Washington State University Bicycle and Pedestrian Plan Working Paper #7: Implementation Strategies

Similar documents
NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Living Streets Policy

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

City of Novi Non-Motorized Master Plan 2011 Executive Summary

PEDESTRIAN ACTION PLAN

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Broad Street Bicycle Boulevard Design Guidelines

Welcome! Public Open House on UBC s Transportation Plan

CHAPTER 3: Vision Statement and Goals

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Pedestrian Project List and Prioritization

Solana Beach Comprehensive Active Transportation Strategy (CATS)

BIKE PLAN CONTENTS GATEWAY

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

ACTIVE TRANSPORTATION

1.0 EXECUTIVE SUMMARY

Bicycle Master Plan Goals, Strategies, and Policies

EXECUTIVE SUMMARY. Vision

Appendix C 3. Bicycle / Pedestrian Planning

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Plant City Walk-Bike Plan

Physical Implications of Complete Streets Policies

City of Charlottesville Bicycle and Pedestrian Master Plan Update

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Chapter PERFORMANCE MEASURES AND ACCOUNTABILITY. Introduction

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Non-Motorized Transportation 7-1

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

TABLE OF CONTENTS. Executive Summary

MASTER BICYCLE AND PEDESTRIAN PLAN

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

4 Goals, Objectives & Actions

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

This page intentionally left blank.

Land Use Bicycle Spaces Required Type Residential

This page intentionally left blank.

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Bicycle and Pedestrian Connectivity Study Phase 2

Chapter 9: Pedestrians and Bicyclists

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

5. Pedestrian System. Accomplishments Over the Past Five Years

Goals, Objectives, and Policies

CPC Parking Lot Riverside Drive. Transportation Rationale

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Bicycle Facilities Planning

Sacramento Grid 2.0. The Downtown Transportation Study

Executive Summary Route 30 Corridor Master Plan

Arlington s Master Transportation Plan

MnDOT Implementation of Complete Streets Policy. January 2014

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Tonight is for you. Learn everything you can. Share all your ideas.

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

See Figure 38, Existing Nonmotorized Connections.

CONNECTING PEOPLE TO PLACES

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

TRANSPORTATION TRAINING TOPICS. April 6, 2010

CITY MANUALS AND STANDARDS REVIEW

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Hennepin County Bicycle and Pedestrian Planning

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

C C C

Broad Street Bicycle Boulevard City Council Study Session Summary

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Omaha s Complete Streets Policy

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Hennepin County Pedestrian Plan Public Comment Report

El Centro Mobility Hub

Introduction.

Chapter Four NON-INFRASTRUCTURE RECOMMENDATIONS. 5 E s. 5 E s. Education. Encouragement. Enforcement. Engineering. Evaluation

The Florida Bicycle and Pedestrian Partnership Council

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

2014 Bellingham Bicycle Master Plan

TRANSPORTATION NEEDS ASSESSMENT

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

5. RUNNINGWAY GUIDELINES

Active Transportation Infrastructure Investment A Business Case

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

City of Birmingham Draft Multi-modal Transportation Plan

Perryville TOD and Greenway Plan

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Cycle Track Design Best Practices Cycle Track Sections

Prince George s County plans, policies, and projects

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

First Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017

Transcription:

nnn Washington State University Bicycle and Pedestrian Plan

nnn TO: Bridgette Brady, CAPP, Director Parking and Transportation Services FROM: Alta Planning Design DATE: November 2013

