Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

Similar documents
WYDOT CONCRETE MIX DESIGN PROCEDURE

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Limerock Bearing Ratio Technician Training Course

Kraton Ultra-thin HMA / WMA Overlay Study

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Asphalt Mixture Quality Acceptance

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

Hot Mix Asphalt (HMA) Quality Assurance

Specifier Note: Retain or delete material(s) below to conform to project requirements.

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Asphalt Mixture Quality Assurance

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Hot Mix Asphalt (HMA) Quality Assurance

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

ASPHALT PAVING LEVEL 1

Apr 16, 2010 LAB MANUAL 1810

Jan 10, 2002 LAB MANUAL

9 QUALITY ASSURANCE PROCEDURES

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

Tex-207-F, Determining Density of Compacted Bituminous Mixtures

SUPERPAVE MIX DESIGN. Superpave Mix Design 1

In Place Density Determination of Asphalt Concrete by the Coring Method

Method of Making and Curing Concrete Specimens in the Field for Compression and Flexural Tests

ASPHALT PLANT LEVEL 1

Le Sueur County, MN Tuesday, April 7, 2015 Board Meeting

OHD L-47. Guidelines for Resolving Differences in Test Results

Rennick Yard Roller-Compacted Concrete Pavement

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST


ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

Road Quality Working Group. June 11, 2015

Notice of Intent to Close Inactive CCR Surface Impoundments

Revised Specifications Highlights. David Wang State Construction Office Feb.23, 2010

State of Nevada Department of Transportation Materials Division

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

* Numbers in parentheses refer to the list of references at the end of this paper. 84

DRAFT WSDOT PAVEMENT POLICY

FINAL REPORT FOR NCHRP (375) Improvements to Dry-Back Procedure of AASHTO T 209. December 2017

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

AGGREGATE INFORMATION

PROPOSAL. PROPOSAL OF, a corporation a

RECENT ADVANCES AND USES OF ROLLER COMPACTED CONCRETE PAVEMENTS IN THE UNITED STATES

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

Reinforced Soil Retaining Walls-Design and Construction

IMPROVED RICE METHOD FOR DETERMINING THEORETICAL MAXIMUM SPECIFIC GRAVITY OF ASPHALT PAVING MIXTURES

Time rate of swelling of compacted highly plastic clay soil from Sudan

Driveway Design Criteria

EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD)

Improved Rice Method for Determining Theoretical Maximum Specific Gravity of Asphalt Paving Mixtures

City of Davis Pavement Management Program

Exclusively by: ENFRA, LLC

Expansion Joint Filler Evaluation APEL. Nomaflex

ASIAN JOURNAL OF CIVIL ENGINEERING (BUILDING AND HOUSING) VOL. 9, NO. 5 (2008) PAGES

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

TABLE OF CONTENTS LEGAL NOTICE

ADA Operations Contact Info

TABLE OF CONTENTS LEGAL NOTICE

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Item 404 Driving Piling

D.B. Wilson Station CCR Landfill

TABLE OF CONTENTS LEGAL NOTICE

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

HIR on Oklahoma Turnpikes

Inspection and Acceptance of Asphalt Mix Design Laboratories

Aug 17, 2001 LAB MANUAL MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified))

Item 585 Ride Quality for Pavement Surfaces

I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION

ASPHALT PLANT LEVEL 1

1 Exam Prep. Questions and Answers

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

EFFECT OF FLY ASH GRADATION ON WORKABILITY, STRENGTH AND DURABILITY OF PORTLAND CEMENT FLY ASH MORTARS

Pole Foundation Design with Spreadsheet

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture

Inspection and Approval of Asphalt Mix Design Laboratories

Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) 1

Access requests to County streets and roadways are processed through one of the following methods:

PERMANENT PAVEMENT MARKING PLAN

Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

State of Nevada Department of Transportation Materials Division METHOD OF TEST FOR DETERMINING THE LIQUID LIMIT OF SOIL

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

Use Part II for absorptive mixtures that have more than 2.0 percent water absorption.

