Estimated/ Tendered Cost (Rs.in lakhs) Name of Contractor. M/s. Royal Const. Co. A- 242,Prashant Vihar, New Delhi-85 12,997,104.10

Similar documents
Sri Venkateshwar International School Sector-18, Dwarka, New Delhi-78 Session Route No. 20

LIST OF HVDS LOCATION IN BRPL

Minutes of opening of Financial Bid NIB No. 726 PMGSY-II RCIP-II

8. M/s Mosmetrostory-Simplex JV 9. M/s HCC-Samsung JV. 5. M/s HCC-Samsung JV. 10. M/s Mosmetrostory-Simplex JV

FORM XVII [SEE RULE 78(1) (A) (i)] REGISTER OF WAGES

No.TR/Sch/(00)/3/2014/4949 Dated:

GOVT. OF N.C.T OF DELHI DIRECTORATE OF EDUCATION (PHYSICAL EDUCATION BRANCH) CHHATRASAL STADIUM: MODEL TOWN: DELHI

INDRAPURAM (2019) (NUR to XII)

MEERUT DEVELOPMENT AUTHORITY

INCOME TAX APPELLATE TRIBUNAL NEW DELHI BENCHES, NEW DELHI CAUSELIST FOR BENCH 'F' Date : 07/11/2016 Sr No.

Roll Number Name Date of Interview Session. 1 SA A KAUSTAV PRASAD 13TH FEBRUARY, 2019 Forenoon 9.00 AM

Tournament Statistics

shop_name address city state R. G. Communication & Cyber SHOP NO - 6, CSC - 11, POCKET G - 27, SECTOR - 3,ROHINI NEW DELHI New Delhi DELHI Gupta

KVPY-2017 CENTRE: DELHI-II

AMOUNT VERIFIED AMOUNT ADMITTED 46, , , , NOTE 1

DSIIDC LIMITED HOUSING DIVISION LIST OF APPLICANTS APPLIED UNDER UNDER TYPE-3 NEW CATEGORY

ITEM NO.41 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS (1) IN RE: REPORT NO. 71, 78 AND 80 SUBMITTED BY EPCA

WRESTLING FOREIGN COACHES SUPPORTING PERSONNEL CENTRES FOR TRAINING COACHES. In Place Scheme. As per Scheme. Scheme. Scheme 56 (M) 29 (W)

DAYALBAGH EDUCATIONAL INSTITUTE CONSOLIDATED CHART 12-Feb-2018 PAGE: 1

RESULTS of 4 th District Level Olympiad 2018

LIST OF WORKMAN AND EMPLOYEES LIST OF CLAIM RECEIVED FROM WORKMAN AND EMPLOYEES FORM D. Claim Amount (in INR) (A+B+C)

ITEM NO.3 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

No.100(3)15/RN/100/B-3678 dt , the 50th

ITEM NO.30 COURT NO.1 SECTION II-C S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

BRT Corridor Shastri Park Karawal Nagar Yamuna Vihar Mori Gate Gandhi Nagar

Gradation List 2017 in r/o Divisional Accounts Officer/Divisional Accountants Cadre

Limited Tender Notice

S.No. Roll No. Name Father s Name Gender D.O.B. Time of Interview ANITA KANOJIA BANSI LAL KANOJIA F 12-Sep-78 10:30 AM

S.No. Roll No. Name Father s Name Gender D.O.B. Time of Interview AVINASH MAHESH CHAND M 20-Sep-93 10:30 AM DEVENDER KUMAR

Invigilation duties S. No. Name of the Faculty Date, session and Room Number of Invigilation duties

ITEM NO.14 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

1. APPROVAL FOR CONVERSION OF COMPULSORY CONVERTIBLE DEBENTURE INTO EQUITY SHARES. Father's Name

ITEM NO.9 COURT NO.4 SECTION XIV S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

No. Name and Reservation Status of Assembly Constituency :

BC EX-SERVICEMAN (DEPENDENT) DEEPAK VERMA DHARAMPAL EX-SERVICEMAN (DEPENDENT)

OUT TODAY ITEM NO.501 COURT NO.2 SECTION XVI S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS VERSUS

Knockout Results. Event Managed by: Eventus Corporate Services India Pvt. Ltd. 51/15, Old Rajinder Nagar, New Delhi

ITEM NO.1 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

MEERUT DEVELOPMENT AUTHORITY

BTC DIET - Lalitpur ch0vh0lh0 dkmfulfyax esa miflfkr vh;ffkz;ksa esa ls efgyk vizosf'kr vh;fkhz & izfke pø.

ITEM NO.1 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

Organization Name. Government - Regular INDIAN AIR FORCE. Government - Regular INDIAN AIR FORCE INDIAN AIR FORCE. Regular.

INSTRUCTIONS FOR CANDIDATES GROUP 'X' (TECH) (MAIN LIST) ST JAN - FEB 2017

SANDEEP 31/12/1997 Male BCB

ITEM NO.303 COURT NO.5 SECTION XI S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Civil Appeal No(s) /2014 VERSUS

Welcome to Data Capturing System: MANAGEMENT

CAUSE LIST. (DEPUTY REGISTRAR) Date: 19/11/2018 Time: 11:00 AM. NO. NO M/S DENTSPLY INTERNATIONAL INC.

VERSUS. SAHARA INDIA REAL ESTATE CORPN.LTD.&ORS. (for appropriate orders and office report)

INDIRA GANDHI UNIVERSITY MEERPUR, REWARI

Rejection List on account of non payment of Registration Money Form No Applicant Name Area Applied for Akash Dixit Arun Mehra

Position of C.G Appointment on

Final Clusters of Govt. Schools for Online Admissions to Class VI Phase III Cluster SNo schoolid schoolname Bhola Nath Nagar-SBV (Babu

Himachal Pradesh University NAAC Accredited 'A' Grade University Summer Hill, Shimla-5. Merit List of B.Ed. Entrance Test-2018(Stream: Non-Medical)

MEERUT DEVELOPMENT AUTHORITY

ITEM NO.62 COURT NO.2 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

Result Status of SC & PH candidates Revised from Not Qualified to Qualified due to change of qualifying criteria.

ITEM NO.1 COURT NO.3 SECTION IV S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Civil Appeal No(s).1727/2016 VERSUS

NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI DAILY CAUSE LIST DATED (Monday) Court of Chairperson 10:30 AM

NEHRU GRAM BHARATI VISHWAVIDYALAYA

Open TRIALS U-19(MEN'S CATEGORY) DOMESTIC SEASON PLAYERS LIST Under -19 Preliminary Trials Following players are requested to report at

EDUCATION STATE DHEERENDRA KUMAR. SURENDRA SINGH M WC OBC UP 10th 25 BN BSF Chhawla camp,najafgarh road New Delhi-71

ITEM NO.6 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. IA NO. 452 in Writ Petition(s)(Civil) No(s).

