GREEN MOUNTAIN POWER CORP.

Similar documents
PLAN - TYPICAL WETLAND NOT TO SCALE SECTION - TYPICAL WETLAND NOT TO SCALE

16" SS CABLE TEE POST 1) STAINLESS STEEL* (STANDARD) *ALL SS IS #6 SATIN FINISH (#8 MIRROR FINISH UPON REQUEST) 2) PVD COATING

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2016 REVISIONS

REQUEST FOR COMMENTS

MISSISSIPPI RIVER SPILLWAY PLAN (2013 FLOOD RECOVERY) MISSISSIPPI RIVER SPILLWAY PROFILE (2013 FLOOD RECOVERY) C-200 PROJECT BOUNDARY

City of Rio Rancho Department of Public Works

THINK SAFETY - WORK SAFELY

* LANDING ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * LANDING ** RAMP FULL CURB HEIGHT MAY BE REDUCED TO ACCOMMODATE MAXIMUM SIDE FLARE SLOPE

8'-11" 76'-4" 28'-3" 43'-9" A306 27'-7" 28'-10" 28'-10" 28'-10" 10'-11" 26'-8" 6'-0" 9'-8" LOW WALL / RETENTION ASSEMBLY, SEE CIVIL 27'-6" 8'-11"

* SEE ANCHOR SCHEDULE SHEET 7

Gary L. Owens Trust Administrative Permit. Application

HD CONDUIT MIN. 10% FALL CHAMBER MONITORING SYSTEM HD CONDUIT REFER NOTE 13 SECTION C-C DETAILS OF BENCHING

JOHNSTON COUNTY DEPARTMENT OF UTILITIES DUCHESS DOWNS FORCE MAIN IMPROVMENTS OCTOBER 2017

FOODSERVICE PLAN ONTARIO SD ONTARIO HS FS1.01 FOOD SERVICE EQUIPMENT LIST FOODSERVICE LAYOUT ITEM QUANTITY. Continental Refrigerator

PRODUCTS, LLC EUROCONTROLS AUTOMATION INC. MICRONESIA (GALVANIZED STEEL) REVISIONS DWN 120' SSV TOWER ASSEMBLY CP FILE NO.

NON-TRAP PARASITIC ELEMENTS ELEMENT P-10 10M Reflector 39 10m Rear Driver 28 10M Front Driver 28 10M Director 24

DIE DESIGN AND CONSTRUCTION SPECIFICATIONS STAMPING - EUROPE MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS

PARK HILL HIGH SCHOOL TURF FIELD IMPROVEMENTS

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

TYPICAL CARRIAGEWAY SCALE - A3 SIZE

INVESTIGATION 2. What s the Angle?

VB-7253 Series. Application. Features. Applicable Literature

United States Patent (19)

Bollard Post, Model R-8902

TOWNSHIP OF LOWER MERION. PUBLIC WORKS COMMITTEE Wednesday, April 3, :00 PM ( Approximately)

Status of Infrastructures HSS Inspections. Conference in The Portland District. By Travis Adams, P.E.

Corrective actions identified

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Fish Passage Planning and Design


JAP Additional Information Sheet

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Skills Practice Skills Practice for Lesson 4.1

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

AN Wireless Tower Assembly Instructions

NMSU PROJ #3077 STORAGE FACILITY - PHASE 3 BUILDING C (384)

NEW SINGLE FAMILY, RUGGIERO WAY, ANDOVER, MA

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

GB Collins Engineering PA

Multiple Meaning Words: Kindergarten to Grade 2 More Teaching Tools at

LARGE BINOCULAR TELESCOPE 2 x 8.4M TELESCOPE SAFFORD, ARIZONA

FenceSafe. Temporary Mesh Fencing Systems

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)


GENERAL LEGEND 12"CMP

Listening & Speaking. Grade 1. Supports. instructi GRADE. Develops oral and receptive language. 15- to 20-minute daily activities

Skills Practice Skills Practice for Lesson 4.1

1'-0" [0.305 m] WALL TYPICAL U.N.O. OPP. HAND C S3.3 S3.3 TW 99'-8 OPP. HAND TW 99'-8 TF 95'-6 B S3.2

ARUNACHAL PRADESH STATE COUNCIL FOR TECHNICAL EDUCATION, ITANAGAR

Design and Calibration of Submerged Open Channel Flow Measurement Structures: Part 3 - Cutthroat Flumes

FITNESS, SAFETY & MEDICAL SUPPLIES

CURB RAMP INSPECTION REPORT

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

SILT SCREEN DEPLOYMENT PLAN

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

MATHEMATICAL PRACTICES In the Solve It, you used what you know about triangles to find missing lengths. Key Concept Law of Sines

GAR-BRO BUCKET LIFTING BAIL INSPECTION RECOMMENDATIONS "COMBO" SERIES BUCKETS

AQUATICS CENTER NEW ENGLAND SPORTS VILLAGE. 60% Construction Set NOT FOR CONSTRUCTION 27 JULY 2017 AQUATICS CENTER LLB ARCHITECTS CONSULTANTS

Newsletter. ratty. What do you call an alligator in a vest? Welcome to the Summer edition of the Ravenglass and Eskdale Railway Kids Club Newsletter.


CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

PASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM. REFERENCES: Land Development Code, Planner II

CLAIBORNE LOCK AND DAM PERTINENT DATA

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA VOLUME I - YEAR 2010 REVISIONS

6 TRIGONOMETRY TASK 6.1 TASK 6.2. hypotenuse. opposite. adjacent. opposite. hypotenuse 34. adjacent. opposite. a f

Stettler Shop and Office

GAR-BRO BUCKET LIFTING BAIL INSPECTION RECOMMENDATIONS G & R SERIES BUCKETS

Minnesota Manual on Uniform Traffic Control Devices

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

SENIOR ASSISTED LIVING FACILITY BASE LINE, HIGHLAND, CA

Developing Back Bay. Pre-Handout. Scope and Background

MODEL ANALOG ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.2 TO 100FT OPERATING RANGE ANALOG OUTPUT

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

Bulletin 71.6:OSE. Type OSE Slam-Shut Valve. Features and Benefits. Introduction

Annex E Bridge Pier Protection Plan

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

REVISED SILT CURTAIN DEPLOYMENT PLAN

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Glass Steel, Inc. Fiberglass Composite Troughs

A Measurement Framework for National Key Performance Measures

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

2014 WHEAT PROTEIN RESPONSE TO NITROGEN

PLAYGROUND PLAYGROUND

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

WASTE ROCK MANAGEMENT AT SANGATTA COAL MINE A CULTURAL CHANGE. By Peter Scott HLA- Envirosciences Pty Limited

J4/J5/J17 MAST SECTION

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

MODEL DIGITAL ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.5 TO 100FT (0.15 TO 30M) OPERATING RANGE SERIAL OUTPUT

Garden City Community Park - Bike Terrain Park Consultation Process

2013 Dealer Workbook

Renewable Energy xxx (2011) 1e10. Contents lists available at SciVerse ScienceDirect. Renewable Energy

RIGGING Blocks. Pulleys Slings Runners

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

Distribution Restriction Statement

Transcription:

Exhibit GMP-H-3 GREEN MOUNTIN POWER CORP. PROJECT LOCTION MONTPELIER MRSHFIELD HYDROELECTRIC STTION SERVICE SPILLWY GTE STRUCTURE VERMONT DRWING LIST SHEET NUMBER STTE MP DRWING NME REVISION GENERL PROJECT NOTES SG 100-02 GENERL TYPICL CONCRETE DETILS SG 100-03 GENERL TYPICL HNDRIL DETILS SG 100-04 GENERL TYPICL STEEL DETILS SG 200-01 EXISTING ND TEMPORRY CONDITIONS SITE PLN SG 200-02 EXISTING CONDITIONS PLN ND ELEVTION SG 300-01 NEW CONDITIONS STEEL PLTFORM OVERLL PLN VIEW SG 300-02 NEW CONDITIONS STEEL PLTFORM PLN VIEW NEW CONDITIONS STEEL PLTFORM ELEVTION ND SIDE VIEW SG 310-01 NEW CONDITIONS FRMING PLNS SG 310-02 NEW CONDITIONS FRMING CROSS SECTIONS I SG 310-03 NEW CONDITIONS FRMING CROSS SECTIONS II SG 400-01 NEW GTE PLN, ELEVTION ND PROFILE SG 400-02 NEW GTE PLN, SECTIONS ND DETILS SG 500-01 CONCRETE RESURFCING PLN ND WLL ELEVTION VIEWS SG 500-02 CONCRETE RESURFCING SECTIONS ND DETILS SG 600-01 ELECTRICL (FUTURE) - NOT SUBMITTED - J:\012\170\s\Working s\new Spillway Gate\012170_SG 000.dwg STTUS SG 100-01 SG 300-03 May. 11, 2018-12:23 PM DTE MRSHFIELD SPILLWY MOLLYS FLLS POND 5-11-18 VICINITY MP

