port Limit to WMT

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route

SAFETY OF NAVIGATION OPERATING ANOMALIES IDENTIFIED WITHIN ECDIS

NAEST(M) training Course Structure and Session Objectives. Day Introduction and enrolment

Outcome of the discussion with other HSSC WG on contribution to the MSP MSP development work

Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG

IMO RESOLUTION A.960(23) Adopted 5 December 2003 (Agenda item 17)

ICES Guidelines for Multibeam Echosounder Data (Compiled September 2006)

Gorgon - Pilotage - Passage Plan - Gorgon Marine Terminal to PBG Alternative Route

1 st Tidal and Water Level Working Group Meeting DHN, Niteroi, Brazil 31/03/09 02/04/09 Vertical Offshore Reference Framework (VORF) Chris Jones

SAFETY NOTICE ABOUT THE RELIABLE OPERATION OF ECDIS

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

Developing a Method to Validate the Navigational Bathymetric Database

V Complying with IHO S-52/S-63/S-64

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

Maritime Rules Part 25: Nautical Charts and Publications

ECDIS Chart Layers. And. Their Navigational Impact

MARINE NOTICE MARINE NOTICE. Marine Notice 7/2012. Guidance on ECDIS for ships calling at Australian ports 7/2012

Uncontrolled document if printed.

PROJECT 1 REMOVAL OF WRECKS IN THE TRAFFIC SEPARATION SCHEME IN THE STRAITS OF MALACCA AND SINGAPORE OBJECTIVE. Generally to enhance the safety of

Uncertainty Estimates in Satellite Derived Bathymetry

MARINE NOTICE MARINE NOTICE. Marine Notice 11/2012 Supersedes 15/2010 and 7/2012. Guidance on ECDIS for ships calling at Australian ports 11/2012

Development of a Geo-spatial Analysis Methodology for Assessing the Adequacy of Hydrographic Surveying and Nautical Charts

Marine Accident Analysis of Collisions and Groundings: How to learn from past incidents to avoid them in the future

Underkeel Clearance. Refresher and changes since EMPA 2015 Lisboa CATZOC s Under-keel clearance methodology

Geospatial Positioning Accuracy Standards Part 5: Standards for Nautical Charting Hydrographic Surveys - Public Review Draft

Introduction. VORF - Model Development and Principles. The required VORF model transformation accuracies were as follows:

INTERNATIONAL HYDROGRAPHIC ORGANIZATION

PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS) [IMO Resolutions A.817 (19), MSC.64 (67) and MSC.

HYDROGRAPHIC SECTION QATAR NATIONAL REPORT TO THE 4 TH ROPME SEA AREA HYDROGRAPHIC COMMISSION MEETING

This report summarizes the activities of Hydrographic Unit of Qatar carried out since the 6 th RSAHC meeting in February 2015.

INTERNATIONAL HYDROGRAPHIC SURVEY STANDARDS

High Precision Hydrography in Canada, the ST. Lawrence River Channel, HD Bathymetry, Production, Distribution and Updating

Journey of a Sounding: Application of NOAA Soundings and Features to Navigation Products

properly applied assessment in the use.1 landmarks.1 approved in-service of ECDIS is not experience The primary method of fixing required for those

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Chart Work

International Conference of Advanced Intelligent Maritime Safety and Technology. Original article

Norwegian Coastal Administration (NCA) HSSC November 2015 Busan - Republic of Korea

RESOLUTION A.817(19) adopted on 23 November 1995 PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS)

IALA Recommendation O-130. Categorisation and Availability Objectives for Short Range Aids to Navigation. Edition 1. December 2004

Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements

FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT

Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April Q1 2019

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DEVELOPING PILOTAGE PLANS ON BRIDGE SIMULATORS: METHODOLOGY, BENEFITS AND CHALLENGES

Hydrodynamic and hydrological modelling to support the operation and design of sea ports

The Value of Hydrographic Information and its Influence

III Code. TRACECA Maritime Safety and Security IMSAS workshop Kiev (Ukraine) III Code. Dr. Jens U. Schröder-Hinrichs

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Forth Ports Limited. Port of Dundee. Rig Move Guidelines

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

The role of UKCM now and the future

ROUTEING MEASURES OTHER THAN TRAFFIC SEPARATION SCHEMES

Hydrographic Surveying at The Port of London

ECDIS Familiarisation Training

Executive Order on the activities of pilotage service providers and the obligations of pilots

PAKISTAN. NATIONAL REPORT, 7 th RSAHC MEETING Feb 17 Muscat, OMAN. RSAHC Pakistan National Report

Harbourmaster s Office Tamaki River. Navigation Safety Operating Requirements 2014

Forth Ports Limited. Ruling Depths & Under Keel Clearances

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

METHODS PAPER: Downstream Bathymetry and BioBase Analyses of Substrate and Macrophytes

Admiralty e-navigator

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

Abstract. Introduction

Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

Compact Light Weight RC Boat for Hydrographic Surveys on Dams, Creeks, Rivers, storm water retention pits and other waterways.

