Report on Air Leakage Testing, in compliance with ATTMA TSL1 (2010) Site address: Cropthorne Autonomous House, WL10 3LZ. Autonomous House, Evesham

Similar documents
Report on the Acceptance Air Leakage Testing of Rectory Cottage in Langattock, Powys, in compliance with ATTMA TSL1 (2010)

Report on the Preliminary Air Leakage Testing of 8 Benson Place in Oxford, in compliance with ATTMA TSL1 (2010)

Report on Pre-improvement Air Leakage Testing, in compliance with ATTMA TSL1 (2010)

Air Leakage Detailing & Awareness Services

Air Pressure Test to EN13829:2000

NSAI Agrément Approval Scheme for. Certified Air Tightness Tester Scheme Master Document

REPORT ON ENVELOPE AIR TIGHTNESS TESTING SPORTS HALL HMP LITTLEHEY CROW SPINNEY LANE PERRY HUNTINGDON PE28 0SR CLIENT: WATES CONSTRUCTION

Overview ASTATT3. Carry out air tightness testing for single dwellings and other small buildings

TECHNICAL STANDARD L1. MEASURING AIR PERMEABILITY OF BUILDING ENVELOPES (DWELLINGS) October 2010 Issue

ASTATT10 Carry out air tightness testing on large and complex, high rise and phased hand over zonal buildings

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

Stirley Barn Pressurisation Test Fri 13-Dec-2013

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

Overview ASTATT2. Prepare building for air tightness. testing

Guidance on room integrity testing and its interpretation

Building air tightness

Duration: 4 hours Type: self-learning 2h and class room lectures 2 hours. Dr.sc.ing. Anatolijs Borodiņecs

Airtightness Testing in Large Buildings: NESEA 2016

List of Appendices. Stamford Brook Deliverable 6: APPENDICES Web version - July 2007

ETEM S.A. LIGHT METALS COMPANY 1, IROON POLYTEHNIOU STR. GR MAGOULA ATTIKIS GREECE

Results of Field Measurements and CONTAM Simulation. Building Science

Steeple Road Industrial Estate Antrim Northern Ireland BT41 1AB

ETEM S.A. LIGHT METALS COMPANY 1, IROON POLYTEHNIOU STR. GR MAGOULA ATTIKIS GREECE

This test shall be carried out on all vehicles equipped with open type traction batteries.

TESTING AT VERY LOW FLOWRATE

Evaluation of n-situ easurement ethods for ir ermeability of indows

Method Statement: Testing Dry Riser System

APPLICATION OF AIRTIGHTNESS TO HEALTHCARE BUILDINGS

The Protection of Silos From Over. Pressurisation During Filling

What is Pressure? Residential Pressure Measurement

TEST CERTIFICATE THE RESULTS CONCERN ONLY THE SPECIMEN TESTED. THE PRESENT DOCUMENT DOES NOT CONSIST PRODUCT APPROVAL BY E.K.AN.AL.

Blower Door Operation Manual

Validation of a Neutral Pressure Isolation Room

Domestic ventilation systems

01 18/11/2013 correction of the reference of the product 1 4 5

Building Official's Guide to Duct Testing based on 2009 IECC

CERTIFICATE OF APPROVAL No ME 5088

Vertex VP Operation and Maintenance

LATICRETE International Inc. One LATICRETE Park North Bethany, CT USA

STANDARD OPERATING PROCEDURE

Getting the Most From Your Diagnostic Equipment

Detecting points of unintentional ventilation

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

1688 Jean-Berchmans-Michaud Drummondville, Quebec. J2C 8E9. Mr. Marc-Etienne Mathieu,ing.

SPD Pressure Sensor Families

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification.

Enclosure Sealing Webinar: Overview

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

General Health & Safety Information for Method Statements. The Use of Piling Equipment Health and Safety Information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

DB 61 Dolphin TMV3 Integrated Thermostatic Mixing Valve

Certification of AMS acc. EN 15267, Part 3 - Overview and First Experience -

PLEA th Conference, Opportunities, Limits & Needs Towards an environmentally responsible architecture Lima, Perú 7-9 November 2012

Subject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR for Antennas, Radomes, and Other External Modifications

Internal Explosion Methodologies

CORESTA RECOMMENDED METHOD N 6

Field Evaluation of ASTM E in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants.

CTG Certification Protocol -- Version 3.0 SUMMARY

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

Opening and closing force guidelines

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

VERTICAL AIR COMPRESSORS

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

Intertek Testing Services Taiwan Ltd.

