Report on the Preliminary Air Leakage Testing of 8 Benson Place in Oxford, in compliance with ATTMA TSL1 (2010)

Similar documents
Report on Pre-improvement Air Leakage Testing, in compliance with ATTMA TSL1 (2010)

Report on the Acceptance Air Leakage Testing of Rectory Cottage in Langattock, Powys, in compliance with ATTMA TSL1 (2010)

Report on Air Leakage Testing, in compliance with ATTMA TSL1 (2010) Site address: Cropthorne Autonomous House, WL10 3LZ. Autonomous House, Evesham

Air Leakage Detailing & Awareness Services

Air Pressure Test to EN13829:2000

NSAI Agrément Approval Scheme for. Certified Air Tightness Tester Scheme Master Document

Stirley Barn Pressurisation Test Fri 13-Dec-2013

Overview ASTATT3. Carry out air tightness testing for single dwellings and other small buildings

REPORT ON ENVELOPE AIR TIGHTNESS TESTING SPORTS HALL HMP LITTLEHEY CROW SPINNEY LANE PERRY HUNTINGDON PE28 0SR CLIENT: WATES CONSTRUCTION

TECHNICAL STANDARD L1. MEASURING AIR PERMEABILITY OF BUILDING ENVELOPES (DWELLINGS) October 2010 Issue

ASTATT10 Carry out air tightness testing on large and complex, high rise and phased hand over zonal buildings

Guidance on room integrity testing and its interpretation

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

Overview ASTATT2. Prepare building for air tightness. testing

List of Appendices. Stamford Brook Deliverable 6: APPENDICES Web version - July 2007

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

Building Official's Guide to Duct Testing based on 2009 IECC

Blower Door Operation Manual

What is Pressure? Residential Pressure Measurement

Airtightness Testing in Large Buildings: NESEA 2016

Building air tightness

Duration: 4 hours Type: self-learning 2h and class room lectures 2 hours. Dr.sc.ing. Anatolijs Borodiņecs

Steeple Road Industrial Estate Antrim Northern Ireland BT41 1AB

APPLICATION OF AIRTIGHTNESS TO HEALTHCARE BUILDINGS

Blower Door Operation Manual

Domestic ventilation systems

Blower Door Operation Manual

Validation of a Neutral Pressure Isolation Room

Field Evaluation of ASTM E in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants.

Technical Report. Title: Product weathertightness testing of a sample of W.G.Ltd 500 series Curtain Walling for The Window Glass Company Limited

Results of Field Measurements and CONTAM Simulation. Building Science

4 Testing Agency Guide. 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage

TESTING AT VERY LOW FLOWRATE

TEST CERTIFICATE THE RESULTS CONCERN ONLY THE SPECIMEN TESTED. THE PRESENT DOCUMENT DOES NOT CONSIST PRODUCT APPROVAL BY E.K.AN.AL.

01 18/11/2013 correction of the reference of the product 1 4 5

Zonal Pressurization Diagnostics (ZPD)

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or

Enclosure Sealing Webinar: Overview

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7

CRITERIA FOR LABORATORY ACCREDITATION IN THE FIELD OF PRESSURE METROLOGY

Pacific Gas & Electric Model Energy Communities Program Air Flow & Duct Leakage Comparative Study

Procedure for Field Calibration Check of Digital Pressure Gauges (Using a DG-700 or DG-500 as the Reference Standard)

Detecting points of unintentional ventilation

Evaluation of n-situ easurement ethods for ir ermeability of indows

Propane Conversion Kit Instruction

The process of measuring air

Particulate Emission Monitor Correlation. Camden Power Station Stack No RSL152

USER S INFORMATION MANUAL

Smoke and heat Ventilator Testing

Operation Manual. Software. FanTestic Integrity (complying with NFPA 2001) rev

Propane Conversion Kit Instruction

ETEM S.A. LIGHT METALS COMPANY 1, IROON POLYTEHNIOU STR. GR MAGOULA ATTIKIS GREECE

ETEM S.A. LIGHT METALS COMPANY 1, IROON POLYTEHNIOU STR. GR MAGOULA ATTIKIS GREECE

Getting the Most From Your Duct Blaster

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

Gas and Carbon Monoxide Safety

Vehicle- or rack-mounted liquefied gas meters, pump supplied

Vehicle-mounted meters, pump supplied

Operation Manual. rev Software. Clean Agent Retrotec Inc.

CERTIFICATE OF APPROVAL No ME 5088

1688 Jean-Berchmans-Michaud Drummondville, Quebec. J2C 8E9. Mr. Marc-Etienne Mathieu,ing.

This test shall be carried out on all vehicles equipped with open type traction batteries.