LAND INFORMATION NEW ZEALAND

LOCAL NOTICES TO MARINERS 1/13. Valid from: 01/1/13 Expires on: Until withdrawn. HHAL Local Notice To Mariners In Force

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This

Evaluation of the Klein HydroChart 3500 Interferometric Bathymetry Sonar for NOAA Sea Floor Mapping

Bathymetry User Needs and Challenges in Australia and New Zealand

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES

Advantages of Using Combined Bathymetry and Side Scan Data in Survey Processing T.M. Hiller, L.N. Brisson

PASSENGER SHIP SAFETY. Review of Operational Safety Measures to Enhance the Safety of Passenger Ships. Submitted by ICS SUMMARY

Tutorial for the. Total Vertical Uncertainty Analysis Tool in NaviModel3

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

All comments received will be taken into consideration before the proposed amendments are implemented.

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B

Appendix 12: Marine Transportation Study. (Gartner Lee Ltd. 2008)

ENVIRONMENT AGENCY GREAT OUSE AND 100 FT DRAIN QUARTERLY BATHYMETRIC SURVEY DECEMBER 2013 SITE SURVEY REPORT NO. H6787

Scientific Journal of Silesian University of Technology. Series Transport Zeszyty Naukowe Politechniki Śląskiej. Seria Transport

APPLICATION FOR PILOT EXEMPTION CERTIFICATE (PEC)

Memorandum of Understanding (MoU) of the Baltic Pilotage Authorities Commission (BPAC) on deepsea pilotage in the Baltic Sea area

Transcription:

Paper for consideration by ENC Working Group Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Submitted by: Alvaro Sanchez (AHS) Executive Summary: Compilation of high density bathymetric ENCs (benc) by Hydrographic Offices using current standards. Related Documents: S-65, S-57 Related Projects: Introduction / Background Last year the AHS determined to send all our cartographers to an IMO approved generic ECDIS training course as part of our ENC first approach. Our staff share the simulator with a range of mariners who perform very different jobs (pilots, masters, tug operators, etc). The cartographers are exposed to seeing how our ENC products are understood and used in the real world. As the majority of the simulations are conducted in the approaches to commercial ports it didn t take too long to realise how the lack of more detailed bathymetry was a major concern for mariners (especially once ships entered dredged areas). This paper shares the AHS experience so far and promotes the concept and production of high bencs using current standards to other IHO member states as well as provide fuel for future S-100 initiatives. Analysis / Discussion The AHS sees three main avenues to produce bencs. 1. Port authorities can use their own GIS department or external contractors to compile non-official S-57 cells and distribute them to their pilots. 2. Official S-57 data (ENCs) can be produced (maybe co-financed by all stakeholders) by contractors but quality controlled and published by HO s. 3. Compiled, quality controlled and maintained by HOs. The AHS has always been supportive of depicting one metre contours in complex areas. In fact, in the early 2000 s the AHS published a series of 12 large scale ENCs to cover the navigation through the Torres Strait. Back then all contours where hand drawn and it took a long time to complete. More importantly the contours were very difficult to maintain without the support of the right tools (automation). The AHS is now intends to publish bencs, this time, supported by a methodology able to repeat itself making it possible to update the products efficiently using CARIS Bathy Database. The second key aspect is that the AHS is supportive of benc that are equally available to all key members of a ship s bridge team, particularly the Pilot, Master