Introduction As described in Working Paper #6, the Washington State University and City of Pullman recommended non motorized system consists of a comprehensive network of sidewalks, on street bikeways, shared use paths, and various programmatic measures. This working paper proposes an implementation strategy that targets the best way to implement projects and programs. The working paper also provides planninglevel cost projections for proposed nonmotorized improvements. The chapter closes with a discussion of supportive policies that can bolster and institutionalize the development of a high quality non motorized network. Implementation Timeline The recommended Bicycle and Pedestrian plan projects were divided into short Phase I, medium Phase II and long term Phase III priorities for a phased implementation. The prioritization was based on a connected bicycle and pedestrian network, integrated with transit to provide access for key destinations. Project Prioritization The project prioritization was developed as the natural extension of the identified goals and objectives Working Paper #1. The goals and objectives help direct resource allocation, program operation, and University prioritization. A prioritized list of bicycle and pedestrian projects will help guide the implementation of the proposed bicycle and pedestrian facilities presented in this plan. The goals and objectives for the WSU Bicycle and Pedestrian Plan were organized into the following seven categories: 1. Health and Safety 2. Education and Encouragement program and policy action 3. Enforcement program and policy action 4. Transit Integration 5. Sustainability 6. Implementation 7. Accountability Prioritization criteria were developed to address categories 1, 4, 5, 6, 7 where the goals and objectives addressed capital improvements. Policy and programmatic improvements will also be part of the final recommendations but are not being prioritized. Based on feedback heard from Washington State University, stakeholder interviews and public outreach, the recommended projects were categorized in one of three ways: Fix What You Have Phase I Connections Phase II & III Circulation Phase II & III All projects in the first category Fix What You Have were automatically considered the Phase I priorities, as the facility already exists, and Washington State University and the City of Pullman should concentrate resources on updating and fixing the existing system. Prioritization Criteria By creating a series of scoring criteria designed to help differentiate and rank the facility improvements outlined in this Plan, University staff can make use of additional priority guidance to aid in the timely, efficient implementation of the proposed bicycle and pedestrian network. The following prioritization criteria were selected to help nn Bicycle and Pedestrian Plan 1nnnnn

identify which improvements are likely to provide the most benefit to the University s bicycle and pedestrian system. Recommended facility implementation measures will ultimately have no specific time line, since the availability of funds for implementation is variable and tied to the priorities of the University s capital improvement projects. The proposed criteria for ranking the recommended facility projects are: Public Input Safety Gap Closure Anticipated Benefit Public Input Public input was received through the two open houses and the online survey completed in Spring 2013. Locations most frequently identified as being in need of improvements are given a greater priority. Safety Bicycle and pedestrian facilities have the potential to increase safety by reducing the potential conflicts between bicyclists, pedestrians, and motorists that often result in collisions. Projects are of higher priority if they reduce the opportunities for conflicts and increase safety. Gap Closure Gaps in the bicycle and pedestrian network come in a variety of forms, ranging from a missing link on a roadway to larger geographic areas without non motorized facilities. Gaps in the network discourage walking and biking because they limit access to key destinations and land uses. Facilities that fill a gap in the existing and proposed network are of high priority. Anticipated Benefit Some facilities will serve a greater number of bicyclists and pedestrians based on their length and locations. Facilities that serve or are located within high traffic areas of campus will have higher anticipated benefits for students, faculty, and staff. Secondary Prioritization Criteria Project Cost While project costs are not considered a primary prioritization criteria, they are useful in prioritizing among projects in the same timeframe category. Funding facilities is a primary focus for all new services and facilities on a university campus. Facilities that need minimal improvements and can be tied in with other construction projects are generally lower in cost and therefore are of high priority. Project Ranking Table 1 shows how the criteria described in the previous section translates into weights for project prioritization and weighting. Weights are based on direct, secondary, or no service at all. Direct service means that a facility intersects with a facility/destination, whereas secondary access occurs when the primary facility is located in close proximity to and existing facility/destination. Table 1.Project Prioritization Criteria Criteria Score Multiplier Total Public Input 2 3 6 1 3 3 0 3 0 Safety 2 3 6 1 3 3 0 3 0 Gap Closure 2 2 4 Anticipated Benefit 1 2 2 0 2 0 2 1 2 1 1 1 0 1 0 nn Bicycle and Pedestrian Plan 2nnnnn

Table 2 presents the list of prioritized projects, with project names and numbers corresponding to the figures in Working Paper #6 Table 2. Prioritized Non-Motorized Projects Project ID Project Name Public Input (6,3,0) Safety (6,3,0) Gap Closure (4,2,0) Anticipated Benefits (2,1,0) Total Connections-6 Long-term Stadium Way Improvements 6 6 4 2 18 Circulation-9 Stadium Way to Grimes Way reconfiguration 6 6 4 2 18 Connections-7 College Hill Neighborhood Hill Greenway 6 3 4 2 15 Connections-8 D Street Neighborhood Greenway 6 3 4 2 15 Circulation-10 Grimes Way reconfiguration 3 6 4 2 15 Circulation-1 Colorado Connector 6 3 4 1 14 Circulation-12 South Campus Trail 3 6 2 1 12 Circulation-14 Connections from Chipman Trail to South Campus Trail 3 6 2 1 12 Connections-9 Grand Avenue Bike Lanes (south of Olsen) 0 6 4 2 12 Connections-1 Sunnyside Hill Neighborhood Greenway 3 3 4 2 12 Connections-3 Military Hill Neighborhood Greenway 3 3 4 2 12 Connections-10 Pioneer Hill Neighborhood Greenway 3 3 4 2 12 Connections-11 SW Gateway - the Zig Zag 6 0 2 2 10 Connections-12 SW Gateway Pathway 6 0 2 2 10 nn Bicycle and Pedestrian Plan 3nnnnn

