45a. Ghid de asamblare. Numerele 45-48

Similar documents
GREEK TRIREME, 480 B.C. Scale: 1/72 Length: 515mm Width: 180mm Height: 220mm

KNARR. SCALE: 1/35 length: 440mm width: 300mm height: 400mm

MARIA HF31. SCALE: 1/72 Length: 365 mm width: 85mm height: 295 mm

Stevenson Projects Building the Hull Top Deck and Bulkheads

Hansa COG 14 th century SCALE: 1/72 Length: 430mm Width: 210mm Height: 330mm

Vikings ship GOKSTAD, 9 th century Scale: 1/72 Length: 305mm Width: 135mm Height: 182mm

Samurai Armor Set: Step by Step

8-GUN CORVETTE ASSEMBLY INSTRUCTIONS

aero naut Order No. 3009/00

RATLINER Assembly Instructions.

INSTRUCTIONS FOR GLUING ON THE BUMPER FOR PORT TOWNSEND WATERCRAFT S NESTING DINGIES. (Or requires a 1 surface to adhere to.)

H.M. SCHOONER PICKLE THE TRAFALGAR DISPATCH

We hope you ll enjoy the Drifter as much as we have! Scott DeTray Model Aero Specifications:

In each step, the needed parts are shown the number right below. Locate all parts for the step.

Building the Corel Endeavour

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

Leopard-class Dropship

Constitution Instructions

Rain Gutter Regatta Pack Event

Ships of the world : Esmeralda : Assembly Instructions

Your kit contains the following items. Additional Items You May Need. Pre- cut parts Propeller rigging and rubber Sandpaper Covering sheet

Bogue Class Escort Carrier Kit

Chapter Twelve. Starting the rigging process

Construction Chapters Index

Miss Mayflower. Build Manual

CATBOX. A Puddle Duck Racer. By Jim Michalak

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat

Building the Model Shipways kit of the colonial schooner Sultana

Euromodel Falmouth Part 5 SHIP S BOAT - v.03. An interpretive build of the. SHIP S BOAT.05.v.03

Tugster. Tug Boat. Competition or Sport Tug Kit. A Zippkits R/C Boat. Building Instructions

THE AMERICAN BARN DOOR KITE

LE CERF, Scale: 1/72 Length: 685mm Width: 255mm Height: 520mm

Building a model of a Thames Barge

Assembly Instruction - Triton Vuoksa 2 advanced Touring kayak

Parts of the Ship. Terms you should already know

Carving Ship Model Hulls Laminated and Machine Carved Hulls

Aliphatic Resin Wood Glue. 18" Fabric Parachute Part #PNC50 Part # Part #11700 Part #J0016. Launch Lug



NAUTICAL TERMINOLOGY

T27 The Classic Beauty of a Timeless Yacht. created by William Lesh

No.5550 INTRUCTION MANUAL WARRANTY WARNING. Notice This is not a toy. Assembly and operating of this boat requires adult supervision.

Samurai Armor Set: Step by Step

275 RID Assembly Instructions

Cub Scout Pack Rain Gutter Regatta

Assembly instructions nortik scubi 2 Recreational kayak

Pakboats PakCanoe Assembly Instructions

Sails. Sails: extract from 'Super-detailing the Cutter Sherbourne' page 1 George Bandurek

Building your first hull.

Easter Bunny Pompoms

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE

DEAR CUSTOMER. Water Fun 275 & 300

Swing Your Partner. by Beth Hester. GH Productions, Inc. The Basket Maker's Catalog

Gluing Guide QCS Oval & Quick Cuff

34. Aft view of the boat at it s highest point.

Melon-Shaped Egg Basket

John with his stiff back, rows Caravan Leghorn ashore in the KISS dinghy.

1/10 th Scale 1956 Ted Jones Classic Hydroplane

Instructions MANUAL. Folding kayak NERIS-3

Assembly Instructions. for. Puffin Saranac. ScanSport, Inc. P.O. Box 700 (234 May Street) Enfield, New Hampshire Phone: (603)

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

SHIP FORM DEFINITION The Shape of a Ship

Paddle Steam Ferry COMMODORE PERRY

Adding Sculpted Toes to a Cloth Doll Foot

GRP BOAT BUILDING INSTRUCTIONS 2006

Robotic Yacht. The construction of Birdy II. Paul

Puffin Sport and Saco

Skinning without a Needle: Fastening a skin around a kayak or boat frame, using splines an open-source project? Text and photos by Robert Morris

PAY N PAK, 1/12 th Scale, Limited Sport Hydro P Sport Hydro

ASSEMBLING INSTRUCTION - TRITON LADOGA 2 ADVANCED

INTERNATIONAL FLYING FIFTEEN CLASS MEASUREMENT FORM

Constructing the Masts

Marking films application guide

UMBILICAL CORD MODEL FOR UMBILICAL VEIN CATHETERIZATION TRAINING

Instructions MANUAL. Folding kayak NERIS-2 (tandem)

E Manual Self tacking system 30

Basic Install Guide. Parts: 1 P a g e

Small, Lightweight, Very Portable and Low Cost. Print in Landscape Mode with ¼ inch borders.