User Information Sheet 015

In Vessel Composter Installation & Commissioning Manual

Siting and Installation Manual

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

VERTICAL AIR COMPRESSORS

TEST REPORT TS EN : TS EN A1 Windows and doors - Product standard. Testing Reference. : BM 72 Gizli Kanat Pencere (Hidden Vent Window)

Appendix C Field Testing of Pipelines

Measurement Device Deployment & Interpretation of Results. Topic 3 - Audio 33. Key Points

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES

Approved Installation Method (AIM)

Blower Door Operation Manual

AVEMS & UNICLIMA joint Position paper on Regulation (EU) No.1253/2014 Paris, June 8 th

Standard Pneumatic Test Procedure Requirements for Piping Systems

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

Examples of pressure systems and equipment are:

Blower Door Operation Manual

Swimming Pools Regulation 1998

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

ASSE International Product (Seal) Listing Program

TESTING APPLICATION STANDARD (TAS)

AIR VENT HEADS STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No OCTOBER 2008

Spirax Compact FREME Flash Recovery Energy Management Equipment

INGROUND OR ABOVE GROUND POOL. APPROVALS REQUIRED (Check here if): Well Septic

4 Testing Agency Guide. 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage

Zonal Pressurization Diagnostics (ZPD)

Testing Procedures of Watertight Compartments

TEST CERTIFICATE PARTIAL REPRODUCTION OF THE PRESENT CERTIFICATE IS PROHIBITED WITHOUT PRIOR WRITTEN PERMISSION BY EKANAL.

Pilot Operated Safety Relief Valves For Liquified Gas Carriers

Airfix D-E-B Installation and operating instructions

Appendix A Preliminary SEMs

Advisory Circular (AC)

CODE OF PRACTICE AIRGUN RANGE CONSTRUCTION

MFP14-PPU (Vented) Automatic Packaged Pump Units

Fire safety of staircases in multi-storey buildings The results of measurements in Buildings and Simulations

Transcription:

Report on Air Leakage Testing, in compliance with ATTMA TSL1 (2010) Result: Satisfactory The Gaia Group 12/1 Gayfield Street Edinburgh EH1 3NR T: 0131 557 9191 M: 07866 948200 M: 07984 805 163 sandy@gaiagroup.org www.gaiagroup.org Site address: Cropthorne Autonomous House, WL10 3LZ Test Reference No.: GALDAS12/01/0002 Test Date: 13 th January 2012 Testing carried out for: Clients: Mike & Lizzie Coe Address: Postcode: Cropthorne Autonomous House, Evesham WL10 3LZ Testing carried out by: Test Engineer: Paul Jennings Design Air Changes: Achieved Air Changes: Company: Aldas Contact Tel: 07866 948200 Contact E mail: Paul@Gaiagroup.org < 0.6 ACH 1 @ 50 Pa 0.36 ACH 1 @ 50 Pa Affiliated to Gaia Research, Gaia Architects, Gaia Planning, Gaia Norway, Gaia Oslo, Gaia Tjome and Gaia Lista Principal Professor Sandy Halliday BSc (Hons) MPhil CEng MCIBSE FRSA Senior Consultant Paul Jennings BSc (Hons), MEng VAT No. 703 8193 43

Introduction & Set-Up: Air leakage testing of the Cropthorne Autonomous House at Cropthorne near Evesham was carried out on the13th January 2012 to determine the Air Permeability of the dwelling for Building Regulations compliance and the achieved Air Change Rate for PassivHaus certification. Testing was carried out using a Retrotec 3300HP Blower Unit, mounted in the front door of the house. Testing was carried out in accordance with the requirements of BS EN 13829 and the BINDT Quality Procedure, in conformance with the ATTMA TSL1 standard (2010), Method B. any queries or complaints about this test should be addressed in the first instance to the test engineer and in the second instance to BINDT. BINDT contact details: Newton Building, St. George s Avenue, Northampton NN2 6JB Tel: 01604 893860 www.bindt.org All external doors and windows, other than that where the test equipment was mounted, were shut for the duration of testing, and internal doors were kept open to ensure the building acted as a single volume. No trickle vents were fitted in the dwelling. Other test preparations included checking that plumbing and waste traps were charged with water and temporarily sealing of the heat recovery ventilation was undertaken on the warm side of the heat exchanger. A preliminary depressurisation test identified significant leakage occurring through the two compost toilets via the lid and the openable hatch of the composting tank in the basement of the property, outside the conditioned environment. Hence the gap around the lid of the tank was mastic sealed and the hatch was temporarily sealed with tape awaiting the fitting of effective draughtseals. The photographs below illustrate some of the key features of the test preparation and equipment set-up: Supply and return ducts disconnected from warm side of heat exchanger and temporally joined for the duration of testing Hatch to composting chamber temporarily sealed with tape awaiting the fitting of effective & robust draughtseals GALDAS12/01/0002 Page 2 of 10