Circulation-2 Priority Bicycle Improvements 3 3 2 2 10 Connections-2 Military Hill Route B 3 3 2 1 9 Connections-4 Grand Avenue Greenway Extension 0 3 4 2 9 Connections-5 Military Hill Route C 3 3 2 1 9 Circulation-3 Veterans Way Pedestrian Mall re-design 3 3 2 1 9 Circulation-4 College Pedestrian Mall re-design 3 3 2 1 9 Circulation-11 Forest Way connections 3 3 2 1 9 Circulation-5 Rec Center Bypass 3 0 4 1 8 Circulation-6 Ferdinand s Connector 3 0 4 1 8 Circulation-7 Tennis Court Bypass 3 0 4 1 8 Circulation-8 Golf Course Connector 3 0 4 1 8 Circulation-13 Stairs to ramps conversions 3 0 2 1 6 Circulation-15 Multimodal Transit Center design 0 0 0 2 2. nn Bicycle and Pedestrian Plan 4nnnnn

Phasing Plan Implementation of the Washington State University Bicycle and Pedestrian Plan will take place incrementally through small steps taken over many years, depending on available funding and coordination with external agencies. The following phasing plan can guide the University and City toward developing the projects identified in this plan. Ideally, the University should complete higher priority projects found within the Phase I, Phase II, and Phase III lists below in the general order that they appear in the prioritization matrix. However, many opportunities will likely arise over the years that will make lower priority projects feasible either through efforts of an external agency e.g. street resurfacing, or through on campus construction projects. Table 3 shows the phasing plan for the nonmotorized prioritized projects. The phasing plan organizes projects into Phase I, Phase II, and Phase III projects. The intent of prioritizing projects is to identify a strategic timeline for implementation. The recommended implementation schedule is as follows: Phase I projects Fix What You Have are the top priority projects, which should be implemented within four years. Phase II projects are planned for implementation within 8 10 years. Phase III projects are future projects recommended for implementation within the next 16 years. These recommendations are designed to encourage the University to develop an interconnected bicycle and pedestrian network that makes best use of existing facilities, key destinations, and other factors that affect walking and bicycling throughout the city. Bicycle and Pedestrian Plan 5nnn

Table 3. Phasing of Non-Motorized Projects Project ID Phase I Fix-1 Fix-2 Fix-3 Fix-4 Fix-5 Fix-6 Fix-7 Fix-8 Fix-9 Fix-10 Fix-11 Fix-12 Fix-13 Fix-14 Fix-15 Fix-16 Phase II Connections-6 Circulation-9 Connections-7 Connections-8 Circulation-10 Circulation-1 Circulation-12 Project Name NW Davis Way Pathway Gap Shared Lane Markings - Campus + City Stadium Way (Grand to Colorado) (short-term) NE Valley Road Terre View Pathway completion Trail/Roadway crossing @ Kamiakan Trail/Roadway crossing @ Whitman Trail/Roadway crossing @ Ritchie Street Trail/Roadway crossing @ Stadium Way Trail/Roadway crossing @ Terre View Automate Pedestrian Signals (Campus + City) Update flashing crosswalk lights to LED (Campus) Add countdown signalheads to pedestrian signals Additional/Improved Bike Parking NE North Fairway Road Trail to Sidewalk Transition Curb Cut Infill/Retrofit Long-term Stadium Way Improvements Stadium Way to Grimes Way reconfiguration College Hill Neighborhood Hill Greenway D Street Neighborhood Greenway Grimes Way reconfiguration Colorado Connector South Campus Trail n Bicycle and Pedestrian Plan 6nnnn

