Planning and Programming Committee Meeting April 14,

Similar documents
SAFETY PERFORMANCE MEASURES AND TARGET SETTING. Transportation Subcommittee September 15, 2017

APPENDIX C. Systems Performance Report C-1

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Basalt Creek Transportation Refinement Plan Recommendations

APPENDIX B: FUNDING MATRIX

AMATS Complete Streets Policy

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

NOACA INVEST Regional Safety Program Evaluation Final Report Appendix

Highway Project Scoring Worksheet Project Name: Ike Brooks Rd/Rives Chapel Church Rd Improvements (SPOT ID: H090571)

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

We believe the following comments and suggestions can help the department meet those goals.

BIKE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT. November 2006

City of Jacksonville Mobility Fee Update

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

Kalamazoo Area Transportation Study (KATS) Complete Streets Policy Approved: Effective: FY 2018 Projects

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Vision Public Workshop: Findings

Executive Summary. September 3, 2014

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

2045 Long Range Transportation Plan. Summary of Draft

Bicycle and Pedestrian Advisory Council May 15, 2015

Best Practices and Recommendations for Metro Countywide Complete Streets Policy January 2014

FY TRANSPORTATION IMPROVEMENT PROGRAM for the National Capital Region. FINAL DRAFT October 17, 2018

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

5. Pedestrian System. Accomplishments Over the Past Five Years

Long Range Transportation Plan and Bicycle Mobility Plan

Context of Transportation Planning in the Central Lane Metropolitan Planning Organization (MPO) Area

Policy Number: Effective: 07/11/14 Responsible Division: Planning Date: 07/11/2014 FUNCTIONAL CLASSIFICATION AMENDMENT POLICY

BIKE PLAN CONTENTS GATEWAY

Section 8. Partnerships and Funding

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories:

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Providing an Efficient and Multi-modal Transportation System

The Florida Bicycle and Pedestrian Partnership Council

PennDOT Bicycle and Pedestrian Initiatives. Jonathan Heilman Roy Gothie Angela Watson

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Moving Towards Complete Streets MMLOS Applications

Linking Transportation and Health in Nashville & Middle Tennessee

Performance Criteria for 2035 Long Range Transportation Plan

Transportation Master Plan Advisory Task Force

Bicycle Master Plan Goals, Strategies, and Policies

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

STREET AND HIGHWAY PLAN

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Section 9. Implementation

Multimodal Connectivity: Walking & Wheeling to Transit

CSS and Complete Streets Partnering with Mn/DOT for Complete Streets. Scott Bradley Director of CSS April 27, 2010 CTS Research Conference

Appendix T 1: Additional Supporting Data

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

900 BICYCLE FACILITIES Traffic Engineering Manual

Implementation of Active Design: Opportunities in Transportation Policies & Plans May 2011

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Improving the Process: How Statewide Organizations Are Winning Federal Dollars for Bicycle and Pedestrian Projects

Prioritizing Transportation Policy and Funding for Active Transportation, Safety, Equity and Health

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

EXECUTIVE DIRECTOR S REPORT. Board of Directors, December 8, 2017

Goals, Objectives, and Policies

Incorporating Health in Regional Transportation Planning

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Performance Measures Target Setting NCTCOG Public Meetings

FORT MYERS CITY COUNCIL AGENDA ITEM SUMMARY

ACTION TRANSMITTAL No

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 25, 2016

Environment and Public Works Committee Presentation

ACTIVE TRANSPORTATION

TOWN OF CHAPEL HILL NORTH CAROLINA

AGENDA ACTIVE TRANSPORTATION PROGRAM (ATP) CYCLE 4 MPO COMPONENT FOR ACTION

Active Transportation Infrastructure Investment A Business Case

Eugene s Strategic Pedestrian and Bicycle Plan

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Cecil County, Maryland. Bicycle Master Plan

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Newport County

Transportation Finance in Los Angeles County: An Overview

Secondary Road Program

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

US 1 Express Lanes Public Kick-Off Meeting

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Incorporating Health in Regional Transportation Planning

