NB Power Field Report. Completed by: Austin Paul. Report covering the period from: July 4 th - 20 th, Neguac Project

Similar documents
First Nations Liaison/Field Monitor Report. Completed by: Austin Paul. Report covering the period from: July 15 th July 29 th, 2016

HOW TO DIG A TEST PIT

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

METHODS REPORT: Fish Taging

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING

Southampton. Our cottage/retirement home: The pre-build phase

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Potomac River Muskellunge

Welcome to the McKenzie Interchange Project Open House!

Fish Survey of Arctic Lake (ID # ), Scott County, Minnesota in 2012

Appendix J: Q1-Highway 35 Route Construction Plan

Report on a Salmon Survey in the Waterford Estuary in 2010

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

SOONER LAKE MANAGEMENT PLAN

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

2010 Wildlife Management Unit 501 moose and deer

What was the historic coaster fishery like?

New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district

ATTACHMENT F. Minnesota Department of Natural Resources. Marsh Lake Ecosystem Restoration Project

***This summary does not include shad and herring net requirements.***

TRAPLINE VC34 Land Use Before the La Grande Complex

De Rust Grass Carp Stocking Policy

Site 4 PEESHOO. Approx. Head = 10 m Design Flow = 70 m 3 /s Capacity = 6 MW. Peeshoo. Kabinakagami River. Rogers Road HWY 11.

USING THE GPS TO WALK TRANSECTS. by Robert L. Hafey

1. Indicate the number of employees and supervisors who will be working on the site. 5-10

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Upper/Lower Owl Creek Reservoir

BENSON PARK POND FISH SPECIES

Michigan Dept. of Natural Resources Status of the Fishery Resource Report Page 1. Weber Lake Cheboygan County, T34N, R3W, Sec.

Introduction: JadEco, LLC PO BOX 445 Shannon, IL 61078

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Cove Point Beach Restoration: Utilization of a Spawning Habitat by Horseshoe Crabs (Limulus polyphemus)

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE SPORT FISHERIES MANAGEMENT

Ross Barnett Reservoir 2018

FISH COMMUNITIES AND FISHERIES OF THE THOUSAND ISLANDS AND MIDDLE CORRIDOR

2008 WMU 360 moose, white tailed deer and mule deer. Section Authors: Robb Stavne, Dave Stepnisky and Mark Heckbert

Stillwater Status Report: Lough Muck, County Donegal

METHODS PAPER: Downstream Bathymetry and BioBase Analyses of Substrate and Macrophytes

EcoLogic Memorandum. TO: Ben Brezell; EDR FROM: Mark Arrigo RE: Possible Impacts of Dredging Snooks Pond DATE: 6/4/07

BIG TWIN LAKE Kalkaska County (T28N, R05W, Section 18, and T28N, R06W, Section 13) Surveyed May 1999

Spring Lake 2017 REEL FACTS Keith Meals Fisheries Biologist

TITLE 800. DEPARTENT OF WILDLIFE CONSERVATION CHAPTER 10. SPORT FISHING RULES SUBCHAPTER 1. HARVEST AND POSSESSION LIMITS

OGILVIE AND PEEL RIVERS

Canoe Route. Dogtooth Lake-Highwind Lake-Dryberry Lake- Lake of the Woods-Blindfold Lake

Reynolds Creek Hydroelectric Project by Doug Linn

2008 WMU 359 moose, mule deer, and white tailed deer

REEL FACTS. Regulations. Limblines Fishing with limblines and set hooks is prohibited at Lake Washington.

Agenda and minutes. Minnesota 1837 Ceded Territory Fisheries Committee January 17, 2018, 10:00 a.m. WebEx

MINNESOTA FRESHWATER MUSSEL SURVEY AND RELOCATION PROTOCOL

Fish Community. Fish Habitat, Streams and Rivers

Hydrographic Surveying Methods, Applications and Uses

East Metro Forest Lake (2,251 acres): Coon Lake (1,481 acres):

Friends of the Detroit River Habitat Restoration Project Update

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

CARL BLACKWELL LAKE MANAGEMENT PLAN

ATLANTIC STURGEON. Consultations on listing under the Species at Risk Act

Ross Barnett Reservoir 2019

Crooked Lake Oakland County (T4N, R9E, Sections 3, 4, 9) Surveyed May James T. Francis