Vertex VP Operation and Maintenance

The Protection of Silos From Over. Pressurisation During Filling

Method Statement: Testing Dry Riser System

IC Sentinel Applications Guide for Healthcare Environmental Air Quality Monitoring

Getting the Most From Your Diagnostic Equipment

Measurement Device Deployment & Interpretation of Results. Topic 3 - Audio 33. Key Points

Propane Conversion Kit Instruction

Appendix A Preliminary SEMs

FAN ENGINEERING. Field Testing of Fans FE-900. Introduction. Testing Equipment. Testing Standards. Prior to Testing

AVEMS & UNICLIMA joint Position paper on Regulation (EU) No.1253/2014 Paris, June 8 th

Fire safety of staircases in multi-storey buildings The results of measurements in Buildings and Simulations

CONSERVATORY DIAGNOSTIC TOOLS TO MEASURE BUILDING PERFORMANCE

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

Technical Report. Product testing of 6 mm Graniti Fiandre Maximum panels with support system and fabrication by Telling Architectural

We measure it. For gas and water installers. testo hpa. bar

Test Report. Test Report Smart Systems Limited Incorporating Smart Extrusions. Page 1 of 78

Mainsboost Installation, Operation & Maintenance Instructions

AIRTIGHTNESS OF BUILDING PENETRATIONS: AIR SEALING SOLUTIONS, DURABILITY EFFECTS AND MEASUREMENT UNCERTAINTY

CRAFTSMAN EXAMINATION, NOVEMBER 2007 GASFITTING ANSWER SCHEDULE

Pressure Measurement

Are you really doing your job if you fail to measure static pressure every time you service a unit? The answer is no.

LATICRETE International Inc. One LATICRETE Park North Bethany, CT USA

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

Standard Operating Procedure Measuring & Testing Equipment

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

PG7000 high line differential mode for defining differential pressure at line pressures above atmospheric pressure (PG7000 V2.

Appendix C Field Testing of Pipelines

CHAPTER 3 RESULTS AND DISCUSSION

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

High-speed pressure sensor Model CPT6140

Installation and Maintenance Instruction Manual

Safety Services. Introduction

OPERATION MANUAL. Version 1. Duct Air Leakage Tester Model DALT Be sure to read this manual thoroughly before using the instrument.

SPD Pressure Sensor Families

Specific Accreditation Criteria Calibration ISO IEC Annex. Mass and related quantities

System Pressure Manager Standard & System Pressure Manager Plus

ITTC Recommended Procedures and Guidelines

Transcription:

Report on the Preliminary Air Leakage Testing of 8 Benson Place in Oxford, in compliance with ATTMA TSL1 (2010) Result: Satisfactory Site address: 8 Benson Place, Oxford, OX2 6QH Test Reference No.: ALDAS, 54 Melville Road, Churchdown, Gloucester GL3 2RG Aldas is a trading name of Jennings Aldas Limited, Co. Reg 8409614 Director: Clare Corley JALDAS5037/R2 Test Dates: 19 th December 2013 Testing carried out for: Client: Tim Nicholson Testing carried out by: Test Engineer: Paul Jennings Target Air Changes, ACH -1 @ 50 Pa: Company: Aldas Contact Tel: 01452 532878 / 07866 948200 Contact E-mail: Doorfanman@hotmail.com < 1.0 (EnerPHit) Achieved Air Changes, ACH -1 @ 50 Pa: 0.89 Achieved Air Permeability, m 3 /hr/m 2 @ 50 Pa: 0.82 Data consistency, r 2 (requirement, r 2 > 0.98): 0.998 Slope, n (requirement, 0.5 < n < 1.0): 0.70 Air Leakage Specialist: Paul Jennings, BSc, MSc doorfanman@hotmail.com 07866 948200

Introduction & Set-Up: Preliminary air leakage testing of 8 Benson Place in Oxford was carried out on the 11th and the 19th of December 2013. Testing was carried out using a Retrotec 3000SR high-power fan mounted in the front door of the house. Testing was carried out in accordance with the requirements of BS EN 13829 and the BINDT Quality Procedure, in conformance with the ATTMA TSL1 standard (2010), Method B. Any queries or complaints about this test should be addressed in the first instance to the test engineer and in the second instance to BINDT. BINDT contact details:newton Building, St. George s Avenue, Northampton NN2 6JB Tel: 01604 893860 www.bindt.org All external doors and windows, other than that where the test equipment was mounted, were temporarily sealed for the duration of testing, many with OSB and/or polythene sheet since the replacement windows have yet to be fitted. Internal doors were kept open to ensure the building acted as a single volume. The pictures below illustrate key parts of the equipment and test set-up used: P3) Temporary seal over end of duct through ground floor P2) Test equipment mounted in front entrance doorway P4) Temporary seal over bathroom waste through ground floor Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 2 of 12