Building Community Partnerships for Mobility:

Welcome. Background. Goals. Vision

Solana Beach Comprehensive Active Transportation Strategy (CATS)

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

FUNDING SOURCES CHAPTER 6

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Stakeholder Communication and Public Involvement Plan

City of San Diego Vision Zero Draft Strategic Plan FY 2017

The Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

City of Ann Arbor Pedestrian Safety & Access Task Force

Mobility and Congestion

900 BICYCLE FACILITIES Traffic Engineering Manual

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Transcription:

Planning and Programming Committee Meeting April 14, 2017

Action Requested: Recommend this item to the Executive Committee for consideration of its placement on the June 2017 Board of Directors agenda: Approval of the State Fiscal Years (SFYs) 2018 2021 Transportation Improvement Program (TIP) Previous Action: Presented to Transportation Subcommittee for consideration and input Input received was utilized by staff to develop the NOACA administered funding recommendations for SFY 2018 2021

Background The TIP is a listing of projects to be funded using Federal aid funds over the next four-year period Developed every two years Implementation arm of the long-range transportation plan Developed in coordination with the Statewide Transportation Improvement Program (STIP)

Background TIP developed in accordance with: ODOT STIP/TIP Development Procedures NOACA Regional Transportation Investment Policy (RTIP) Coordination with project sponsors and program managers

Background The TIP comprises: Roadway & Transportation Alternatives Element ODOT District, Major, & Local federal funding programs Statewide Congestion Mitigation and Air Quality Program NOACA administered funding programs Surface Transportation Block Grant (STBG) - $31.3 M Transportation Alternatives Program (TAP) - $3.1 M Transit Element Each transit agency s 4-year program Appendices 5

Background Appendices Public involvement procedures Financial assessment & fiscal constraint Air quality conformity documentation Environmental justice analysis SFY 2016 & 2017 projects implemented and delayed

Draft List of NOACA Funded Projects & Initiatives List contains: Projects programmed in SFY 2018 and 2019 of current TIP Regional initiatives Air Quality Program Rideshare Program Transportation for Livable Communities Initiative

Draft List of NOACA Funded Projects & Initiatives Additional projects considered for NOACA funding 2018 2021 identified through: 2017 2019 Transportation Asset Management Program (TAMP) Draft 2020 2021 TAMP Sponsor requests Applications submitted for Project Planning Review (PPR) 2014 and 2017 LRTP project solicitations $475.7 M identified in total needs

Draft List of NOACA Funded Projects & Initiatives $475.7 M identified in total needs Only $55.2 M in NOACA STBG and TAP funds available STBG ($M) 2018 2019 2020 2021 Total Budget $30.2 $30.9 $31.7 $31.7 $124.5 Commitments $22.0 $27.9 $13.5 $12.7 $76.1 Available $8.2 $3.0 $18.2 $19.0 $48.4 TAP ($M) 2018 2019 2020 2021 Total Budget $3.0 $3.1 $3.1 $3.2 $12.4 Commitments $2.4 $3.2 $0.0 $0.0 $5.6 Available $0.6 ($0.1) $3.1 $3.2 $6.8 GRAND TOTAL AVAILABLE $8.8 $2.9 $21.3 $22.2 $55.2

Background Given limited resources, staff polled Transportation Subcommittee for how to best allocate available funds on the following: Apply a minimum and maximum estimated project cost threshold 75% of the TS members supported this criterion Prioritize projects identified through the SFY 2017-2019 TAMP 67% of the TS members supported this strategy Allocate funding based on the vehicle miles traveled (VMT) in urban and rural area 50% of the TS members supported this strategy

NOACA Funded Projects In addition to TS input, projects considered for NOACA funding were evaluated and prioritized according to: Regional benefits, Impact/connectivity; and Readiness factors