Circulation-14 Connections-9 Connections-1 Connections-3 Connections-10 Connections-11 Connections-12 Circulation-2 Phase III Connections-2 Connections-4 Connections-5 Circulation-3 Circulation-4 Circulation-11 Circulation-5 Circulation-6 Circulation-7 Circulation-8 Circulation-13 Circulation-15 Connections from Chipman Trail to South Campus Trail Grand Avenue Bike Lanes (south of Olsen) Sunnyside Hill Neighborhood Greenway Military Hill Neighborhood Greenway Pioneer Hill Neighborhood Greenway SW Gateway - the Zig Zag SW Gateway Pathway Priority Bicycle Improvements Military Hill Route B Grand Avenue Greenway Extension Military Hill Route C Veterans Way Pedestrian Mall re-design College Pedestrian Mall re-design Forest Way connections Rec Center Bypass Ferdinand s Connector Tennis Court Bypass Golf Course Connector Stairs to ramps conversions Multimodal Transit Center design n Bicycle and Pedestrian Plan 7nnnn

Implementation Costs This section summarizes planning level cost opinions associated with the recommended nonmotorized improvement projects. An overview of the phased cost opinions is presented at the beginning of this section, followed by specific project costs by facility type and phase. Cost Opinions Overview The total implementation cost of the Washington State University Bicycle and Pedestrian Plan is estimated at approximately $11.5 million, as shown in Table 4. Fix What You Have recommendations account for just over $4 million. Cost Opinion by Phase Table 5. Cost Opinion by Phase Phase WSU Pullman Total I $484,000 $3,626,000 $4,110,000 II $4,272,000 $483,000 $4,755,000 III $2,170,000 $577,000 $2,747,000 Totals $6,926,000 $4,686,000 $11,612,000 Table 4. Summary of Cost Opinion Category WSU Pullman Total Fix What You Have $484,000 $3,626,000 $4,110,000 Connections $1,612,000 $995,000 $2,607,000 Circulation* $4,830,000 $65,000 $4,895,000 Totals $6,926,000 $4,686,000 $11,612,000 * The Circulation planning level cost estimates do not include the costs for the Stadium Way/Grimes Way reconfiguration. The planning level cost estimate for each project can be found in Appendix H1 at the back of this Working Paper. Bicycle and Pedestrian Plan 8nnn

Implementation Strategies Implementation strategies and their related action items support the goals and policies and projects outlined above. 1. Health and Safety Provide and promote safe and accessible routes and accommodations for walking and biking as a daily form of physical activity. Action 1.1: Reduce Crashes Reduce crashes involving bicyclists, pedestrians, and motor vehicles by at least 10 percent by 2018. Action 1.2: Address Conflicts Use current best engineering practices for minimizing and mitigating conflicts between bicycles, pedestrians and motor vehicles. Action 1.3: Promotion Work with Alive!, the Green Bike Program, URec, and other campus programs to actively promote walking and biking on campus. Action 1.4: Prioritize Safety Prioritize pedestrian and bicyclist safety during construction and maintenance activities and ensure that accessibility guidelines are followed. 2. Education and Encouragement Increase the public s awareness and usage of the bicycle and pedestrian network on campus and in Pullman through targeted education and encouragement programs. Action 2.1: Safety Education Educate the general public on bicycle and walking safety issues and encourage nonmotorized transportation with programs that target pedestrians, bicyclists and motorists. Action 2.2: Promotion through City/Campus-Sponsored Events Encourage pedestrians and bicyclists through City and Campus sponsored events, such as Bike/Walk to Work Day. Action 2.3: Education on Laws and Regulations Educate the general public on bicycle and pedestrian laws and regulations via the University and City s website and other education programs. Action 2.4: Education for Drivers Educate drivers transit drivers, delivery drivers, etc. on bicyclist rights and safe motoring behavior around bicyclists. Provide appropriate materials to pedestrians, motorists and cyclists convicted of specified violations Action 2.5: Proper and Safe Behavior Educate bicyclists and pedestrians on proper and safe behavior for biking and walking via the University s and City s website and other education programs. Action 2.6: Awareness of Pedestrians with Disabilities Improve the general public's awareness of the transportation needs and requirements of people with a variety of mobility and sensory disabilities via the University s and City s website and other education programs. Action 2.7: End of Trip Facilities Install bike racks, accessible parking and other support infrastructure at destinations citywide, including transit stations, retail area, parks, public facilities, and other high traffic areas. Action 2.8: Wayfinding Signage Install wayfinding signage in proximity to bike lanes, bike boulevards, shared use paths and destinations. 3. Enforcement Enhance safety for all road users through increased traffic enforcement on city streets, walkways and bikeways. Action 3.1: Traffic Law Enforcement Enforce traffic laws consistently for all users Bicycle and Pedestrian Plan 9nnn

