Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

Similar documents
C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

References 6 k thermal overload relays, adjustable from 0.11 to 16 A

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

MaxSB - Low Voltage Switchboard

PSSI 3 High Voltage Metal-Enclosed Switchgear

IECEx Certificate of Conformity Annexe

London Underground - Section 12 approved Switch Disconnectors

It is essential that the maintenance staff is qualified for electrical works and follows safety procedures.

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

METROSIL CURRENT TRANSFORMER PROTECTION UNIT (CTPU) ENCLOSURES IEC COMPLIANT

Inspection and Testing Pocket Notes

2-1- Shipping Receiving Lifting Location on Site Installation Stages 6

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

Electrical Safety Program

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073

Inspection and Test Plan for Gas Circuit Breaker

Inspection and Testing

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager

TeSys protection components

Selection of Electrical PPE Tables

Check with local zoning official for property line distance requirements.

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

i) Filtration machine, measuring equipment and other related machinery

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Ground Fault Circuit Interrupter(GFCI) Policy

Gas Network Craftsperson

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Electrical Shore Connections

Maintaining electrical equipment/systems

UNIVERSITY OF TOLEDO

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

Further technical information is available on

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

Session Seven: Arc Flash Hazard (AFH) Rio Tinto Bell Bay Site

Manual Power relay SR853

SEMEEE3-34 Carrying out functional tests on electrical equipment

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Ventam 85 Installation & Commissioning Instructions

PRICE LIST Effective From January LV SWITCHGEAR. Be Switch. The Real Switchgear 230 V. SwitchTM INDUSTRIAL PIONEER VALUE CREATOR

SEMEM3-65 Servicing anaesthetic and ventilation equipment

Operating Instructions

Leakage Current Testing Is it right for your application?

AUTOMATIC GAS MANIFOLDS

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Single-Phase Pad-Mounted Distribution. Single-Phase Pad-Mounted Distribution Transformers KVA

SEMAE3064 Installing aircraft visual display units and computer systems

Electrical Safety in the Food Industry

Pushbuttons, Indicating Light, and Rotary Switch Stations Series 4975

Innovative Techniques for Mitigating Arc Flash Exposure

Rigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0

MP15 Jockey Pump Controller

Inspection Recommendations

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

enclosed product catalogue 2010 isolating switches main/emergency off switches changeover switches insulated stainless steel mild steel

Why do I need to do an Arc-Flash Analysis?

ES18 Security Theory/Regulations Answer Schedule

Best Practice Guide, Servomex 2700

Technical News. The evolution of Switchboard Standards

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

General Requirements of the NEC Advanced Course. Building Officials and Inspectors Educational Association

Management Plan for Electrical Safety ISD #535

Safety Regulations and Procedures

! Warning, refer to accompanying documents.

REPORT EN :2007+AC:2011 Low voltage switchgear and controlgear - Part 1:General rule

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

Arran LED Floodlight Luminaire

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT)

Inspection and Testing of Signalling Inspection and Testing Principles

Lockout/Tagout - Energy Control Program

Digital Melting Point Apparatus

Equipment Accuracy / Selection

The invisible killer - electrical safety in the food and drink industry

Landlord Report Operational limitations including the reasons (see page No. ) N/A

Construction & Building Industry Safety Guideline. Electrical Isolations

MSA Latchways Ladder System

Recent changes in workplace safety regulations have heightened the awareness of hazards associated with electrical arcs.

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SCIENCE LAB UTILITY CONTROLS

Operating Instructions

Postal Service Practice Exam Sample Exam # 5 Exam # 955E

Miniature controls. Contactors. Overload relays. Starters. Control relays

UL TEST REPORT AND PROCEDURE

Electrical Safety Program

List all key terms and acronyms used in the procedure, and their definitions.

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

Part 3: Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines

Appendix A: Energized Work Permit

IECEx Certificate of Conformity

Standard. Extra High Voltage (EHV) Indoor Gas Insulated Switchgear Standard R Version 1.0, June 2018

6 lockout operations every electrician MUST perform and respect

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

MANAGING ARC FLASH: A Risk Management Approach. Steve Williams Engineers Australia - Electrical College 14 June 2017, Brisbane

Pneumatic spool valve islands

Health & Safety: Electrical safety

GOST R CERTIFICATION SYSTEM FEDERAL AGENCY OF TECHNICAL REGULATION AND METROLOGY CERTIFICATE OF CONFORMITY

Electrical. Version 1.0

Transcription:

PRCEDURES FR RUTINE TESTING F CAPACITR BANKS Consultant : MEP Contractor: Project: PREPARED BY: DRMAN SMITH SWITCHGEAR - DUBAI NAME: REVIEWED BY CNSULTANT : NAME: SIGNATURE: SIGNATURE: Page 1 of 15

Table of Contents Description SCPE PURPSE DEFINITIN RESURCES TEST INSTRUMENT MANPWER MANUFACTURER / VENDR / SPECIALIST LIAISN REFERENCE LIST F RUTINE TESTS TESTING METHDLGY RUTINE TESTS Page 2 of 15

