November 2018 Monthly Report

Similar documents
September 2017 Monthly Report

April 2018 Monthly Report

January 2019 Monthly Report

May 2017 Monthly Report

January 2017 Monthly Report

October 2016 Monthly Report

March 2016 Monthly Report

Table of Contents. January 2016 Monthly Report

NYCBS September 2015 Monthly Report

NYCBS October 2015 Monthly Report

NYCBS August 2015 Monthly Report

NYCBS December 2015 Monthly Report

NYCBS January 2015 Monthly Report

NYCBS November 2014 Monthly Report

NYCBS December 2014 Monthly Report

NYCBS August 2014 Monthly Report

NYCBS April 2014 Monthly Report

NYCBS March 2014 Monthly Report

NYCBS January 2014 Monthly Report

NYCBS September 2013 Monthly Report

NYCBS July 2013 Monthly Report

NYCBS October 2013 Monthly Report

Planning Transit Operations and Bike Sharing Denver RTD. Bill Van Meter, Assistant General Manager, Planning March 23, 2012

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

DRAFT. Table of Contents. Background

1999 On-Board Sacramento Regional Transit District Survey

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

GOLD COAST TRANSIT DISTRICT SHORT RANGE TRANSIT PLAN FY 2015 FY 2019 APPENDICES

Rochester Area Bike Sharing Program Study

TAC February 1, 2012 Prepared by Metro Bike Program

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

About Us. Boulder B-cycle is a community nonprofit (501c3) formed in May 2011 to implement, own and operate a public bikesharing system in Boulder.

REQUEST FOR PROPOSALS TULSA BIKE SHARE SYSTEM APPENDICES

Village of Plainfield Design and Operational Guidelines for Outdoor Uses within the Public Right-of-Way

BICYCLE SHARING PROGRAM DEVELOPMENT. CUTR Webcast Series June 27, 2013

B. THAT Council direct staff to prepare by-law amendments to allow for Public Bike Share City-wide.

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

MASTER BICYCLE AND PEDESTRIAN PLAN

Eliminate on-street parking where it will allow for a dedicated bus only lane %

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

Chapter Four NON-INFRASTRUCTURE RECOMMENDATIONS. 5 E s. 5 E s. Education. Encouragement. Enforcement. Engineering. Evaluation

WALK- AND bike-friendly TURLOCK

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

2012 Transit Study Randolph County

GOALS, OBJECTIVES, AND RECOMMENDATIONS

ADA TRANSITION PLAN. For

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Draft. Lecompton. Table of Contents. Background

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Swift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit

Public Bike Share Schemes. 14 December 2017

March 8 th. CCT riders relief was. noted as the. suggested. According corridor. CCT

EAST VILLAGE SHOPPERS STUDY A SNAPSHOT OF TRAVEL AND SPENDING PATTERNS OF RESIDENTS AND VISITORS IN THE EAST VILLAGE

Multimodal Transportation Plan

Reducing Pedestrian Delay at Half Signals in the City of Portland, OR

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

February 4, Community Meeting August 2, :30 6:10 Presentation

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Sacramento Metropolitan Air Quality Management District. Technical Working Paper #7: On-Going Evaluation Methods

CHAPTER 3. Transportation and Circulation

Next Steps Staff report to Council on October 2, 2018 to present the Whistler 2018 Transportation Action Plan Final Draft

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received.

DRAFT. Lecompton. Table of Contents. Background

Sustainable Transportation Plan Draft 4/24/2012

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

Set of plans containing details for game day operations of the Ballpark. Plans set forth the responsibilities and the specific actions of:

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

TRANSPORTATION & ACCESS

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

STONY PLAIN ROAD STREETSCAPE

Yale University Human Research Protection Program

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

Peterborough Council on Aging

MTA CAPITAL PROGRAM: Tri-State Transportation Campaign

Minnesota Ballpark Authority Board Meeting Minutes October 11, 2018

43 rd Avenue, Skillman Avenue Protected Bike Lanes

TRANSPORTATION & MOBILITY

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Agenda Item # Page # RECOMMENDATION

Most Important Part of any Plan

Case 1 Flexible Urban Spaces Frederiksborggade

WILMAPCO Public Opinion Survey Summary of Results

Los Angeles County Metropolitan Transportation Authority Metro Bicycle Roundtable

June 3, Attention: David Hogan City of San Mateo 330 W. 2oth Avenue San Mateo, CA 94403

complete streets design and construction standards public primer City of Edmonton

Chapter 3 DESIGN SPECIFICATIONS

Non-Motorized Transportation 7-1

Street Paving and Sidewalk Policy

Bicycle and Pedestrian Level of Service Evaluation

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

Transcription:

Table of Contents Introduction... 3 Membership... 3 Ridership... 3 Environmental Impact... 4 Rebalancing Operations... 4 Station Maintenance Operations... 4 Bicycle Maintenance Operations... 4 Incident Reporting... 4 Customer Service Reporting... 4 Financial Summary... 5 Service Levels... 5 SLA 1 Station Cleaning and Inspection... 5 SLA 2 Bicycle Maintenance... 5 SLA 3 - Resolution of Station Defects Following Discovery or Notification... 6 SLA 3a - Accrual of Station Defects Following Discovery or Notification... 6 SLA 4 Resolution of Bicycle Defects Following Discovery of Notification... 6 SLA 4a Accrual of Bicycle Defects Following Discovery or Notification... 6 SLA 5 Public Safety Emergency: Station Repair, De-Installation, or Adjustment... 6 SLA 6 Station Deactivation, De-Installation, Re-Installation, and Adjustment... 7 SLA 7 Snow Removal... 7 SLA 8 Program Functionality... 7 SLA 9 Bicycle Availability... 7 SLA 10 Never-Die Stations... 8 SLA 11 Rebalancing... 8 SLA 12 Availability of Data and Reports... 8 2

Introduction On average, there were 39,335 rides per day in November, with each bike used 3.74 times per day. 7,980 annual members and 53,455 casual members signed up or renewed during the month. Total annual membership stands at 147,090 including memberships purchased with Jersey City billing zip codes. There were 749 active stations at the end of the month. The average bike fleet last month was 10,505, with 11,568 bikes in the fleet on the last day of the month. There 126,884 bike/dock actions in November, averaging 4,229 per day. Citi Bike technicians conducted 23,158 bicycle inspections and repairs throughout the month and responded to 1 reported case of vandalism. In November, there were 10,878 total customer service calls and 4,034 emails and web forms, with a rate of 0.90 customer service calls per 100 rides. The total revenue for the month was $2,448,260.97 with $2,298,260.97 from membership and user fees and $150,000.00 from sponsorship. Membership Citi Bike members purchased or renewed 7,980 annual passes, 30,609 single-trip passes, 21,059 single-day passes, and 1,787 three-day passes in November. There were 146,760 active annual members by the end of November. Ridership There were 1,180,064 trips in November, with an average of 39,335 trips per day. The combined distance traveled for all trips was 2,028,127 miles. The average trip lasted 12 minutes and 30 seconds and covered 1.60 miles. Annual members completed the majority of trips, recording 1,180,064 trips, compared to 96,224 trips by casual members. Ridership was generally higher on weekdays, but weekends were more popular among casual riders. November 1 st was the highest day for ridership this month with 75,713 rides. The most popular origins and destinations continue to be stations near large transit and tourist hubs, including the stations near Central Park, Penn Station and the Port Authority, Pershing Square, and the area around Union Square. As has been the pattern, the least frequented destination stations are in Brooklyn and Queens. 3

Environmental Impact Citi Bike riders burned a total of 86,218,840 calories for the month. According to a calculation published in the 2012 MTA Sustainability Report, we find that Citi Bike offset 1,628,133 pounds of carbon in November. Rebalancing Operations Citi Bike staff rebalanced a total of 126,884 bicycles during the month of November. The Service Delivery Department utilizes box trucks, vans, contracted trikes, articulated trikes ('bike trains'), valets, and member incentives ('Bike Angels') to redistribute bikes system-wide. Trike service is available in the Financial District, Midtown, Lower East Side and East Village, and valet service is available in the Financial District, Flatiron, East Village, Midtown, Penn Station, and Port Authority Bus Terminal. Bike Angels incentives are available throughout the system and dependent on predicted need for docks and bikes. Station Maintenance Operations There were 749 active Citi Bike stations at the end of November. Technicians made a total of 189 station visits to address dock and station field maintenance orders. There were 8 reported station malfunctions and 181 reported dock malfunctions. Docking point repairs were the most common ticket types. Station uptime for the month was 99.18%. Bicycle Maintenance Operations The bike shop at Gowanus completed 9,249 bicycle repairs in November. total unique bikes were checked or repaired during the month in depots or in the field. Incident Reporting In November, there was 1 reported instance of vandalism, including stickers, graffiti, and damage to stations, which were addressed either by Citi Bike field staff or a third-party cleaning vendor. There were 17 crashes reported to Customer Service by Citi Bike riders. Customer Service Reporting In November, there were 10,878 total customer service calls. The Citi Bike call center processed 9,073 calls with an abandonment rate of 2%. The overflow call center, which also takes overnight calls, processed 1,805 calls. Call volume for November was approximately 0.90 calls per 100 rides. At Citi Bike, the average time to handle a call was four minutes and forty two seconds with an average hold time of fourteen seconds. Citi Bike also received 4,034 emails and web forms. 4

Financial Summary Revenue Categories November November YTD Annual Membership $1,652,908.01 $23,556,547.08 Casual Membership $393,170.27 $7,426,243.53 Annual Overages $122,064.00 $1,093,039.74 Casual Overages $219,491.42 $3,891,513.78 Other Revenue $105,609.43 $677,059.04 Refunds and Discounts ($385,627.98) ($3,565,982.56) Taxes $190,645.82 $2,962,647.37 Sponsorship $150,000.00 $14,022,171.20 Total $2,448,260.97 $50,063,239.17 Service Levels SLA 1 Station Cleaning and Inspection Description: Every Station, as well as all Bicycles present, must be cleaned, wiped down, and inspected at least one time between the first and fifteenth days of the month, and one time between the sixteenth and last days of the month. SLA 2 Bicycle Maintenance Description: Every Bicycle that appears in the Bicycle Fleet level recording each day shall have received a Bicycle Maintenance check and cleaning within the last 45 Days. Performance Rate: 99.99% 5

