HIR on Oklahoma Turnpikes

Similar documents
Low Traffic Volume LR 159 Low Traffic Preservation

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

MNDOT PAVEMENT DESIGN MANUAL

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Pavement Management Program

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

Keeping good roads good

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA

Kraton Ultra-thin HMA / WMA Overlay Study

City of Davis Pavement Management Program

New Mexico Transportation Funding Challenges

Binder Modified with a Combination of PPA and SBS: The NCAT Test Track Experience PPA Workshop April 7, 2009

Managing Density For Asphalt Pavement

ASPHALT PAVING LEVEL 1

General References Definitions. (1) Design Guidance. (2) Supporting Information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Paul Vraney Bureau of Project Development 02/11/2016

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Why We do Preventive Maintenance

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

Kentucky Transportation Center

NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

50 Year Roads: Don't Accept Anything Less

Driving Indiana s Economic Growth

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

T-24. A Practical Approach to Managing Density

Stop Chasing & Start Managing Density

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

9 QUALITY ASSURANCE PROCEDURES

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Compaction Theory and Best Practices

Pavement Management Report. City Council Meeting of May 21, 2013

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

Challenges of Tack Coat

Lake Waterford Community Association Meeting. November 15, 2016

High Performance Racetracks

Tabulation of Bids. Counties: Project(s):

NCHRP Project 9-40 Update Optimization of Tack coat for HMA Placement

MnROAD Mainline IRI Data and Lane Ride Quality MnROAD Lessons Learned December 2006

I-64 BATTLEFIELD BLVD: PERFORMANCE MEETS EXPECTATION

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

BALANCED MIX DESIGN APPROACH. Robert Lee, P.E. Flexible Pavements Director

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Welcome! Urban Work Zone Design. Training Course 0-1

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

land transport road assets

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

"Emul Asph (SS-1HP) Tack".

Highway Committee MINUTES OF MEETING August 22, 2016

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

2018 ROAD MAINTENANCE PROGRAM

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

General Notes. Project No /15/2018 Page 1 of 1

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Project Update: Characterization of Alaskan Hot-Mix Asphalt containing RAP

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Driveway Design Criteria

SECTION 14: LANDSCAPING AND BEAUTIFICATION

IL Route 71 Construction Update

Update on Performance of Thin Asphalt Overlays

IH 20 RANGER HILL PUBLIC MEETING

ASPHALT PLANT LEVEL 1

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

PENNDOT HPMS DATA COLLECTION GUIDE. Bureau of Planning and Research Transportation Planning Division April 2016 (Updated March 2018)

Pavement Type Selection Not a Black or White Issue. Marvin Traylor

Design Criteria. Design Criteria

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Restoration Requirements

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Transcription:

HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center

HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Former Construction Engineer Oklahoma Turnpike Authority

Turner Turnpike I-44 Between Tulsa and Oklahoma City Opened to traffic May 1953, 29,000 ADT Full-depth asphalt, 86 miles in length

Will Rogers Turnpike I-44 Between Tulsa and Joplin, MO Opened to traffic June 1957; 34,000 ADT Full-depth asphalt, 88.5 miles in length

Turner & Will Rogers Turnpikes Average HMA thickness 14 inches, portions 24 inches thick No longer use thick HMA overlays - bridge clearance issues Managed as perpetual pavements Both won Perpetual Pavement Awards Use Ultra-Thin Bonded Wearing Course (UTBWC) due to minimal cross slope

OTA Maintenance Contract Design Selection Process Performs detailed Engineering Report Report typically includes options for: 10, 15 and 20 year pavement life Reconstruction Option, typically 35-40 year pavement life

OTA Maintenance Contract Design Selection Process Engineering Obstacles: Concrete median barrier with limited area for build up Maintenance of existing bridge clearances Limited Funding Available

June 2006, 1-mile HIR Demo Turner Turnpike, MP 194 2 inch HIR WB Driving Lane 2 inch Mill & Fill WB Passing Lane Both Lanes Capped Ultra-Thin Bonded Wearing Course

Surface Recycling 4 heater units & 4 heater scarification units that remove 1/2 inch material each unit, mixed with emulsified asphalt recycling agent (ARA-1P)

Surface Recycling Placed using paver windrow elevator Compacted using HMA procedures

HIR Demo Performance Turner Turnpike experiences heavy truck traffic ~ 20% 2 years after the Demo Passing Lane (MF) shows a crack thru the UTBWC Outside/Driving Lane (HIR) did not exhibit any signs of crack propagation

Why consider HIR? Ability to Utilize Short-term Lane Closures Elimination of Edge Drop-offs Reduced Exposure of Milled Surfaces to Elements Cost Comparison Speed of Construction

Potential Obstacles. Requires suitable base to support equipment OTA considers this option on preservation/ rehabilitation contracts that will receive a wearing course.

When HIR becomes desirable 2 (MF) inlay of driving lanes using Virgin Mix Superpave S4 (PG 76-28 OK), NMS = ½ inch (12.5 mm) Average Cost = $68/ton Average cost 2 inlay, 13 ft wide, 1 mile long: ~ $58,100 2 inlay of driving lanes using HIR Hot-in-Place Recycled Asphalt Concrete = $3.75/SY Hot-in-Place Asphalt Emulsion = $750/ton Average cost of 2 HIR, 13 ft wide, 1 mile long: ~ $41,500 Both would receive UTBWC

Thousands ($) When HIR becomes desirable Cost Savings on a 5 mile contract, 4 lanes wide $332,000 savings 30% reduction in cost 100% Recycled Material 1,200 1,000 800 600 400 200 0 MF HIR

How does OTA ensure quality? Quality Control Testing Asphalt Emulsion Content Maximum Specific Gravity (G mm ) Depth Checks every ¼ mile Compaction Requirement Require same compaction as HMA Minimum 92.0% of G mm at JMF emulsion content Test by cores or nuclear gauge

$$$ Time is Money $$$ Utilize temporary lane closures, working hours only 3.5 lane miles/day 2 HIR vs. 1-1.5 lane miles/day of 2 (MF) Weather event: can pick up equipment and move off road quickly Return traffic 45 minutes to 1 hour

HIR Contracts Performed HIR on 25% of T and WR Turnpikes Completed Contracts T-MC-96, 40 lane miles T-MC-97, 24 lane miles WR-MC-112, 38 lane miles WR-MC-113A, 27 lane miles Current Contracts WR-MC-117, 19 lane miles Upcoming Contracts WR-MC-113B, 17 lane miles Considering inclusion on other maintenance contracts

Questions??? Tammy Robinson EST, Inc. 615 North Hudson, Third Floor Oklahoma City, OK 73102 (405) 815-3600 office (405) 815-4080 fax (405) 206-5119 cell tammy@estinc.net www.estinc.net David Murdock OTA 405-424-7492 dmurdock@pikepass.com www.pikepass.com

Thank You Oklahoma Heart of Tornado Alley