Action 3.2: Diversion Course Collaborate with law enforcement and the court system on the development of a traffic skills education course aimed to reduce aggressive and/or negligent behavior among drivers, bicyclists and pedestrians by providing the option of taking a traffic skills education course in lieu of fines for traffic violations. Action 3.3: Obstruction Prevention Prevent the obstruction of dedicated bikeways and walkways. Action 3.4: Violation Reporting Develop and promote efficient mechanisms for reporting behaviors and conditions that endanger cyclists and pedestrians to law enforcement 4. Transit Integration Action 4.1: Partner with Transit Work cooperatively with adjoining jurisdictions and transit agencies to coordinate nonmotorized planning and implementation activities. Action 4.2: Routes to Transit Provide safe and accessible routes and intersections to transit for pedestrians of all abilities. Action 4.3: Bicycle Facilities at Transit Hubs Provide safe end of trip facilities bike parking, bike lockers, etc at all transit hubs/centers. 5. Sustainability Encourage and improve the appeal of modes of transportation with negligible carbon emissions, such as walking, biking, and using assistive devices, thereby reducing the miles traveled by single occupancy vehicles. Action 5.1: Sustainability Support Washington State University s sustainability goals by developing a comprehensive pedestrian and bicycle network. Action 5.2: Parking Strategies to Reduce Driving Support changing parking policies to discourage single occupancy vehicle driving, while recognizing the need to provide accessible parking. Action 5.3: End of Trip Facilities for Active Commuting Give incentives for bicycle storage, locker rooms and shower facilities for all major office building construction and remodeling projects in the downtown core. 6. Implementation Implement the 2013 WSU Bicycle and Pedestrian Plan s recommendations for developing a non motorized network that reduces auto travel, increases the number of non motorized users of all ages and abilities, and improves the health of our people and local ecology. Action 6.1: Connected Network Complete the connected network of sidewalks, trails, bike lanes, bike boulevards, shared lane markings, and cycle tracks throughout the city that serves pedestrians and all bicycle user groups. Action 6.2: New Dedicated Source of Funding Pursue establishment of a new dedicated source of funding for non motorized improvements. Action 6.3: Barriers and Hazards Reduce barriers and hazards to non motorized users by ensuring safe and sufficient crossings of major roadways and by providing routes that minimize steep slopes. Action 6.4: Inspection and Maintenance Create safe and accessible bikeways and walkways through regular inspection and maintenance. Bicycle and Pedestrian Plan 10nnn

7. Accountability Establish benchmarks measurements and monitor the effectiveness of the 2013 WSU Bicycle and Pedestrian Plan on an annual basis. Action 7.1: Bicycle/Pedestrian Tracking Track trends in non motorized usage through the use of Census data, annual user surveys, and annual bicycle and pedestrian counts. Action 7.2: Collision Data Monitor bicycle and pedestrian collision data with the goal of reducing non motorized collisions. Action 7.3: Pedestrian/Bicycle Report Card Produce a regular report card tracking pedestrian and bicycle trends on the Washington State University campus and in Pullman including percent of the system that has been completed, funds invested, identification of ongoing problems, public feelings of safety, status of reaching Health and Safety goals, and educational outreach efforts. Action 7.4: Track Implementation Track implementation of improved and increased walkway and bikeway facilities, ADA accessible features, and amenities. Bicycle and Pedestrian Plan 11nnn