M.P. BHOJ (OPEN) UNIVERSITY, BHOPAL

IMED SPORTS REPORT PARTICIPATION IN SPORTS

ITEM NO.8 COURT NO.5 SECTION XIV S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

Date: 20 and 21 April 2019

2 BHK Type-C ( Carpet Area SqFt)

ITEM NO.301 COURT NO.3 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

KENDRIYA VIDYALAYA SANGATHAN

CURRICULUM VITAE EDUCATION. PROFESSIONAL EXPERIENCE (14+ years)

ITEM NO COURT NO.2 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS IN RE : T.N. GODAVARMAN THIRUMULPAD

GOVERNMENT OF NATIONAL CAPITAL TERRITORY OF DELHI DIRECTORATE OF EDUCATION: SPORTS BRANCH CHHATRASAL STADIUM: MODEL TOWN, DELHI CIRCULAR

NoCapacity of Distribution Transformer (in KVA).

INDRAPRASTHA GAS LIMITED

Workshop Report. Cleaner Brick Production Technologies - Promoting Fly Ash Brick Production in Bihar

38 BALBIR NAGAR B 39 BALBIR NAGAR EXTN. B 40 BALDEV PARK B 41 BANK COLONY, MANDOLI B 42 BANK ENCLAVE, GEETA COLONY B 43 BANKUR VIHAR D 44 BASTI

All the Sr. Executive Engineers/Resident Engineers, In HPSEBL/HPPCL/BVPCL. the concerned officials and got noted from them and kept on record.

AHLCON PUBLIC SCHOOL SESSION BUS ROUTE NO. - A1 AHLCON PUBLIC SCHOOL SESSION BUS ROUTE NO. - A2

ITEM NO.1 COURT NO.2 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

No. Name and Reservation Status of Assembly Constituency :

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED "A STATE GOVT. UNDERTAKING"

ITEM NO.301 COURT NO.1 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS WRIT PETITION (CIVIL) NO(S).

III First Division First Division Compulsory - Compulsory. VII First Division First Division - - Compulsory VIII High (55-59.

GOVERNMENT OF INDIA OFFICE OF THE MEDICAL SUPERINTENDENT SAFDARJANG HOSPITAL & V.M.M.C NEW DELHI Result

Scheduled Caste(SC) Delhi including PwD and CW AIPMT MARKS FORM. (Out of 720) DU S.NO.

Sr. No. Name E- Card No. Branch Date of Birth. Study Centre Photo. 1. Aap Singh Electrical 1980/01/

ITEM NO.15 COURT NO.3 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

Ref: - GGSIPU/EXAM/R-II/2018/001 Dated: 23 rd October 2018 NOTICE

DELHI PUBLIC SCHOOL GREATER NOIDA INTER SCHOOL SPORTS RESULTS

ITEM NO.1 COURT NO.3 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI DAILY CAUSE LIST DATED (Monday) Court of Chairperson 10:30 AM

PIONEER EDUCATION Result of Scholarship Test Of 10 th For +1

SL.N ADM. NAME CLASS ACHIEVEMENTS

UDHAV DAS MEHTA BHAIJI CENTRAL CENTRE BHOPAL

63rd Men & 26th Women Senior National Weightlifting Championships BANGALORE - KARNATAKA (23-27 MARCH 2011) SCORE SHEET

Under the auspices of Bridge Federation of India

ITEM NO.13 COURT NO.4 SECTION PIL-W S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS. Writ Petition(s)(Civil) No(s).

Senior Bus Route - Winters w.e.f. 12th November Sec 51 (For New Light, Aryan Enclave, Ajanta Enclave, Defence Encl.

Office of IIT JEE (Advanced) IIT(ISM) Dhanbad

IGNOU REGIONAL CENTRE RANCHI (RC 32)

Transcription:

S. No 1 2 3 4 5 DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. OFFICE OF THE PROJECT DIRECTOR (UC) WEEKLY PERFORMANCE REVIEW REPORT Name of Project Director: Rajendra Status of Work as on: 21.03.2012 List of Works Indraprastha Colony Burari Mukundpur Extn. Part Burari Jagat Pur Village Extended Abadi, Burari. Krishan Vihar Pt-I (A,B,C,D& O Blk) Bawana. Vasu Vihar Colony in Narela. Name of. Burari Burari Burari Burari Narela Name of MLA Shrikrishan Tyagi Shrikrishan Tyagi Shrikrishan Tyagi Shrikrishan Tyagi Jaswant Rana Name of CPM P.K. Tyagi (CD-I) Estimated/ Tendered Cost (Rs.in lakhs) 12,997,104.10 11,828,442.00 10,493,492.00 5,665,203.00 5,499,568.00 Name of Contractor M/s. Royal A- 242,Prashant Vihar, New Delhi-85 M/s. Kuldeep Dixit Contractor M/s. Orbit Buildtech Pvt. M/s. Antartica M/s Sanu Date of Start 03.02.2011 Project Timelines Stipulated 02.08.2011 Provisional extension granted Status at the Beginni ng of the Week Progres s/ Activity During the Week Status at the End of the Week 65% 1% 66% 08.10.2011 07.04.2012 31% 1% 32% 04.11.2011 02.05.2012 26% 1% 27% 25.01.2012 24.07.2012 25% 1% 26% 18.11.2011 17.05.2012 40% 2% 42% Key Bottlenecks Notice has already been issued under clause 2 to the contractor

6 7 8 9 10 11 12 13 Gautam Vihar In Narela. Ankur Vihar in Narela S.H C/o Roads & S. W. Prem Colony in Narela S.H C/o Roads & S. W. Shayama Kunj Colony in Narela S.H: Hazari Park Colony in Narela. S.H: Sangam Vihar Gali No 8 to 19 in Timapur S.H C/o Roads & S. W. Munshi Ram Colony Near Indra Vikas Colony Gali No. 1 & 2 in Timarpur S.H C/o Roads & S. W. Munshi Ram Colony Near Mukharjee Nagar in Timarpur. Narela Narela Narela Narela Narela Ti marpur Ti marpur Ti marpur Jaswant Rana 11,670,511.00 Jaswant Rana 3,653,823.00 Jaswant Rana 21,447,419.00 Jaswant Rana 3,665,879.00 Jaswant Rana 5,515,138.94 Pal Pal Pal P.K. Tyagi (CD-I) 5,936,305.95 782,867.00 2,690,201.00 M/s Orbit Buildtech Pvt M/s Sanu M/s Shree M/s Vijender Bhardwaj M/s V.K Gupta M/s The Krishna M/s Dev Construction Co. M/s Mayank 01.12.2011 31.08.2012 38% 2% 40% 18.11.2011 17.04.2012 40% 1% 41% 10.01.2012 24.12.2012 14% 6% 20% 16.02.2012 06.10.2012 10% 2% 12% 28.03.2011 27.09.2011 100% 0% 100% Completed 03.02.2011 02.06.2011 31.08.2011 100% 0% 100% Completed 31.01.2012 02.06.2012 10% 5% 15% 27.01.2012 24.07.2012 10% 5% 15%

