PCS 340 Core Saturator : 115 Volt : 230 Volt. Instruction Manual

Similar documents
Recording Calcimeter with DAQ. # Standard # C - With Laptop. Instruction Manual. Updated 3/14/2017

Instruction Manual. Updated 12/30/2014 Ver. 2.5

Instruction Manual Updated 7/26/2011 Ver. 2.2

Aging Cell, OFITE Style. Included Items

Instruction Manual Updated 6/22/06 Ver. 2.0

Adjustable. Unloader Valve. O&M Manual. Part #

GETZ EQUIPMENT INNOVATORS PART NO.: 9G59554 MODEL: MS 36 SC-R HYDROSTATIC TEST PUMP

HTHP Viscometer. Features DRILLING FLUIDS EQUIPMENT

Instruction Manual Updated 5/26/2009 Ver. 2.0

HTHP Filter Press for Ceramic Disks with 175-mL, Double-Capped Test Cell and CO 2 # : (115 V) # : (230 V) Instruction Manual

P5523. Users Manual. Liquid to Gas Separator. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

Garrett Gas Train. Part No Instruction Manual. Updated 5/10/16 Ver. 4.0

92831 TEL: (714) FAX:

Techcon Systems TS1254 Pressure Pot

User Instruction Manual

HTHP Filter Press with Threaded Cells for Drilling Fluids Testing. # : 115 Volt # : 230 Volt. Instruction Manual

Color/Catalyst Dispense Valves

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures

CLEMENTS. ANA Oxygen Regulator with Yoke Connector. User Manual. Manual No. ANA Issue 1

PRESSURE COMPARATOR 10000PSI 700bar. Operator Instructions CRYSTAL. engineering corporation

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions

INSTALLATION AND OPERATION INSTRUCTIONS

TL-12 FLUSH TANK. Manual Ref. # MN-??? Polyurethane Machinery Corp. REVISION 1.0

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

SPECIFICATIONS TABLE Maximum Air Pressure 115 PSI Air Tank Capacity 20 Gallons

3800 SERIES END SUCTION PUMP REPAIR PARTS INDEX. Model Model 3804

92831 TEL: (714) FAX:

Pressure Regulating Valve. O&M Manual. PRV-15K Part # ,000 PSI MAWP. PRV-20K Part # ,000 PSI MAWP

Techcon Systems TS1258 Pressure Pot

Model ASSEMBLY and OPERATING INSTRUCTIONS

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

WXG-4 Manual Polarimeter. Instruction Manual BANTE INSTRUMENTS CO., LTD

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

SIX R (P ) AND SEVEN R (P ) POSITION CYLINDERS Service Information

3" UC Ultra-Chuck Durable Lightweight Air Inflated Bladder Chuck Operation/Repair Manual. (76.2 mm) DOUBLE E COMPANY, INC.

Operation Manual. PEGAS NovoTap, PEGAS NovoTap+

GE Oil & Gas Model. Masoneilan* Air Lock-up Valve Instruction Manual. GE Data Classification : Public

U S E R M A N U A L CAUTION. SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician.

Installation, Operation and Maintenance Manual

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

INSTRUCTIONS PARTS LIST

453 Series Steam Heated Vaporizing Regulator

AA100 Acoustic Actuator

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

AUTOMATED INDUSTRIAL MACHINE, INC TOGGLE-AIRE DIVISION

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

Sunset Swings By Health in Motion, LLC

This document to be used with Hurley traditional Davits

TOP VALVE. Pat. #5,857,486 & 5,944,050. High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves. Instruction Manual

INSTALLATION AND OPERATION INSTRUCTIONS

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

Yoke Block Instruction Manual

HoverJack. Air Patient Lift. Equipment Manual. From HoverTech International. Issued: June 1,

Pressure Relief Valve Instruction Manual

G7S Hand Pump Owner s Manual

User s Guide. VetPro 5000 Wall / Cabinet & Table Mount Dental Delivery System. For Models: Rev L (11/10/15)

6 & 8 Bubble Panel Installation Manual

HUBEN K1 Pre-charged Pneumatic Air Rifle Owner s Manual

Yoke Block Instruction Manual

WEATHERIZING INSTRUCTIONS

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

HYDROVEX TTT Membrane Flow Regulator

3 Scotch-Weld Polyurethane Reactive Adhesive Applicator Replacement Part Installation Guide

URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports

Cylinder Tilt Saddle Instruction Manual

Instruction Manual LIMITED 1 YEAR WARRANTY. Hydraulic Punch Driver Read this material before using this product.