SLA 3 - Resolution of Station Defects Following Discovery or Notification Description: Instances of deficient, damaged, or unclean Station components, or adverse conditions caused to the surrounding public property by the presence of the Station must be timely resolved following Discovery or Notification. Station Defects fall into the following severity classes, based on whether they are: (i) Defects Impacting the Area Surrounding Station (must be resolved within 24 hours); (ii) Defects Impacting the Usability of Entire Station (must be resolved within 48 hours); (iii) Defects Impacting the Usability of Specific Dock(s) (must be resolved within 48 hours); (iv) Defects Impacting the Appearance of Station (must be resolved within 72 hours). Performance Rate: (i) 100%; (ii) 80%; (iii) 78.02%; (iv) 96.77% SLA 3a - Accrual of Station Defects Following Discovery or Notification Description: Every individual instance of a deficient, damaged, or unclean Station component must be resolved within 7 Days of Discovery or Notification. Station Defects fall into the severity classes listed in SLA #3, above. Performance Rate: (i) 100%; (ii) 100%; (iii) 100%; (iv) 100% SLA 4 Resolution of Bicycle Defects Following Discovery of Notification Description: Instances of deficient, damaged, or unclean Bicycles, or adverse conditions caused to the surrounding public property by the presence of Bicycles must be timely resolved following Discovery or Notification. For the purposes of this SLA, Wrenching of Bicycle by a user will constitute Notification, and removal of Bicycle from service by Citi Bike will constitute resolution of defect. Defects related to Bicycles must be resolved within 48 hours if Bicycle is Wrenched, or 96 hours if Bicycle is not Wrenched. Performance Rate: 96.60% SLA 4a Accrual of Bicycle Defects Following Discovery or Notification Description: Every individual instance of a deficient, damaged, or unclean Bicycle must be resolved within 7 Days of Discovery or Notification. Performance Rate: 99.89% SLA 5 Public Safety Emergency: Station Repair, De-Installation, or Adjustment Description: In the event of a Public Safety Emergency, a Station must be repaired, De- Installed, or Adjusted as soon as possible, but no later than 12 hours after Notification. Stations De-Installed for Public Safety Emergencies must be reinstalled within 72 hours after the end of the Public Safety Emergency, as determined by DOT. 6

SLA 6 Station Deactivation, De-Installation, Re-Installation, and Adjustment Description: As directed by DOT, Citi Bike must perform: (i) Station Deactivation(s); (ii) Station De-Installation(s); (iii) Station Re-Installation(s); (iv) Station Adjustment(s). DOT will provide a minimum of 48 hours advance notice prior to any of the above, except in instances where the continued presence/activity of the Station has been determined to pose a threat to public safety. Deactivated Stations must be reactivated within 24 hours of direction from DOT. De-Installed or Adjusted Stations must be reinstalled or Readjusted to their original configurations within 72 hours of direction from DOT. SLA 7 Snow Removal Description: Following snow events, Citi Bike must remove snow within 12 hours so as to maintain: (i) Parallel pedestrian clear path adjacent to Stations located on sidewalks and in plazas; and (ii) Perpendicular pedestrian paths through Stations where gaps in Docks provide pedestrian access. SLA 8 Program Functionality Description: The Program is completely unavailable, such that no Program user can dock, undock, and Wrench Bicycles as intended, exclusive of planned Program outages for upgrades and maintenance as agreed upon by Citi Bike and DOT and Program outages caused by an Event of Force Majeure. SLA 9 Bicycle Availability Description: This Bicycle Availability requirement is met if the monthly average Bicycle Fleet Level, recorded once each Day of the month between the hours of 11:00 AM and 3:00 PM, meets or exceeds the required Bicycle Fleet Level. Performance Rate: 50% 7

SLA 10 Never-Die Stations Description: The minutes of Station Outage at each Never-Die Station shall not exceed three (3) percent of Station-minutes at that Station between the hours of 6:00AM and 12:00AM per month. This SLA shall be adjusted or suspended during snow events and at times when the City has implemented an emergency suspension of alternate side parking following a snow event. Performance Rate: 96.84 % SLA 11 Rebalancing Description: No individual Station Outage shall continue for longer than 4 hours. Damages will not accrue between the hours of 10:00PM and 6:00AM. Performance Rate: 97.11 % SLA 12 Availability of Data and Reports Description: (i) Real-time Program data (i.e., JSON feed) will be accurate and available to the public at all times. In addition, the following data sources will be furnished to DOT: (ii) Real-time, read-only access to data as per the Functional Specifications; (iii) Real-time, read-only access to any databases or other record-keeping sources used by Citi Bike to manage and operate the Program, including but not limited to all data sources required to determine compliance with the service levels incorporated herein; and (iv) A monthly report as required by Appendix G, "Reporting Requirements." Performance Rate: (i) 100%; (ii): 100%; (iii) 100%; (iv): 100% 8