Draft NOACA Administered Programs Summary DRAFT 2018-2021 TIP NOACA STP PROGRAM SUMMARY 2018 2019 2020 2021* TOTAL TOTAL AVAILABLE BUDGET $26,957,887 $28,916,607 $31,655,514 32,437,405 $119,967,413 TOTAL COMMITMENTS $26,032,750 $29,555,214 $31,565,590 32,813,860 $119,967,413 ANNUAL BALANCE $925,137 ($638,607) $89,924 ($376,455) $0 * SFY 2021 Original balance adjusted for NOACA AIM Forward 2040 revenue projection increase of.08% over that of SFY 2020 DRAFT 2018-2021 TIP NOACA TAP PROGRAM SUMMARY 2018 2019 2020 2021* TOTAL TOTAL AVAILABLE BUDGET (SUBTOTAL) $3,729,451 $3,091,658 $3,165,549 $3,243,738 $13,230,395 TOTAL COMMITMENTS $3,014,599 $3,712,000 $2,503,000 $3,960,000 $13,189,599 ANNUAL BALANCE $714,852 ($620,342) $662,549 ($716,262) $40,796 * SFY 2021 Original balance adjusted for NOACA AIM Forward 2040 revenue projection increase of.08% over that of SFY 2020 DRAFT 2018-2021 TIP STATEWIDE CMAQ PROGRAM SUMMARY 2018 2019 2020 2021 TOTAL TOTAL BUDGET AND COMMITMENTS $17,311,305 $21,515,984 $13,103,354 $5,730,000 $57,660,643

Total Draft TIP Highway and Transit Projects Funding Summary ($M) HIGHWAY Project Type 2018 2019 2020 2021 Total Bridge $383.9 $79.6 $75.2 $69.9 $608.6 Enhancement $15.4 $6.9 $21.7 $2.4 $46.5 Roadway $161.2 $150.7 $108.1 $105.9 $525.9 Shared Use $18.5 $13.3 $20.8 $1.9 $54.6 Total $579.1 $250.6 $225.9 $180.0 $1,235.6 TRANSIT Project Type 2018 2019 2020 2021 Total Non-Vehicle Capital $62.2 $64.4 $42.0 $42.8 $211.4 Vehicle Replacement $22.7 $20.8 $28.6 $27.0 $99.2 Vehicle Maintenance/Upgrade $13.6 $16.9 $14.5 $14.5 $59.5 Total $98.6 $102.1 $85.1 $84.3 $370.1 GRAND TOTAL $677.7 $352.6 $311.0 $264.3 $1,605.7 13

Total Draft TIP Highway and Transit Projects Total TIP Funding By Improvement Type Expand 14% Enhance 8% $1,605.7 B Maintain 78% Roadway 43% Shared Use 4% Vehicle Replacement 27% Vehicle Maintenance/Upgrade 16% $1,235.6 B $370.1 M Enhancement 4% Bridge 49% Non-Vehicle Capital 57% Roadway Projects Transit Projects 14

Draft TIP Impact 3,451 miles of roadway improvements and enhancements 8,140,832 sq/ft deck area of bridge improvements 35 miles of new bicycle and shared use facilities 260 total transit vehicle replacements 2 transit station rehabilitations

TIP Public Availability Period STIP/TIP Public Review Period 3/27/17 4/7/17 Distributed to ODOT Districts and MPOs Open Houses ODOT 3 (4/4/17); ODOT 12 (4/6/17) NOACA public review period 3/27/17 to 6/9/17 The draft SFY 2018 2021 TIP is available on web site NOACA will host public meetings in May 16

Next Steps Following Board adoption, final TIP will be sent to external oversight agencies for approval Staff will continue to work with projects sponsors to ensure projects are awarded on time, on budget and within the approved scope

Action Recommend this item to the Executive Committee for its consideration of placement on the June 2017 Board of Directors agenda: Approval of the State Fiscal Years (SFYs) 2018 2021 Transportation Improvement Program (TIP) Motion Second Discussion Put the Question

NOACA will STRENGTHEN regional cohesion, PRESERVE existing infrastructure, and BUILD a sustainable multimodal transportation system to SUPPORT economic development and ENHANCE quality of life in Northeast Ohio.