Project Design New Softball Stadium MU

Similar documents
hoovermetcomplex.com

East Tennessee State University. Johnson City, Tennessee

giving back 2009 INDIANA hoosiers 19 iuhoosiers.com

A NEW ERA FOR BASEBALL AND SOFTBALL. RENOVATING Joe Brooks Baseball Field Jessica Kamp Softball Field

EXCELLENCE University of Wisconsin - Madison Athletic Facility Master Plan August 29th, 2007

NAVY ATHLETICS

WHAT IS THE PROPOSAL? SB is a new proposal to construct a football stadium on campus.

Big 12 Baseball Replay Protocol

m.l. tigue moore FielD

Alternative 1 Five Multi-Use Diamond Fields

ACES BALLPARK FREIGHT HOUSE DISTRICT. and the EVENT PLANNING GUIDE

BIG EAST Baseball Replay Protocol final for 2019 season

THE ONCE AND FUTURE K.

NORTH CAROLINA FURNITURE DIRECT FARM CLUB BUSINESS PLAN

BUD GRANT, UPON ARRIVING IN MINNESOTA IN 1967

Welcome to Memorial Stadium

Maryland Stadium Authority to Release Phase Two of the Pimlico Race Course Study

CASE. The unusual parking challenges faced at Penn State (and the creative solutions that worked) when a new ice arena was constructed on campus.

riverfront club Features/Capacity

VENUES TO MATCH THE EVENTS

Naming Inventory Athletics Capital Campaign. Visitor s Locker Room (could be separated into 2 naming opp$50,000. Equipment Room $250,000

Elm Street Park Greenville, North Carolina July 12 - July 19

MARKETING OPPORTUNITIES

2014 COLLEGE. SPRING TRAINING The Ripken Experience Myrtle Beach, SC. Our 2014 College Spring Training package includes: Other Highlights Include:

Strength Coach Jeff Watkinson is regarded as one of the top professionals in his field and helps each player reach his full potential.

NJCAA REGION XXI DIII BASEBALL TOURNAMENT

U.S. Bank Stadium Media Overview

NEW BALLPARK PLANNING STUDY

Sponsorship Opportunities. Western Carolina University

STREET LEVEL PLAYING FIELD

Every fan who walks into City Stadium will receive a FREE copy of the Hillcats Gameday Magazine. This collectible item features articles,

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Chapter. Athletic Facilities. Introduction. Need for New Baseball and Softball Facilities

INNOVATIVE INTERSECTION DESIGN

GOALS & OUTCOMES EXAMPLES OF EFFECTIVE GOALS

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

2018 Corporate Media Kit

Baseball Stadium Renovations at US Cellular Field

Softball Technical and Facilities Manual For Olympic, World Cup, Regional, and Multi- Sport Competitions

Title IX Athletics Q & A

Section XI Appendix A-1 Stakeholders Meeting

TABLE OF CONTENTS. Area Information Campus Map Preferred Hotels, Transportation, & Restaurants

TOURNAMENT HOSTING POLICY

Carmel Tennis Renovation Frequently Asked Questions

PARTNERSHIP OPPORTUNITIES

Tommy Briggs Cougar Stadium

Support Student Athlete Scholarships. Texas State University-San Marcos. A member of The Texas State University System

Stadium/Athletic Improvements Update October 12, 2015

Adjustment Grand Total Special Instructions: Page 1 of 5 Client Initials:

CPC Parking Lot Riverside Drive. Transportation Rationale

Existing Transportation System

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department

Babe Ruth Softball Divisions Facilities Planning Guide. Field Layout Checklist General Considerations Tournament Considerations

Chapter. Athletic Facilities. Introduction. Need for New Baseball and Softball Facilities

2019, 2020, 2021 & 2022 NCAA DIVISION III SOFTBALL CHAMPIONSHIP SPORT SPECIFIC INFORMATION

D o n o r G u i d e B o o k

Field Usage & Behavior Expectations RHWS: Guidelines for field usage and behavior are common sense

