STONY PLAIN ROAD STREETSCAPE

Similar documents
A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Why invest in the 1 Street S.W. Corridor?

122 Avenue: 107 Street to Fort Road

CLOSED. Highlights of the Final Concept Design:

Tonight is for you. Learn everything you can. Share all your ideas.

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

MASTER BICYCLE AND PEDESTRIAN PLAN

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Living Streets Policy

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

COMPLETE STREETS PLANNER S PORTFOLIO

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Executive Summary Route 30 Corridor Master Plan

S T A T I O N A R E A P L A N

EXECUTIVE SUMMARY. Vision

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

NEWMARKET UPHAM S CORNER

FOLSOM-HOWARD STREETSCAPE OVERVIEW

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Terwillegar Drive Expressway Draft Concept Plan

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

PEDESTRIAN ACTION PLAN

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

North Avenue Corridor Study

North Shore Transportation Improvement Strategy

Paoli Road Improvement Feasibility Study

Major Bike Routes 102 Avenue Workshop April 21, 2015

5 Circulation & Parking

San Jose Transportation Policy

Chapter 5 Future Transportation

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Welcome. If you have any questions or comments on the project, please contact:

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

West LRT Workshop Session Welcome Stony Plain Road from 149 Street to 124 Street May 12, 2010

Illustrated Principles of Good Planning

complete streets design and construction standards public primer City of Edmonton

East Burke Transportation, Safety and Capacity Improvements

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

6.4 RECOMMENDED IMPROVEMENTS

Miami Health District

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

102 Avenue Corridor Review

Table #6 VISION CHARACTERISTICS

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Vision. Goals and Objectives. Walking

TRANSPORTATION NEEDS ASSESSMENT

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Transportation Assessment

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Sacramento Grid 2.0. The Downtown Transportation Study

CONNECTING PEOPLE TO PLACES

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Omaha s Complete Streets Policy

Welcome to the Quebec Alternatives Analysis Public Meeting

COMMUNITY WORKSHOP #2 DOWNTOWN CONCORD SPECIFIC PLAN

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

C C C

Sixth Line Development - Transit Facilities Plan

Lincoln Neighborhood Corridor Plan The LiNC

Streetscape: Core Shopping District

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Highland Creek Village Transportation Master Plan

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

York Boulevard Streetscape Master Plan

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

FONTAINE AVENUE STUDY Final Report

Chapter 3: Multi-Modal Circulation and Streetscapes

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

Working Group Meeting

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Arterial Transitway Corridors Study. Ave

17 AVE SE BRT Project

5 CIRCULATION AND STREET DESIGN

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Circulation Improvement Strategy. Chapter 5: Improvement Strategy. Cross Street Neighborhood Improvement Plan

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

A Guide to Great Streets: The Basics. September 25, 2009

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Transcription:

Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where children can play freely, residents and visitors can walk and ride bikes safely, and where drugs and crime are under control. The Jasper Place area will be known as a safe community in which to live, work and play. Goal 2: Connecting our community Create a community where neighbours and business owners know each other and all work together to resolve issues and create opportunities. Residents and business owners take pride in their community and share this pride through street appeal, cleanliness and events. A community newspaper and other efforts help to market a positive image. Goal 3: Building our community Jasper Place is the place to live and have a business. Storefronts are well kept, clean and bring pride to the area. Parkland, schools and pedestrian walkways have plenty of lighting. Sidewalks, roadways and signage are improved and safe for all users. Adult businesses are only a small component of area business. The Stony Plain Road Streetscape Improvements Initiative is one element of the Jasper Place Revitalization Strategy.