2012 North Ottawa Dunes Deer Management Hunt. Rules and Regulations

EXECUTIVE SUMMARY FISH COMMUNITY AND HABITAT EXISTING CONDITIONS REPORT

7/29/2011. Sport fish. Rough fish. Fish Population Assessment

Investigation of Cultural and Environmental History on the Hudson River Superfund Site, NY February 2011

FINAL PHASE I ARCHAEOLOGICAL SURVEY CARTER ROAD

LAKE DIANE Hillsdale County (T8-9S, R3W, Sections 34, 3, 4) Surveyed May Jeffrey J. Braunscheidel

Lake Mead Fishing Fun

2009 WMU 527 Moose, Mule Deer, and White tailed Deer

Rivers Inlet Salmon Initiative

Chapter 4 Cyclo-cross

Lower Mississippi River Dispatch No. 289 Wednesday, May 20th, 2015 Mark River: The Spawn Mark River: The Spawn

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

California Steelhead: Management, Monitoring and Recovery Efforts

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE SPORT FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Current Status and Management Recommendations for the Fishery in the Cloverleaf Chain of Lakes

An Assessment of the Fish Community in Lake Acworth

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Pascagoula River Marsh 2017 REEL FACTS Stephen Brown Fisheries Biologist

Moon Lake 2019 REEL FACTS Nathan Aycock - Fisheries Biologist (601)

Kemper County Lake 2019 Reel Facts Trevor Knight Fisheries Biologist (662)

Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017

Intersessional Working Group Regional Observer Programme September 2007 WCPFC MINIMUM DATA STANDARDS FOR REGIONAL OBSERVER PROGRAMME (DRAFT)

Pearl River 2018 Middle Reach REEL FACTS Dustin Rodgers Fisheries Biologist

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Wine Water. process occurs in wet environments,

P.O.Box 23 Sw an Reach 3903 Victoria Phone E m ail- bigpond.com

2009 WMU 328 Moose and Elk

Beaches of the Delaware Estuary

StriperTackle Charters StriperTackle Charter Service, Year Round Striper Fishing

Pacific Water Shrew Salvage on SFPR Advanced Works July to September 2010

Pascagoula River Marsh 2018 REEL FACTS Stephen Brown Fisheries Biologist

5. purse seines 3 000

What are the most recent changes to the Fisheries Regulations in The Bahamas?

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

ADOPT-A-STREAM WATERSHED APPROACH COMMUNITY-BASED STEWARDSHIP. Nova Scotia Salmon Association March 2005

SKIATOOK LAKE MANAGEMENT PLAN

Transcription:

NB Power Field Report Completed by: Austin Paul Report covering the period from: July 4 th - 20 th, 2017 Neguac Project Project Description The Neguac project consists of the replacement of a 69kv transmission line with a 138kv line. An additional 23 km of new transmission line will be constructed. Stantec Consulting is currently carrying out a walk over survey to identify any areas of high/medium archaeological potential. The walk over will be followed by shovel testing of the identified high/medium potential areas. Dates: July 4 th - 6 th, 2017 Activities Conducted Assisted Stantec Consulting with an archaeological walk over survey of the proposed Neguac Transmission Line. Pertinent Tasks This walk-over survey was carried out by a team of 3 covering a 30 meter study corridor. The team walked the study corridor noting features of interest and delineating areas for future testing on a Flint GIS device. This device also records a track log that shows the areas that have been covered. The relatively small watercourses that were encountered were deeply incised within their respective valleys; indicating that the streams had a much greater flow rate in the past. The archaeological potential model provided by Archaeological Services Unit NB indicated that some areas fell within Palaeo shoreline buffers which increased the amount of survey coverage. To provide further context; after the territory was freed from the glacial ice cover, shorelines changed dramatically. In some cases and for various factors, sea levels rose approximately 75 meters higher than the present. This higher sea level created beaches that

