Bioerosion Monitoring Unit (BMU) SOP

Similar documents
CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

BALL STOP INSTALLTION GUIDE

LEGACY II TM STARTING PLATFORMS

Assembly Guide ST200 FUNCTIONAL TRAINER

Troyer s Gourd Rack 8 unit F R H O P

Ground Release Shackle

EZ-Mount 4 Spring Enclosed System to 22 (Low & High Mount Applications) Installation Instructions

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

PORTABLE LIGHTNING MAST PROTECTION PLP SERIES INSTRUCTION MANUAL

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

Installation Instructions - Steel 4 Spring Arm Kits , , , ,

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Collecting corals for histopathology. A practical guide

Assembly Instructions

M2 Antenna Systems, Inc. Model No: VLP16

SPM B-Net Assembly Instructions. Installation Recommendations

3. Align ratchet drive with female insert on assembly, and raise ratchet handle until the ratchet drive is firmly seated into the assembly.

CORALS OF OPPORTUNITY AS A RESTORATION TOOL

FITNESS, SAFETY & MEDICAL SUPPLIES

Construction of the Eddie Drifter Versions 1.0 through 1.2

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

DELUXE LOW PROFILE 18 & 30 STARTING PLATFORMS

Installation Instructions

Trim Tab Wind Vane for boats with transom mounted rudders

INSTALLING THE TRIDENT 11, 13 OR 15 RUDDER

How to Build BabyLegs A citizen science research trawl for studying marine plastics

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

Big Ride ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * *

Freshwater Mussel Tagging, Release, and Monitoring Date Prepared: 11/20/2017

How Do I Install My Garden Master Bucket Garden?

E Lightband Compression Tool Operating Procedure

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

CORPORATE SAFETY MANUAL

Installation Instructions - Electric Aluminum Drive Systems for Arm Sets to 22 Electric Arm Systems , ,

Installation Instructions - Super Six Electric Arm Kits with Underbody Pivots , , ,

USE OF REELS IN DIVING

Installation Instructions - Electric Steel Drive Systems for Arm Sets to ,

Crystal Spring Feeder Protocols

Array Solutions 350 Gloria Rd Sunnyvale, TX Phone FAX

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

INSTALLATION GUIDE. Doc ID: Doc Rev:

Precision Liquid Settlement Array Manual

Intro to Tech Instructor

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Tripod Setup Guide (M-TPx)

CHECK READOUT LOOP CONTINUITY IN PROBE C

NAVIGATOR PROP BUILDING INSTRUCTIONS & PHOTOS

Boat Boat Loader Fitting Instructions

-- SGP (NOVA TEAM SQUARE)

Field Manual. Simple by Design

OPERATIONS CHALLENGE 2017

ABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR U SERIAL No

Connecting a SSL/PTV Backflush System

E. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.

Blocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.

Retractable Security Cover for a Swim Spa

Ultra Concentrate Dispensing System

Paddle Bar Replacement

400/488 Rotating Davit Installation Instructions

Parts List. Description. Additional Considerations. Installation Instructions. Dual/Elite Hydraulic Treadmill Kit (supplied by EPI)

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

CB-50 Data Buoy Quick Start Guide

8. Decompression Procedures Diver

Trampoline & Enclosure Assembly Instructions

REPLACING THE AFT RUDDER CABLES

Booster Pump PB4-60 Replacement Kits

ROCKSOLID SINGLE POST ANCHOR

AVK SERIES 601, 602, 603 & 605 UNIVERSAL COUPLINGS, ADAPTORS & END CAPS INSTALLATION, OPERATION & MAINTENANCE MANUAL

Trilogy Theory of Operation

Common-duct series-cell electrolyzer with anomalous gas production rate

XTS-Impact. XTS-Terminal (hold)

ASSEMBLY MANUAL HOBIE CATSY

Regulators repair and maintenance. XS Compact 2nd stage. January 2014 Rev XSC /3 Ed. C /14 1

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

User Manual Important, read before use!

Monitoring the Recruitment of Postlarval Caribbean Spiny Lobster (Panulirus argus) Using Witham Artificial Collectors

Bladerider X8 Assembly Help Notes

Safety System Installation Guide for ARE Wind Poles

RANGER PROP BUILDING INSTRUCTIONS & PHOTOS

CamRT Sun Top Bimini Installation Instructions

HermanMiller Aeron. New Aeron Disassembly for Recycling. Materials Identification and Segregation: Tools Required. Step 1

Focus Benthic habitats found at Gray s Reef National Marine Sanctuary

Reliance Industries, LLC. Installation, Operation, Inspection and Maintenance Instructions for the Skyline Horizontal Lifeline System

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

Module 2, Add on Lesson Depth Sensor. Teacher. 90 minutes

Trampoline & Enclosure Assembly Instructions

REVISIONS. Note: All revisions are highlighted in yellow within the document. 2/24/2017 TASK 2 Valve page 18

INDEX. Specifications 1. Important Safety Precautions 2. Operating Instructions 3, 4. Optional Extras (Meal Tray & Footrest) 5.