Measurement Procedures: Test procedures in accordance with the following standards: ATTMA TSL1, 2010, Method B. After a preliminary single-point depressurisation test and leakage check, full multi-point depressurisation testing was carried out, followed by multi-point pressurisation testing. The Envelope Area of the building was calculated according to TSL1 whilst the effective internal volume, for Air Change Rate purposes, was calculated according to guidance provided by the PassivHaus Institute and Warm Associates, PassivHaus Certifiers. The envelope area and volume was calculated from measurements taken on site by the test engineer in consultation with the builder and the clients (occupants). Based upon: BS EN 13829:2001 Dwelling Nett Volume Envelope area m 2 m 3, V N50 Cropthorne Autonomous House 363.3 340.9 Measurements Recorded: Averages of zero flow pressure differentials were recorded before and after the test, as were internal and external temperatures, windspeed and barometric pressure. Depressurisation Test After an initial single-point depressurisation test and leakage check, a full multi-point depressurisation test was undertaken, suitable for certification of the completed dwelling for Building Regulation purposes. Date: 13 th January 2012 Time: 12.08 pm to 12.31 pm Environmental Conditions: Barometric Pressure: 103.7 KPa Wind speed: 0.8 m/s Temperature: Initial: indoors 20 C outdoors 10 C. Final: indoors 20 C outdoors 12 C. Test Data: At least 3 static pressures taken for 10 sec each. A minimum of 10 induced pressures taken for >20 sec each. GALDAS12/01/0002 Page 3 of 10

Existing Pressure Differentials (Static pressure): Baseline, initial [Pa] -1.5-1.5-1.5 Baseline, final[pa] -0.5-1.0-0.5 Static Pressure Averages: initial [Pa] P 01-1.50 P 01- -1.50 P 01+ 0.00 final [Pa] P 02-0.67 P 02- -0.67 P 02+ 0.00 Results: All results are compared to the standards set in Building Regulations Approved Document L1A Conservation of fuel and power in new dwellings (2010), and to the requirements of the PassivHaus Institute for buildings meeting the PassivHaus standard. Results are calculated using the formula set out in ATTMA TSL1 (section 3.2). Readings collected are detailed below: Reading: 1 2 3 4 5 6 7 8 9 10 11 12 Induced Pressure [Pa] -15.0-18.5-25.0-30.0-34.5-37.5-41.5-45.0-48.5-50.5-53.5-59.5 Total flow, Q r 54.3 63.2 80.6 91.2 100.6 109.0 117.9 121.7 130.0 138.3 143.9 160.3 [m 3 /h] Corrected flow, Q env [m 3 /h] 51.3 59.7 76.2 86.2 95.1 103.0 111.5 115.1 122.9 130.7 136.0 151.5 Error [%] 1.3% 0.0% 0.9% -0.7% -1.6% -0.3% 0.0% -2.9% -2.0% 1.2% 0.8% 3.7% Graph of imposed pressure differentials: GALDAS12/01/0002 Page 4 of 10

Graph of imposed pressure differential against airflow: Depressurisation Test Results Correlation, r 2 0.9986 Intercept, C env [m 3 /h.pa n ] Results Results Uncertainty 95% confidence limits 7.255 6.585 7.255 Slope, n 0.7379 0.7107 0.7379 Air flow at 50 Pa, Q 50 [m 3 /h] Permeability at 50 Pa, AP 50 [m 3 /h.m 2 ] Equivalent leakage area at 50 Pa [m 2 ] 132.0 +0.0156 0.387 +0.0163 0.006585 +0.0156 Air changes, n 50 0.3630 +0.0164 GALDAS12/01/0002 Page 5 of 10

Pressurisation Test A multi-point pressurisation test was then undertaken, as required for PassivHaus certification. Date: 13 th January 2012 Time: 12.34 pm to 12.58 pm Environmental Conditions: Barometric Pressure: 103.7 KPa Wind speed: 0.8 m/s Temperature: Initial: indoors 20 C outdoors 12 C. Final: indoors 20 C outdoors 12 C. Test Data: At least 3 static pressures taken for 10 sec each. A minimum of 10 induced pressures taken for >20 sec each. Existing Pressure Differentials (Static pressure): Baseline, initial [Pa] -0.5-1.0-0.5 Baseline, final[pa] +0.8 +0.7 +0.5 Static Pressure Averages: initial [Pa] P 01-0.67 P 01- -0.67 P 01+ 0.00 final [Pa] P 02 0.67 P 02-0.00 P 02+ 0.67 Results: Once again, the readings collected are detailed below: Reading: 1 2 3 4 5 6 7 8 9 10 11 Induced Pressure [Pa] 35.0 40.0 47.0 50.5 53.5 56.5 61.5 17.5 21.0 28.5 36.0 Total flow, Q r 96.0 108.2 123.5 132.9 142.8 148.3 162.6 59.4 66.6 84.3 98.9 [m 3 /h] Corrected flow, Q env [m 3 /h] 93.8 105.7 120.7 129.8 139.6 144.8 158.9 58.0 65.1 82.3 96.7 Error [%] -3.6% -2.4% -2.0% -0.5% 2.2% 1.5% 4.1% 3.7% 0.5% -0.3% -2.9% GALDAS12/01/0002 Page 6 of 10

