FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017

Similar documents
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

CONDITION ASSESSMENT REPORT

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

Perched Box Caisson Overview. January 2014

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

High Definition Laser Scanning (HDS) Underwater Acoustic Imaging and Profiling

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

MAHS Field School 2018 Pickles Reef Florida Keys National Marine Sanctuary

SPECIAL LAUNCHING METHODS

Item 404 Driving Piling

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

MIRABAY PILOT PROJECT REPORT

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016

Information for File # SEW

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION

TOWER INSPECTION REPORT

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

FALL PROTECTION / ELEVATED WORK

Fall Protection STANDARD PROCEDURE INSTRUCTION. Fall Protection. Title SPI. Department. Supersedes SPI Dated. Jan 19, 2016.

State DOT - Bridge Inspection Manual Part II Course No. SE0117 PDH: 10

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

User Instructions 1789 Parapet Wall Anchor

DE8410 FIVB Official Beach Volleyball Net

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

First Team Sports, Inc. Stellar Recreational Volleyball System

Gerald P. Oliveto, P.E. George Franz NJDOT

Playground Inspection Report

THOR 10 HAMMER CAGE INSTRUCTIONS

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

MODEL DIGITAL ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.5 TO 100FT (0.15 TO 30M) OPERATING RANGE SERIAL OUTPUT

Structural Assessment. USS Yorktown CV-10

Operating instructions. Bolt-on Bar Joist Anchorage

Construction Dewatering

Fall Protection / Open Holes & Guardrail

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Pole & Tree Climbers. Pole & Tree Climbers. 1972AR Series. Pole Climbers with 1-1/2" Gaffs Complete Set

MODEL ANALOG ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.2 TO 100FT OPERATING RANGE ANALOG OUTPUT

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

A A A T E C H N O L O G Y

MODULAR ALUMINUM PANEL SHIELDS MAPS

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

A PHYSICAL AND BIOLOGICAL SURVEY OF THE MID-REACH MITIGATION REEF SET NUMBER 1

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

Instructions for The Rose Crossover Style Full Body Harness For Women

SECTION FACILITY FALL PROTECTION PART I - GENERAL

SPEED SHORE MANUFACTURER S TABULATED DATA MANGUARDS. October 31, 2005

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

FALL PROTECTION CODE OF PRACTICE

Cranes Roost Park Facility Analysis

PLAYGROUND SAFETY PURCHASE OF PLAYGROUND EQUIPMENT

COASTAL HAZARDS. What are Coastal Hazards?

NAVSEA STANDARD ITEM. 1.1 Title: Reduction Gear Security; accomplish

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

FALL PROTECTION (SAF-SPI-06)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

User Instructions 1790 Rail Anchor

Introduction to Guideline Procedures - Part 2: Methods

Methylethycetone (MEC) - PMS 60 polyurethane glue - Grease - White silicone

The Dalles Dam Powerhouse Trash Rack ROV Inspection Report

Instruction Manual for ZY-021 Height adjustable Acrylic Backboard with Chain net

"STEEL FRAMED" ALUMINUM PANEL SHIELDS

Once the job has been planned and the site has been inspected according to WHS and site requirements it is important to follow work procedure and

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Trogear Bowsprit Through Hull Installation Manual

3. Types of foundation

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

2.2 S0600-AA-PRO-160/CH-16, Underwater Ship Husbandry Manual, Cofferdams

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS

Made in the USA. For Fall Protection Only. SafeLok Part Description

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder

2018 Beach Preservation Project Information

1 SafeClaw Anchorage Connectors

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

UNDERWATER SERVICES COMPANY PROFILE

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

Near Miss Incident Report

REVIEW ALL INSTALLATION NOTES PRIOR TO INSTALLATION!