SILENTAIRE TECHNOLOGY

MANUAL BE SERIES Test Benches

AIR INLINE METAL SHEAR

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

Manual. FRESH AERO OneOP Model PC (Portable Compressors) Tire Inflator. Where Imagination Meets Innovation

Masoneilan* 78 Model Air Filter Regulator

Installation Instructions Air Compressor Part # 2780, 2781

DAKOTA 2006 DUMP BOX ILLUSTRATED PARTS MANUAL

Model No Product Name Handpiece Only Complete System

J Air and Water Kit Instructions Part# 02584

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

TactAir PCP Fill Kit/Adapter. Operation Manual

KJ4000 Operating Instructions & Parts Manual NSN

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

User Instruction Manual

INSTRUCTIONS PARTS LIST U.S. PAT: 6,874,404; 6,516,707; 6,223,645

USER MANUAL

D Series Air and Water Kit Part# 02550

Constant Pressure Crude Oil Container Model CPCCP

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

Lost Circulation Material Evaluation Receiver Instruction Manual

JBR Ford Focus ST Heavy Shift Knob Installation Instructions

MODEL 840 AIR HYDRAULIC PUMP INSTRUCTION

BS Series Basket Strainer

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

RADROVER REAR RACK INSTALLATION MANUAL

PERSONAL AIR BREATHING UNIT

21 Gallon. Model Visit our website at:

VOLUME BOOSTER RELAYS YT-300 / 305 SERIES

AIR/OVER HYDRAULIC JACK 20 TON

CF-SERIES HIGH FLOW REGULATORS

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Transcription:

PCS 340 Core Saturator 127-70: 115 Volt 127-70-1: 230 Volt Instruction Manual Updated 4/30/2015 Ver. 1.2 OFI Testing Equipment, Inc. 11302 Steeplecrest Dr. Houston, Texas 77065 U.S.A. Tele: 832.320.7300 Fax: 713.880.9886 www.ofite.com Copyright OFITE 2015

Table of Contents Intro...2 Specifications...3 Components...3 Installation...4 Preparation...5 Procedure...8 Maintenance...10 Warranty and Return Policy... 11 OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 1

Intro The OFITE PCS 340 Core Saturator is designed to fully saturate a core sample before starting a permeability test. This reduces the time required to reach steady state conditions and increases the accuracy and reproducibility of the test results. The Core Saturator includes a test cell, vacuum pump, air-driven pump, and saturation fluid reservoir. The vacuum pump removes air from the core sample prior to saturation. Then the air driven pump pulls saturation fluid from the reservoir and pressurizes the test cell. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 2

Specifications Maximum Pressure: 2,500 PSI (2.5 MPa) Maximum Core Size: 3" Diameter 24" Long Air Requirement: 100-120 PSI (689.5-827.4 kpa) Components #127-70-020 Cell Body #127-70-021 Cell Plug #127-70-022 Lock Ring #127-70-023 Bottom Cell Closure #127-70-024 Handle #127-70-026 Cell O-ring #127-70-027 Cell Backup Ring #127-70-028 Retaining Ring #127-70-030 Vacuum Gauge #120-910-022 Pressure Gauge #120-00-030 Air Filter OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 3

Installation 1. Remove the unit from the crate and place it on a flat, stable surface. 2. Make sure all valves and the Vacuum Pump switch are OFF. 3. On the back of the unit connect an air supply (100-150 PSI) and drain line. Both connections are ¼" NPT. 4. Plug the unit into an appropriate power source. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 4