Stony Plain Road Streetscape Improvements Initiative Stage 1: 149 Street to 158 Street The Project Stony Plain Road streetscape improvements are a result of the City's continued efforts to revitalize the neighbourhoods of West Jasper Place, Canora, Glenwood, and Britannia-Youngstown--the Jasper Place Revitalization Strategy. Stony Plain Road is emerging as one of West Edmonton's key destinations. The project will help make Stony Plain Road a place where people want to live, work and shop. Streetscape improvements involve creating a sustainable, vibrant and well-designed pedestrian-friendly mixed-use 'main street', accessible by a variety of transportation modes. Public consultation for Stony Plain Road began in 2008 with the local community and businesses working with the Project for Public Spaces and the City of Edmonton in identifying ways to improve the Stony Plain Road corridor. Eleven million in funding through the Great Neighbourhoods Initiative is earmarked for the Stony Plain Road streetscape improvements over the next three years. The Project Area Stage 1-149 Street to 158 Street (includes side streets one block north and south of corridor) Stage 2-158 Street to 170 Street

Timeline The project is two stages. Construction for Stage 1 (149 Street to 158 Street) will be carried out over two years. Stage 2 (158 Street to 170 Street) will be conducted following the completion of Stage 1; currently no schedule has been set. January 2012 Public Input to Streetscape Improvements February 2012 Streetscape Improvements Concept Plan Summer 2012-2013 149 Street - 158 Street Construction (Stage 1) Following Stage 1 Completion 158 Street - 170 Street (Stage 2)

West LRT: Downtown to Lewis Farms Transit Centre The City is committed to ensuring that future LRT becomes an asset to the village character as part of the revitalization strategy for Stony Plain Road. City Council passed several important motions related to improving the Stony Plain Road corridor and surrounding neighbourhoods including the Jasper Place Revitalization Strategy and West LRT line. The goal is for LRT and the Stony Plain Road streetscape to be complementary. The City is moving forward with the planned investments as part of the council approved revitalization strategy including physical components for identified needs like walkability, biking, way finding, gathering places, connections to businesses and the river valley, parking, transit, streetscape elements including trees, and green infrastructure. City Council has not provided a timeline for construction of the West LRT, therefore work is continuing on the streetscape mindful of LRT but focusing on achieving the vision of the Jasper Place Revitalization Strategy. Future changes related to transit service related to LRT may impact the streetscape. Funding Funding for West LRT is currently not in place. LRT projects require significant investment from all levels of government. Timing February 2010 Council identified Southeast to West LRT would be next priority after (or concurrent with) NAIT LRT. November 2011 Council passed a motion to prioritize Southeast to Downtown LRT and a funding formula of $800 million from 2014 to 2018. Fall 2013 Completion of preliminary design for West LRT.

Stony Plain Road Streetscape Improvements Initiative Public Consultation This public consultation process builds upon the extensive involvement of the community and input received on this project to date. The City is committed to open and transparent public consultation processes; the public consultation component of this project follows the City's Involving Edmonton initiative. Previous Consultation March 2008 April/May 2008 October 2008 December 2008/ January 2009 February 2009 March 2009 December 2011 Design Charrette on Physical Changes Projects for Public Spaces Report and Open House Building Group Workshop - Consultation with BRZ Discussions with Property Owners Workshop with Stakeholders (Building Group, Property Owners and Steering Committee) Urban Design Framework Open House Testing of Key Streetscape Elements with Stakeholders 2012 Consultation January 31, 2012 Public Open House Presentation of Draft Streetscape Improvements Input and Comments Gathered February 15, 2012 May 2012 Public Information Session Presentation of Final Recommended Streetscape Improvement Concept Streetscape Design Construction Meeting Final Detailed Streetscape Design Construction Schedule Detours, Traffic, Cyclist and Pedestrian Accommodation

Stony Plain Road Streetscape Improvements Initiative: Proposed Key Elements Sidewalk Current 1.5 metres wide (in most locations) Proposed 2.8 metres wide (in most locations) The additional 1.3 metres of sidewalk is obtained from narrowing Stony Plain Road from its current 16.0 metres (curb face to curb face) to 14.5 metres, and widening the sidewalk to property lines. Future businesses' The City of Edmonton would also like to immediately explore an agreement for the inclusion of the streets for the inclusion of the streetscaping for the 3 additional meters back from the property line to the building faces. This would allow for the best possible streetscape and sidewalk for Stony Plain Road. Roadway Current 16 metres (curb face to curb face) - 4 travel lanes plus one parking lane on north side. Proposed 14.5 metres (curb face to curb face) - 4 travel lanes Two 3.75 metre outside lanes (including gutter width) and two 3.5 metre inside lanes Weekday Peak Hours - Two travel lanes both east and westbound Weekday Off-peak and Weekend - One travel lane both east and westbound and one parking lane on both north and south sides. Future May be impacted by future West LRT.