14 15 16 17 18 19 20 21 22 23 24 S.H C/o Roads & S. W. Sangam Vihar in Timarpur S.W. Drain at Baprolla Vihar S.W. Drain at Deep Enclave S.W. Drain at Nangli Vihar S.W. Drain at Harphool Vihar, Jai Vihar S.W. Drain at Kanwar (I.G. Colony) S.W. Drain at Vikas Vihar, Vikas Nagar S.W. Drain at Raksha Enclave Extn.- III S.W. Drain at Satyam Vihar. S.W. Drain at Suraksha Vihar S.W. Drain at Shiv Vihar Ti marpur Pal 67,727,299.00 M.P. Nand Arora Kishor 58,451,226.00 (CD-III) Nand Kishor 39,243,189.00 Nand Kishor 50,779,663.00 Nand Kishor 24,970,527.00 Nand Kishor 1,863,241.00 Nand Kishor 4,418,413.00 Nand Kishor 20,194,546.00 Nand Kishor 17,449,120.00 Nand Kishor 5,700,650.00 Nand Kishor 21,989,360.00 M/s The Krishna M/s KCC Buildcon Pvt. M/s KCC Buildcon Pvt. M/s KCC Buildcon Pvt. M/s Gawar Construction M/s Pawan Kumar Gupta M/s Pragati M/s Kuldeep Dixit Contractor M/s Competent Construction Co. M/s Nitin Kumar Sharma M/s Antarctica Construction Co. 04.01.2012 03.03.2013 16% 2% 18% 27.09.2011 28.09.2012 24% 2% 26% 27.09.2011 28.09.2012 24% 2% 26% 27.09.11 28.09.2012 24% 2% 26% 30.09.11 30.06.2012 79% 3% 82% 01.10.11 28.02.2012 71% 5% 76% 04.10.11 28.02.2012 100% 0% 100% Completed 10.10.11 11.08.2012 31% 2% 33% 10.10.11 11.08.2012 22% 2% 24% 10.10.11 11.05.2012 40% 2% 42% 12.10.11 11.10.2012 92% 2% 94% 25 S.W. Drain at Defence Enclave Nand Kishor 2,123,233.00 M/s A. K. 13.10.11 12.03.2012 100% 0% 100% Completed

Pt-I 26 27 28 29 30 31 32 33 34 35 36 37 S.W. Drain at Kotla Vihar PhII S.W. Drain at Akash Vihar, Bakkarwala S.W. Drain at Deep Enclave S.W. Drain at Nangli Vihar S.W. Drain at Press Enclave S.W. Drain at Rishal Garden Ph-I S.W. Drain at S- Block Shiv Enclave S.W. Drain at Shiva Enclave F- Block Green Avenue S.W. Drain at Brahampuri Ph- I S.W. Drain at Kotla Vihar PhII S.W. Drain at Gupta Enclave S.W. Drain at Rishal Garden Ph-II Nand Kishor 9,000,233.00 Nand Kishor 2,234,231.00 Nand Kishor 8,227,810.00 M.P. Nand Arora Kishor 13,386,879.00 (CD-III) Nand Kishor 9,391,723.00 Nand Kishor 4,888,598.00 Nand Kishor 11,956,972.00 Nand Kishor 9,006,208.00 Nand Kishor 3,060,026.00 Nand Kishor 5,799,793.00 Nand Kishor 15,721,646.00 Nand Kishor 6,918,885.00 M/s Globe M/s Sushil Kumar Gupta M/s Orbit Buildtech Pvt. M/s Orbit Buildtech Pvt. M/s Orbit Buildtech Pvt. M/s Khanna Enterprises M/s Orbit Buildtech Pvt. M/s Orbit Buildtech Pvt. M/s Pawan Kumar Gupta M/s Pawan Kumar Gupta M/s Rajan M/s Nitin Kumar Sharma 15.10.11 14.05.2012 54% 2% 56% 15.10.11 14.03.2012 100% 0% 100% Completed 19.10.11 18.05.2012 85% 2% 87% 19.10.11 18.08.2012 96% 0% 96% 19.10.11 18.05.2012 95% 0% 95% 19.10.11 18.03.2012 100% 0% 100% Completed 19.10.11 18.08.2012 99% 1% 100% Completed 19.10.11 18.05.2012 95% 0% 95% 19.10.11 18.03.2012 27% 10% 37% 22.10.11 21.05.2012 97% 0% 97% 25.10.11 24.08.2012 44% 2% 46% 25.10.11 24.05.2012 1% 2% 3%

38 39 40 41 42 43 44 45 46 S.W. Drain at G-II & G-III Sai Enclave S.W. Drain at Baprolla Vihar S.W. Drain at B & C Block Vikas Nagar in. S.W. Drain at G-I & G-II Sai enclave Mohan Garden in. S.W. Drain at G-III Sai enclave Pt- III Mohan Garden in. S.W. Drain at Hastsal Vihar in. S.W. Drain at K-5 & R Extn. Block Mohan Garden in. S.W. Drain at K-6 Block Mohan Garden in. S.W. Drain at Nayadar enclave in. Nand Kishor 5,857,015.00 Nand Kishor 20,928,990.00 Nand Kishor 13,331,213.00 Nand Kishor 16,168,881.00 Nand Kishor 10,202,208.00 Nand Kishor 9,084,002.00 Nand Kishor 11,586,212.00 Nand Kishor 4,965,927.00 Nand Kishor M.P. Arora (CD-III) 3,500,838.00 M/s Dharamvir Saroha M/s. Gawar M/s. V.K. Gupta M/s. Dabas M/s. Dabas M/s. H. R. M/s. Utkarsh M/s. Baba M/s. Baba 27.10.11 26.05.2012 98% 0% 98% 23.11.2011 22.08.2012 91% 0% 91% 07.01.2012 06.10.2012 11% 4% 15% 07.01.2012 06.10.2012 15% 3% 18% 25.12.2011 24.06.2012 17% 2% 19% 01.01.2012 30.06.2012 3% 2% 5% 25.12.2011 24.09.2012 14% 2% 16% 21.01.2012 20.05.2012 10% 2% 12% 25.01.2012 24.05.2012 2% 2% 4%

47 48 49 50 51 52 53 54 55 S.W. Drain at R-5 Block Mohan Garden in. S.W. Drain at Tilak enclave in. S.W. Drain at Tyagi Enclave in A.c. S.W. Drain at Vikas Vihar & Sai enclave Vikas Nagar in. S.W. Drain at Harpool Vihar Village Baprolla in S.W. Drain at Jat Vihar Extn. in. S.W. Drain at Jai Vihar Nangli Road in. S.W. Drain at Kanwar Nagar S.W. Drain at Brahampuri Colonies in Nand Kishor 9,917,660.00 Nand Kishor 5,534,791.00 Nand Kishor 3,065,608.00 Nand Kishor 10,302,878.00 Nand Kishor 37,913,680.00 Nand Kishor 21,902,434.00 Nand Kishor 74,178,368.00 Nand Kishor 61,127,328.00 Nand Kishor 6,098,739.00 M/s. Bawania Enterprises M/s. Pragati M/s. Baba M/s. V.K. Gupta M/s. Baba M/s. Rana Enterprises M/s. Swastic Constn. M/s. Gawar M/s. Pawan Kumar Gupta 25.12.2011 24.06.2012 6% 2% 8% 25.12.2011 25.04.2012 12% 2% 14% 21.01.2012 20.05.2012 10% 2% 12% 08.01.2012 07.07.2012 12% 2% 14% 20.01.2012 20.01.2013 10% 2% 12% 20.01.2012 19.10.2012 10% 2% 12% 20.01.2012 19.01.2013 17% 1% 18% 20.01.2012 19.01.2013 15% 1% 16% 10.02.2012 09.06.2012 5% 3% 8%

