ADL Attachment 1

Similar documents
Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Nome Harbor Page 2 of 12

TOWN OF DUXBURY Rules and Regulations for Moorings, Permits and Waiting Lists

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Cordova Harbor Page 2 of 9

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

XXX. Chisolm Island Creeks. Map Continued on SC-48. Judge Island. SC49-03 Jenkins Creek/Morgan River Intersection XXX. Saint Helena Island

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Juneau Douglas Harbor

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE

Good Mooring to You! Jensen Beach Mooring Field. Kathy Fitzpatrick, P.E. Coastal Engineer, Martin County

***This summary does not include shad and herring net requirements.***

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

IF YOU BUILD IT THEY WILL COME

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Delaware River Vessel Reporting System Mariners Advisory Committee For

APRIL 2017 LIVE BAIT

LOCAL NOTICE TO MARINERS

Ninilchik Harbor Page 2 of 11

Discussion Paper: Consideration of a Registration for Self-Guided Halibut Rental Boats

HARBOR INFRASTRUCTURE INVENTORIES West Harbor, OH

Summary of Water Access for Marinas and Public Boat Ramps

August 2018 LIVE BAIT

Geographic Response Plan Map: SC-41 ACE BASIN NERR. u [b. Big Island. SC47-08 Old Chehaw. River SC Bull River XXX

ARTIFICIAL REEF CONSTRUCTION: AN ENGINEERED APPROACH. Timothy K. Blankenship, P.E. R. Harvey Sasso, P.E.

NORMAL MEAN WATER LEVEL

Notice of operations at London Array Offshore Wind Farm

Cable Grid Testing 2018 Panama City Beach Trawl Diving and TED Testing

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

JOINT PUBLIC NOTICE. October 5, 2015

The Malaspina Okeover

Harbor Safety Committee HEAVY WEATHER (WX)

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

STONINGTON HARBOR AND WATERS ORDINANCE

CASTLEWELLAN REGATTA EQUIPMENT:

LOCAL NOTICE TO MARINERS

Geographic Response Plan Map: SC-35 Pleasant Point. Map Continued on SC-36. SC35-05 Church Flats Creek. SC35-01 Mouth of Stono River XXX.

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

CHAPTER 2 PROPOSED ACTIONS AND ALTERNATIVES TABLE OF CONTENTS

TOMALES BAY MOORING PROGRAM REQUIREMENTS (POLICIES AND CRITERIA) AUGUST 25, 2017

LIST OF NOTICES TO MARINERS 2017 CEN 308 RIDEAU CANAL AND OTTAWA RIVER, FIRST EDITION, 2003

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

13 August 14, 2013 Public Hearing

Chateaugay Lakes Milfoil Control Program

Geographic Response Plan Map: EFL-25. Map Continued on Page: EFL-30. EFL25-01 Cape Canaveral Air Force Station Nesting Beach - South

3.7 River Navigation Affected Environment

Redondo Beach Boat Launch Ramp Facility

2005 ABC. Chapter 3 Part 2. Navigating with ATON's. Revision to D-13 Local Notes. Instructor Notes for Mike Brough. Mike Brough

Geographic Response Plan Map: EFL-13NW AB 608 AB 5 1 AB 68 ") 770. !Å Heliport [ Historical!Å Site!(RSeagrass! Manatee

Forth Ports Limited. Ruling Depths & Under Keel Clearances

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

SECTION I NM 25/16 CHART CORRECTIONS

Update from Port Metro Vancouver Deltaport Third Berth Project Community Liaison Group. Meeting Date: August 28, Construction Update

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

Environmental Assessment Registration File Ref No NAME OF UNDERTAKING: Replacement of St. Vincent s Breakwater

Pioneer Array Micro-siting Public Input Process Frequently Asked Questions

WHEREAS, the ordinance will not create excessive additional requirements for public facilities and services at public cost.

Geographic Response Plan Map: VI-7 Inset Map A567 TRUNK AND HAWKSNEST BAYS XXX. St. John. qxxxa551 - V.I. WAPA WATERINTAKE, Acropora Priority Sites

Certified Professionals in Hydrographic Solutions

Chart Features Maritime maps and Admiralty charts have these features:

U.S. Army Corps of Engineers Sacramento District

St. George Harbor Feasibility Study. Appendix A - Hydraulic Design. St. George, Alaska. Tentatively Selected Plan August 17, 2018

UMass Boston Waterfront at a glance

17. High Resolution Application of the Technology Development Index (TDI) in State Waters. South of Block Island

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

New Requirements for Commercial Fishing Industry Vessels Section 604 Coast Guard Authorization Act of 2010 (Public Law )

TO: FROM: Y.102/MIN

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

: AUTHORITY: This ordinance is adopted under the authority granted by Section 30.13(2) and 30.13(3) of the Wisconsin Statutes.

