PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB101 PROJECT DESCRIPTION: Safety improvements of Estimated Cost: 8,316,364 section of Glade Road from Misty Valley Drive to County: Brandy Lane including the relocation of the bridge over 0013321 Clark Creek. Limits included within PI 0003770. Bridge NEED AND PURPOSE: To improve road alignment in order to meet specifications for 35 mph routes. Network Year: 2024 0.4 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 2,300 SOURCE 2018 2019 2020 2021 TOTAL AUTHfLAP FLAP 1,890,000 1,890,000 FLAP/Local 86,000 86,000 Local 6,340,364 6,340,364 1,890,000 280,000 2,170,000 6,146,364 6,146,364
PROJECT NAME: SR 3/US 41 NB @ SR 293 Bridge PROJECT #: CB108A PROJECT DESCRIPTION: Estimated Cost: 3,800,000 County: 15534 Bridge NEED AND PURPOSE: # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional Distric 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2015 210 SOURCE 2018 2019 2020 2021 TOTAL Z001 600,000 Z001 250,000 250,000 Z001 Z001 120,000 50,000 170,000 480,000 200,000 680,000
PROJECT NAME: SR 3/US 41 SB @ SR 293 Bridge PROJECT #: CB108B PROJECT DESCRIPTION: Estimated Cost: 3,800,000 County: 15535 Bridge NEED AND PURPOSE: # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional Distric 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2015 2,840 SOURCE 2018 2019 2020 2021 TOTAL Z001 600,000 Z001 250,000 250,000 Z001 Z001 120,000 50,000 170,000 480,000 200,000 680,000
PROJECT NAME: I75 @ CR 630/CassWhite Road PROJECT #: CB109 PROJECT DESCRIPTION: The project consists of minor Estimated Cost: 300,000 roadway widening, striping to add east and west bound County: left turn lanes and an east bound right turn lane, as well 13296 as signalization. Rightsofway are not anticipated. Safety NEED AND PURPOSE: The project will improve traffic flows and the safety of left and right turns at the intersection. 0.4 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional Distric 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2015 6,510 SOURCE 2018 2019 2020 2021 TOTAL M210 AUTH M210 AUTH M210 AUTH HB170 300,000 300,000 300,000 300,000
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Transit Operating Funding PROJECT #: CB300 PROJECT DESCRIPTION: Funding available for operating Estimated Cost: expenses (personnel, supplies, etc.) necessary to operate the County: Transit Department. Operating NEED AND PURPOSE: To maintain and expand current levels of service. n/a # of Existing Lanes: n/a # of Lanes Planned: n/a 6 Congressional District: 11 RC: NWG Sponsor: 2018 2019 2020 2021 T006041 T006102 T006113 T006124 TOTAL FTA Lg Urban 5307 FTA Sm Urban 5307 45,238 199,313 199,313 199,313 643,177 FTA 5311 Transportation Alliance 22,619 148,659 148,659 148,659 468,596 13,967 13,697 13,697 22,619 36,687 36,687 36,687 132,680
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Regional Transit Planning PROJECT #: CB3005304 PROJECT DESCRIPTION: Provide assistance to GDOT in Estimated Cost: 13,676 collecting data for transit operations in Northwest County: Georgia Regional Commission Service Area. Study NEED AND PURPOSE: Assist GDOT in regional data collection and monitoring of transit activities. n/a # of Existing Lanes: n/a # of Lanes Planned: n/a 6 Congressional District: 11 RC: NWG Sponsor: NWGRC FTA Lg Urban 5307 FTA Sm Urban 5307 FTA 5311 Transit Alliance 2018 2019 2020 2021 T006057 T006070 T006082 T006093 3,419 3,419 3,419 3,419 2,735 2,735 2,735 2,735 684 684 684 684 TOTAL 13,676 10,940 2,736
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Transit Capital Feasibility Study PROJECT #: CB307 PROJECT DESCRIPTION: Conduct a study of the Estimated Cost: 90,000 Transit System to consider expansion of the services County: offered. Study NEED AND PURPOSE: To examine the feasibility of expanding current levels of service. n/a # of Existing Lanes: n/a # of Lanes Planned: n/a 6 Congressional District: 11 RC: NWG Sponsor: FTA Lg Urban 5307 FTA Sm Urban 5307 FTA 5311 Transit Alliance 2018 T006041 2019 2020 2021 154,075 123,260 15,407 15,408 TOTAL 154,075 123,260 15,407 15,408
PROJECT NAME: Glade Road realignment PROJECT #: CB401 PROJECT DESCRIPTION: Realign portion of CR Estimated Cost: 2,038,836 633/Glade Road between Wildflower Trail and County: Camp Drive. Project limits are within former PI 12599 0003770. Reconstruction NEED AND PURPOSE: Improve horizontal and vertical alignments of this section of roadway to allow safe travel at posted speed of 35 mph. Network: 2020 0.2 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 4300 SOURCE 2018 2019 2020 2021 TOTAL AUTHZ230 275,000 Z230 Z230 125,000 125,000 Z230 1,913,836 1,913,836 1,540,000 1,540,000 498,836 498,836