56 57 58 59 60 61 62 63 64 S.W. Drain at Kotla Vihar PH-II S.W. Drain at Prarshant Vihar S.W. Drain at Sainik Vihar Ph-II S.W. Drain at Sainik Enclave (Raksha enclave) Sec.I S.W. Drain at Shiv Vihar S.W. Drain at Vikas Vihar Vikas nagar S.H: Viney Enclave Part-I & Part-II, Aman Enclave and Aastha Vihar Part-I, II & III in S.H: C/o Road with & S.W. Hari Enclave in. S.H: Hind Vihar in. Nand Kishor 6,456,249.00 Nand Kishor 9,836,486.00 Nand Kishor 197,317.00 Nand Kishor 16,154,827.00 Nand Kishor 12,557,030.00 Nand Kishor 17,880,771.00 Anil Jha Anil Jha Anil Jha R.S. CHAUHAN (CD-V) 37,524,275.00 19,747,096.00 17,558,548.00 M/s. Pawan Kumar Gupta M/s. Antartica M/s. Dabas M/s. Orbit Buildtech Pvt. M/s. Antartica M/s. Orbit Buildtech Pvt. M/s Amar Const.Co The Krishna Const.Co. M/s Royal Const.Co 10.02.2012 09.06.2012 5% 3% 8% 10.02.2012 09.08.2012 0% 2% 2% 10.02.2012 09.04.2012 10% 1% 11% 10.02.2012 09.11.2012 0% 2% 2% 10.02.2012 09.11.2012 0% 2% 2% 10.02.2012 09.11.2012 0% 2% 2% 18.06.2010 18.06.2010 18.06.2010 17.12.2010 14.08.2011 17.12.2010 31.08.2011 17.12.201014.0 8.2011 100% 0% 100% Completed 100% 0% 100% Completed 100% 0% 100% Completed

65 66 67 68 69 70 71 S.H: Tripathi Enclave Part-I & Part-II and Gauri Shanker Enclave-I in. S.H: Agar Nagar F- Block, Pt-I & II and Satya Enclave, Pt-II in. S.H: Adarsh Enclave & Raghuvir Vihar in S.H: Aastha Vihar Pt- IV Gali No. 61 in S.H: Prem Nagar N.O. Block mubarakpur Road in S.H: RST Block Prem Nagar Gali No. 1 to 38 in S.H: Sheesh Mahal in Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha 15,857,400.00 13,954,251.00 2,460,793.64 1,687,596.34 5,517,742.00 9,105,626.00 13,292,099.87 M/s Rajan Buliders M/s Royal Const.Co M/s Sushil Kr. Gupta M/s Sushil Kr. Gupta M/s The Krishna M/s The Krishna Const. Co M/s The Krishna Const. Co 18.06.2010 18.06.2010 17.10.2010 14.08.2011 17.10.2010 14.08.2011 100% 0% 100% Completed 100% 0% 100% Completed 17.01.2011 29.02.2012 96% 0% 96% 17.01.2011 03.02.2011 03.02.2011 03.02.2011 16.03.2011 31.08.2011 02.06.2011 31.08.2011 02.08.2011 31.08.2011 02.08.2011 31.08.2011 100% 0% 100% Completed 100% 0% 100% Completed 100% 0% 100% Foreclose 100% 0% 100% Completed (Fore Closed)

72 73 74 75 76 77 78 79 S.H: Gauri Shanker Enclave-II in S.H: Vikas Enclave A-Block Part-I in S.H: Prem Nagar Extn in. S.H: Agar Nagar Meetha Paani Prem Nagar-III in. S.H: Vikas Enclave B-Block Part-I & III in Kiarri. Sharda Vats Enclave in U/A Block Extn Shanker Vihar in Dhruv Enclave in Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha R.S. CHAUHAN (CD-V) 7,560,547.10 21,407,633.00 8,004,327.59 6,102,779.28 13,435,918.59 25,593,210.00 2,495,364.00 2,758,598.00 M/s The Krishna Const. Co M/s Kaisier M/s Anshul M/s Anshul M/s Rajan M/s Rajan Verma M/s J.P.Kapoor M/s J.P.Kapoor 03.02.2011 02.06.2011 31.08.2011 100% 0% 100% Completed (Fore Closed) 04.02.2011 03.11.2011 100% 0% 100% Foreclose 28.03.2011 27.09.2011 100% 0% 100% Foreclose 28.03.2011 27.09.2011 100% 0% 100% Foreclose 28.03.2011 27.12.2011 100% 0% 100% Foreclose 03.11.2011 02.11.2012 27% 1% 28% 02.11.2011 01.03.2012 45% 1% 46% 02.11.2011 01.03.2012 41% 0% 41%

80 81 82 83 84 85 86 87 Prem Nagar I- Block in Prem NagarII J- Block in F & G Block in Block D Baljeet Vihar Extn in Panday Enclave in Z- Block Narain Vihar in Aastha Vihar (Balance Work) in Satya Enclave (Balance Work) in Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha R.S. CHAUHAN (CD-V) 16,835,660.00 16,864,056.00 600,944.00 9,924,364.00 11,051,079.00 15,908,296.00 3,131,667.00 6,725,427.00 M/s Rajan Verma M/s Rajan Verma M/s Guri Shaner Const. Co. M/s Ram Kumar Prasad M/s Vikas Gaur M/s Rajan Verma M/s J.P.Kapoor M/s Krishan Chander 02.11.2011 01.08.2012 49% 0% 49% 02.11.2011 01.11.2012 61% 0% 61% 25.11.2011 24.01.2012 100% 0% 100% Completed 17.11.2011 16.08.2012 28% 1% 29% 02.11.2011 01.08.2012 52% 0% 52% 02.11.2011 01.08.2012 32% 1% 33% 02.12.2011 31.05.2012 43% 0% 43% 04.11.2011 03.08.2012 25% 1% 26% 88 Avadh Vihar Prem Nagar-I V- Block in Anil Jha 9,982,146.00 M/s Ram Kumar Prasad 17.11.2011 16.08.2012 36% 1% 37%

89 90 91 92 93 94 G- Block Janata Enclave in Prem Nagar-III Y Block in Agar Nagar Block C & D Mubarak Pur Road in Link Road From Mubarak Pur Road to Mundka Railway X-ing in Inder Enclave Ph-I Main Mubark Pur Road in. Inder Enclave F- Block in. Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha 10,456,352.00 10,214,532.00 5,452,854.00 38,850,009.00 39,502,990.00 36,451,892.00 M/s Antartica const. co. M/s Rajan Verma M/s Krishan Chander M/s Amar M/s Kaiser Const. Engineers & Contractor M/s Amar 17.11.2011 16.08.2012 47% 0% 47% 02.11.2011 01.08.2012 25% 1% 26% 04.11.2011 03.08.2012 31% 1% 32% 29.11.2011 29.11.2012 21% 1% 22% 04.12.2011 13.12.2012 15% 1% 16% 25.11.2011 24.11.2012 16% 5% 21%