ROCKSOLID DUAL POST ANCHOR

Final Assembly Instructions Bikes with Quill Stems

Initial Setup Instructions

Supplementary Operation, Assembly, Maintenance Manual for F3-42 model and optional attachments

Road Chain Catcher Installation Instructions (K13-001, K13-006, K SL1, K SL2)

Transcription:

Bioerosion Monitoring Unit (BMU) SOP I. Purpose II. Construction and predeployment analysis a. Materials b. Assembly procedure III. Deployment directions a. Materials b. Dive preparation c. Dive operation d. Post-dive IV. Post-deployment a. Collection b Analysis Purpose: The term bioerosion refers to the biological destruction of hard structures, such as coral skeletons. On coral reefs, this process opposes coral reef calcification. If rates of bioerosion are higher than those of calcification, healthy reef habitats can fall apart. Bioerosion Monitoring Units (BMU) are constructed of an exactly measured piece of calcium carbonate mounted on a PVC base. They are deployed on the seafloor, as seen in the picture above, collocated with Calcification Accretion Units (CAU). After 3 years in the ocean, BMUs are collected for analysis of changes in density, volume, and mass, which provide an indication of bioerosion rates. Construction and pre-deployment analysis: Materials: QTY Description 1 Clean coral skeleton block 2 x 5 x 1cm (use Porites lobata in Pacific, Orbicella faveolata in Atlantic and Caribbean) 1 Gray PVC base plate (2cm x ~8.5cm with 14mm (3/8 ) hole drilled on one end) 1 Epoxy (JB KWIK) 1 Metal ID tag 1 Cable tie 1 Small plastic bag 1 Analytical balance 1 Drying oven 1 3D scanner 1 CT scanner

Assembly Procedure: 1. Dry coral block in oven at 60 ours, until dry. 2. Mark the least clean 5 x 2 block side with BMU number using pencil. 3. Weigh, and input into BMU database. 4. Measure all dimensions and volume (3D scanning, Figure 1). 5. CT scan block using Skyscan 1174 microct (Figure 2). 6. Reconstruct the scanned images into 3D image stacks using NRECON and the reconstruction parameters at the end of this document. 7. Open the image stack in CTAn and Confirm that x-ray attenuation is properly calibrated to real-world density using the appropriate carbonate calibration phantom and note which phantom was used. 8. Epoxy coral block to PVC plate that has been scored to increase epoxy bond (Figure 3). 9. Weigh BMU after epoxy has cured and record the mass. 10. Place completed BMU (Figure 4) into its own small plastic bag (labeled with the ID tag number) along with a zip-tie, and its unique metal ID tag. Deployment directions: Materials: QTY Description 5 BMUs per benthic survey site 1 Container for carrying/protecting 5 BMUs during the dive (NOAA uses a small plastic case which floods as it is submerged) 5 Stainless steel stakes (can use the same stakes as used for CAUs if appropriate) 1-2 Sledge hammers for driving stakes 5 18mm (11/16 ) wire rope clips 1 Container of Aqua-lube for limiting biofouling on the wire rope clip threads 1-2 18mm (11/16 ) socket drivers 1-2 18mm (11/16 ) wrenches. NOTE: the socket driver works best when tightening the nuts on the wire rope clip. The wrench can be used if the horizontal access to the nuts is hindered, but the nuts on the wire rope clip are so close together that the wrench doesn t get good purchase on the nut, making this tool s use less efficient. 2 Tubes of underwater, 2-part, epoxy per survey site 1 Mesh dive bag for carrying above listed supplies Dive Preparation: 1. Record the CAU serial numbers (found on the yellow bands on an assembled CAU unit) on a metadata sheet. 2. Record the BMU serial numbers (found on the blue marker tab, cable-tied onto the BMU) on a metadata sheet.