Care, Use and Inspection

Soling Building Tips II

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

New Mexico Institute of Mining & Technology. Fall Protection Program

Build This World Record Fuselage Model

To address this issue, Ariens Company has developed two cradle plates kits:

Transcription:

LOGAN DIVING & SALVAGE 2815 SAINT JOHNS BLUFF JACKSONVILLE, FLORIDA 32246 TEL: (904) 731-0000 FAX: (904) 731-5493 MARINE SPECIALTY CONTRACTOR FL SCC131151014 FLAGLER BEACH PIER POST INCIDENT SAFETY INSPECTION HURRICANE IRMA SEPTEMBER 15-17, 2017 Page 1 of 9

Professional commercial diving and marine construction services were requested to inspect and document existing substructure conditions at the Flagler Beach Pier, Flagler Beach, Florida, post Hurricane Irma. The Flagler Beach Pier is a timber pile structure located at the intersection of 2nd. Street and Florida A1A, Flagler Beach, Florida. Original pier construction was completed in 1928. Pier substructure composition is comprised of 12 to14 diameter (butt) timber pile bents supporting 12 x 12 timber caps (running north to south). Transverse pile caps support longitudinal stringers (running east to west) which are 4 x 12 providing the substructure and superstructure for transverse 2 x 6 decking. Pile bents and piling are connected by cross bracing which are 4 x 8 or 4 X 6 timbers bolted to the piling diagonally and pinned in the middle where they cross. Additional cross bracing consists of a 4 X 8 horizontal X brace between the pile bents directly below the stringers. Divers utilizing surface supplied dive gear with hardwire communications inspected the subsea structure timber piling. Inspection was visual and accomplished by divers familiar with this type of pier construction and configuration. Pile layout and sequencing was referenced from drawings Titled FISHING PIER- HURRICANE MATTHEW EMERGENCY SAFETY TEMPORARY REPAIRS dated JANUARY 2017 supplied by and prepared by Mott Macdonald. The results of Inspection are as follows: Inspection of the Fishing Pier substructure was completed with divers for the underwater portions and marine construction personnel working beneath the pier from the waterline to the sub deck level. Substructure Piling Inspection I Revealed The FollowingF ollowing: 40 Piles were found to have greater than 50% of the pile not touching the cap beam, 11 of those 40 piles have 100% of the pile not touching the cap beam. 11 piles are providing no support to the caps, stringers and deck (see attached Pile Inspection Sheets). Heavy seas and currents experienced during the hurricane have scoured out the ground line, exposing and suspending past pile jacket repairs from 0' to 3' 49 Piles have scour resulting in suspended pile jackets. Previously buried sections of piling now are exposed and unprotected against marine borers. One pile was moving freely at the top (Bent 13 Pile C). A second pile was found to be moving slightly in heavy seas (Bent 15 Pile D) (see attached Pile Inspection sheets). Due to the piles moving or working during the storm, the majority of epoxy seals on every pile jacket are broken/cracked/failed, leaving an annular space of trapped seawater. There are at least 7 pile that are deteriorated 60% or more (see attached Pile Inspection Sheet). Deteriorated refers to the percentage of the substructure member that appears weakened beyond its useful service life. Page 2 of 9

Cap and Stringer Inspection I Revealed the Following: The cap beams were found to be generally in good condition. There are however, 2 beams deteriorated more than 60% (see attached Pile Inspection sheets). Overall Specific Findings Bent 13 Pile C is moving and does not touch cap Pile E 90% pile does not touch cap Pile B, G and H 50% of pile does not touch cap SS strap on Pile Band C is Broken Pile H has suspended jacket Bent 14 Pile B is not touching cap Pile H 50% of pile does not touch the cap The west face vertical diagonal X brace hardware is working/loose Bent 15 Piles D 100% of pile not touching the cap, pile is moving at the top, hardware working out of timber on SS straps Pile B 50% of pile does not touch cap Bent 16 Pile H has 50% not touching the cap Bent 17 Pile F and H 50% of pile does not touch the cap The west face vertical diagonal X brace broken Bent 18 The south face vertical diagonal X brace broken Bent 19 Pile B 100% of pile is not touching the cap Pile F 70% of pile is not touching cap Pile H failed pile to cap repair Horizontal X brace hardware is working Piles B, F and H have suspended jackets Bent 20 Piles F and H have suspended jackets Bent 21 Pile H 90% of pile is not touching cap Horizontal X Brace Hardware is working Piles D, F and H have suspended jackets Bent 22 Piles B, and F have suspended jackets Page 3 of 9