95 96 97 98 99 100 101 102 Gaurav Nagar-II Prem Nagar-III in. Vikas Enclave A-Block in. Aman Vihar H Block in Inder Enclave, Ph-II A,B,C,D and E Block in. Agar Nagar-D Block in. Harsukh Block Prem Nagar in. Approach Road for Karan Vihar Part-V in. Karan Vihar Part-VI in. Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha R.S. CHAUHAN (CD-V) 31,411,188.00 27,636,012.00 13,945,918.00 26,885,154.00 2,528,896.00 15,765,580.00 18,168,410.00 7,693,886.00 M/s The Krishna M/s Kaiser Const. Engineers & Contractor M/s Bawania Enterprises M/sOrbit Buildtech Pvt. Ltd M/s V.S Const Co M/s Ram Kumar Prasad M/s Antarctica Const. Co M/s Raghuver Dayal Panday 26.11.2011 25.11.2012 30% 1% 31% 04.12.2011 03.12.2012 8% 1% 9% 02.12.2011 01.09.2012 41% 0% 41% 26.11.2011 23.11.2012 24% 1% 25% 28.01.2012 27.05.2012 3% 0% 3% 23.01.2012 22.10.2012 5% 4% 9% 23.01.2012 22.10.2012 25% 2% 27% 29.01.2012 28.10.2012 8% 1% 9%

103 104 105 106 107 108 109 110 Laxmi Vihar Extn Prem Nagar in. Mithila Vihar in. Roop Vihar in. Krishan Vihar &Roop Vihar in. Vikas Enclave B-Block (Bal Work) in. Hari Enclave Pt- I in. Approach Rd for Aman Vihar, Hari Enclave Part-I, Hari Enclave Part-II and Karan Vihar in. Nithari Rd in. Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha R.S. CHAUHAN (CD-V) 18,961,089.00 2,107,778.00 3,800,396.00 6,676,305.00 22,825,615.00 49,947,420.00 17,097,854.00 3,822,949.00 M/s Gaur (Vikas) M/s V.S Const Co M/s Antarctica Const. Co M/s Ram Kumar Prasad M/s S.K Yadav M/s Ram Kumar Prasad M/s Dabbs M/s Sanjeev Kumar Yadav 28.01.2012 27.10.2012 5% 2% 7% 28.01.2012 17.05.2012 11% 1% 12% 28.01.2012 27.07.2012 11% 2% 13% 23.01.2012 22.10.2012 22% 1% 23% 04.02.2012 02.11.2012 3% 0% 3% 04.02.2012 03.02.2013 3% 0% 3% 28.01.2012 27.10.2012 26% 1% 27% 07.02.2012 06.08.2012 3% 0% 3%

111 112 113 114 115 116 117 118 119 Sharma Enclave in. Vidya Pati Nagar in Balbir Nagar in Prem Nagar A,B,C Block in S.W. Drain at Ratan Vihar in S.W. Drain at D & E Block, Prem Nagar in S.W. Drain at RST Block (Bal work) in C/o Outfall drain at link RD (Nahar Rd) in S.W. Drain at Gaurav Nagar Anand Ngr. in Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha Anil Jha 17,899,676.00 47,044,258.00 8,049,170.00 5,159,050.00 19,599,432.00 6,486,371.00 7,667,837.00 23,095,122.00 22,583,290.00 M/s V-2 Associats M/s The Krishna M/s Anshul M/s A.K.Associats M/s Birender M/s. Virender M/s. Anshul M/s. Birender M/s. Rajender Constn, Co. 07.02.2012 06.08.2012 4% 1% 5% 15.02.2012 13.04.2013 12% 1% 13% 09.02.2012 08.01.2013 16% 1% 17% 16.02.2012 13.10.2012 3% 1% 4% 10.02.2012 08.01.2013 4% 2% 6% 23.02.2012 22.11.2012 1% 0% 1% 23.02.2012 22.11.2012 4% 1% 5% 22.02.2012 21.11.2012 0% 0% 0% 22.02.2012 21.11.2012 4% 2% 6%

120 121 122 123 124 125 126 127 S.W. Drain at Shani Bazar Road Prem Nagar-III in S.W. Drain at A,B-Block Prem Nagar in S.W. Drain at Karan Vihar Part-V in Shiv Puri Badli S.H C/o Roads & S. W. Swami Sardhanand Park (Part-I) in Badli Rana Park Siraspur in Badli. Rana Park Extn. in Badli. Bhagat Park Gali no. 45 to 45 & 53 to 59 in Badli Badli Badli Badli Badli Badli Anil Jha Anil Jha Anil Jha Devender Yadav Devender Yadav Devender Yadav Devender Yadav Devender Yadav R.S. CHAUHAN (CD-V) 23,095,122.00 23,114,284.00 48,573,905.00 7,110,660.00 64,608,546.00 5,018,683.00 4,951,699.00 10,216,915.00 M/s. Rajender Constn, Co. M/s. Antartica M/s. Amardeep M/s Nearsh Kr Bansal M/s J.B. M/s Sudhir Kadyan M/s Sudhir Kadyan M/s Orbit Buildtech Pvt 22.02.2012 21.11.2012 3% 0% 3% 0% 0% 0% LOA issued 0% 0% 0% LOA issued 04.11.2011 03.05.2012 35% 1% 36% 15.02.2012 13.01.2013 5% 2% 7% 18.11.2011 17.05.2012 25% 0% 25% 18.11.2011 17.05.2012 35% 0% 35% 30.11.2011 29.08.2012 31% 2% 33%

128 129 130 131 132 133 134 135 Saroop Nagar W,X,Y,Z Block Gali No.5 to 79 & 12 to 16 in Badli. Rajiv Nagar Badli S.H: Rajiv Nagar 1, 3 to 7, 9,11 to 14,21,3639,46 to 50,52 to 57 & 59 to 62 in Badli S.H: Bhagat Park in Badli S.W. Smalka Extn., Old Gurgaon Road S.W. Kapashera Extn. A- Block S.W. Raj Nagar Pt-II, H- Block Palam Colony S.W. Raj Nagar Extn. Palam Colony Badli Badli Badli Badli Bijwasan Bijwasan Bijwasan Bijwasan Devender Yadav Devender Yadav Devender Yadav Devender Yadav 23,534,822.00 38,961,981.00 18,816,239.31 13,711,324.00 S.P. Rana 17,617,209.64 S.P. I.J.S. Rana 5,020,816.50 Sehgal (CD- XXIII) S.P. Rana 13,818,247.00 S.P. Rana 46,213,401.00 M/s Orbit Buildtech Pvt. Ltd M/sRaunaq Const. Co M/s Rajan M/s Royal Const.Co M/s. K.B.G. Engineers, 200, Sharda Niketan, Saraswati Vihar,N.D-34 M/s. Kavinder Veer M/s. Gawer Constn. M/s. Gawer Constn. 13.12.2011 12.12.2012 32% 2% 34% 24.11.2011 23.11.2012 34% 1% 35% 28.03.2011 27.12.2011 100% 0% 100% Foreclose 18.06.2010 17.10.2010 14.08.2011 100% 0% 100% Foreclose Completed 17.06.2011 16.03.2012 98% 2% 100% Completed 11.07.2011 10.01.2012 34% 1% 35% 10.10.2011 09.07.2012 34% 1% 35% 31.10.2011 30.10.2012 82% 1% 83%