Lake Marian Lakefront Hunting & Recreation Kenansville, FL Osceola County 130 +/- Acres

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

Hydraulic Modeling Analysis

R & E Grant Application 15 Biennium

LaSalle Park Marina Wave Break

This training is intended to be educational and should not be construed as legal guidance. It is provided as a courtesy to our customers and others

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

ESTABLISHING AN OFFSHORE MUSSEL FARM IN FEDERAL WATERS IN THE GULF OF MAINE

Holding Pond Annual Inspection Report

Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application

Chapter 269: MOORING REGULATIONS

ARTICLE III. CERTAIN PUBLIC PLACES* DIVISION 1. GENERALLY DIVISION 2. MUNICIPAL YACHT BASIN DIVISION 3. MANAGED MOORING FIELD

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

TOWN OF SOMERSET HARBORMASTER. REGULATIONS FOR MOORING, MOORING PERMITS and ANCHORING

2018 Annual Beach Monitoring Report


Procedure for Setting a Mooring

2 Boating Rules and Regulations... 73

INTRACOASTAL WATERWAY DEEPENING BROWARD COUNTY, FLORIDA HARD CORAL RELOCATION SUMMARY REPORT

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Hydrographic Surveying Methods, Applications and Uses

The Array cable installation vessel Stemat 82 and Assist tugs Lydia D and Claudia B are expected to commence installing array cables during week 5.

Washington State Parks comments to the Draft Clallam County Shoreline Master Program Update Consistency Review June 3, 2011

Sport Fishing Expenditures and Economic Impacts on Public Lands in Washington

Long Beach Island Holgate Spit Little Egg Inlet Historical Evolution Introduction Longshore Transport Map, Survey and Photo Historic Sequence

Transcription:

(formerly) 106502 Kina Cove A reapplication for an expired lease. The type of commercial use is identical to that previously. The immediate off-shore tidelands will be used to dump, raft, and store round log bundles. Bundles will be secured by cables into log-rafts and temporarily stored until they can be towed to a ship loading area. Latitude 55d 29' 36" North; Longitude 132d 31' 28" West Northern Tract 2 Section 29, T.73S., R.85E., CRM Southern Tracts 1&3 Section 32, T.73S., R.85E., CRM N/A - Tidelands only. Tidal contours taken from NOAA Chart #17426 Access by boat or float plane only. General public access allowed but discouraged. A 24'x36'floating dock for seaplane access is currently on site. The existing walkway is 10' x 70'. Other structures planned are described below: The only permanent structure is the existing LTF drive-down ramp per attached schematic. Dimensions 40'x200' w/ attached barge ramp 25'x30'. (Total 2606 cy) All the in-water gear (buoys, anchors, log booms, float & walkway) are future planned and are only installed when logging operations resume in the future. N/A The bark dislodging from log bundles is regulated under the DEC APDES Program. Annual Dive surveys are conducted of the sea floor, as required by permit. N/A N/A for the tidelands (lease) portion of the operation. N/A There's currently no one using the facility. When it becomes operational at a later date, people utilizing the site are listed below: The contractor will have Front-End Loader, boom boat, & tug boat operators using the site on a daily basis when it becomes operational. STC will have 2 additional. Periodically, 2-4 clients will arrive by float plane to inspect log rafts. Sealaska Timber Company, LLC uses independent contractors to perform daily and seasonal operations at this site. However, at least two STC staff will be on site daily when operations are underway. Typical harvest operations occur generally between mid-february through mid-december. This site is currently dormant of activity and the next operations are not likely to occur for at least a decade. [Note: The original ACOE permit was modified to relocate the seaplane float. The modified location is depicted on the survey plat.] CLOSURE: During periods of non-use and idle operations, all of the in-water seasonal gear is to be removed and stored on the uplands owned by Sealaska. This includes everything placed in the waters depicted on the schematics, with the exception of the LTF ramp & attached barge ramp, which is a permanent structure constructed on tidelands. As of this date, this site is dormant of commercial activities. The seaplane float remains in place at this time. Ongoing upland silviculture activity precludes its removal at the moment. Reclamation Plan: It is the current intent of the applicant to renew this lease every 20 years. In the event that lease renewal is not sought at the termination of any given lease, and in addition to the removal of features described above, the LTF ramp, barge ramp and all backfill on state-owned tidelands will be removed and the tideland terrain returned to its original pre-lease condition inasmuch as the terrain conditions will allow. Dismantling of the existing features will require use of heavy equipment directly on tidelands currently covered by fill.

