RIDE III PROPOSED PROJECTS. April 2015

Similar documents
TABLE OF CONTENTS. Transportation Element 1

APPENDIX L: COST ESTIMATING TOOLS

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

Pedestrian Walkways and Bikeways

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Cincinnati Dayton Rd Widening

Highway 56 Traffic Study Rymal Road to Cemetery Road

The Burgess Community Bicycle and Pedestrian Plan

Parks, Open Space, Trails and Recreation Master Plan

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

STUDY ADVISORY COMMITTEE. October 8, 2015

LIST OF PRIORITY PROJECTS 2020/ /35

STAGE #3 TRANSITION 1 at Camp Keystone

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

West End Connectivity Master Plan

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

FDOT Treasure Coast Traffic Impact Report

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Planned Improvements from Sector & Area Plans that have been added to the MTP

MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Arkansas State Highway and Transportation Department. Hot Springs Village Kiwanis Club

Plant City Walk-Bike Plan

To Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

8 Bicycle and Pedestrian Facilities

The Richland County Transportation Penny Program. September 21, 2015

RZC Appendix 8A Marymoor Subarea Street Requirements

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Non-Motorized Transportation 7-1

Project Fact Sheet. August 1,

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets

Columbia Pike Implementation Team (CPIT) Meeting

SC 41/Joe Rouse Intersection Improvements

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

FDOT Treasure Coast Traffic Report

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

5 CIRCULATION AND STREET DESIGN

February 11, 2016 TPO Board Presentation

Transportation Committee Project Priority List

APPENDIX D COST SUMMARY TABLES

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

2012 PRIORITY TRANSPORTATION PROJECTS

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

FDOT Treasure Coast Traffic Report

2016 TELL THE TPO SURVEY

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

County of Fairfax, Virginia. Department of Transportation

Secondary Road Program

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Transportation Planning Division

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Tigard Tigard Transit Center

The Year Ahead: Virginia Department of Transportation Northern Virginia District

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

Diamond Springs Parkway Project

ITEM 3 ATTACHMENT A RESOLUTION NO

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

Emergency Response Support Signage on Multi-Use Trails Plan

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Healthy Built Environments Cowlitz-Wahkiakum County, Washington

3.0 Future Conditions

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Polk Streetscape Project

SPRINGFIELD REVITALIZATION REPORT

Ocean Park Boulevard Green Street Project Community Workshop

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

TABLE OF CONTENTS. Executive Summary

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Florida Redevelopment Association 2015 Annual Conference

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

ISSUE 1. Geography challenge. Geography funnels traffic from several key corridors onto I-5.

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

CMAQ DETAILED PROJECT LISTING REPORT ( FY 2002 )

CITY OF LANCASTER PROPOSED NEW PROJECTS

Appendix 1. Public Participation

Transcription:

RIDE III PROPOSED PROJECTS April 2015

Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy 17 Bus Intersection Improvements 6 8 3 15 Hwy 501 Improvements 9 30 31 16 SC 31/CBP Extension to NC Carolina Forest Blvd Realignment of Hwy 501 Palmetto Point Blvd. Ext. Design: Carolyn Wright, Public Works

Pave 100 Miles of the 645 Mile County Road Unpaved Network $60M

100 Miles of Resurfacing $15M PAVED MILEAGE WITHIN COUNTY/CITIES Total City/County maintained mileage Percentage of total paved mileage Prorated share of 100 miles of resurfacing 792.00 69.86% 66.87 Myrtle Beach 146.29 12.90% 12.90 North Myrtle Beach 74.00 6.53% 6.53 Conway 76.00 6.70% 6.70 Loris 0.00 0.00% 1.00 Aynor 0.00 0.00% 1.00 Surfside Beach 34.40 3.03% 3.00 Atlantic Beach 0.00 0.00% 1.00 Briarcliffe Acres 11.00 0.97% 1.00 TOTALS 1133.69 100.00% 100.00 *Mileage not available for the City of Loris, Aynor & Atlantic Beach ** Note - mileage has been reduced slightly to provide Loris, Aynor & Atlantic Beach with one mile each

Hwy 501 Improvements $50M Option #1 Complete six lanes widening from SC Hwy 31 to US Hwy 501/544 interchange (includes intersection improvements) Option #2 Extend Postal Way to east (to Waccamaw Pines) and related intersection Improvements (including CF Blvd/Renee Dr. area) Option #3 Extend Middle Ridge Dr. to east (to W. Perry Rd) - $3.8 M and to west (Singleton Ridge) Project Length: TBD by Design 3 (Foxworth), 4 (Loftus), 8 (Vaught), City of Conway, City of Myrtle Beach

Realignment of Hwy 501 $13.9M at the intersection with Broadway St. into 7 th Ave. North Project Length: TBD by Design 3 (Foxworth) City of Myrtle Beach

SELL $25M funding to complete the final studies and record of Decision and/or some initial land purchase of right of way Project Length: 27 Miles 4 (Loftus), 5 (Servant), 7 (Frazier), 11 (Allen)

Conway Perimeter Road Phase II $18.4M Construct new road with multi use trail from US 378 to US 701 South Project Length: 1.9 Miles 7 (Frazier)

Forestbrook Road $89.1M widening and/or turn lane additions on Forestbrook Road from Rt. 501 to Dick Pond Road (project includes installation of bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 4.5 Miles 6 (Vacant), 8 (Vaught)

Carolina Forest Blvd. $54.7M widen and add a series of traffic lights (project includes installation of a multi-use trail). Project Length: 4.8 Miles 2 (Howard), 3 (Foxworth)

Hwy. 9 East $21.7M from the end of the existing four lane pavement to intersection of Hwy. 66 - expand to 4 lanes with curb/gutter and sidewalks. Project Length: 1.2 Miles 9 (P Prince), City of Loris

Hwy. 701 N widening from Hwy. 319 to Hwy. 22 $65.1M (project includes bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 4 Miles 7 (Frazier), 11 (Allen)

Hwy. 17 Business in Garden City Intersection Improvements $19.8M (project includes Inlet Square Dr., Atlantic Ave. and Garden City Connector) Project Length: TBD by Design 5 (Servant)

Palmetto Pointe Blvd. Ext. to SC Hwy. 544 $7.5M (project includes bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 0.8 Miles 6 (Vacant)

SC 31/Carolina Bays Parkway Extension to NC line. $89.8M Project Length: 4.8 Miles 1 (Worley), 9 (P Prince)