SCOPE OF WORK CONCRETE NOTES GTE NOTES May. 11, 2018-10:16 M J:\012\170\s\Working s\new Spillway Gate\012170 100-01.dwg 24x36 = FULL SCLE GENERL NOTES GENERL STEEL NOTES CONCRETE REINFORCEMENT DEVELOPMENT SCHEDULE BR SIZE BR DIMETER (in) *UNLESS OTHERWISE NOTED ON DRWING. (NOT FOR EPOXY COTED REINFORCEMENT) DEVELOPMENT LENGTH (in) CLSS B* SPLICE (in) CONCRETE REINFORCEMENT DEVELOPMENT EPOXY SCHEDULE BR SIZE BR DIMETER (in) *UNLESS OTHERWISE NOTED ON DRWING. DEVELOPMENT LENGTH (in) CLSS B* SPLICE (in) CFT BH Designed Drawn Checked JDB CFT BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES 012-170 GENERL PROJECT NOTES SG 100-01

May. 11, 2018-2:47 PM J:\012\170\s\Working s\new Spillway Gate\012170 100-02.dwg 24x36 = FULL SCLE TYPE 1 - DEEPER THN 5" PTCH REPIR DETIL NOT TO SCLE TYPE 2-1" UP TO 5" DEEP PTCH REPIR DETIL NOT TO SCLE TYPE 3-1/8" UP TO 1" DEEP PTCH REPIR DETIL NOT TO SCLE TYPE 4 - TYPICL LRGE CRCK NON-STRUCTURL REPIR DETIL NOT TO SCLE CONCRETE RESURFCING ND REPIR NOTES: SCLE IN FEET TYPE 5 - TYPICL HIRLINE CRCK NON-STRUCTURL REPIR DETIL NOT TO SCLE TYPICL CONCRETE RESURFCING DETIL 4 0 4 CFT BH Designed Drawn Checked JDB CFT BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES EXISTING ND TEMPORRY CONDITIONS PLN VIEW 012-170 SG 100-02

May. 11, 2018-10:56 M J:\012\170\s\Working s\new Spillway Gate\012170 100-03.dwg 24x36 = FULL SCLE PLN PERSONNEL GURDRIL ELEVTION 3/4"= 1'-0" ELEVTION TOP OF STEEL CONNECTION PROFILE PERSONNEL GURDRIL PROFILE 3/4"= 1'-0" PROFILE WELDED - PROFILE PLN ELEVTION TOP OF CONCRETE CONNECTION - FIXED PROFILE PLN ELEVTION PROFILE SIDE OF CONCRETE CONNECTION - FIXED CFT Designed JDB Drawn CFT BH Checked BH Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES GENERL TYPICL HNDRIL DETILS SG 100-03

May. 11, 2018-10:56 M J:\012\170\s\Working s\new Spillway Gate\012170 100-04.dwg 24x36 = FULL SCLE TYPICL STIR TO CONCRETE CONNECTION DETIL 1"= 1'-0" TYPICL STIR GURDRIL ND HNDRIL DETIL 1"= 1'-0" TYPICL GRTING STIR DETIL 1"= 1'-0" TYPICL STIR LNDING DETIL 1 1/2"= 1'-0" SECTION 1" = 1'-0" DETIL 1 1/2"= 1'-0" 1 1 1/2"= 1'-0" TYPICL FIXED LDDER DETIL TYPICL GRTING CLERNCES N.T.S CFT Designed JDB Drawn CFT LDDER MTERILS DETIL 3"= 1'-0" TYPICL STRP NCHOR DETIL 3"=1'-0" BH Checked BH GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES GENERL TYPICL STEEL DETILS Project SG 100-04 012170

3" 2" 1" 0 24x36 = FULL SCLE May. 11, 2018-2:48 PM J:\012\170\s\Working s\new Spillway Gate\012170 200-01.dwg LEGEND GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES EXISTING ND TEMPORRY CONDITIONS SITE PLN 50 0 1 50 SCLE IN FEET CFT BH Date Drawn Checked Designed Drawn Checked Project JDB CFT BH 012-170 SG 200-01

EROSION CONTROL NOTES: May. 11, 2018-10:57 M J:\012\170\s\Working s\new Spillway Gate\012170 200-02.dwg 24x36 = FULL SCLE SILT FENCE DETIL N.T.S. HY BLE EMBEDDING DETIL N.T.S. TURBIDITY CURTIN DETIL N.T.S. TYPICL STRW OR HY BLE DIKE N.T.S CFT BH Designed Drawn Checked JDB CFT BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES TEMPORRY CONDITIONS SOIL & EROSION CONTROL DETILS 012-170 SG 200-02

C May. 11, 2018-1:48 PM J:\012\170\s\Working s\new Spillway Gate\012170 200-03.dwg 24x36 = FULL SCLE B SECTION 1/4"= 1'-0" SCLE IN FEET C 4 0 4 8 SECTION 3/16"= 1'-0" SCLE IN FEET SECTION 3/16"= 1'-0" SCLE IN FEET 4 0 4 8 12 B 4 0 4 8 12 CFT Designed JDB Drawn CFT BH Checked BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES 012-170 EXISTING CONDITIONS PLN & ELEVTIONS SG 200-03