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

EVALUATION OF ASPHALT PAVEMENT ANALYZER FOR HMA MIX DESIGN

Transcription:

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department of Transportation Bureau of Materials and Tests

110 + MILES ALDOT FDR TOTALS JANUARY 2014 - PRESENT

FULL DEPTH RECLAMATION WITH PORTLAND CEMENT SECTION 302 Job Special Provision Project Specific

CONTRACTOR REQUIREMENTS Pulverizing, Mixing, Compaction Roadbed Sampling Job Mix Design Quality Control Plan Other Construction Requirements

PULVERIZING, MIXING, AND COMPACTING Length of pulverization limits 100% by weight passes a 3 inch sieve A minimum of 95% passes a 2 inch sieve and A minimum of 50% passes a Number 4 Sieve Portland cement shall not vary more than 5% of approved mix design Dust Control Addition of water and mixing to be completed in a continuous pass The moisture content shall be within ± 2% of the theoretical optimum moisture The pulverizing, mixing, and compacting shall be a continuous operation Compaction shall be to 96% of Theoretical maximum density

Pulverizing Mixing Compaction Roadbed Sampling Job Mix Design Quality Control Plan Other Construction Requirements CONTRACTOR REQUIREMENTS CONT.

Sample existing roadbed Materials at least every 1,000 feet along roadbed Submit 75 pounds of composite roadbed material to M&T Soils Laboratory Submit 5 pounds of cement for each proposed job mix design to M&T Soils laboratory SAMPLING EXISTING ROAD

Pulverizing Mixing Compaction Roadbed Sampling Job Mix Design Quality Control Plan Other Construction Requirements CONTRACTOR REQUIREMENTS CONT.

Design as per ALDOT-416, Laboratory Design of Soil-Cement and Full-Depth Reclamation Mixes Approved materials only(cement, water) If not shown in the plans, Contractor is responsible for the design and approval request of the job mix design More than one job mix design may be required Changes on the approved job mix design would require a new mix design submittal Five copies no less than 21 calendar days prior to beginning the FDR JOB MIX DESIGN

Pulverizing Mixing Compaction Roadbed Sampling Job Mix Design Quality Control Plan Other Construction Requirements CONTRACTOR REQUIREMENTS CONT.

QUALITY CONTROL PLAN Provide a Quality Control Plan to include Procedure, equipment, and frequency for monitoring Cement placement Amount of water utilized Reclaimed material moisture requirements Density and moisture content of in-place FDR Materials characteristics of reclaimed materials Provide six copies of plan Provide weekly documentation showing that work is performed according to the plan Quality Control Plan will be review by ALDOT for completeness

Pulverizing Mixing Compaction Roadbed Sampling Job Mix Design Quality Control Plan Other Construction Requirements CONTRACTOR REQUIREMENTS CONT.

OTHER CONSTRUCTION REQUIREMENTS Description of all equipment that will be used during the construction of FDR Daily check of spread rate of cement At beginning of production Each 2,000 linear feet Surface finish Responsible for roadbed grade controls ¼ of an inch from a 16 foot straightedge Cross slope shall not vary more than 50% Curing: Finished surface shall be covered with a Type A bituminous treatment until a pavement layer or additional surface treatment is applied. Quality Control During Production Moisture requirements Density requirements Compressive Strength Thickness

ALDOT REQUIREMENTS ALDOT = OWNER or OWNER s REPRESENTATIVE Laboratory Responsibilities Field Responsibilities

ALDOT LABORATORY RESPONSIBILITIES Mix design verification or design of FDR mixes for inclusion in contract plans Determination of Moisture-Density relationship Compressive strength Review of Contractor s Quality Control Plan for completeness Approve final mix design

ALDOT REQUIREMENTS ALDOT = OWNER or OWNER s REPRESENTATIVE Laboratory Responsibilities Field Responsibilities

ALDOT FIELD RESPONSIBILITIES Verify that field theoretical optimum moisture is maintained within ± 2% Check gradation at least once for each 2,000 linear feet of FDR placed Verify that the cement spread rate does not vary more than 5% by weigh from approved mix Determine the in-place density using AASHTO T 310 at least once for each 1,000 linear feet of FDR placed Verify that the work performed is in compliance with the QC Plan

ALDOT FIELD RESPONSIBILITIES CONT. Check the surface finish at intervals of 100 feet Verify that cross slope does not vary by more than 0.50% from required slope Verify that finished surface does not vary more than ¼ of an inch from a 16 foot straightedge placed parallel to the centerline of roadbed Check the thickness of the FDR at least once per 200 linear feet of roadbed

Special Thanks to Sergio Rodriguez