Featuring Coats Dual Duty XP. Supplies

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE

Shrouds, dead-eyes and ratlines

1. For the purposes of this standard, the maximum weight capacity of a boat is:

Vacuum Bagging Wings Instruction Manual Purdue University

Kayaking Bob s Tandem Island SpraySkirt Kit Installation Instructions

Carbo Racing Foil Instruction Manual Unit 0, 1, 2, 3

Trogear Bowsprit Through Hull Installation Manual

BASIC COROPLAST HULLS FOUR HULLS, all single occupant designs. Choose the one that suites your needs.

Blazer Marine, Whiplash Sport 40

PACK 24 RAINGUTTER REGATTA November 19, 2010 (7pm at Hawthorne)

Angel 250 Angel 250 (H) Angel 300 Angel 300 (H) Angel 330 Angel 330 (H)

An Australian Classic by spectre.com

18. Tailplane torque-tube

MANDATORY BULLETIN No.: SAFETY RELATED. EV a SR. Appendix 1 Bulletin Flow Chart

How To Build A Water Rocket

Puffin Sport Assembly and User Information

RUDDER KIT INSTRUCTIONS

STUDY GUIDE A Day By Day Course Refreshment Quiz To Ensure That You Make The Most Out Of Your Rod Building Class

Making Spars for the Schooner Jeanette

Chapter Fourteen. Foresale Halliard

Assembling Instruction - Triton Ladoga 1 advanced Allround touring and sea kayak

Transcription:

Ghid de asamblare Numerele 45-48 NUMĂRUL 45 Piesele oferite cu nr. 45:. Strips imitating the sheathing (veneer) 45a Now, we ll continue the sheathing of the starboard side. Glue the strips of the veneer along the body of the vessel. Glue first layer strips of the sheathing, as shown in the picture. 279 GV UK CNST LFLT 2.indd 279 22/03/202 :44 μ.μ.

NAVE CELEBRE 45b In the bow side of the vessel, the strips should reach the keel (see the picture). 45c Using short pieces of the strips, sheath the aft part of the vessel. Cut carefully the exceeding parts of the sheathing. 280 GV UK CNST LFLT 2.indd 280 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL 45d Stick the strips the way it is shown in the figure and then cut the exceeding parts of the sheathing. 45e Glue the strips on the bow side of the vessel. Helped by the wedge-shaped inserts, fill the gaps of the sheathing. 28 GV UK CNST LFLT 2.indd 28 22/03/202 :44 μ.μ.

NAVE CELEBRE 45f Helped by some pieces of strips, with the length of 50 mm, glue the rest of the ship's starboard side, as shown in the picture. In this case, the gun ports and other openings should be covered. 45g Wait the glue to dry. With a special knife or with a scalpel cut the gun ports and the scuppers, as shown in the picture. The forty-fifth stage of the assembly is completed. Keep the assembled structure in a place that ensures its safety, before the next step. 282 GV UK CNST LFLT 2.indd 282 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL NUMĂRUL 46 2 Piesele oferite cu nr. 46:. Strips imitating the lining (veneer) 2. Strips for the construction of the gunwale.5 x 6 x 300 mm 46a Glue the two rows of strips along the length of the hull, putting them under the scuppers (see picture). Fill the gaps with wedge inserts. Mark with a pencil the location of the gun ports, which need to be cut later. Glue the strips of the veneer so that they cover the gun ports of the upper deck bulwark. 283 GV UK CNST LFLT 2.indd 283 22/03/202 :44 μ.μ.

NAVE CELEBRE 46b With a special knife or with a scalpel, cut the porthole of the bottom and the top decks. 46c Finish the lining of the left side of the ship and cut the protruding strips. With fine emery paper, sand gently the hull. Avoid strong pressure, as you may damage the top layer of the sheathing. Collect the remaining sawdust and mix them with colourless glue, in order to get the material to fill the gaps. With a thin spatula fill the resulting gaps of the top layer of the sheathing. After the glue has dried, sand neatly the excesses of the glue. 284 GV UK CNST LFLT 2.indd 284 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL 2 2 46d Measure the required length of the gunwale of the bow superstructure bulwark (see the picture) and cut the strips no. 2 according to these dimensions. Glue the strips so that they are overboard about.5 mm. 2 2 46e Similarly, glue the gunwale of the upper deck bulwark. 285 GV UK CNST LFLT 2.indd 285 22/03/202 :44 μ.μ.