Bicycle and Pedestrian Plan 12nnn

Appendix H1: Planning Level Cost Estimates The Opinion of Probable Cost includes preliminary estimates of construction costs based upon the recommended non motorized projects in the Washington State University Bicycle and Pedestrian Plan. Important assumptions used to arrive at these estimates include: All costs are in 2013 dollars Costs do not include property acquisition, utilities, and custom overpasses/underpasses Standard construction methods and materials are used In developing these cost estimates, we have relied upon our experience with similar projects to select the construction materials with the best life cycle cost and performance characteristics. Since these preliminary estimates are based on a planning level understanding of the components, rather than on a detailed design, they should be considered as Order of Magnitude. Final construction phasing Selected alignment Revisions to the design as required by local, state and federal permitting agencies Additional requirements imposed by property owners as a condition of granting property rights e.g., fencing, vegetated buffers, etc. Fluctuations in commodity prices during the design and permitting processes Selected construction materials Type and quantity of amenities e.g., benches, lighting, bike racks, etc. Extent of landscaping desired Availability of donated materials and volunteer labor Property Acquisition As the project progresses through preliminary, semi final and final design phases, these uncertainties begin to diminish. With each round of refinement a range of expected construction costs will become more accurately known. American Society for Testing and Materials ASTM Standard E2620 defines Order of Magnitude as being accurate to within plus 50% or minus 30%. This broad range of potential costs is appropriate given the level of uncertainty in the design at this point in the process. Many factors can affect final construction costs, including: Bicycle and Pedestrian Plan 13nnn

Table A. Planning level Cost Estimates by Project Project ID Project Name Planning Level Cost Estimate Phase I WSU Pullman Fix-1 NW Davis Way Pathway Gap $280,000 Phase II Fix-2 Shared Lane Markings - Campus + City $10,000 Fix-3 Stadium Way (Grand to Colorado) (short-term) $1,015,000 Fix-4 NE Valley Road $15,000 $15,000 Fix-5 Terre View Pathway completion $219,000 $511,000 Fix-6 Trail/Roadway crossing @ Kamiaken $45,000 Fix-7 Trail/Roadway crossing @ Whitman $45,000 Fix-8 Trail/Roadway crossing @ Ritchie Street $65,000 Fix-9 Trail/Roadway crossing @ Stadium Way $200,000 Fix-10 Trail/Roadway crossing @ Terre View $1,375,000 Fix-11 Automate Pedestrian Signals (Campus + City) $50,000 $50,000 Fix-12 Update flashing crosswalk lights to LED (Campus) $50,000 Fix-13 Add countdown signalheads to pedestrian signals $25,000 $25,000 Fix-14 Additional/Improved Bike Parking $50,000 Fix-15 NE North Fairway Road Trail to Sidewalk Transition $15,000 Fix-16 Curb Cut Infill/Retrofit $50,000 Connections-6 Long-term Stadium Way Improvements $40,000 Circulation-9 Stadium Way to Grimes Way reconfiguration n/a Connections-7 College Hill Neighborhood Greenway $41,000 $41,000 Connections-8 D Street Neighborhood Greenway $11,000 $42,000 Circulation-10 Grimes Way reconfiguration n/a Bicycle and Pedestrian Plan 14nnn

Circulation-1 Colorado Connector $240,000 Circulation-12 South Campus Trail $2,400,000 Circulation-14 Connections from Chipman Trail to South Campus Trail $65,000 Connections-9 Grand Avenue Bike Lanes (south of Olsen) $40,000 Connections-1 Sunnyside Hill Neighborhood Greenway $84,000 Connections-3 Military Hill Neighborhood Greenway $95,000 Connections-10 Pioneer Hill Neighborhood Greenway $76,000 Connections-11 SW Gateway - the Zig Zag $60,000 Connections-12 SW Gateway Pathway $1,500,000 Circulation-2 Priority Bicycle Improvements $20,000 Phase III Connections-2 Military Hill Route B $130,000 Connections-4 Grand Avenue Greenway Extension $400,000 Connections-5 Military Hill Route C $47,000 Circulation-3 Veterans Way Pedestrian Mall re-design $50,000 Circulation-4 College Pedestrian Mall re-design $50,000 Circulation-11 Forest Way connections $600,000 Circulation-5 Rec Center Bypass $340,000 Circulation-6 Ferdinand s Connector $540,000 Circulation-7 Tennis Court Bypass $240,000 Circulation-8 Golf Course Connector $250,000 Circulation-13 Stairs to ramps conversions $50,000 Circulation-15 Multimodal Transit Center design $50,000 Bicycle and Pedestrian Plan 15nnn