Preparation Before beginning the procedure, make sure all four valves and the Vacuum Pump switch are OFF. 1. Place the reservoir on the left-hand side of the unit and fill it with saturation fluid. Place the reservoir tube down into the saturation fluid. Reservoir Reservoir Tube 2. Lift the stop pin and rotate the test cell until it is horizontal. Release the stop pin to hold the cell in place. Stop Pin OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 5

3. Screw the bottom cell cap into the bottom of the test cell. Tighten it hand tight. Top Cell Cap Bottom Cell Cap 4. Place the core sample on the provided tray and slide it all the way into the test cell. 5. Screw the top cell cap into the top of the test cell. Tighten it hand tight. 6. Lift the stop pin and rotate the test cell until it is vertical. Release the stop pin to hold the cell in place. 7. Install the supplied high-pressure lines into the quick-connect fittings on the unit cabinet. High-Pressure Line Quick-Connect Fitting Quick-Connect Fitting High-Pressure Line 8. The port on the bottom cell cap should already be turned to the correct angle to line up with the high-pressure line. However, on the top cap, the port may need to be rotated to line up with the high-pressure line. If so, use an adjustable wrench to turn the inner portion of the cap so that the port is at the correct angle to line up with the high-pressure line. 9. Connect the two cell cap ports to the high pressure lines. Tighten the fittings finger tight. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 6

10. Turn the Vacuum Pump switch ON. Wait for the vacuum pressure to stabilize (approximately 25-26 Hg). This will remove the air from the pore spaces in the core. 11. Once the vacuum pressure has stabilized, turn the Reservoir and Pump valves ON. This will allow saturation fluid from the reservoir to fill the test cell. 12. Watch the filter on the front of the cabinet. When saturation fluid starts to collect in the filter, immediately turn the Vacuum valve and Vacuum Pump switch OFF. This will prevent the fluid from reaching the vacuum pump. 13. Turn the Air Supply valve ON. 14. Turn the regulator clockwise to apply pressure to the test cell. 15. When the procedure is complete, turn the regulator counter-clockwise to stop applying pressure to the cell. 16. Turn the Air Supply and Reservoir valves OFF. 17. Turn the Pump valve to DRAIN. Wait for the pressure in the cell to drop to zero. 18. Turn the Vacuum valve to DRAIN. Do not turn the Vacuum valve to DRAIN until all pressure has been released from the cell. 19. When the test cell has completely drained, disconnect the high-pressure fittings from the cell caps. 20. Rotate the cell back to the horizontal position. 21. Unscrew the top cell cap. 22. Remove the core sample. 23. Remove the bottom cell cap. 24. Clean the inside of the test cell with water and an appropriate solvent. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 7

Procedure Once the core sample is loaded and the test cell is sealed and connected, you are ready to begin the procedure. 1. Turn the Vacuum Pump switch ON. Wait for the vacuum pressure to stabilize (approximately 25-26 Hg). This will remove the air from the pore spaces in the core. 2. Once the vacuum pressure has stabilized, turn the Reservoir and Pump valves ON. This will allow saturation fluid from the reservoir to fill the test cell. 3. Watch the filter on the front of the cabinet. When saturation fluid starts to collect in the filter, immediately turn the Vacuum valve and Vacuum Pump switch OFF. This will prevent the fluid from reaching the vacuum pump. Filter Window 4. Turn the Air Supply valve ON. 5. Turn the regulator clockwise to apply pressure to the test cell. 6. When the procedure is complete, turn the regulator counter-clockwise to stop applying pressure to the cell. 7. Turn the Air Supply and Reservoir valves OFF. 8. Turn the Pump valve to DRAIN. Wait for the pressure in the cell to drop to zero. 9. Turn the Vacuum valve to DRAIN. Do not turn the Vacuum valve to DRAIN until all pressure has been released from the cell. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 8