1.0SCPE This Method Statement covers the routine testing of the Capacitor Banks to be supplied for in compliance with the specified tolerance and limitations outlined with IEC / EN standards, guidelines and with reference to project specifications, Dorman Smith test criteria / instructions and requirements of BSEN 61439-2 and Utility requirements 2.0PURPSE This procedure provides the methodology that will be used for routine testing of the LV Main power distribution boards / Sub-main distribution boards / Motor Control Centres as per the project specifications, manufacturer recommendations, relevant standards, and approved drawings. This procedure is a guideline and includes an internal routine test checklist to record & complete routine testing of the Equipment/Panel. 3.0DEFINITINS Main Consultant Contractor MS QAQC Lab. Tech TITLE DEFINITIN Method Statement Quality Assurance Quality Control 3 rd Party Laboratory Technician Page 3 of 15

4.0Resources 4.1 Measuring and Test equipment 4.1.1 Digital Multifunction meter. 4.1.2 Insulation Resistance Tester (Megger) 4.1.3 HV Test Kit 4.1.4 Torque Wrench 4.1.5 Electrician Hand tools 4.2 Personnel involved: 4.2.1 Consultant (WSP) 4.2.2 Contractor Representatives (TGEM) 4.2.3 Manufacturer representatives.(ds) 4.2.4 QA/QC Engineer. (DS) 4.3 Manufacturer / Vendor / Specialist Liaison 4.3.1 Dorman Smith Switchgear Ltd. (DS) 4.4 Reference: 4.4.1 Approved Shop Drawings. 4.4.2 Test equipment calibration certificates 4.4.3 Internal Routine test certificate format (Annexure-1) 4.4.4 Routine test checklists & Test Formats (Annexures 2-5) 4.5 List of Routine tests Visual Inspection Mechanical Functional test Electrical Functional test All internal pre-inspection checks & records carried out and maintained as per Internal Routine test format - Annexure-1. Tests carried out in the check lists being part of this document is for verification and record of pre-dispatch tests carried out in the presence of the Client / Contractor and cover test requirements of the BSEN / IEC standards Page 4 of 15

5.0TESTING METHDLGY 5.1General Requirements 5.1.1 Ensure that all equipment and materials are as per approved shop drawing prior to the commencement of any testing. 5.1.2 All materials and documentation relevant to this testing works shall be checked by the responsible personnel prior to the commencement of testing activities. 5.1.3 Before any item of equipment is accepted for testing a visual inspection will be carried out on that equipment. Where defective equipment is found the same is to be reported to the concerned authority. 5.1.4 Test power supply availability. 5.1.5 Ensure all test equipment is calibrated. 5.2 Visual Check of Distribution Boards: 5.2.1 As per Visual Inspection Checklist Annexure - 2 5.3 Mechanical Functional Test: 5.3.1 As per Mechanical Function Checklist Annexure 3 5.3.2 Random Torque test on Bus Bar Joints Annexure -4 5.4 Electrical Functional test: 5.4.1 As per Electrical Function Checklist Annexure - 5 Page 5 of 15

ANNEXURE - 1 INTERNAL RUTINE TEST DCUMENT Documents Attached : Format of Internal Routine test format Page 6 of 15

ANNEXURE - 2 Test: Visual Inspection Documents Attached : Check list for Visual Inspection Page 7 of 15

VISUAL INSPECTIN Equipment Type / Ref : Contractor : I Visual Inspection Test Test Description bservations / Results 1 Enclosures & General Arrangement of Capacitor Banks a Form of Construction as per approved drawing K NT K N/A b IP rating as per approved drawing K NT K N/A c General arrangement / Dimensions / No. of sections as per approved drawings K NT K N/A d Ratings / Mounting arrangements of CT s / Metering as per approved drawings K NT K N/A e Main labels / designation labels / Danger labels as per requirements K NT K N/A f Conformance of switchboard / panel board to distribution system rating K NT K N/A requirements Voltage / frequency / power g Neatness of Metal work and cut outs, paint finish K NT K N/A h Check door locking provisions / panel covers / enclosure ventilations K NT K N/A i Check lifting provisions / mounting plinth K NT K N/A J Check interlocking limit switch provisions on removable doors K NT K N/A 2 Bus bar System a Confirm main bus bar sizes and interconnections sizes as per approved K NT K N/A drawings b Check vertical bus bar sizes and interconnections as per approved drawings K NT K N/A c Check identification of color codes on phases, earth and neutral K NT K N/A d Protection shrouds / barriers against accidental access of LIVE parts K NT K N/A e Conformance of segregation to Form of construction as per requirement K NT K N/A f Check bus bar supports K NT K N/A g Check earthing bus bars / Neutral bus bars K NT K N/A 3 Incoming & utgoing Devices / Capacitors / Reactor / Control gear a Switchgear Devices mounting location as per approved drawings K NT K N/A b Switchgear Devices / Rating / Type / Trip unit as per approved drawings K NT K N/A c Check Incoming cable provisions (cable space) / bus bar extension links / K NT K N/A protective shrouding d Controlgear & Reactors, HRC Fuses, Capacitor Rating / Type as per approved K NT K N/A drawings e Check rotary handles / racking handles K NT K N/A f Check Identification / Designation / Danger labels K NT K N/A g Check cable glanding facility and gland plates (Al. / GI) as required K NT K N/A Page 8 of 15