136 137 138 139 140 141 142 143 144 145 S.W. Smalka Extn. Palam Colony S.W. Dev Kunj Raj ngr Palam Colony S.W. Dr. B.R. Ambedkar Colony S.W. Khushi Ram Park, Uttam Nagar() S.W. Jain Colony, T- Extn., Pt-II & III (1325) S.W. Jain Colony park, Road S.W. Jain Colony T-Extn. Part-I S.W. Guru Harikishan Palam Colony S.W. Sainik Nagar Colony S.W. U- Block Uttam Nagar Bijwasan Bijwasan Bijwasan I.J.S. S.P. Rana Sehgal (CD- 7,097,776.00 XXIII) S.P. Rana 47,314,932.00 S.P. Rana 4,964,039.00 Somesh Shokeen 4,237,087.00 Somesh Shokeen 19,459,733.00 Somesh Shokeen 12,407,190.00 Somesh Shokeen 18,299,669.00 Somesh Shokeen 18,280,968.00 Somesh Shokeen 19,166,502.00 Somesh Shokeen 10,089,479.00 M/s. Jasvinder Pal M/s. Gawar M/s. Himgiri Infraconstn. M/s. Sushil Kumar Gupta B-50, C. C. Colony, New Delhi-110007 M/s. Rajbir Const. Pvt, M/s. Naresh Rai M/s. Naresh Rai M/s. Naresh Rai M/s. Naresh Rai M/s. J.P. Kapoor 19.01.2012 03.08.2012 12% 1% 13% 27.02.2012 26.02.2013 2% 0% 2% 14.02.2012 13.08.2012 0% 0% 0% LOC Issued 17.10.2011 16.04.2012 2% 0% 2% 13.11.2011 12.08.2012 30% 2% 32% 05.12.2011 04.09.2012 18% 2% 20% 12.12.2011 04.09.2012 1% 0% 1% 02.12.2011 04.09.2012 3% 0% 3% 12.12.2011 04.09.2012 11% 1% 12% 05.01.2012 20.07.2012 4% 1% 5% workstarted but held up due to shifiting of service by local resident

146 147 148 149 150 151 152 153 154 155 S.W. Shivani enclave, Ph-I, Part-II & III S.W. Main Bharat Garden S.W. Qutab Ph-I, Najafgarh S.W. Shiv puri Pt-II Village Deendanpur S.W. Nangli Vihar Extn. Pt-I Najafgarh S.W. Nangli Vihar RZ-44 Maruti Bhawar Najafgarh S.W. Niranjan Park Road Nangli Dairy S.W. Shiv Puri PH-I Deendanpur S.W. Shanti vihar Deenpur Najafgarh S.W. Ranaji Enclave Najafgarh Somesh Shokeen 9,623,657.00 Somesh Shokeen 1,490,344.00 Somesh Shokeen 53,102,269.00 Somesh Shokeen 19,892,998.00 Somesh Shokeen 14,945,761.00 Somesh Shokeen 18,835,385.00 Somesh Shokeen 12,513,539.00 I.J.S. Somesh Shokeen Sehgal (CD- 11,436,838.00 XXIII) Somesh Shokeen 8,016,969.00 Somesh Shokeen 67,995,111.00 M/s. Himgiri Infraconstn. M/s. Rajeshwar Dayal Pandey M/s. K.B.G. Engineers, M/s. Sanjeev Kumar Yadav M/s. Sanjeev Kumar Yadav M/s. V-2 Associate M/s. Dabas M/s. Dabas M/s. Jasvinder Pal M/s. Gawar 05.01.2012 20.07.2012 3% 1% 4% 21.02.2012 19.05.2012 0% 0% 0% 28.02.2012 30.04.2013 0% 0% 0% LOC Issued 06.02.2012 05.11.2012 0% 0% 0% LOC Issued 06.02.2012 05.11.2012 0% 0% 0% LOC Issued 22.02.2012 21.11.2012 0% 0% 0% LOC Issued 10.02.2012 09.08.2012 0% 0% 0% LOC Issued 10.02.2012 09.08.2012 0% 0% 0% LOC Issued 06.02.2012 05.08.2012 0% 0% 0% LOC Issued 28.02.2012 30.04.2013 0% 0% 0% LOC Issued

156 157 158 159 160 161 162 S.W. New T-Block Uttam Nagar S.W. Surya Vihar Deenpur gurgaon Road Najafgarh S.W. Ghasipura Extn. Colony Nangli Dairy Najafgarh S.W. Prem vihar Colony Nagli Dairy S.W. Rajouri Garden Extn. Tatarpur Molarband Extn. (305) Molarband Extn. Block- E1,E2&E3 (1211) Rajouri Garden Badarpur Badarpur 163 Sai Nagar (273) Badarpur 164 165 S.W. Shakti Vihar (186) S.W. E-2, Molarband Extn. (1030) Badarpur Badarpur Somesh Shokeen 13,610,413.00 Somesh Shokeen 7,992,721.00 Somesh Shokeen 4,008,848.00 Somesh Shokeen 29,637,225.00 Dayanand Chandila Ram Netaji Ram Netaji Ram Netaji Ram Netaji Ram Netaji Naresh Dargan (CD-XXV) 12,799,731.42 14,887,006.00 1,766,137.13 20,047,409.00 4,914,595.87 19,526,882.00 M/s. Himgiri Infraconstn. M/s. Rajeshwar Dayal Pandey M/s. J.P. Kapoor M/s. Rajbir Const. Pvt, M/s. K.B.G. Engineers, 200, Sharda Niketan, Saraswati Vihar,N.D-34 M/s. Amit, 107, Bahubali Enclave, M/s. Amit, 107, Bahubali Enclave, M/s. Amit, M/s. Indus M/s. Sanjeev Kr. & Bros. 14.02.2012 13.11.2012 0% 0% 0% LOC Issued 22.02.2012 21.08.2012 0% 0% 0% LOC Issued 14.02.2012 13.08.2012 0% 0% 0% LOC Issued 28.02.2012 30.11.2012 0% 0% 0% LOA issued 30.07.2011 29.04.2012 64% 4% 68% 13.06.2011 12.03.2012 100% 0% 100% Completed 13.06.2011 12.03.2012 100% 0% 100% Completed 13.06.2011 12.03.2012 100% 0% 100% Completed 14.10.2011 13.04.2012 40% 2% 42% 15.11.2011 14.08.2012 16% 24% 40%

166 167 168 169 170 171 172 173 174 175 S.W. Hari Nagar, Pt-II, A- Block (1124) S.W. Hari Nagar, Pt-II, B- Block (1129) S.W. Shakti Vihar (400) S.W. Molarband Extn. E-2 Block (B/W)(1030) S.W. Lakpat Colony Pt-II (240) S.W. Jaitpur Extn. Pt- II (890) S.W. A Block Meethapur Extn. (174) S.W. Molarband Extn. Block E1, E2 & E3 (1211) Balance work S.W. Shiv Puri (414) S.W. Bank Colony (581) Badarpur Badarpur Badarpur Badarpur Badarpur Badarpur Badarpur Badarpur Badarpur Gokalpur Ram Netaji Ram Netaji Ram Netaji Ram Netaji Ram Netaji Ram Netaji 7,073,406.00 9,878,149.00 11,706,669.00 15,943,265.00 16,425,477.00 41,115,314.00 Ram Netaji 4,876,404.00 Ram Netaji Ram Netaji Kumar Naresh Dargan (CD-XXV) 32,914,006.00 6,768,689.00 12,429,109.00 M/s. Shambu M/s. Shambu M/s. Shambu M/s. Amit M/s. Amit M/s. Anshum M/s. Amit M/s. Sanjeev Kr. & Bros. M/s. J.P. Kapoor M/s. Amit 10.12.2011 09.09.2012 26% 2% 28% 10.12.2011 09.09.2012 26% 2% 28% 10.12.2011 09.09.2012 15% 20% 35% 27.12.2011 26.09.2012 15% 2% 17% 27.12.2011 26.09.2012 13% 1% 14% 17.12.2011 30.01.2013 9% 1% 10% 27.12.2011 26.06.2012 15% 5% 20% 31.01.2012 30.01.2013 5% 2% 7% 03.03.2012 02.09.2012 0% 0% 0% 15.11.2011 14.08.2012 21% 2% 23%