and other ship s navigation staff. This position has resulted from discussions with the Australian Maritime Safety Authority (SOLAS requires the Master to plan berth to berth, not just to the pilot boarding point), the Australian Marine Pilots Institute, and a study of a number of ship accident reports discussing breakdowns in Bridge Resource Management. These all lead to a view that all involved in this critical phase of navigation should have access to the same data irrespective of whether they are using a Portable Pilotage unit (PPU) or ECDIS. Bathymetric overlays created for and usable only within closed PPU systems do not meet this requirement. The final key aspect is customer engagement - face to face meetings with port authorities, pilots and port surveyors. These meetings create a partnership where the Ports identify what they need in an ENC and the AHS identifies what they need in terms of a hydrographic survey AHS s key points to produce benc (using current standards) are; Discuss the need of such a product, on a port by port basis. The meeting must include, at least the Harbourmaster, a senior pilot and port surveyors. The area covered MUST be as small as possible in order to safely operate the largest ship calling the port. It must focus on restricted waters (very narrow passages, strong currents, sharp turns, etc). The size of the area directly affects production times and ENC file size. One metre contours are AHS preferred option. It was selected as the most realistic contour spacing to be offered to mariners based on the uncertainty of all the different measurements involved in the determination of the final depth figures (tidal models, depth (e.g. +/- 0.5m + 1%d for an A1 survey). We also consider uncertainties coming from the measurement of the draught of the ship itself (especially when it is also affected by squatting). For bencs covering dredged channels, the use of an intermediate contour equal to the design depth of the channel (e.g. 11.7m) is strongly recommended as it normally reflects the maximum draught (plus tide, less port s UKC requirements) of vessels able to enter the port. Soundings, spaced at 50/100m depending on the width of the channel, were also requested by mariners. They are considered important to support the one metre contours utilising the safety depth setting in ECDIS. The port survey areas must overshoot the benc extents and must be supplied to the HO in full (there s no such a thing as merging old and new one metre contours). Harbourmasters and port surveyors must commit to this process in order to maintain consistency on their deliverable, making the HO s internal processes repeatable. Let the Harbourmaster, local pilots and port surveyors come up with the extents of the benc cells. By doing that they are committing to the project. Port stakeholders are quick to ask HO s for more contours over large areas

but they seem not to be aware of the fact that those areas must be re surveyed periodically and that in the end it will affect their resources. From our experience, making them accountable for one of the key moving parts of the project ends up resulting on very sensible product extents. We intend to produce our AU6 ENC based on survey extents created by the Ports. Surveys must provide full sea bottom coverage and be within ZOC A1 horizontal and vertical accuracy. Port surveyors and HO s tides and bathymetric data validation representatives must agree, beforehand, on file formats, metadata and LAT adjustment values in order to speed up as much as possible the registration, processing and validation of the incoming data. We would like to aim for new surveys to be passed on to the chart production team within 48 hrs. Ideally, the updated ENC cell must be released to the RENC in not more than 7 working days since the receipt of the new bathy by the HO. Bathymetric ENCs (bencs) will be published as standalone AU6 cells, each covering an individual dredged channel, segment or manoeuvring area, as defined by the port s various survey / re-survey areas. Maximum ENC cell size is still 5MB so if an area becomes too large it must be split in more than one product. The survey must be processed by BDB as one entity. A surface will be created and the depth contours (DEPCNT) and depth areas (DEPARE) will be auto generated. The result file will be cropped using the official ENC extents ; all the previous contours and areas will be deleted from the AU6 cell and replaced with the new ones. Soundings will be also auto generated by the software. Any other non-bathymetric data overlapping the area will be included in the AU6 (e.g. navaids, wrecks, etc, to ensure correct layering when displayed in ECDIS). High resolution coastline will be retained at the AU5 level and the AU6 will run very close to it without duplicating the data. This will avoid topology issues while trying to join auto generated contours and depth areas against other non-bathymetric features. On the AU5, a M_CSCL object with the same scale than the AU6 (extending up to 100m from the seawall) can be added to avoid the over scale warning pattern display on ECDIS. This provides a seamless display.

Port of Cairns - Proposed AU6 limits On the eastern side the limits of a different polygon can be seen. It corresponds to a different AU6 as the re-surveying (dredging) frequency is different in both areas (6 months vs 3 months). AU5 ENC showing DRGARE and no bathy AU5 ENC with overlapping AU6 (benc) Conclusions The automated production of high density bathymetric ENCs (at one metre interval), using existing standards (S-57 and ECDIS PS) and with maintenance regimes related to survey programmes is expected to be feasible when the Ports are able to provide timely data to the necessary specifications. Justification and Impacts The production of bencs as official ENC products mean that they will be equally accessible to ship masters and pilots and they will be able to have the same view (ECDIS vs PPU) improving communication and therefore Bridge Resource Management (BRM) principles. Recommendations Promulgate the production of benc test cells by HOs and the discussion of its benefits as an official product with port authorities, pilots, navigation safety agencies and mariners in general.

Actions required of ENCWG a. Note this paper b. Discuss the pros and cons of officially produced bencs c. Agree and support the implementation of the recommendations