RIDE III PROPOSED PROJECTS April 2015
Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy 17 Bus Intersection Improvements 6 8 3 15 Hwy 501 Improvements 9 30 31 16 SC 31/CBP Extension to NC Carolina Forest Blvd Realignment of Hwy 501 Palmetto Point Blvd. Ext. Design: Carolyn Wright, Public Works
Pave 100 Miles of the 645 Mile County Road Unpaved Network $60M
100 Miles of Resurfacing $15M PAVED MILEAGE WITHIN COUNTY/CITIES Total City/County maintained mileage Percentage of total paved mileage Prorated share of 100 miles of resurfacing 792.00 69.86% 66.87 Myrtle Beach 146.29 12.90% 12.90 North Myrtle Beach 74.00 6.53% 6.53 Conway 76.00 6.70% 6.70 Loris 0.00 0.00% 1.00 Aynor 0.00 0.00% 1.00 Surfside Beach 34.40 3.03% 3.00 Atlantic Beach 0.00 0.00% 1.00 Briarcliffe Acres 11.00 0.97% 1.00 TOTALS 1133.69 100.00% 100.00 *Mileage not available for the City of Loris, Aynor & Atlantic Beach ** Note - mileage has been reduced slightly to provide Loris, Aynor & Atlantic Beach with one mile each
Hwy 501 Improvements $50M Option #1 Complete six lanes widening from SC Hwy 31 to US Hwy 501/544 interchange (includes intersection improvements) Option #2 Extend Postal Way to east (to Waccamaw Pines) and related intersection Improvements (including CF Blvd/Renee Dr. area) Option #3 Extend Middle Ridge Dr. to east (to W. Perry Rd) - $3.8 M and to west (Singleton Ridge) Project Length: TBD by Design 3 (Foxworth), 4 (Loftus), 8 (Vaught), City of Conway, City of Myrtle Beach
Realignment of Hwy 501 $13.9M at the intersection with Broadway St. into 7 th Ave. North Project Length: TBD by Design 3 (Foxworth) City of Myrtle Beach
SELL $25M funding to complete the final studies and record of Decision and/or some initial land purchase of right of way Project Length: 27 Miles 4 (Loftus), 5 (Servant), 7 (Frazier), 11 (Allen)
Conway Perimeter Road Phase II $18.4M Construct new road with multi use trail from US 378 to US 701 South Project Length: 1.9 Miles 7 (Frazier)
Forestbrook Road $89.1M widening and/or turn lane additions on Forestbrook Road from Rt. 501 to Dick Pond Road (project includes installation of bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 4.5 Miles 6 (Vacant), 8 (Vaught)
Carolina Forest Blvd. $54.7M widen and add a series of traffic lights (project includes installation of a multi-use trail). Project Length: 4.8 Miles 2 (Howard), 3 (Foxworth)
Hwy. 9 East $21.7M from the end of the existing four lane pavement to intersection of Hwy. 66 - expand to 4 lanes with curb/gutter and sidewalks. Project Length: 1.2 Miles 9 (P Prince), City of Loris
Hwy. 701 N widening from Hwy. 319 to Hwy. 22 $65.1M (project includes bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 4 Miles 7 (Frazier), 11 (Allen)
Hwy. 17 Business in Garden City Intersection Improvements $19.8M (project includes Inlet Square Dr., Atlantic Ave. and Garden City Connector) Project Length: TBD by Design 5 (Servant)
Palmetto Pointe Blvd. Ext. to SC Hwy. 544 $7.5M (project includes bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 0.8 Miles 6 (Vacant)
SC 31/Carolina Bays Parkway Extension to NC line. $89.8M Project Length: 4.8 Miles 1 (Worley), 9 (P Prince)