Bent 23 Pile B 50% of pile not touching cap Pile H 60% of pile not touching cap Horizontal X Brace Hardware is working Pile H has suspended jackets Bent 24 Pile B has 50% not touching the cap Piles B, F and H have suspended jackets Bent 25 Pile D 90% not touching the cap Piles B, D, F, and H have suspended jackets Bent 26 Piles B, D, F, and H have suspended jackets Bent 27 Pile B has 80% not touching the cap Piles B, F, and H have suspended jackets Bent 28 Bent 29 The west face vertical diagonal X brace Hardware is loose Bent 30 Pile D 50% of pile not touching cap SS strap on Pile D is Loose Pile F east Face vertical diagonal hardware is working Bent 31 Bent 32 Bent 33 Pile E SS strap Missing Hardware Pile H 100% of pile not touching cap The East face vertical diagonal has no hardware on pile D The West face vertical diagonal has no hardware on pile E Piles E and G have suspended jackets Bent 34 Pile F has 80% of pile not touching the cap Pile H has 50% of pile not touching the cap Horizontal X brace missing hardware Bent 35 Pile D 60% of pile not touching the cap The horizontal X braces are 60% wasted Pile F has a suspended jacket Page 4 of 9

Bent 36 Bent 37 Pile E 90% of pile not touching the cap Pile E is 70% wasted (top of pile split) Pile G 90% of pile not touching the cap Bent 38 Pile H has 100%of pile not touching the cap Pile H has broken SS straps Bent 39 Bent 40 Pile E 100% of pile not touching cap Pile F 90% of pile not touching cap and SS strap hardware working West face vertical diagonal X brace broken Bent 41 Pile G 90% of pile is not touching cap Pile H 80% not touching Cap Bent 42 Bent 43 Pile G 100% of pile is not touching cap Pile H 100% of pile is not touching cap Pile cap 60% wasted Bent 44 Pile C SS strap missing hardware West face vertical diagonal is missing hardware on pile D Bent 45 Pile C 100% of pile is not touching the cap Pile C SS strap has no hardware Pile E 100% of pile is not touching the cap Piles D and B are 50% deteriorated Pile F is 80% deteriorated Horizontal X brace Hardware 60% wasted Cap is 50% wasted Bent 46 Pile H 90% of pile not touching cap Horizontal X brace hardware 90% wasted Cap is 80% wasted Bent 47 East face vertical diagonal missing hardware on pile D Cap is 50% wasted Page 5 of 9

Bent 48 Cap is 50% wasted Bent 49 Bent 50 Pile D is severely split on the east face 90% wasted Pile F is 60% wasted and 20% of pile not touching cap Pile H is 70% wasted and 20% of pile touching the cap Cap 50% wasted Synopsis: Fishing Pier Hurricane driven elevated seas and current have scoured out the ground line removing sand by approximately - 3 from the baseline set after hurricane Matthew along the Fishing Pier, resulting in less pile embedment depth /burial and allowing more movement working of the substructure. Recommendations: 1) Remove and replace all missing, failed, loose, cracked cross bracing. 2) Repair all suspended epoxy pile jacket repairs by installing pile jacket extensions from the lower suspended elevation into the existing ground line - 3. 3) Jack, shim, and level all loose piles that are not touching pile caps and carrying deck load. 4) Replace all failed or missing Hurricane straps and hardware. 5) Apply 2-part epoxy in all upper elevation pile jackets gaps. Inject or force epoxy into the annular space for permanent repair. 6) Install ¾ galvanized through bolts with ¾ galvanized Ogee washers on the ends of all stringers into the corresponding stringer ends to better tie them together at each bent. /Scott C. Anderson/ S. C. Anderson President Logan Diving & Salvage sanderson@logandiving.com Page 6 of 9

Bent 47 Pile D Bent 13 Pile Page 7 of 9

Bent 13 Pile C Bent 37 pile E Page 8 of 9

Bent 45 pile C and E Bent 17 to 18 failed cross bracing Page 9 of 9