About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Similar documents
Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Meade Street Bridge Design Alternative Study

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

122 Avenue: 107 Street to Fort Road

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Lawrence Avenue Streetscape Concepts August 30, 2011

Tonight is for you. Learn everything you can. Share all your ideas.

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Station 1: Street & Sidewalk Upgrades

Major Bike Routes 102 Avenue Workshop April 21, 2015

6.4 RECOMMENDED IMPROVEMENTS

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

S T A T I O N A R E A P L A N

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

SAFE ROUTES TO SCHOOL (SR2S)

See Figure 38, Existing Nonmotorized Connections.

STONY PLAIN ROAD STREETSCAPE

NEWMARKET UPHAM S CORNER

Financial Project ID No(s).: and ETDM No(s).: and 14181

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

42nd Ave N Reconstruction

Welcome to the Quebec Alternatives Analysis Public Meeting

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

MAKE YOUR PLACE IN CHANNELSIDE

SPEED MANAGEMENT FOR VISION ZERO

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Chapter 2: Standards for Access, Non-Motorized, and Transit

Living Streets Policy

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Fulton Market Streetscape

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

KEARNY MESA COMMUNITY PLAN UPDATE

MARTIN LUTHER KING JR. WAY

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Appendix A-2: Screen 1 Alternatives Report

Transportation Planning Division

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

I-290 Phase I Study Village of Forest Park November 9, of 25

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Why invest in the 1 Street S.W. Corridor?


Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Road Diets FDOT Process

C C C

Project Kickoff Meeting February 15, 2018

City of Davis East Covell Corridor Plan

F L E T C H E R A V E N U E

Montford Drive Parking & Circulation Study

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Blair/Williamson Intersection Expressed Needs

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Item No. 14 Town of Atherton

The Wiggle Route in Context

Station Plan: Penn & 43rd Avenue

Maywood Town Hall Meeting. May 4, 2016

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

North Shore Transportation Improvement Strategy

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Improving intersections for people that walk in Minneapolis

Polk Streetscape Project

COMMUNITY MEETING AGENDA

Table #6 VISION CHARACTERISTICS

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Boston Post Road Design Feasibility Study

Access Routes from US 101 to the Richmond San Rafael Bridge

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Transcription:

About the study Key goals of this study are to: North Milwaukee Avenue is a local and regional street for multiple modes of transportation. It is officially zoned and functions as a pedestrian street southeast of Diversey. Create public Achieve Vision Zero* by Harmonize the space and improve walkability enhancing traffic safety and access to the area various modes of transportation *Vision Zero will reduce the number of roadway crashes with the goal of eliminating traffic fatalities and serious injuries in Chicago by 2026. PROJECT MILESTONES Aug 2017 Jan 2018 WE ARE HERE GATHER REVIEW DEVELOP PRESENT SELECT PREPARE START data and identify existing concepts options a recommended final design construction stakeholders conditions concept and affirm project goals

FIRST PUBLIC What We Heard MEETING Improve traffic Create more useful Improve pedestrian Preserve neighborhood safety. public and green space. crossings and sidewalks. identity and historic features. Create a multimodal corridor Create easier access Control traffic speeds, Integrate native plants, that considers and balances and connectivity to the improve intersection flow, trees, lighting and the needs of residents, Square and within the rebuild traffic signals and outdoor seating. businesses and users. neighborhood. add more traffic signs.

SECOND PUBLIC MEETING Milwaukee Ave. Concepts CONCEPT 1 Dashed Bike Lanes Maintains curb lines and parking Encourages moving vehicles to drive closer to the centerline with re-striped dashed bike lanes Adds curb extensions for pedestrian safety and outdoor seating What We Heard Increase outdoor seating and sidewalk cafes. Improve pedestrian and bicycle CONCEPT 2 safety and comfort. Separated Bike Lanes Maintain Consolidates parking to one side, 46% loss in parking existing parking for businesses. Provides a physical barrier between moving traffic and people biking 11 5 2 11 11 8 2 5 11

SECOND PUBLIC MEETING Logan Square Concepts CONCEPT 1 CONCEPT 2 Spot Improvements Traffic Oval M aintains Kedzie Ave. east of the CTA terminal Realigns Kedzie Ave. at CTA terminal to create new plaza space M aintains Milwaukee Ave. through the Square M aintains the one-way traffic configuration around the Square A dds bike lanes and curb extensions to improve bicycle and pedestrian access Reroutes Milwaukee Ave. around the Square to create a larger public space Maintains one-way configuration around the Square CONCEPT 3 CONCEPT 4 Two Way, Trip Match Two Way, The Bend M aintains Milwaukee Ave. through the Square. Bends Milwaukee Ave. around the north and east sides of the Square to create a larger public space C onverts streets on the west and south sides of the Square to twoway configuration Creates larger park space east of Milwaukee Ave. Converts streets on the west and south sides of the Square to twoway configuration

RECOMMENDED CONCEPT Bus Stop Changes Milwaukee Ave. Route #56 LEGEND Retained Elimination Relocation S Shelter at stop Signalized intersection Transfer to Blue Line

Recommended Milwaukee Ave. Concept Dashed IMPROVEMENTS & IMPACTS Increases public space Bike Lanes Improves pedestrian and bicycle safety Maintains existing parking on both sides of the street, compared to 46% removed in Concept 2 Avoids utility conflicts with electric, water, gas and telecom

Recommended Logan Square Concept Two Way, The Bend WHAT WE HEARD AT PUBLIC MEETING 2 Reroute Milwaukee Avenue to create a larger public space within the Square. Realign Kedzie Avenue to create new public space to the east. Create easier pedestrian access to the Square. Questions about how two-way traffic would operate.

RECOMMENDED CONCEPT Pedestrian Access Existing conditions 6 Crosswalks to the Square 90 LEGEND Concept 4 : Two Way, The Bend 8 Average crosswalk length Signal or Stop-Controlled Crosswalk to Square Uncontrolled Crosswalk to Square Crosswalks to the Square Pedestrian walking Path 49 Average crosswalk length Crosswalk length Maximum distance between crosswalks

RECOMMENDED CONCEPT Bicycle Routes LEGEND NB Milwuakee Ave and NB Kedzie SB Milwaukee Ave and SB Kedzie NB Kedzie Blvd to EB Logan Blvd WB Logan Blvd to SB Kedzie Blvd

RECOMMENDED CONCEPT Driving Routes Existing Connections LEGEND Concept 4 : Two Way, The Bend Milwaukee Ave Kedzie Ave/Blvd Kedzie Blvd to/ from Logan Blvd Wrightwood Ave to/ from Logan Blvd

RECOMMENDED CONCEPT Parking Changes Parking Space Summary 109 Existing 110 Proposed LEGEND xx Number of proposed parking spaces compared to number of existing legal parking spaces

Logan Square Concept Comparison Concept 2 : Traffic Oval Concept 4 : Two Way, The Bend PUBLIC SPACE Both concepts unify Logan Square and create new Kedzie Plaza, providing opportunities for activities and events. 4 Crosswalks to Logan Square 770 Maximum distance between crosswalks 38 Average crosswalk length 8 Crosswalks to Logan Square 430 Maximum distance between crosswalks 49 Average crosswalk length EVENT FLEXIBILITY TRAVEL TIMES EVENT FLEXIBILTY TRAVEL TIMES 28 % Increase on average 3 % Increase on average PARKING SPACES PARKING SPACES This concept re-routes Milwaukee Ave. and unifies Logan Square, allowing for a fixed event space. 99 spaces The two-way street design in this concept provides additional event space by temporarily closing one of the perimeter legs around Logan Square. 110 spaces