Route Segment Descriptions

Similar documents
Purpose. Process. Recommendations

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS. Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven

07:59 DAILY FRS REPORT FOR 2/2/2018

11:42 DAILY FRS REPORT FOR 5/1/2018

11:43 DAILY FRS REPORT FOR 6/21/2018

Chapter 5 Future Transportation

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

BRR Leg 25 (4.3 miles, Moderate)

15A NCAC 10C.0205 PUBLIC MOUNTAIN TROUT WATERS

Gravel Bike Guide Haywood County

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

CURRENT INVENTORY AS OF SEPTEMBER 1, 2015 INSTRUCTIONS

Feb 22, Supplemental Reclassification of Streams in the Catawba and Yadkin River Basins to Trout Waters

Spring The Boone Area. Outdoor Recreation Plan. Produced by: Watauga County Tourism Development Authority

Road safety design standards and the Asian Highway Network. irap Asia Pacific Workshop Greg Smith 2016/05/26

Agenda Item No. 6C ATTACHMENT 1

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

REGULATIONS FOR MOUNTAIN TROUT

Bicycle Friendly Niagara Falls

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS

Technical Memorandum TO: Joel DeNunzio, P.E. Residency Administrator Charlottesville Residency FROM:

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

TABLE OF CONTENTS. Executive Summary

Day 1 to Jasper Engines, Schwartz s Restaurant and Shoe Tree. 95 miles. Elevation gain/loss: 5648 feet.

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

City Council Work Session

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Brick names: Spalding Tudor. RESIDENTIAL BRICK- PASTEL TONES generalshale.com

TRAFFIC SIGNAL WARRANT STUDY

Secondary Road Program

To Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)

US Bicycle Route 1 Summary Report: Selection of Preferred Route

APPENDIX D LEVEL OF TRAFFIC STRESS METHODOLOGY

Basalt Creek Transportation Refinement Plan Recommendations

Driver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx

Performance Criteria for 2035 Long Range Transportation Plan

Existing Data. City of Mauston. Legend " 58 " 82 " 16. ù ù. ù Pedestrian. Miles !G!G. !G ù. Sidewalk Location. Crash Type ( )

Culpeper District. Albemarle County Monthly Report October, 2011

Downtown Signals Traffic Analysis

H 232 Bicycle Safety Report

Arkansas State Highway and Transportation Department. Hot Springs Village Kiwanis Club

USBR 21 KENTUCKY TO GEORGIA ROUTE MILE TURNS ROADS

Project #: From: VHB Re: NC 54 West Corridor Community Meeting Round #2

Trail Notes Local Mountain Bike Areas

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

BIG STONE GAP RANSPORTATION

WalkBikeNC Plan. Presenters Anne Eshleman, EIT, LEED AP Led bike route analysis. Stephen Bzomowski, Planner Public input and data development

Arlington Public Schools Thomas Jefferson Site Evaluation Preliminary Findings. Thomas Jefferson Working Group Meeting #2 October 1, 2014

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Draft Local Input Points for Division Needs Transportation Projects

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

What is the distance from Minneapolis to Duluth, computed via trunk highways? 155 miles (1 point) see chart at top of map

Description of Road Management Objectives, Existing Use, and Proposed Use:

Culpeper District. Albemarle County Monthly Report September, 2011

U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0

Identify the letter of the choice that best completes the statement or answers the question.

ACTION TRANSMITTAL No

Bikeability Checklist

Recommendations. Unaddressed Deficiencies. Implementation

Module 5: Navigating Roadways

A Step-by-Step Guide to Complete Streets Implementation. Mark A. Cole, PE Charlotte Department of Transportation

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Bikeway Plan for the Roanoke Valley Area MPO Update ACKWOWLEDGEMENTS

Irondale on the Move Public Outreach Summary to Date. July 8, 2015

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

VIII. Project Prioritization & Implementation

Road Diets and Roundabouts

North Carolina Department of Transportation Transportation Planning Branch. Comprehensive Transportation Plan. Stokes County

OTO BIKE/PED PLAN REPORT

Route 15 Congestion Report Findings

Description of Road Management Objectives, Existing Use, and Proposed Use:

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

A.G. Wright Middle School Map 100 Wood Drive, Stafford, VA 22556

Parks, Open Space, Trails and Recreation Master Plan

What is Going on with Complete Streets

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Thank you for attending

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

CTH M HIGHWAY PROJECT CTH Q to STH 113

EXECUTIVE SUMMARY. Vision

Unit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Mountain Bike! The Southern Appalachian And Smoky Mountains, 2nd (America By Mountain Bike - Menasha Ridge) By Steve Jones READ ONLINE

SNCC Demographic Trends

Project Narrative Old Durham Road/Old Chapel Hill Road Complete Streets Project

CTDOT Pedestrian and Bicycle Safety Initiatives

Route 29 Solutions Projects

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Transcription:

Route Segment Descriptions 1. US 19, US 19E from Madison County to Burnsville Four-lane currently under construction including 4 shoulders Will match to Blue Ridge Bike Plan network High speed 2. US 19W from US 19E to TN Not on long-range plan Limited sight distance 3. NC 197, NC 226 from Burnsville to Bakersville (NC 226) Alternative route between Burnsville and Bakersville (versus US 19E, NC 226) 4. US 19E from Burnsville to Spruce Pine Four lane currently under construction, scheduled to include 4 shoulders Included in Bike element of Yancey CTP Part on NC Scenic Byway No viable alternative 5. NC 261 from Bakersville to TN (Carvers Gap) Not on Work Program or long-range plan Provides access to Roan Mtn. Not identified as need in survey or workshop

6. NC 80, Parkway, NC 128 from US 19E to Mt. Mitchell Provides access to Parkway, Pisgah NF, and Mt. Mitchell State Park Included in Bike element of Yancey CTP 7. NC 226 from Spruce Pine to Bakersville 8. Altapass Highway from Spruce Pine to Parkway Identified as better access from Spruce Pine to Parkway than NC 226 9. US 19E, NC 194, US 221 from Spruce Pine to Crossnore, segments and intersections of 221/194 (both) 10. US 19E from Ingalls to Elk Park 10A. US 19E, NC 194 Ingalls to Elk Park, Newland (NC 194) 10B. US 19E, NC 194 Ingalls to Elk Park, Banner Elk NC Scenic Byway (Banner Elk to Elk Park)

(NC 194) 11. NC 194, Hickory Nut Gap Rd. from Crossnore to Banner Elk Truck Route (NC 194) 12. US 221 from Crossnore to Blowing Rock, segment and intersections of 221/181 Truck Route (Crossnore to Linville) (Crossnore to Linville) NC Scenic Byway (Crossnore to Linville) Identified as need in workshop 13. NC 184 from NC 105 to Beech Mountain (for 4 lanes) 14. NC 105 from Linville to US 421 in Boone High crash incidence 15. Broadstone Rd., Mast Gap Rd. US 321 from NC 105 to US 421 (Vilas) (short section in Valle Crucis) Included in Bike element of Watauga CTP Identified as need in workshop 16. US 421 from NC 194 (Boone) to TN 67 (Trade, TN), High crash rate at intersection on King Street Closest connection to Tennessee State Bike Route network (in Mtn. City) Included in Bike and Highway elements of Watauga CTP 17. US 321 from Boone to Blowing Rock High crash incidence

Included in Bike element of Watauga CTP General route of Middle Fork Greenway plan 18. Deerfield Rd. from US 321 to Parkway Included in Bike and Highway elements of Watauga CTP 19. NC 194 from US 421 (Boone) to US 221 (Fleetwood) Included in Bike and Highway elements of Watauga CTP Identified as need in workshop Provides access to Railroad Grade Rd. 20. US 421, Old US 421 from Boone to US 221 (Deep Gap), medium crash rate at intersections of Bamboo, US 221 US 421 is NC Scenic Byway 21. TN 67, NC 88 from US 421 to NC 194 (Warrensville) Provides alternative to US 421/US 221 to connect Watauga and Ashe 22. Elk Creek Rd., NC 268 from Old US 421 to Wilkesboro Includes gravel section (approx. four miles) (NC 268) (NC 268) 22. US 221 from US 421 to West Jefferson (construction starts in 2015) (Highway and Bike Elements of Ashe CTP) 24. US 221 Business from West Jefferson to Jefferson

(Highway and Bike Elements of Ashe CTP) Provides alternative connection from West Jefferson to Jefferson 25. NC 88, NC 194 from Jefferson to VA (to Lansing) Provides access to US Bike Route (US 58 in VA) (Jefferson to Smethport) (Highway and Bike Elements of Ashe CTP) 26. NC 163 from West Jefferson to Parkway (Highway and Bike Elements of Ashe CTP) 27. US 221 from Jefferson to US 21 in Alleghany, medium crash rate at intersection of NC 16 Provides access to New River State Park (short section in Jefferson) Identified in Highway element of Ashe CTP 27A. US 221, NC 113, NC 93 from Jefferson to US 21 in Alleghany Provides alternative to segment 27 that connects the Piney Creek community and NC Bicycling Highway #4, medium crash rate at intersection of NC 16 Provides access to New River State Park (short section in Jefferson, and NC 113) US 221 included in Highway element of Ashe CTP NC 113 and NC 93 included in Bike element of Alleghany CTP 28. NC 16, US 421, US 421 Business NC 88 to North Wilkesboro, high crash rate at intersection on US 421 (NC 16, US 421 Superstreet) (NC 16) 29. NC 88, NC 18 from Jefferson to Sparta

30. US 21 from Sparta to VA Connects to Independence, VA 31. NC 18 from Sparta north to Parkway (Highway element of Alleghany CTP) 32. US 21, US 21 Business from Sparta to Elkin Provides access to Stone Mtn. State Park (Highway and Bike elements of Alleghany CTP) Part of North Line Trace Bicycling Highway 33. NC 18, Yellow Banks Rd., Traphill Rd. from North Wilkesboro to US 21 Provides access to Stone Mtn. State Park (NC 18) (short section of NC 18) (short section of NC 18) (Traphill Rd.) 34. NC 268 from North Wilkesboro to Elkin High crash incidence (short section of NC 268) (short section of NC 268) 35. NC 115 from North Wilkesboro to Fishing Creek Rd.