h Check provisions for Neutral and Earth 4 Metering & Indications a Check mounting arrangements / front facia arrangements of meters / switches / K NT K N/A control devices / PF Regulators b Check CT provisions / mounting / control fuse provisions K NT K N/A c Check Indications K NT K N/A 5 Power & Control wiring K NT K N/A a Control voltage as per approved drawings K NT K N/A b Size and identification of control wires K NT K N/A c Terminal block provisions for control wiring / BMS provisions / Inter-panel wiring K NT K N/A / Identification of control cables d Check control cable dressing / routing of cables K NT K N/A Tests Conducted by Date Name : Signatur e : Page 9 of 15

ANNEXURE - 3 Test: Mechanical Functional Test Documents Attached : Check list for Mechanical functional test. Page 10 of 15

MECHANICAL FUNCTINAL TEST Equipment Type / Ref : Contractor : II Mechanical Functional Test Test Test Description bservations / Results 1 Enclosures A Checking of hinge operation, alignment of doors and door closing. K NT K N/A B Check door earthing cable and termination K NT K N/A C Check locking provisions / keys for doors K NT K N/A D Check transport joints of sections and busbars K NT K N/A E Check limit switch operation on removable doors K NT K N/A 2 Bus bar System A Check transport interconnection of bus bars and random torque tightness (record values) B Check all segregations and protective shrouds are in place and secured K K NT K N/A NT K N/A 3 Incoming & utgoing Devices / Capacitors / Reactor / Control gear A Check manual spring charging mechanism for ACB s (if applicable) K NT K N/A B Check racking mechanism for drawing out ACB (if applicable) K NT K N/A C Draw out ACB and check position interlock in Connected-Test-Isolated K NT K N/A positions. (if applicable) D Check the mechanical N-FF function for ACB. (if applicable) K NT K N/A E Check N-FF operation of all Non-Auto MCCB / Isolators extended K NT K N/A rotary handles and door interlock features. F Check mechanical N-FF-TRIP functions for MCCB devices. K NT K N/A 4 Metering & Indications A Check mechanical operation for all selector switches, pushbuttons K NT K N/A B Check all pointers in analog measurement instruments are set to 0 K NT K N/A C Check PF Regulator mounting K NT K N/A D Check kwh wiring / mounting and viewing provisions K NT K N/A Tests Conducted by Date : : Name : Signature Page 11 of 15

ANNEXURE - 4 Test: Random Torque Test on Bus bar Joints Documents Attached : Bus bar tightening torque test Record. Page 12 of 15

RANDM BUS BAR TIGHTENING TRQUE TEST RECRD Thread size Torque Required N-M Tested Torque N-M Remarks M6 9.5 11 M8 24-27 M10 48-52 M12 83-87 Remarks (if any) Tests Conducted by Date : Name : Signature : Page 13 of 15

ANNEXURE - 5 Electrical Functional Test Documents Attached : Check list for conducting Electrical Functional Test Page 14 of 15

ELECTRICAL FUNCTINAL TEST Equipment Type / Ref : Contractor : ELECTRICAL FUNCTINAL TEST Test Test Description bservations / Results 1 Service conditions A Check supply system parameters with a digital multi meter on the incoming cable K NT K N/A termination end.(voltage / Frequency / phase sequence) B Check auxiliary supply availability. K NT K N/A C Check fuses continuity and ensure all protection in place on auxiliary circuits K NT K N/A D Check limit switch electrical operation on removable doors K NT K N/A 2 Incoming & utgoing Devices / Capacitors / Reactor / Control gear A Manually charge spring for closing mechanism of ACB s / or through motor K NT K N/A mechanism if provided B Check and close the incoming device. Check supply availability on outgoing side of K NT K N/A incoming device C Check and close the outgoing devices. Check supply availability on outgoing side of K NT K N/A device. D Manually switch FF / TRIP all devices and check loss of supply on outgoing side of K NT K N/A all devices. E Close all devices to energize switchboard on completion of above sequence K NT K N/A F Check operation of capacitor contactors via manual switching operations of PF K NT K N/A Regulator G Check remote signalling (Volt free contact initiation) as applicable in devices K NT K N/A 3 Metering & Indications A Check Voltmeter / MFM readings direct / PF regulator etc via selector switches on K NT K N/A front facia of panel. B Check provisions for communication in metering as applicable K NT K N/A C Check all indication lamps K NT K N/A Tests Conducted by Date : Name : Signature : Page 15 of 15