are now far inland and located on higher ground. These ancient beaches could contain cultural material as humans have always been attracted to the coast. Water courses are paid special attention during walk over surveys. The area that extends 50 meters from a watercourse is considered high potential. From 50-80 meters from a watercourse is considered to be medium potential and both buffers on either side of the watercourse must be assessed. When shovel testing is carried out within these buffers a minimum standard of testing is imposed. In a high potential buffer, testing must be carried out by setting up a grid with 5 meter spacing. In a medium potential buffer, a grid with 10 meter spacing is used. Shovel test pits measure 50x50 cm and are dug until bedrock or glacial till is encountered. Interests and Potential Concerns from a First Nations Perspective The study area consisted of a mixed forest of varying degrees of maturity with an abundance of wetland areas. I did not encounter any Sweet Flag (Calamus) while surveying, although many of the wetland features had to be circumvented and were not thoroughly examined in terms of plant species. Pitcher plants were fairly abundant although I am unsure of their traditional use. Photographs Above: A Doe grazing in the transmission line corridor.

Above: Deeply incised watercourse valley. The Houlton Waters Project Project Description NB Power is proposing to construct and operate a 15.7 km, 69kv transmission line, beginning in Woodstock and extending to the Maine-New Brunswick border. The study corridor associated with the project is located adjacent to the twin-highway which leads to Houlton Maine. Dates: July 6 th and 13 th, 2017 Activities Conducted: Assisted Stantec Consulting with an archaeological walkover survey of the proposed Houlton Waters Project transmission line. Pertinent Tasks:

This walk-over survey was carried out by a team of 3 covering a 30 meter study corridor. The team walked the study corridor noting features of interest and delineating areas for future testing on a Flint GIS device. This device also records a track log that shows the areas that have been covered. The forest composition is composed mainly of semi-mature mixed forest with occasional wetlands and planted spruce sections. Many linear stone feature associated with property boundaries extend throughout the study corridor; all of which needed to be recorded. An intact stone house foundation was identified outside of the study corridor, this area will not be impacted by NB Power operations and the site is now registered with the province. Shovel testing of high/medium potential buffers will be carried out later in the field season. Interests and Potential Concerns from a First Nations Perspective The Woodstock area has many recorded archaeological sites. George Fredrick Clarke (GFC) was an avocational archaeologist that had found many artifacts while walking ploughed fields in the Woodstock area. Among the known sites that GFC had collected/excavated were the Meductic Flats, Phillips Flat, Bulls Creek, Grafton and Lanes Creek. None of these sites are located near the Project Development Area (PDA). I have personally identified 3 archaeological sites while paddling the Meduxnekaeg River in my spare time. Although the PDA runs adjacent to the Meduxnekaeg, it does not come close to the shoreline and will not impact the sites that I have identified along the River. Although the Meduxnekaeg River is full of cobble stones suitable for crafting tools and weapons, I did not identify any of such material in the PDA. White Quartz is very common, although the specimens that I have examined are sub-par at best: full of voids and fracture planes. In terms of species of interest, moose tracks are present all along the corridor. Black ash is present throughout the PDA, although much of what I have seen is relatively small in size (6 inch diameter). I was quite surprised with the abundance of butternut trees throughout the area. Seeing as the butternut is becoming an endangered species due to an illness that they carry, our team recorded the locations of all stands of butternut encountered. Photographs:

Above: A porcupine was spotted while recording a stand of butternut trees. Above: The Northern wall of the stone foundation found outside of the study corridor. The glass medicine bottle can be used to provide a rough date for the structure.