10. When the test cell has completely drained, disconnect the high-pressure fittings from the cell caps. 11. Rotate the cell back to the horizontal position. 12. Unscrew the top cell cap. 13. Remove the core sample. 14. Remove the bottom cell cap. 15. Clean the inside of the test cell with water and an appropriate solvent. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 9

Maintenance 1. Periodically inspect the o-rings and backup rings on the cell caps. Also inspect the o-ring in the cell cap fitting. Replace any that show signs of damage or wear. O-ring Cell Cap 2. The filter on the front of the unit will collect fluid during a test. The filter reservoir should be emptied before it is completely full. To do this, simply turn the reservoir and pull down. Pour the fluid out and replace the reservoir. 3. Inside the unit cabinet is a second filter for the incoming air line. This filter also collects water over time and should be emptied. To do this, press the button on the bottom of the filter. A paper towel can be used to soak up any water. Air Filter Drain Button OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 10

Warranty and Return Policy Warranty: OFI Testing Equipment, Inc. (OFITE) warrants that the products shall be free from liens and defects in title, and shall conform in all respects to the terms of the sales order and the specifications applicable to the products. All products shall be furnished subject to OFITE s standard manufacturing variations and practices. Unless the warranty period is otherwise extended in writing, the following warranty shall apply: if, at any time prior to twelve (12) months from the date of invoice, the products, or any part thereof, do not conform to these warranties or to the specifications applicable thereto, and OFITE is so notified in writing upon discovery, OFITE shall promptly repair or replace the defective products. Notwithstanding the foregoing, OFITE s warranty obligations shall not extend to any use by the buyer of the products in conditions more severe than OFITE s recommendations, nor to any defects which were visually observable by the buyer but which are not promptly brought to OFITE s attention. In the event that the buyer has purchased installation and commissioning services on applicable products, the above warranty shall extend for an additional period of twelve (12) months from the date of the original warranty expiration for such products. In the event that OFITE is requested to provide customized research and development for the buyer, OFITE shall use its best efforts but makes no guarantees to the buyer that any products will be provided. OFITE makes no other warranties or guarantees to the buyer, either express or implied, and the warranties provided in this clause shall be exclusive of any other warranties including ANY IMPLIED OR STATUTORY WARRANTIES OF FITNESS FOR PURPOSE, MERCHANTABILITY, AND OTHER STATUTORY REMEDIES WHICH ARE WAIVED. This limited warranty does not cover any losses or damages that occur as a result of: Improper installation or maintenance of the products Misuse Neglect Adjustment by non-authorized sources Improper environment Excessive or inadequate heating or air conditioning or electrical power failures, surges, or other irregularities Equipment, products, or material not manufactured by OFITE Firmware or hardware that have been modified or altered by a third party Consumable parts (bearings, accessories, etc.) Returns and Repairs: Items being returned must be carefully packaged to prevent damage in shipment and insured against possible damage or loss. OFITE will not be responsible for equipment damaged due to insufficient packaging. Any non-defective items returned to OFITE within ninety (90) days of invoice are subject to a 15% restocking fee. Items returned must be received by OFITE in original condition for it to be accepted. Reagents and special order items will not be accepted for return or refund. OFITE employs experienced personnel to service and repair equipment manufactured by us, as well as other companies. To help expedite the repair process, please include a repair form with all equipment sent to OFITE for repair. Be sure to include your name, company name, phone number, email address, detailed description of work to be done, purchase order number, and a shipping address for returning the equipment. All repairs performed as repair as needed are subject to the ninety (90) day limited warranty. All Certified Repairs are subject to the twelve (12) month limited warranty. Returns and potential warranty repairs require a Return Material Authorization (RMA) number. An RMA form is available from your sales or service representative. Please ship all equipment (with the RMA number for returns or warranty repairs) to the following address: OFI Testing Equipment, Inc. Attn: Repair Department 11302 Steeplecrest Dr. Houston, TX 77065 USA OFITE also offers competitive service contracts for repairing and/or maintaining your lab equipment, including equipment from other manufacturers. For more information about our technical support and repair services, please contact techservice@ofite.com. OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com 11