2015 Dublin High School Irish Guard Band Tournament Director s Packet

WHEATON PARK DISTRICT YOUTH BASEBALL/SOFTBALL

STEPHEN F. AUSTIN STATE UNIVERSITY WOMEN S SOCCER CAPITAL IMPROVEMENT PLAN -SPRING 2013-

Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update

Welcome to the 42nd Annual Eastern Illinois University Panther Marching Band Festival INFORMATION PACKET

CLEAR CREEK I.S.D. CHALLENGER COLUMBIA STADIUM GENERAL INFORMATION

Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update

2018 UHSAA/LES SCHWAB TIRE CENTERS 5A/6A HIGH SCHOOL STATE BASKETBALL TOURNAMENT Feb. 28 Mar. 3 GENERAL INFORMATION

5.0 Roadway System Plan

A. Host Organization:

The Public Safety Complex Southampton MA. a critical time

Washington St. Corridor Study

2016 Americas Master Games Baseball THE BOYS OF SUMMER ARE BACK...

Fan Guide Football 2017

Leander ISD Athletic Administration 202 West S, Street Austin, TX 78641

Site Improvements

2017 Independence Band Tournament Director s Packet

SEC Relays April 28-29, 2017 Bernie Moore Track Stadium, Louisiana State University Invited Teams Only Southeastern Conference Schools may participate

locker room 2009 indiana volleyball 21

Fitting Light Rail through Well-established Communities

ATM s An ATM is located inside the Ralph O Connor Recreation Center.

FANS A TO Z GUIDE TO ISOTOPES PARK. Revised February 9, 2018 TABLE OF CONTENTS

2017 AHSAA VOLLEYBALL STATE CHAMPIONSHIPS

Final Sidewalk Feasibility Study

All athletes are required to check in and pick up their bib between 12:30 and 5:00 pm.

4:45 PM 5:50 PM 6:05 PM TO CONCLUSION OF EVENT 8:00 PM 8:30 PM TO CONCLUSION OF EVENT 1:00 PM TO 2:25 PM 3:30 PM TO 4:25 PM 6:00 PM

2011 MEMORIAL STADIUM CLUB PATRON S MANUAL

2016 KANSAS CITY ROYALS SCHEDULE

Innovative Intersections Presented by: Matt Crim P.E., PTOE Stantec Consulting Services Inc. October 29, 2015

General Manager, Parks, Recreation and Culture. Request for Upgrades to Bridgeview Park Ball Diamonds

SPRINGFIELD REVITALIZATION REPORT

Special Events. Make your special event truly unique by hosting it at Banner Island Ballpark!

HIGH SCHOOL STATE FOOTBALL PLAYOFFS GENERAL INFORMATION

Victory Park Softball Rules and Regulations Revised 3/26/2018

ASSIGNMENT OF SCHOOLS WILL BE ON A GEOGRAPHICAL BASIS IN FIVE DIVISIONS

Revised 4/18/2017, 11:21:41 AM. Dear Visiting Coach,

U.S. Equities Realty. Luay R. Aboona, PE Principal. Traffic and Parking Evaluation Fourth Presbyterian Church of Chicago Chicago, Illinois

2018 SEC SOFTBALL TOURNAMENT COLUMBIA, MISSOURI

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

2014 FACILITIES REQUIREMENTS

INNING Grass Baseball/Softball Field Renovation

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

Transcription:

Project Design New Softball Stadium MU At the February 2015 meeting, the Board approved the $16,000,000 New Softball Stadium project to be funded from $13,500,000 in private gifts and $2,500,000 in debt financing. Additionally, at the February 2015 meeting, the Board approved employing Lempka Edson Architects (L+E), Overland Park, Kansas, as the project architect. Debt financing was approved at the June 2012 meeting for renovations to the existing softball stadium as part of the $72 million debt financing for Intercollegiate Athletics Projects. The University of Missouri-Columbia Campus Master Plan, which included the Intercollegiate Athletics Master Plan, approved by the BOC in June 2014, identified a need for a new softball stadium. The on-the-field success of the MU softball team has increased the demand for spectator seating and support facilities, and improved and expanded team facilities. At the same time, NCAA regulations for competitive venues call for increasing the depth of the homerun fence by the year 2017 to 230 feet to center field, a nearly 40 foot extension. The growing needs for MU Softball have exceeded the feasibility of expanding and improving the existing location due to site constraints, including the significant topography changes at the existing golf course, proximity of the existing roadway, and cellular and power infrastructure. The new facilities will provide fans with a full-view concourse and outfield plaza, a 1,500 to 1,700 seat venue, and outfield bermed lawn area offering increased capacity for an additional 500 to 1000 spectators. The existing stadium is limited to 600 stadium seats and little opportunity for outfield seating. The stadium includes an elevated press box with radio and television broadcast booths, writing press suite, and a game management booth. The Tigers Home Team Suite will be located directly behind the home dugout and will include a mud room and team locker room facilities. The remaining shell building is configured to house future fit-out of a press level Club Suite with seating for approximately forty (40) patrons, a field level home team lounge, theater, video room, coaches locker rooms and meeting room, a sports medicine/ rehabilitation facility, and umpire and visiting team locker rooms. The shelled space at the concourse level is available for future fit-out for coach and staff offices and a conference room with direct access to the stadium concourse. The site for a future indoor practice infield is part of the master facility plan. A ticket booth will be located at the south entrance main gates. The improvements will also include heated dugouts, batting cages, and bullpens for each team. The field dimensions will be 190 feet at the foul lines and 230 feet at center field. The home run wall will be 6 feet in height. The field will be a natural turf outfield, dirt infield with apron inserts of synthetic turf, and a crushed brick 10 foot warning track. OPEN FIN INFO 4-1

The project also includes the redevelopment of the existing 1,109 car MU student and commuter parking lot that will displace 503 parking spaces. A new parking lot will be constructed south of Champions Drive at the intersection with Providence Point Drive to replace 251 spaces. A new band practice field will be constructed south of the new parking lot to allow the existing practice area to accommodate 217 parking spaces for student and commuter parking near the transit stop. A new storage building and parking area for the band s semi-trailer will also be located adjacent to the practice area. The existing conductor s tower will be relocated to the new site as well. The total base bid construction cost is $11,600,000. The new parking lot is anticipated to be completed in November 2015, with the new Softball Stadium completed by December 2016. Site plan and floor plan diagrams and renderings of the design concept are attached. OPEN FIN INFO 4-2

Mizzou Softball Stadium University of Missouri Project No CP150451 OPEN - FIN - INFO 4-3 JUNE 2015

PARKING REPLACEMENT COUNTS Softball Stadium Hearnes Parking Lot Existing Prkg Spaces: 1,109 Total Displaced Spaces 503 Realigned Pkg Reclaimed Prkg Former Band Practice (217 spcs) Reassigned Prkg (48 spcs) Total to be Replaced 516 South of GSB 48 Current Band Practice Area 217 New Parking Lot 251 New Prkg (251 spcs) Realigned Providence Point Drive Band Practice Facility Composite Site Plan OPEN - FIN - INFO 4-4

Fire vehicle turnaround Stadium Site Plan OPEN - FIN - INFO 4-5

Field Level Floor Plan OPEN - FIN - INFO 4-6

Plaza Level Floor Plan OPEN - FIN - INFO 4-7

Concourse Level Floor Plan OPEN - FIN - INFO 4-8

Press Level Floor Plan OPEN - FIN - INFO 4-9

Looking at Main Entrance OPEN - FIN - INFO 4-10

Aerial View from South OPEN - FIN - INFO 4-11