The Mactaquac Aquatic Ecosystem Study Project Description The Mactaquac Project involves various scientific studies associated with the re-build of the generating station. This is the third field season in which I have actively monitored and participated in fieldwork. Among the scientific studies being carried out is The Mactaquac Aquatic Ecosystem Study (MAES). This study, led by the Canadian Rivers Institute (CRI) is a multi-disciplinary, whole-river ecosystem study. CRI has a DFO issued fishing license granting them authority to fish for scientific research purposes. The avoidance of undo harm to fish species is one of the MAES team's primary concerns Stantec Consulting is carrying out various geotechnical and environmental studies in the project development area of the Mactaquac Generating Station. Date: July 11 th, 2017 Activities Conducted: Both striped bass and eel studies were conducted on the 11 th of July, 2017. The striped bass study was carried out during daylight hours and the eel work was done at night. Both of the studies were carried out near the Mactaquac Generating Station. Pertinent Tasks: The purpose of the striped bass study was to establish if the bass were in the process of spawning. To accomplish this task, active angling was carried out from the shoreline. When bass were caught, they would be weighed, measured and milked (rubbing the belly to exude sperm). All of the bass caught on the 11 th weighed over 20 pounds and did not appear to be in the process of spawning. It would seem that the further out you can cast, the larger the fish you will catch. The lead fisherman was using a 10.5 foot fishing rod with a 4 ounce buck-tail jig. The length of the rod and weight of the lure allowed the fisherman to cast well out into the current, therefore hooking very large fish. As for the eel study, our team traveled to the spillway ramps during the night. Eels are far more active at night and attempt to ascend the spillway ramps to access the head pond. Using small hand-held dip nets, eels would be collected from the spillway ramps and placed in a sedative solution (clove oil, ethanol and water).

The purpose of the study was to VIE tag (Visible Implant Elastomer) the eels at the dam. This implant is a 2-part silicon based material that is injected just under the surface of the eels skin. The implant is UV sensitive and can be detected using a ultra-violet light. A ultra-violet light was used to see if any of the eels had been previously tagged, only one was found to contain an implant. Only the smaller eels attempt to ascend the spillway ramps; the largest of which was 15 cm and smallest was 9 cm. Over the course of the night, the team tagged over 350 eels. Interests and Concerns from a First Nations Perspective Both striped bass and eels studies conducted did not involve mortalities and are relatively non-invasive. I did not identify and interests or concerns from a First Nation perspective. Photographs Above: CRI staff measuring a 24 pound striped bass

Above: American Eels held in a vessel containing fresh water. The Kedgwick Project Project Description In an effort to improve the reliability of the transmission line (138 KV) infrastructure in the Kedgwick area, a replacement of poles and wires is planned. The project corridor extends for 5.3 kilometers through a mixed forest. The project also involves the decommissioning of a 25 kilometer section of transmission line, which will be carried out at a later date. Dates: July 17 th -20 th, 2017 Activities Conducted: Assisted Stantec Consulting with shovel test pit excavation associated with the proposed Kedgwick Project. The testing areas were established using the data obtained through the walk over survey carried out in June 2017.

Pertinent Tasks: Once all of the necessary permits were acquired, the team would choose an area to start the testing. Not all of the testable areas have suitable access roads, therefore we choose to start in an area that did provide good access. To start the survey, a reference point is chosen that is located in the center of the testable area. A GPS coordinate is taken and a pin-flag is placed in the ground. From this point, a grid must be set up using a compass and tape measure. Brush clearing of the proposed transect lines is a must if in a heavily vegetated area. Firstly, the north-south line is flagged in, followed by the east-west. From the 2 established lines, the rest of the grid would be filled in. Every team member would be assigned a pit and excavation would begin. The shovel test pits have to measure 50x50cm and go deep enough to reach bedrock or glacial till. The areas were difficult to dig due to the abundance of flag-stone and root mass. Most of the pits in the testable areas did not exceed 60 cm in depth. All excavated material is sifted using ¼ inch wire mesh screen. No cultural material has yet been found. Once the pits are excavated, the soil horizons are recorded on shovel test pit forms, photographed and promptly back-filled to prevent injuries to animals. The shovel test pit program is on-going and is planned to pick back up during the week of August 1 st, 2017. Interests and Concerns from a First Nations Perspective Aside from the interests and concerns expressed in the last field report concerning the Kedgwick Project, I have not identified any other concerns at this time. I have not identified any outcrops or cobbles of suitable tool-stone and no cultural material has been excavated from the shovel test pits at this point. Photographs

Above: The location of the first shovel test pit location Above: A shovel test pit location depicting the abundant root-masses that blanket the area.

If there are any questions or concerns associated with the fieldwork depicted in this report, do not hesitate to reach out to me so that we may find an acceptable path to move forward. Contact Austin Paul: apaul@nbpower.com