CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

Similar documents
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Route 29 Solutions Projects

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Route 7 Corridor Study

Donahue Drive Corridor Traffic Operational Evaluation

Major Mobility Improvement Program (MMIP)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Basalt Creek Transportation Refinement Plan Recommendations

Project Description Form 8EE

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

State Route 160 (Blue Diamond Highway)

MARTA Expansion Update

ARRENTON RANSPORTATION

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

TRASBURG RANSPORTATION

Executive Summary June 2015

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Glenn Avenue Corridor Traffic Operational Evaluation

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Transportation Committee Project Priority List

Designing with the Railroad

Project Update May 2018

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Short and Long Term Needs

Reams Road RCA Study. Board of County Commissioners Public Hearing

FY 2006 TRANSPORTATION CAPITAL PROGRAM

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

4. Action Plan & Projects

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

3.0 Future Conditions

Harrah s Station Square Casino

MnPASS System Today and the Future

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Intersection Traffic Control Feasibility Study

Regional Bicycle Barriers Study

US 69 RELIEF ROUTE STUDY

Proposed White Flint Separated Bike Lane Network September 2015

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Chapter 5 Future Transportation

Transportation Corridor Studies: Summary of Recommendations

Transportation and Air Quality Committee GEL Project Briefing and Update

Water Street Promenade Engineering and Design Services

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Project Description Form 6V

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Final Project Prioritization Plan

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

FDOT Treasure Coast Traffic Report

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

Appendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP

TRAFFIC SIGNAL WARRANT STUDY

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

City of Moorhead Committee of the Whole Meeting

Austell Road Access Management Plan. Georgia Planning Association Fall Conference October 1, 2009

Prince George s County plans, policies, and projects

Fitting Light Rail through Well-established Communities

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Preliminary Engineering Study

Oldham County Major Thoroughfare Plan

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

HSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Creating the Future Bruce B Downs Blvd

Roundabout Feasibility Memorandum

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Peterborough County Transportation Master Plan

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

A: PLANNED P ROJECTS PROJECTS

Status February Transportation Priority Projects in Chester County

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Golden s Plan. For the Highway 6 & 93 Corridor

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Diamond Springs Parkway Project

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Transcription:

PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB101 PROJECT DESCRIPTION: Safety improvements of Estimated Cost: 8,316,364 section of Glade Road from Misty Valley Drive to County: Brandy Lane including the relocation of the bridge over 0013321 Clark Creek. Limits included within PI 0003770. Bridge NEED AND PURPOSE: To improve road alignment in order to meet specifications for 35 mph routes. Network Year: 2024 0.4 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 2,300 SOURCE 2018 2019 2020 2021 TOTAL AUTHfLAP FLAP 1,890,000 1,890,000 FLAP/Local 86,000 86,000 Local 6,340,364 6,340,364 1,890,000 280,000 2,170,000 6,146,364 6,146,364

PROJECT NAME: SR 3/US 41 NB @ SR 293 Bridge PROJECT #: CB108A PROJECT DESCRIPTION: Estimated Cost: 3,800,000 County: 15534 Bridge NEED AND PURPOSE: # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional Distric 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2015 210 SOURCE 2018 2019 2020 2021 TOTAL Z001 600,000 Z001 250,000 250,000 Z001 Z001 120,000 50,000 170,000 480,000 200,000 680,000

PROJECT NAME: SR 3/US 41 SB @ SR 293 Bridge PROJECT #: CB108B PROJECT DESCRIPTION: Estimated Cost: 3,800,000 County: 15535 Bridge NEED AND PURPOSE: # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional Distric 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2015 2,840 SOURCE 2018 2019 2020 2021 TOTAL Z001 600,000 Z001 250,000 250,000 Z001 Z001 120,000 50,000 170,000 480,000 200,000 680,000