Parking Reconfiguration Current Weekday Peak Hours (07:00-09:00 and 15:30-18:00) On-street, parallel parking on north side Side street parallel parking Weekday Off-Peak Hours and Weekends On-street, parallel parking on north and south sides Side street parallel parking Proposed Weekday Peak Hours No parking both north and south sides Weekday Off-Peak Hours and Weekends Two on-street, parallel parking lanes (north and south sides of Stony Plain Road) Perpendicular parking will be added to side streets where appropriate. (A 90 parking configuration allows for nearly double the stalls in the same amount of space as a parallel parking configuration.) Removal of "bulbings" on existing parking lane on north side of Stony Plain Road and closure of 152 Street will create more parking stalls during off-peak hours and weekends. Existing transit exclusive peak hour bus lanes and no parking at bus stops remains unchanged. Future May be impacted by future West LRT There is potential for land and business owners to reconfigure onsite parking to make the best use of available space.

Public Places Current No public gathering places between 149 and 157 Streets. Proposed Create a public gathering place/amenity space by closing 152 Street to traffic on both the north and south sides of Stony Plain Road. Alley access will be maintained. Addition of a public gathering place/ amenity space adds to the Urban Design vision of Stony Plain Road. Provides for a focal point (area of interest) to stage events or increase outdoor space for businesses. Increases on-street parking on Stony Plain Road during weekday off-peak hours and weekends. Existing bus stops will be improved with shelters (space permitting) and made more accessible for mobility impaired riders. Future Improve Butler Park (158 Street) to increase vibrant public places.

Stony Plain Road Streetscape Improvements: Moving Forward The Stony Plain Road Streetscape Improvements concept design addresses the council approved Jasper Place Revitalization Strategy and draft Urban Design Vision for a pedestrian-oriented mixed-use main street. Proposed Elements Gateway Features - Community, district and neighbourhood gateway features provide a distinct, recognizable character to Stony Plain Road and adjacent pedestrian oriented areas. Crossings - Visually enhanced and clearly designated crosswalks increase pedestrian safety and help control vehicular traffic flow. Bicycle Facilities - Bicycle facilities may be located, if space is available, at bus stop locations and selected intersection corners to contribute to the network of bicycle amenities. Bicycle Lanes - Strengthened bicycle lanes along 153 Street promote north south connections from Stony Plain Road to the shared-use path along 100 Avenue with further connections to MacKinnon Ravine and the river valley. Side Street Parking - Ninety degree side street parking helps maximize overall parking availability. (A 90º parking configuration allows for nearly double the amount of stalls in the same space as a parallel parking configuration.) Pass Throughs - Redeveloped existing and proposed building pass throughs provide efficient pedestrian access to businesses from rear parking and increased pedestrian traffic past storefronts of mid-block businesses. Bus Stops - Existing bus stops will be enhanced with shelters, subject to available space, and made more accessible for mobility impaired riders. Jasper Place Transit Centre - This centre will remain in its present location and configuration until the WLRT line is constructed. When LRT is constructed it will be relocated and combined with the new Jasper Place LRT station.

Stony Plain Road Streetscape Improvements Initiative: Next Steps Information Session Presentation of Final Recommended Streetscape Improvement Concept Wednesday, February 15, 2012 5:00 p.m. to 9:00 p.m. Westlawn Chapel Streetscape Design Construction Meeting May 2012 Location TBD Presentation of final detailed streetscape construction schedule, detours and traffic, cyclist and pedestrian accommodations

Welcome Stony Plain Road Streetscape Improvements Initiative (149 Street to 158 Street) Open House January 31, 2012 5:00-9:00 p.m. Presentation: 5:30 and 7:00 p.m. (Chapel)