P5) Temporary seal over end of flue for wood burner (not yet fitted) P6) Temporary seal over end of incoming air duct for wood burner (not yet fitted) P7) Temporary seal to end of duct from MVHR system in cupboard off landing P8) Temporary seal over end of MVHR ductwork through upstairs ceiling P9) Temporary seal to ground floor opening when new window yet to be fitted P10) Temporary seal to bedroom window where new window yet to be fitted, also tape seal to damaged membrane above window Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 3 of 12

Measurement Procedures: Test procedures in accordance with the following standards: ATTMA TSL1, 2010, Method B. After a preliminary single-point depressurisation test and a short leakage check, a full multi-point depressurisation test was carried out. As required by the PassivHaus Institute, a full multi-point pressurisation test was also then undertaken, after turning the fan around. The Envelope Area and Volume were calculated by the test engineer directly from measurements made on site on the 11 th December. Based upon: BS EN 13829:2001. Dwelling Envelope area m 2 (ATTMA conventions) Volume m 3 (PHI conventions) 8 Benson Place, Oxford, OX2 6QH 343 316.5 Measurements Recorded: Averages of zero flow pressure differentials were recorded before and after the test, as were internal and external temperatures, windspeed and barometric pressure. Equipment Calibration: All test equipment and accessories are calibrated. The table below provides details of the equipment and the calibration validity for each: Retrotec 3000SR Blower Unit Serial No: PH001057 Expires 15 th April 2014 Retrotec DM2A Digital Gauge Serial No: 102036 Expires 15 th April 2014 Testo 511 Digital Barometer Serial No: 39107531/301 Expires 6 th June 2014 Testo 110 Digital Thermometer Serial No: 33949361/208 Expires 9 th June 2014 Testo 525 Digital Anemometer Serial No: 01712338 Expires 16 th June 2014 Depressurisation Test During the extensive leakage check, a number of major and minor leakage sites were identified, which are discussed later in this report. The only leakage site which was both accessible and could be practically tackled immediately was around the boiler flue through the wall, which was resealed by the resident. A full multi-point pressurisation test was then carried out. Test date: 19 th December 2013 Time: 11.42 am to 12.17 pm Environmental Conditions: Barometric Pressure: 99.9 KPa Wind speed: 0.5 m/s Temperature: Initial: indoors 12 C outdoors 12 C Final: indoors 11 C outdoors 9 C Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 4 of 12

Test Data: At least 3 static pressures taken for 10 sec each. A minimum of 10 induced pressures taken for >20 sec each. Existing Pressure Differentials (Static pressure): Baseline, initial [Pa] Baseline, final[pa] +0.3 0.0 0.0 +0.1-0.2-0.2-0.3 +0.1-0.2 0.0 +0.2-0.1 Static Pressure Averages: initial [Pa] P 01 0.00 P 01- -0.20 P 01+ +0.10 final [Pa] P 02-0.05 P 02- -0.20 P 02+ +0.10 Results: All results are compared to the standards set in Building Regulations Approved Document L1A Conservation of fuel and power in new dwellings (2010). Results are calculated using the formula set out in ATTMA TSL1 (Section 3.2). Readings collected are detailed below: Reading: 1 2 3 4 5 6 7 8 9 10 11 12 Induced Pressure [Pa] Total flow, Q r [m 3 /h] Corrected flow, Q env [m 3 /h] -82.0-77.0-70.5-64.5-56.5-52.0-48.5-44.5-42.5-39.5-36.0-30.5 419.4 401.2 378.0 353.2 326.7 312.6 297.7 282.2 265.5 247.8 235.0 220.4 411.0 393.1 370.4 346.1 320.1 306.3 291.7 276.5 260.1 242.8 230.2 216.0 Error [%] +0.1% -0.1% -0.1% -0.9% +0.3% +1.5% +1.3% +1.8% -1.2% -3.1% -2.2% +2.6% Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 5 of 12

G1: Graph of imposed pressure differentials, depressurisation: G2: Graph of imposed pressure differential against airflow, depressurisation: Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 6 of 12