PROJECT NAME: I75 @ CR 630/CassWhite Road PROJECT #: CB109 PROJECT DESCRIPTION: The project consists of minor Estimated Cost: 300,000 roadway widening, striping to add east and west bound County: left turn lanes and an east bound right turn lane, as well 13296 as signalization. Rightsofway are not anticipated. Safety NEED AND PURPOSE: The project will improve traffic flows and the safety of left and right turns at the intersection. 0.4 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional Distric 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2015 6,510 SOURCE 2018 2019 2020 2021 TOTAL M210 AUTH M210 AUTH M210 AUTH HB170 300,000 300,000 300,000 300,000

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Transit Operating Funding PROJECT #: CB300 PROJECT DESCRIPTION: Funding available for operating Estimated Cost: expenses (personnel, supplies, etc.) necessary to operate the County: Transit Department. Operating NEED AND PURPOSE: To maintain and expand current levels of service. n/a # of Existing Lanes: n/a # of Lanes Planned: n/a 6 Congressional District: 11 RC: NWG Sponsor: 2018 2019 2020 2021 T006041 T006102 T006113 T006124 TOTAL FTA Lg Urban 5307 FTA Sm Urban 5307 45,238 199,313 199,313 199,313 643,177 FTA 5311 Transportation Alliance 22,619 148,659 148,659 148,659 468,596 13,967 13,697 13,697 22,619 36,687 36,687 36,687 132,680

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Regional Transit Planning PROJECT #: CB3005304 PROJECT DESCRIPTION: Provide assistance to GDOT in Estimated Cost: 13,676 collecting data for transit operations in Northwest County: Georgia Regional Commission Service Area. Study NEED AND PURPOSE: Assist GDOT in regional data collection and monitoring of transit activities. n/a # of Existing Lanes: n/a # of Lanes Planned: n/a 6 Congressional District: 11 RC: NWG Sponsor: NWGRC FTA Lg Urban 5307 FTA Sm Urban 5307 FTA 5311 Transit Alliance 2018 2019 2020 2021 T006057 T006070 T006082 T006093 3,419 3,419 3,419 3,419 2,735 2,735 2,735 2,735 684 684 684 684 TOTAL 13,676 10,940 2,736

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Transit Capital Feasibility Study PROJECT #: CB307 PROJECT DESCRIPTION: Conduct a study of the Estimated Cost: 90,000 Transit System to consider expansion of the services County: offered. Study NEED AND PURPOSE: To examine the feasibility of expanding current levels of service. n/a # of Existing Lanes: n/a # of Lanes Planned: n/a 6 Congressional District: 11 RC: NWG Sponsor: FTA Lg Urban 5307 FTA Sm Urban 5307 FTA 5311 Transit Alliance 2018 T006041 2019 2020 2021 154,075 123,260 15,407 15,408 TOTAL 154,075 123,260 15,407 15,408

PROJECT NAME: Glade Road realignment PROJECT #: CB401 PROJECT DESCRIPTION: Realign portion of CR Estimated Cost: 2,038,836 633/Glade Road between Wildflower Trail and County: Camp Drive. Project limits are within former PI 12599 0003770. Reconstruction NEED AND PURPOSE: Improve horizontal and vertical alignments of this section of roadway to allow safe travel at posted speed of 35 mph. Network: 2020 0.2 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 4300 SOURCE 2018 2019 2020 2021 TOTAL AUTHZ230 275,000 Z230 Z230 125,000 125,000 Z230 1,913,836 1,913,836 1,540,000 1,540,000 498,836 498,836

PROJECT NAME: SR 113/Old Alabama Rd relocation PROJECT #: CB504 PROJECT DESCRIPTION: Relocation of SR 113 from Estimated Cost: 63,825,903 Pumpkinvine Creek to CR 699 County: 621410 GDOT Project # NEED AND PURPOSE: To improve road alignment for new designated SR 113 route. Network: 2020 5.35 # of Existing Lanes: 2 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2014 N/A Z240 SOURCE 2018 2019 2020 2021 TOTAL AUTHZ240 AUTHZ240 Z240 2,181,780 2,181,780 Z240 61,644,123 61,644,123 51,060,722 51,060,722 12,765,181 12,765,181