500-01 May. 11, 2018-2:50 PM J:\012\170\s\Working s\new Spillway Gate\012170 300-01.dwg 24x36 = FULL SCLE 5 SCLE IN FEET 0 5 10 B 500-01 CFT BH Designed Drawn Checked JDB CFT BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW CONDITIONS STEEL PLTFORM OVERLL PLN VIEW 012-170 SG 300-01

May. 11, 2018-10:59 M J:\012\170\s\Working s\new Spillway Gate\012170 300-02.dwg 24x36 = FULL SCLE B 03 UPPER PLTFORM PLN, EL. 1249.93' 3/8"= 1'-0" LOWER PLTFORM PLN, EL. 1241.77' 3/8"= 1'-0" 03 CFT Designed JDB Drawn CFT BH Checked BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW CONDITIONS STEEL PLTFORM PLN VIEW 012-170 SG 300-02

May. 11, 2018-12:49 PM J:\012\170\s\Working s\new Spillway Gate\012170 300-03.dwg 24x36 = FULL SCLE ELEVTION LOOKING DOWNSTREM 02 3/4"= 1'-0" SECTION B 02 3/4"= 1'-0" CFT Designed JDB Drawn CFT BH Checked BH Project GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW CONDITIONS STEEL PLTFORM ELEVTION & SIDE VIEW 012-170 SG 300-03

B 03 May. 11, 2018-12:00 PM J:\012\170\s\Working s\new Spillway Gate\012170 310-01.dwg 24x36 = FULL SCLE 02 D 03 UPPER PLTFORM FRMING PLN T.O.S. EL. 1249.8' 3/8"= 1'-0" LOWER PLTFORM FRMING PLN T.O.S. EL. 1241.77' 3/8"= 1'-0" C 03 CFT BH Designed Drawn Checked JDB CFT BH Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW CONDITIONS FRMING PLNS SG 310-01

May. 11, 2018-11:59 M J:\012\170\s\Working s\new Spillway Gate\012170 310-02.dwg 24x36 = FULL SCLE UPPER PLTFORM SECTION 1/2"= 1'-0" LOWER PLTFORM SECTION 1/2"= 1'-0" 01 01 CFT BH Designed Drawn Checked JDB CFT BH Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW CONDITIONS FRMING CROSS SECTIONS I SG 310-02

May. 11, 2018-11:59 M J:\012\170\s\Working s\new Spillway Gate\012170 310-03.dwg 24x36 = FULL SCLE UPPER PLTFORM SECTION B 01 3/4"= 1'-0" LOWER PLTFORM SECTION C 01 3/4"= 1'-0" SECTION D 01 3/4"= 1'-0" CFT BH Designed Drawn Checked JDB CFT BH Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW CONDITIONS FRMING CROSS SECTIONS II SG 310-03

1 May. 11, 2018-3:07 PM J:\012\170\s\Working s\new Spillway Gate\012170 400-01.dwg 24x36 = FULL SCLE PLN 1"= 1'-0" ELEVTION LOOKING UPSTREM 1"= 1'-0" 2 LIFTING LUG DETIL 1 1/2"= 1'-0" PROFILE 1"= 1'-0" CFT Designed JDB Drawn CFT BH Checked BH Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW GTE PLN, ELEVTION ND PROFILE SG 400-01

May. 11, 2018-2:58 PM J:\012\170\s\Working s\new Spillway Gate\012170 400-02.dwg 24x36 = FULL SCLE DETIL 3"= 1'-0" 1 DETIL 1 1/2"= 1'-0" 2 CFT BH Designed Drawn Checked JDB CFT BH Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES NEW GTE SECTIONS ND DETILS SG 400-02

E 02 D 02 May. 11, 2018-3:02 PM J:\012\170\s\Working s\new Spillway Gate\012170 500-01.dwg 24x36 = FULL SCLE D 02 C E 02 1 SECTION 300-01 1/4"= 1'-0" SECTION B 300-01 1/4"= 1'-0" SECTION 1 1/2"= 1'-0" DETIL 1 1/2"= 1'-0" CFT Designed JDB Drawn CFT C BH Checked BH 1 Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES CONCRETE RESURFCING SECTIONS ND DETILS SG 500-01

May. 11, 2018-3:02 PM J:\012\170\s\Working s\new Spillway Gate\012170 500-02.dwg 24x36 = FULL SCLE SECTION B 01 1/4"= 1'-0" 2 DETIL 3/4"= 1'-0" 2 CFT BH Designed Drawn Checked JDB CFT BH SECTION C 01 1 1/2"= 1'-0" Project 012-170 GREEN MOUNTIN POWER CORPORTION MRSHFIELD SPILLWY IMPROVEMENTS NEW SPILLWY GTES CONCRETE RESURFCING SECTIONS ND DETILS SG 500-02