Kina Cove - 2016 Lease Application Seaplane Float Schematic-Profile View (above HTL) ~70' long (10' wide) I-------------24'---------------I ^ [The other float dimension is 36'] Kina Cove, Kasaan Bay, POW Island, Alaska 20 0 10 20 SCALE (FT.) Application by Sealaska Timber Company, LLC October 18, 2016 Sheet 4 of 5

* 10-18-16 Sealaska Timber Company, LLC Buoy depicted with USCG markings 58" spherical buoy Development Plan Close-up of In-Water Features 29 & 32 73 S 85 E CRM water surface depicted not to scale Kina Cove LTF & LSA - Planned Features (future) 5 5 Additional NOTE: < Buoys that are at the ends of standing booms will be secured with two sets each of anchors and galvanized cable. Therefore, in summary, the total anchors and cable connections by tract: TRACT 2 LSA: TRACT 1 Log Rafting: Total 6-7 ton: 7 anchors 12 anchors 19 anchors (schematic only - water depths vary) At all buoy locations, boom chains are also shackled to the underside of buoys at this location and to the Boom Chain ring end. Ocean Floor (See Note*) (for purposes of perspective) [*The anchors used for securing the seaplane float will be smaller than this schematic, and minus the buoys. Anchors for boom & buoy configurations range from 6 to 7 tons, depending on density of concrete and quantity of rebar used to construct. The anchors for the seaplane float will be roughly one ton in weight and dimensions 2'x2'x4'.] * **Boom Chains (connecting one log boom to another, and connecting booms to buoys, as in TRACTS A & B) Schematic Details for "TRACT 1" & "TRACT 2" Only

132 32'0"W 132 31'45"W 132 31'30"W 132 31'15"W 132 31'0"W 132 30'45"W 132 30'30"W 132 30'15"W 55 30'30"N!. Tidal Data (US ACE Charts) HTL - 18.0 Ft MHW - 15.0 Ft Bathemetry Data NOAA Chart 1742 55 30'30"N Rock Pit Reference Point 29 28 55 30'15"N Log Storage Area Tract 2 (LSA) (8.93 acres) 55 30'15"N Legal Description: Section 29, T. 73 S., R. 85 E., CRM Refer to Survey Plat 2 for Metes & Bounds description. Kina Cove 55 30'0"N 55 30'0"N Float Tract 3 (0.56 acre) Legal Description: Section 32, T. 73 S., R. 85 E., CRM 33 Refer to Survey Plat 1 for Metes & Bounds description. 55 29'45"N #0 Log Transfer Facility Tract 1 (LTF) (9.34 acres) 55 29'45"N!. Kina Cove Sortyard Legal Description: Section 32, T. 73 S., R. 85 E., CRM 132 32'15"W R082E R083E R083E 132 32'0"W R083E Puyallup Mine Dawson Mine Rush and Brown Mine Hollis R084E Hollis _ Althouse Point R084E _ Salt Chuck Mound Point 132 31'45"W R084E Sandy Point Outer Point Haida Mine It Mine!. Adams Point Project Location 132 31'30"W Kasaan _ Kasaan Baker Point R086E R086E Figgins Point Giants Head R086E R087E Mamie Mine Black Rock R087E JJ Beach 132 31'15"W Refer to Survey Plat 1 for Metes & Bounds description. NAME: WATERWAY: LOCATIONS: ADJ OWNERS: 132 31'0"W 132 30'45"W Vicinity Map Kina Cove LTF & LSA Kasaan Bay Kasaan, AK Sealaska Corporation 132 30'30"W Legend (Vicinity Map) Legend _ Cities µ Estuary Sealaska Nutkwa Tax Block A (Anadromous) Bureau of Land Management B (Anadromous) Fish and Wildlife Service HTL Forest Service Bathymetry National Park Service MHHW; MHW; MHW - 12.0 FT Native Selected HTL; HTL - 15.6 FT Military Existing Tidelands State Patent or TA; State Selected Private 1 inch = 1,000 feet R083E R084E R086E Thumb Point 1 in = 7 miles R087E STC GIS

LIST OF IMPROVEMENTS WITHIN LEASE AREA - EXISTING & PLANNED EXISTING 9.34 PLANNED-FUTURE EXISTING In the attached PLANNED-FUTURE