NAVE CELEBRE 46f Set at its place the gunwale of the aft superstructure. 2 46g Gently sand the joints of the gunwale strips with the sanding block. The forty-sixth assembly stage is over. Keep the assembled structure in a place that ensures its safety, before the next step. 286 GV UK CNST LFLT 2.indd 286 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL NUMĂRUL 47 4 3 2 Piesele oferite cu nr. 47:. Strips of.5 x 6 mm for the construction of the gunwale 2. Strips of 0.6 x 20 mm for the bulwark decoration 3. Beams of.5 x 3 mm for the body finishing 4. Beams of 2 x 2 mm for the stern superstructure finishing 47a Cut out 0 segments of 6 mm from the strips no. for the construction of the gunwale and glue them to the remaining curved parts of the bulwark, as shown in the figure. Gently sand them, lining up differences in height and width and forming a smooth line. 287 GV UK CNST LFLT 2.indd 287 22/03/202 :44 μ.μ.

NAVE CELEBRE 47b Pour a little of instant glue into a shallow container. When you work with details of small sizes, it will be easier to apply the adhesive on the right places with the help of an awl (needle): incline the container, take an awl and apply the droplets of glue on the right areas. 47c Glue the beams no. 4 of 2 x 2 mm, so that they continue the line of the bulwark gunwale in the upper deck; in the area of the transom stern, the distance between the beam and the gunwale should be of 5 mm (see the figure). Cut off the protruding pieces of the beams. 288 GV UK CNST LFLT 2.indd 288 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL 47d Glue the beams no. 3 of,5 x 3 mm, as shown in the figure, from the front wall of the forecastle superstructure to the stern transom. Respect the distance indicated on the sidebars (0 mm at the front, 5 mm at the stern). 3 3 47e Glue the strips of,5 x 6 mm, as shown in the figure. In the bow side, the strip must pass under the first scupper. 289 GV UK CNST LFLT 2.indd 289 22/03/202 :44 μ.μ.

NAVE CELEBRE 47f In the stern side of the ship, the strip should be placed under the grooves of the aft transom (see the picture). The strips must be symmetrical on both sides of the vessel. 47g Glue the strips of.5 x 6 mm to the aft transom, as shown in the figure. The strips no. 2 will be needed for the further phases of the work. The forty-seventh stage of the assembly is completed. Keep the assembled structure in a place that ensures its safety, before the next step. 290 GV UK CNST LFLT 2.indd 290 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL NUMĂRUL 48 Piesele oferite cu nr. 48:. Gripe 2. Knee of the head 2 48a From the strips of 0.6 x 20 mm, remaining from the previous phase of work, create a work piece imitating the "space" between the elements of the superstructure aft trimming on the right side (see picture). In order to ease the work, you can prepare previously a pattern of heavy paper. Similarly, fabricate the detail for the left side. 29 GV UK CNST LFLT 2.indd 29 22/03/202 :44 μ.μ.

NAVE CELEBRE 48b Mark on the details nine equilateral triangles with the length of 8 mm. Start the markup from the front edge of the detail on the upper side (see picture). The triangles marked with "x" should be removed. 8 mm 48c Using a scissors, carefully cut out the triangles. 292 GV UK CNST LFLT 2.indd 292 22/03/202 :44 μ.μ.

SFÂNTUL IOAN BOTEZĂ TORUL 48d Glue the triangles at their place with quick-drying glue. 48e Prepare the ornamental elements of the second row according to the dimensions shown in the figure. There is no need to glue the dark marked triangles. Prepare in a similar way the ornamental elements of the other side. 29 mm 24mm 24 mm 24 mm 24 mm 24 mm 24 mm 24 mm 20 mm 0 mm 293 GV UK CNST LFLT 2.indd 293 22/03/202 :44 μ.μ.

NAVE CELEBRE 48f Separate the prepared elements of the breakwater from the substrate and gently sand them. Then, paint the components in a light color, imitating the "walnut". Glue the knee of the head (2) to the keel, as shown in the figure. Note that the protruding upper part is located above the deck of the vessel. 2 48g Glue the gripe () in a place so that it matches tightly the bottom of the keel and the knee of the head. The forty-eighth stage of the assembly is completed. Keep the assembled structure in a place that ensures its safety, before the next step. 294 GV UK CNST LFLT 2.indd 294 22/03/202 :44 μ.μ.