Correlation, r 2 0.997 Intercept, C env [m 3 /h.pa n ] Pressurisation Test After the depressurisation test a full multi-point pressurisation test was then carried out, as required by the PassivHaus Institute. Test date: 19 th December 2013 Time: 1.34 pm to 1.51 pm Environmental Conditions: Depressurisation Test Results Results 95% confidence limits 21.0 18.0 24.3 Slope, n 0.68 0.64 0.71 Air flow at 50 Pa, Q 50 [m 3 /h] Permeability at 50 Pa, AP 50 [m 3 /h.m 2 ] Equivalent leakage area at 50 Pa [m 2 ] Barometric Pressure: 99.9 KPa Wind speed: 0.5 m/s Temperature: Initial: indoors 12 C outdoors 9 C Final: indoors 11 C outdoors 7 C Results Uncertainty 295.5 +1.1% 0.86 +1.2% 0.015 +1.1% Air changes, n 50 0.93 +1.2% Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 7 of 12

Test Data: At least 3 static pressures taken for 10 sec each. A minimum of 10 induced pressures taken for >20 sec each. Existing Pressure Differentials (Static pressure): Baseline, initial [Pa] Baseline, final[pa] -0.3 +0.1-0.2 0.0 +0.2-0.1 +0.6 +0.8 +2.6 +0.4 +0.8 +0.8 Static Pressure Averages: initial [Pa] P 01-0.05 P 01- -0.20 P 01+ +0.10 final [Pa] P 02 +1.00 P 02- -0.00 P 02+ +1.00 Results: All results are compared to the standards set in Building Regulations Approved Document L1A Conservation of fuel and power in new dwellings (2010). Results are calculated using the formula set out in ATTMA TSL1 (Section 3.2). Readings collected are detailed below: Reading: 1 2 3 4 5 6 7 8 9 10 11 12 Induced Pressure [Pa] Total flow, Q r [m 3 /h] Corrected flow, Q env [m 3 /h] 89.5 85.5 77.5 72.5 68.5 62.5 59.0 55.5 52.0 46.5 43.0 39.5 415.0 392.5 368.9 352.2 334.6 321.1 306.6 291.5 275.5 258.9 240.9 226.3 407.5 385.4 362.3 345.9 328.5 315.3 301.1 286.2 270.5 2564.2 236.6 222.3 Error [%] +1.1% -1.2% -0.3% -0.1% -1.2% +1.3% +0.8% +0.2% -0.8% +1.1% -0.4% -0.5% Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 8 of 12

G3: Graph of imposed pressure differentials, pressurisation: G4: Graph of imposed pressure differential against airflow, pressurisation: Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 9 of 12

Correlation, r 2 0.999 Intercept, C env [m 3 /h.pa n ] Leakage Inspection Results Pressurisation Test Results 95% confidence limits 16.3 14.8 16.3 Slope, n 0.71 0.69 0.71 Air flow at 50 Pa, Q 50 [m 3 /h] Permeability at 50 Pa, AP 50 [m 3 /h.m 2 ] Equivalent leakage area at 50 Pa [m 2 ] Results Uncertainty 267.0 +0.7% 0.78 +0.9% 0.013 +0.7% Air changes, n 50 0.85 +0.9% Extensive inspections for leakage were carried out during both visits, with considerable permanent and temporary remedial sealing works being undertaken prior to the full multi-point testing. Various leakage sites were identified, which are illustrated in the pictures below and on the following pages: P11) Leakage behind conduit, removed and wall parged before final test P12) Red tape sealing crack across top of existing window Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 10 of 12

P13) Leakage in various gaps in brickwork at locations around existing fireplace P14) Fireplace completely parged before final test P15) Expanding foam used to seal void behind intermediate floor joist near existing chimney P16) Tape seal around end of floor joist into wall P17) Leakage found at edge of floor behind existing chimney P18) Foam around floor edge trimmed back and then parged over to seal before final test Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 11 of 12

P19) Significant hole found in extrenal wall beneath upper internal partition wall P20) Same section of wall parged to eliminate leakage P21) Temporary mastic sealing to remove leaks around existing windows that will be replaced before the acceptance test P22) Damaged membrane around window opening temporarily sealed before final test (see P10) Comments & Conclusions: The air leakage results achieved in the preliminary air leakage testing of the refurbished dwelling at 8 Benson Place in Oxford were an average Air Change Rate of 0.89 ACH-1 @ 50 Pa and an average Air Permeability of 0.82 m3/hr/m2 @ 50 Pa. These are excellent results, and already meet the EnerPHit target of < 1.0 ACH-1 @ 50 Pa. Although there is obviously a risk of additional leakage as the new windows have yet to be installed and most of the services are incomplete, yet we would also expect the current residual leakage to be reduced as the plastering of the walls is finished and the plasterboard ceilings are installed. Hence we confidently expect the final Acceptance Test to achieve an Air Change Rate of < 1.0 ACH-1 @ 50 Pa and therefore meet the EnerPHit target. Jaldas Benson Place Preliminary Air leakage Testing Report December 2013 Page 12 of 12