176 177 178 179 180 181 182 183 184 185 S.W. Ganga Vihar (1046) S.W. Ganga Vihar B,D & F (1046) S.W. Bhagirathi Vihar Ph-I (1353) S.W. Ganga Vihar H-Block (1485) Shiv Vihar Ph V (548) S.W. Shiv Vihar Phase-II (686) S.W. Brij puri(736) S.W. Extn. (995) S.W. Bhagirathi Vihar Ph-II (270) S.W. Amar Vihar (1384) Gokalpur Gokalpur Gokalpur Gokalpur Kumar Kumar Kumar Kumar 19,048,235.91 23,404,558.00 41,882,495.00 219,038.00 Hasan Ahmed 15,629,601.00 Hasan Ahemad 18,130,553.76 Hasan Ahemad 18,294,537.94 Hasan Ahemad 18,286,937.18 Hasan Ahemad 13,581,773.54 Hasan Ahemad Naresh Dargan 12,740,496.00 M/s. Indus M/s. Indus M/s. Sanjeev Kr. & Bros. M/s. Harish M/s. Amit M/s. Amit, 107, Bahubali Enclave, Delhi-110092 M/s. Indus, M/s. Indus, 173, Chand Tara Bldg, G.T. Road, Shahdra, Delhi-110032 M/s. Sanjeev Kumar Yadav M/s. Amit 22.05.2011 21.02.2012 100% 0% 100% Completed 15.11.2011 14.11.2012 10% 1% 11% 16.12.2011 15.12.2012 42% 5% 47% 13.01.2012 12.04.2012 100% 0% 100% Completed 22.05.2011 21.02.2012 100% 0% 100% Completed 22.05.2011 21.02.2012 100% 0% 100% Completed 22.05.2011 21.02.2012 100% 0% 100% Completed 22.05.2011 21.02.2012 85% 0% 85% 14.10.2011 13.07.2012 75% 2% 77% 15.11.2011 14.08.2012 18% 2% 20%

186 187 188 189 190 191 192 193 194 195 S.W. Babu Nagar (1097) Balance work S.W. Kamal Vihar (1275) S.W. Shakti Vihar (655) S.W. Dayalpur Extn. Block E (435) S.W. Brijpur (736)Balance work S.W. Extn. (Balance Work) (995) Mahalaxmi Vihar 505/1639 Shiv Vihar ph VIII Shanti Nagar (277) Covering of S.W. Extn. (995) (CD-XXV) Hasan Ahemad 11,851,907.00 Hasan Ahemad 20,017,250.00 Hasan Ahemad 16,725,981.00 Hasan Ahemad 12,935,354.00 Hasan Ahemad 49,472,490.00 Hasan Ahemad 48,475,842.00 Hasan Ahemad Hasan Ahemad Hasan Ahemad Hasan Ahemad 5,15,00,97.00 2,79,32,07.00 6,57,58,95.00 3,703,762.00 M/s. Amit M/s. Amit M/s. Amit M/s. Amit M/s. Sanjeev Kr. & Bros. M/s. A.K. M/s. Indus, M/s. Indus, M/s. Indus, 173, Chand Tara Bldg, G.T. Road, Shahdra, Delhi-110032 M/s. Anshul 15.11.2011 14.08.2012 15% 1% 16% 15.11.2011 14.08.2012 10% 2% 12% 15.11.2011 14.08.2012 15% 1% 16% 15.11.2011 14.08.2012 7% 1% 8% 16.12.2011 15.12.2012 26% 2% 28% 31.01.2012 30.01.2013 3% 0% 3% 17.02.2012 16.08.2012 0% 0% 0% 17.02.2013 16.08.2013 0% 0% 0% 17.02.2014 16.08.2014 0% 0% 0% 02.03.2012 01.09.2012 0% 0% 0% LOC Issued

196 197 198 199 200 201 202 Dayalpur Extn. Block-D Gali no.1,2,4 & Link roads (435) Pooth Kalan Village Extended Abadi (ELD-450) Bawana Gupta Colony Prahalad Vihar Ph-II Bawana Shiv Vihar, Main Bawana. Krishan Vihar Pt-I (A,B,C,D& O Blk) Bawana. Krishan Vihar (RL&M Block) Bawana. Krishan Vihar Colony Gali Near MCD School in Bawana Bawana Bawana Bawana Bawana Bawana Bawana Hasan Ahemad 10,559,928.00 Kumar Kumar Kumar Kumar Kumar Kumar A.K. Mishra (CD- XXVIII) A.K. Mishra (CD- XXVIII) 7,267,706.00 15,403,807.00 10,557,206.00 43,598,544.00 38,925,420.00 33,460,064.00 M/s. Yuvansh M/s. Kuldeep Dixit Contractor M/s. Rajan M/s. Bawania Enterprises M/s. Raunaq M/s. A.K. M/s. A.K. 01.03.2012 30.11.2012 0% 1% 1% 13.10.2011 11.04.2012 43% 25% 68% 13.10.2011 11.04.2012 48% 1% 49% 14.12.2011 13.06.2012 100% 0% 100% Completed 13.01.2012 13.01.2013 19% 1% 20% 20.02.2012 19.02.2013 3% 2% 5% 27.01.2012 07.11.2012 4% 1% 5% 203 Pappu Colony in Bawana. Bawana Kumar 33,133,760.00 M/s. Raunaq 26.01.2012 27.10.2012 3% 14%

11% 204 205 206 207 208 209 Gali from X-Y to AB Blk, Budh Vihar, Ph-I, Rithala. Gali No.1 to 80 Mange Ram Park, Rithala. Budh Vihar Ph- II area on the LHS of Citizen Public School Road, Rithala. Budh Vihar Ph- II area on the RHS of Citizen Public School Road, Rithala. Gali No.20-32, Budh Vihar, Ph- II, Rithala. Gali No 1 to 42 in Budh vihar Ph-I Rithala. Rithala Rithala Rithala Rithala Rithala Rithala Kulwant Rana Kulwant Rana Kulwant Rana Kulwant Rana Kulwant Rana Kulwant Rana 25,369,375.00 31,796,172.00 41,937,463.00 30,439,874.00 20,956,756.00 56,245,282.00 M/s. Rajan M/s. Shivalaya Constn. Pvt. M/s. KCC Buildcon Pvt. M/s. Orbit Buildtech Pvt. M/s. Antartica M/s KCC Buildcon Pvt Ltd 18.11.2011 16.08.2012 25% 1% 26% 13.01.2012 13.10.2012 11% 1% 12% 04.12.2011 30.09.2012 9% 1% 10% 20.01.2012 19.10.2012 12% 1% 13% 18.11.2011 19.08.2012 44% 5% 49% 11.02.2012 10.11.2012 1% 1% 2%