Graph of imposed pressure differentials: Graph of imposed pressure differential against airflow: GALDAS12/01/0002 Page 7 of 10

Pressurisation Test Results Correlation, r 2 0.9968 Intercept, C env [m 3 /h.pa n ] Results Results Uncertainty 95% confidence limits 5.690 4.765 5.690 Slope, n 0.7985 0.7502 0.7985 Air flow at 50 Pa, Q 50 [m 3 /h] Permeability at 50 Pa, AP 50 [m 3 /h.m 2 ] Equivalent leakage area at 50 Pa [m 2 ] 130.0 +0.0232 0.381 +0.0236 0.006485 +0.0232 Air changes, n 50 0.3575 +0.0238 Combined Test Data Results Uncertainty Air flow at 50 Pa, V 50 [m 3 /h] 131.0 +/-0.0194 Permeability at 50 Pa, Q 50 [m 3 /h.m 2 ] 0.384 +/-0.0200 Equivalent leakage area at 50 Pa [m 2 ] 0.006535 +/-0.0194 Air changes, n 50 0.3605 +/-0.0201 GALDAS12/01/0002 Page 8 of 10

Conclusions: The result achieved, an Air Permeability of 0.38 m 3 /hr/m 2 @ 50 Pa, meets and exceeds by a very substantial margin the Building Regulations requirement to not exceed 10 m 3 /hr/m 2 @ 50 Pa. The Air Change Rate achieved, 0.36 ACH -1 @ 50 Pa also meets and exceeds by a substantial margin the PassivHaus target for newbuild dwellings (a maximum Air Change Rate of 0.6 ACH -1 @ 50 Pa), indicating that this characteristic of the dwelling permits PassivHaus Certification to proceed. Hence we are happy to issue an air leakage certificate, a copy of which is attached. Leakage Inspection: Prior to the testing, and particularly whilst the building was depressurised during the preliminary testing, it was inspected for leakage. The photographs below show the key leakage sites that were identified and repaired prior to the acceptance test. Substantial leakage through gap around top of composting chamber, despite compressive seals attached to the underside of the lid. Gap around lid of composting chamber, mastic sealed prior to the acceptance air leakage test. Leakage along section in roof void where adhesion between Intello + membrane and Contega sealing tape plastered into wall was ineffective. This was repaired prior to the acceptance test. GALDAS12/01/0002 Page 9 of 10

Air Leakage Certificate In accordance with BS EN 13829 & ATTMA TSL1 (2010) Dwelling tested: Cropthorne Autonomous House, Cropthorne, Evesham, Test Date: 13 th January 2012 Test Engineer: Paul Jennings Site Contacts: Mike & Lizzie Coe Certificate No: GALDAS12/01/0002C This is to certify that the above named structure has been tested for air tightness in accordance with the BS EN 13829:2001 methodology. The average Leakage Characteristics of the building were recorded as follows: Airflow @ 50 Pa: 131.0 m³/hr Air Permeability Rate @ 50 Pa: 0.38 m³/(hr.m²) Air Change Rate @ 50 Pa: 0.36 ACH -1 Test Parameters: Correlation of results, R²: 0.998 Slope, n: 0.77 Intercept, C env : 6.47 m³/(hr.pa n ) Envelope Area, A E : 340.9 m 2 Volume, V: 363.3 m 3 Env. Calc Prepared by: Paul Jennings, Aldas Initial Offset Pressure: -1.50 Pa Final Offset Pressure: + 0.67 Pa Initial Inside Temperature: 20 C Final Inside Temperature: 20 C Average Outside Temperature: 11 C Barometric Pressure: 103.7 KPa This certificate should be read in conjunction with the report GALDAS12/01/0002 and associated test method statement. Signed: Name: Paul Jennings Date Issued: 7 th February 2012 Position: Building Air Leakage Specialist The Gaia Group 12/1 Gayfield Street Edinburgh EH1 3NR Tel: +44 131-557 9191 E-mail: research@gaiagroup.org Affiliated to: Gaia Research, Gaia Architects and Gaia Planning, Edinburgh; Gaia Norway, Gaia Oslo, Gaia Tjome and Gaia Lista Principal: Professor Sandy Halliday, MPhil CEng MCIBSE FRSA