PROJECT NAME: SR 113/Old Alabama Rd relocation PROJECT #: CB504 PROJECT DESCRIPTION: Relocation of SR 113 from Estimated Cost: 63,825,903 Pumpkinvine Creek to CR 699 County: 621410 GDOT Project # NEED AND PURPOSE: To improve road alignment for new designated SR 113 route. Network: 2020 5.35 # of Existing Lanes: 2 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2014 N/A Z240 SOURCE 2018 2019 2020 2021 TOTAL AUTHZ240 AUTHZ240 Z240 2,181,780 2,181,780 Z240 61,644,123 61,644,123 51,060,722 51,060,722 12,765,181 12,765,181
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: SR 20 (Canton Highway) widening PROJECT #: CB507 PROJECT DESCRIPTION: Widen to four lanes from I Estimated Cost: 217,717,045 75 in County to the Cherokee County line County: (and beyond to I575). Figures shown reflect portion 7836 of project within County (35%) Widening NEED AND PURPOSE: Improve eastwest access through northern tier of Atlanta metro counties. 17.1 # of Existing Lanes: 2 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2014 14800 SOURCE 2018 2019 2020 2021 TOTAL HB170 2,188,175 2,188,175 Z001 Z001 Z001 2,188,175 2,188,175
PROJECT NAME: Douthit Ferry Road widening PROJECT #: CB508 PROJECT DESCRIPTION: Widen Douthit Ferry Road from Estimated Cost: 22,320,283 Old Alabama Road to SR 113 including the bridge over the County: Etowah River 7494 Widening NEED AND PURPOSE: Provide connection to SR 113 bypass corridor from downtown Cartersville. 2030 2.5 # of Existing Lanes: 2 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: Cartersville Average Daily Traffic Volume: 2014 N/A SOURCE 2018 2019 2020 2021 TOTAL AUTHZ231 LOCAL 4,293,731 4,293,731 LOCAL Z231 4,293,731 4,293,731
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: CassWhite Road Ph I widening PROJECT #: CB510A PROJECT DESCRIPTION: Widen CassWhite Road Estimated Cost: 6,200,000 between Colonel Way and US 411 to standardwidth County: 2lane roadway with construction of railroad 15144 overpass and relocation of intersection with US 411 GDOT Project # NEED AND PURPOSE: To improve road alignment and improve safety. 0.7 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 2180 LOCAL SOURCE 2018 2019 2020 2021 TOTAL AUTHLocal LOCAL LOCAL LMIG/Local 6,200,000 6,200,000 6,200,000 6,200,000
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: CassWhite Ph II widening PROJECT #: CB510B PROJECT DESCRIPTION: Improve CassWhite Road Estimated Cost: 13,672,000 from 2 to 4lanes with divided median on 400' ROW County: between Busch Drive and 250' east of Great Valley 15145 Parkway/Highland 75 Industrial Park GDOT Project # NEED AND PURPOSE: To improve safety and handle addition of 1,000 employees and 270 freight trips as this corridor develops into industrial center for the community. 1.3 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWG Sponsor: Co Average Daily Traffic Volume: 2014 2180 SOURCE 2018 2019 2020 2021 TOTAL AUTHLocal LOCAL 1,921,000 1,921,000 LOCAL 900,000 900,000 LOCAL 10,851,000 10,851,000 1,921,000 900,000 10,851,000 13,672,000
CARTERSVILLEBARTOW COUNTY METROPOLITAN PLANNING ORGANIZATION PROJECT NAME: RomeCartersville Development Corridor PROJECT #: CB512 PROJECT DESCRIPTION: On new alignment connect US Estimated Cost: 98,468,279 411 to I75 from its intersection at MacJohnson Road and County: US 41. 13238 GDOT Project # NEED AND PURPOSE: Provide connection to 175 for MemphisAtlanta corridor and for economic development. 7.31 # of Existing Lanes: 0 # of Lanes Planned: 4 6 Congressional District: 11 RC: NWG Sponsor: GDOT Average Daily Traffic Volume: 2014 N/A Z240 SOURCE 2018 2019 2020 2021 TOTAL Z240 2,000,000 2,000,000 1,600,000 1,600,000 400,000 400,000
TRANSPORTATION IMPROVEMENT PROGRAM, 20162019 PROJECT NAME: Glade Road Corridor Safety Impr. PROJECT #: CB609 PROJECT DESCRIPTION: Glade Road (CR 633) safety Estimated Cost: 14,550,000 improvements from Homestead Drive (CR 605)/Apache County: Drive (CR 377) to Ryan Road (CR 810)/Yacht Club Road (CR 386), formerly GDOT P.I. No. 0003770. Safety NEED AND PURPOSE: Correct geometric deficiencies in order to reduce crash frequency and severity. The project incorporates, and includes the limits of, PI# 12599 and PI# 13321. Network Year: 2035 3.7 # of Existing Lanes: 2 # of Lanes Planned: 2 6 Congressional District: 11 RC: NWGRC Average Daily Traffic Volume: 2014 4,300 SOURCE 2016 2017 2018 2019 TOTAL M210 AUTH 40,000 40,000 40,000 160,000 M210 M210 LOCAL 40,000 40,000 40,000 40,000 160,000