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: SR 20 (Canton Highway) widening PROJECT #: CB507 PROJECT DESCRIPTION: Widen to four lanes from I Estimated Cost: 217,717,045 75 in County to the Cherokee County line County: (and beyond to I575). Figures shown reflect portion 7836 of project within County (35%) Widening NEED AND PURPOSE: Improve eastwest access through northern tier of Atlanta metro counties. 17.1 # of Existing Lanes: 2 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2014 14800 SOURCE 2018 2019 2020 2021 TOTAL HB170 2,188,175 2,188,175 Z001 Z001 Z001 2,188,175 2,188,175

PROJECT NAME: Douthit Ferry Road widening PROJECT #: CB508 PROJECT DESCRIPTION: Widen Douthit Ferry Road from Estimated Cost: 22,320,283 Old Alabama Road to SR 113 including the bridge over the County: Etowah River 7494 Widening NEED AND PURPOSE: Provide connection to SR 113 bypass corridor from downtown Cartersville. 2030 2.5 # of Existing Lanes: 2 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: Cartersville Average Daily Traffic Volume: 2014 N/A SOURCE 2018 2019 2020 2021 TOTAL AUTHZ231 LOCAL 4,293,731 4,293,731 LOCAL Z231 4,293,731 4,293,731

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: CassWhite Road Ph I widening PROJECT #: CB510A PROJECT DESCRIPTION: Widen CassWhite Road Estimated Cost: 6,200,000 between Colonel Way and US 411 to standardwidth County: 2lane roadway with construction of railroad 15144 overpass and relocation of intersection with US 411 GDOT Project # NEED AND PURPOSE: To improve road alignment and improve safety. 0.7 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 2180 LOCAL SOURCE 2018 2019 2020 2021 TOTAL AUTHLocal LOCAL LOCAL LMIG/Local 6,200,000 6,200,000 6,200,000 6,200,000

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: CassWhite Ph II widening PROJECT #: CB510B PROJECT DESCRIPTION: Improve CassWhite Road Estimated Cost: 13,672,000 from 2 to 4lanes with divided median on 400' ROW County: between Busch Drive and 250' east of Great Valley 15145 Parkway/Highland 75 Industrial Park GDOT Project # NEED AND PURPOSE: To improve safety and handle addition of 1,000 employees and 270 freight trips as this corridor develops into industrial center for the community. 1.3 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 2180 SOURCE 2018 2019 2020 2021 TOTAL AUTHLocal LOCAL 1,921,000 1,921,000 LOCAL 900,000 900,000 LOCAL 10,851,000 10,851,000 1,921,000 900,000 10,851,000 13,672,000

CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: RomeCartersville Development Corridor PROJECT #: CB512 PROJECT DESCRIPTION: On new alignment connect US Estimated Cost: 98,468,279 411 to I75 from its intersection at MacJohnson Road and County: US 41. 13238 GDOT Project # NEED AND PURPOSE: Provide connection to 175 for MemphisAtlanta corridor and for economic development. 7.31 # of Existing Lanes: 0 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2014 N/A Z240 SOURCE 2018 2019 2020 2021 TOTAL Z240 2,000,000 2,000,000 1,600,000 1,600,000 400,000 400,000

TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Glade Road Corridor Safety Impr. PROJECT #: CB609 PROJECT DESCRIPTION: Glade Road (CR 633) safety Estimated Cost: 14,550,000 improvements from Homestead Drive (CR 605)/Apache County: Drive (CR 377) to Ryan Road (CR 810)/Yacht Club Road (CR 386), formerly GDOT P.I. No. 0003770. Safety NEED AND PURPOSE: Correct geometric deficiencies in order to reduce crash frequency and severity. The project incorporates, and includes the limits of, PI# 12599 and PI# 13321. Network Year: 2035 3.7 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWGRC Average Daily Traffic Volume: 2014 4,300 SOURCE 2016 2017 2018 2019 TOTAL M210 AUTH 40,000 40,000 40,000 160,000 M210 M210 LOCAL 40,000 40,000 40,000 40,000 160,000