210 211 212 Shiv Vihar Pt-I, Mundka. Shiv Vihar Pt-II in Mundka. Shiv Vihar Pt-III in Mundka. Mundka Mundka Mundka Manoj Kr. Shokeen Manoj Kr. Shokeen Manoj Kr. Shokeen 28,567,093.00 33,133,562.00 31,120,010.00 M/s. Shree Contn. Co. M/s Dabas Construction Co M/s. Antartica 15.02.2012 16.11.2012 7% 2% 9% 24.02.12 23.11.12 4% 1% 5% 15.02.2012 16.11.2012 7% 1% 8% TOTAL 3,656,721,99 7.60 Project Director (UC)

DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORP. LTD OFFICE OF THE PROJECT DIRECTOR (UC) WEEKLY PERFORMANCE REVIEW REPORT Name of Project Director : Ranjeet Status of Work as on : 20/03/12 S.no List of Works Name of CPM Estimated/Te ndered cost( Rs. In Lacs) 1 C/o Roads with CC & SW L-II,A Block, Mohan garden Name of Contractor Date of Start Project Timelines Status at the Beginning of the Week Progress/ Activity During the Week Status at the End of the Week 5976675/- M/s Kaiser Constructions 11.02.11 10.08.11 Completed Key Bottlenecks 2 C/o Roads with CC & SW L-II BCD Block, Mohan Garden 6598564/- M/s Kaiser Construictions 11.02.11 10.08.11 Completed 3 C/o Roads with CC & SW Anand Vihar Gurpreet Nagar, New R- Block 4 C/o Roads with CC & SW K-I Extn, Uttam Nagar Completed 19371126/- M/s Sanjeev Kumar & Bros. 06/03/11 05/12/11 10518679/- M/s Kaiser Constructions 11.02.11 10.08.11 Completed 5 C/o Roads with CC& SW Anand Vihar, R Block, Part-I K.M.Sharma 6215360.12/- M/s Garg 20/06/11 19/10/11 98% 98% Construction Co. 6 C/o Roads with CC& SW Raja 98% Puri East,Palam 11714978.28/- M/s Swastic Construction 27/06/11 26/03/12 97% 1% Co. 7 C/o Roads with CC& SW R-III 99% 1% Completed Block, A Block, Mohan Garden 15597373.02/- M/s K.B.G. Engineers 20/06/11 19/03/12 8 C/o Roads with CC& SW Mohan Garden,R-III Block 2850423.74/- M/s Garg Construction 20/06/11 19/08/11 Completed 9 C/o Roads with CC& SW R Block & R Extn. Uttam Nagar 19656433.09/- M/s K.B.G. Engineers 20/06/11 19/03/12 97% 3% Completed 10 C/o Roads with CC& SW Mohan Garden,D-Block 5558065.87/- M/s Garg Construction Co. 20/06/11 19/10/11 97% 97% 11 C/o Roads with CC& SW Drains at L-II BCD Block, Addl-I 6588705.38/- M/s Garg Construction Co. 20/06/11 19/10/11 Completed

12 C/o Roads with CC & SW Mohan garden, C-1 Block 3342795.76/- M/s Garg Const. Co 20.06.11 19.09.11 Completed 13 C/o Roads with CC & SW Rama Park, C-1 Block 1645411.25/- M/s Garg Const Co. 20.06.11 19.08.11 Completed 14 C/o Roads with CC & SW shakti vihar, Mohan Garden 5737011/- M/s Garg Construction Co 10/12/11 09/06/12 38% 2% 40% 15 C/o Roads with CC & SW shyam park M-Block 4100673/- M/s Birender construction Co. 10/12/11 09/04/12 85% 5% 90% 16 C/o Roads with CC & SW L Extn, I,II,III, Mohan garden 17 C/o Roads with CC & SW outfall at K-I Extn, Gurudwara road K.M.Sharma 9529044/- M/s Antarctica Constructions Co. 10/12/11 09/06/12 40% 5% 45% 6773857/- M/s Nitin Kumar Shrama 28/12/11 27/06/12 20% 5% 25% 18 C/o Roads with CC & SW L-II A block, Mohan Garden 11103395/- M/s Antarctica Constructions Co. 28/12/11 27/09/12 13% 2% 15% 19 C/o Roads with CC & SW R blk & R Extn, Mohan garden (Addl-IV) 10846067/- M/s Antarctica Constructions Co. 10/12/11 09/06/11 60% 20% 80% 20 C/o Roads with CC & SW P blk to S blk 22251952/- M/s Rajinder Parshad Gupta 28/12/11 27/09/12 13% 2% 15% 21 C/o Roads with CC & SW R3 blk to R3A2 Blk, Mohan Garden 9463911/- M/s Antarctica Constructions Co. 28/12/11 27/06/12 25% 15% 40% 22 C/o Roads with CC & SW Mahavir vihar, Palam 16725814/- M/s Kaiser Constructions Co. 10/12/11 09/09/12 22% 3% 25% 23 C/o Roads with CC & SW C/C-I blk Madhu Vihar, Palam 8153539/- M/s Antarctica Constructions Co. 10/12/11 09/06/12 20% 6% 26% 24 C/o Roads with CC & SW Nanda Blk 11880247/- M/s Antarctica Construction Co. 10/12/11 09/09/12 45% 10% 55% 25 C/o Roads with CC & SW T- Extn 13443928/- M/s Antarctica Construction Co. 19/01/12 18/10/12 18% 10% 28%

26 C/o Roads with CC & SW P Blk & P Extn, Uttam Nagar 20700347/- M/s Baba Constructions 02/02/12 01/08/12 2% 1% 3% 27 C/o Roads with CC & SW G Blk, Vijay Enclave, Palam 3635181/- M/s V.R Constructions 02/02/12 01/05/12 Just started 28 C/o Roads with CC & SW C&D Blk, Vijay Enclave, Palam 5067064/- M/s V.R Constructions 28/01/12 27/07/12 Just started 29 C/o Roads with CC & SW L-II BCD, Mohan Garden K.M.Sharma 12782359/- M/s Baba Constructions 02/02/12 01/08/12 3% 1% 4% 30 C/o Roads with CC & SW Vijay enclave, C&D blk (Addl-I), palam 12645177/- M/s Baba Constructions 02/02/12 01/08/12 Just started 31 C/o Roads with CC & SW Vipin Garden, Uttam Nagar 36074777/- M/s Baba Constructions 28/02/12 27/11/12 Just started 32 C/o Roads with CC & SW L-II B,C&D Blk, (Addl-II), Uttam Nagar 3757972/- M/s Garg 02/02/12 01/06/12 3% 20% 23% 33 C/o Roads with CC & SW Sadh Nagar, F Blk, Part-II, Palam 4394505/- M/s Baba Constructions 02/02/12 01/06/12 - Just started 34 C/o Roads with CC & SW G&L Blk, Shyam Park, Uttam Nagar 9305606/- M/s Baba Constructions 02/02/12 01/08/12 3% 1% 4% 35 C/o Roads with CC & SW S Exnt,A-2 Blk to A-3 Blk, U.N 21255234/- M/s Baba Constructions 07/02/12 06/11/12 3% 3% 36 C/o Roads with CC & SW Nawada Housing Complex, Uttam nagar 6053075/- M/s Garg Constructions 02/02/12 01/06/12 Just Started (JE) SPM CPM(CD-II)