3. Cover the threaded portion of the wire rope clips in Aqua-lube prior to the dive. By inhibiting marine growth, it becomes much easier to remove the wire rope clips during CAU/BMU recovery 3 years later. Dive Operations: 1. Hammer the stainless steel stakes vertically into the benthic substrate, making sure each stake is secure. The stake should be rigid in its placement, and one should not rely on the epoxy to exclusively hold the CAU/BMU assembly in place over the duration of the 3 year deployment. The epoxy should be used in conjunction with a good stake placement. 2. Use a 5-8cm (2-3in) amount of the 2-part epoxy stick for each stake placement. Make sure the epoxy is well mixed by squeezing the 5-8cm mass between your fingers. A well-mixed amount of epoxy will be all one color (white) and will react evenly. The epoxy will get on your dive gloves, so remove them prior to mixing epoxy in your hand. Pack the epoxy around the base of the stake and into the surrounding substrate (ensuring there isn t sand/debris within the application site is important, as sand/debris will make for a poor contact site with the epoxy). 3. Slide the BMU to the base of the stake and seat it into the epoxy mass holding the stake, ensuring that the BMU is flush with the benthos. 4. Secure the BMU in place by sliding an 11/16 wire rope clip down the stake to the plastic base portion of the BMU. Ensure that the wire rope clip is prepared with Aqua-lube on the threads and use the socket driver to tighten the nuts (Figure 5). 5. Attach a CAU to the upper 7.5cm (3in) of the stainless steel stake with a wire rope clip. Mount with 7.5cm of overlap between the stake and the threaded pin of the CAU. Again, ensure the wire rope clip is prepared with Aqua-lube and use the socket driver to tighten the nuts. The CAU should be mounted parallel to the ocean surface and the individual CAU plates should be squared up (sometimes the two plates can rotate on their mounting pin and not be perfectly positioned on top of each other, so correct this if present). Often the benthos is sloped; however, try to have the CAU surface horizontal to the ocean surface. 6. Re-address the epoxy at the base of the stainless steel stake. If mounting the BMU and/or CAU on the stake has caused the epoxy to no longer be tightly packed around the stake s base, fix the epoxy. It takes approximately an hour for the epoxy to begin to harden underwater. 7. Collect a waypoint on the survey site with a GPS. NOAA uses two waypoint marking techniques: 1. If the survey site can be seen from the surface, a snorkeler swims the GPS unit over the survey site and records a single waypoint for where the benthic survey site is located. 2. A SCUBA diver takes up the slack in the line of the dive team s surface float, making the line taut from diver to the surface float, and then

repeatedly pulls the float under water. This up/down action on the dive float signals the boat tending the divers to come overhead and record a GPS waypoint at the position where the diver is repeatedly pulling the surface float underwater. The coxswain signals to the divers that a waypoint has been collected by loudly revving the engine two times. The diver signals the coxswain that he understands the GPS point has been taken by no longer pulling on the surface float line. Post Dive: 1. Record the GPS location of the survey site on a metadata sheet. Post-deployment: Collection: 1. Collect after 3 years in the field. 2. Carefully remove each BMU and tag, bag the entire unit in a 4-9oz. Whirlpak with seawater in the bag, and secure the bag closed. 3. Bring 5 BMUs to surface in a bag or protective container, ensuring the BMU is not hit or broken in any way during ascent. 4. Store BMUs in a bucket of seawater or in a cooler of ice for transit to the ship or laboratory. 5. Upon return to the ship or laboratory, drain seawater from each Whirlpak, re-close Whirlpak with BMU inside, and freeze. Analysis: 1. Dry, may take 24-96hrs. 2. Weigh dry BMU using analytical balance. 3. Place BMU in a 15% diluted hydrogen peroxide solution for two hours to remove non-calcified organics (Kobluk & Risk, 1977). 4. Rinse with fresh water to remove hydrogen peroxide. 5. Dry -48hrs. 6. Weigh dry BMU using analytical balance. 7. Measure all dimensions and volume (3D scanning, Figure 1). 8. Remove PVC base plate from coral block. 9. CT scan block using Skyscan 1174 microct configured with the CT scan parameters noted herein. 10. Check for CT Scan drift by using calibration standards at least once throughout the course of BMU analysis. 11. Reconstruct the scanned images into 3D image stacks. 12. Volumetrically partition secondary accretion, external bioerosion, and macroboring (Figure 6). 13. Using a consistent and unbored region of interest, compare attenuation coefficients of pre and post-scans, calibrated with carbonate density phantoms to calculate microboring.

Figure 1. 3D scan of BMU coral block for dimensional analysis and volume calculation. Figure 2. Side view of microct scan of BMU coral block.

Figure 3. PVC base showing scored area for BMU coral skeleton attachment Figure 4. Bioerosion Monitoring Unit (BMU) including coral skeleton and PVC base.

Figure 5. Bioerosion Monitoring Unit deployed at a reef. Figure 6. Volumetrically isolated accretion (blue) and macroboring (red).