Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Similar documents
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

^ Lee County So^mst <T:[oV1]^ Lee County

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Update January 4, 2016

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

^Lee County Jt Sotft^West T:foH^a Lee County

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

^ Lee County ^OU fewest T:foH^ Lee County

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Lee County Department of Transportation

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Route 1 and Harrison Road Intersection Improvements

Legislative Update Williamsburg Residency

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update November 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

FDOT Broward County Traffic Report April 20 through April 27, 2018

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Florida Department of Transportation MIKE DEW SECRETARY

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Important Lane Closures for Jan , 2012

FDOT Treasure Coast Traffic Impact Report

FDOT Broward County Traffic Report April 27 through May 4, 2018

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

PUBLIC INFORMATION MEETING

FDOT Broward County Traffic Report March 2 through March 9, 2018

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

IL Route 71 Construction Update

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

El Dorado County / Tahoe Roadwork Schedule

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Readington Road (C.R. 637) Construction

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Highway Construction

Rio Intersection Traffic Restrictions Begin Monday

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018

122 Avenue: 107 Street to Fort Road

PROJECT FACT SHEET May 25, 2018

Blair/Williamson Intersection Expressed Needs

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN

Hidden Oaks Elementary School

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

City of Margate, Florida. Neighborhood Traffic Management Manual

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Palm Beach County Traffic Report November 16 through November 23, 2018

Mandan Commission Meeting August 2, 2016 Mandan City Hall

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Meadow Woods Elementary School

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Lake Whitney Elementary School

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

APPENDIX E GRADE CROSSING LOCATIONS

Taylor Road Resurfacing Project

Windy Ridge Elementary School

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

2017 Temporary traffic control guidelines for pedestrians. v.2

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Traffic Signal Phasing Study Summary & Staff Recommendations

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

Transcription:

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May 25 May 31, 2017 College Parkway: Lee County DOT will be trimming trees for height clearance on College Parkway beginning May 31 st, through June 8 th. Motorists should use caution when traveling in this area, as there will be a lane closure between U.S. 41 and Summerlin Road. For further questions relating to this project, contact Mike Williams at 239-533-9400.

Hancock Bridge Parkway: Lee County DOT will be removing plants for sight distance on Hancock Bridge Parkway from U.S. 41 to Orange Grove Boulevard on May 30, 2017. Motorists should use caution, as there will be lane closures both east and west bound. This project will be completed by the end of day, Thursday, June 1, 2017. For further questions, contact Mike Williams at 239-533-9400. Road Maintenance This Week: Striping Maintenance: Lee County DOT will be performing a moving operation with traffic delays on 5-25-17 through 5-31-17 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways: April Lane Avenue D Avenue E Barrancas Avenue Bokeelia Road Camelot Drive Cook Road Enterprise Parkway Glenwood Avenue Hagie Drive Harbor Drive (Pine Island) Homestead Lane Hutto Road Island Circle Lover Rock Way Magnolia Point Main Street McNeil Road Neal Road Nuna Avenue Old McGregor Blvd. Paul Schultz Way Riverside Drive Tanglewood Circle Thorton Road Tipton Drive Williamson Road York Road Intersection Work: Intermittent lane closures and delays are possible on 5-25-17 through 5-31-17 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways: College Parkway Veterans Parkway For further questions regarding the above projects, contact Randy Hart at 239-533-9500.

1. Road Work/Maintenance/Improvements: Boca Grande: Lee County DOT began managing the 5 th Street West parking lot project in Boca Grande on April 17, with an anticipated completion date of May 30, 2017, weather permitting. A variable message board will be in place to alert drivers of the closure for the current parking area. For further questions, please contact DOT Operations at 239-533- 9400. Burnt Store Road from Diplomat Parkway to Van Buren Parkway: Construction Project: This project consists of the initial widening of Burnt Store Road to four lanes (ultimately the future design is for six lanes with a two-lane frontage road). The project also includes installation of conduits under the road for the City of Cape Coral. Motorists should expect intermittent southbound lane closures during nighttime/overnight hours on Wednesday, April 5, weather permitting. Motorists should follow detour signs. The speed limit is reduced to 45 miles per hour. Motorists should use caution as construction vehicles enter and exit the roadway. Van Buren Parkway at the intersection of Burnt Store Road: Northbound and southbound Burnt Store Road motorists must use the new connecting ramp just north of Van Buren Parkway to access Van Buren Parkway. Westbound Van Buren Parkway motorists must also use this ramp to access Burnt Store Road. Motorists should follow detour signs and use extreme caution while driving in this area. Diplomat Parkway at the intersection of Burnt Store Road: Northbound and southbound Burnt Store Road motorists must use the new connecting ramp at NW 12 th Terrace to access Diplomat Parkway. Westbound Diplomat Parkway motorists must also use this ramp to access Burnt Store Road. Motorists should follow detour signs and use extreme caution while driving in this area. NW 12 th Terrace at the intersection of Burnt Store Road: This intersection will close TEMPORARILY. This road closure will remain in effect for the duration of the project. Motorists should access NW 31 st Place via NW 9 TH Terrace. Local area residents will have access at all times during construction. NW 14 th Terrace at the intersection of Burnt Store Road: This intersection will CLOSE PERMANENTLY. Motorists should access NW 14 th Terrace via NW 16 th Street. Local area residents will have access at all times during construction. NW 17 th Lane at the intersection of Burnt Store Road: This intersection will CLOSE PERMANENTLY. Motorists should now use NW 16 th Street to access the neighborhood. Local area residents will have access at all times during construction.

NW 19 th Terrace from Burnt Store Road to NW 31 st Place will CLOSE PERMANENTLY. Motorists should now use NW 18 th Terrace to access the neighborhood. Local area residents will have access at all times during construction. This north segment from Diplomat Parkway to Van Buren Parkway costs $15.3 million and the City of Cape Coral s utility conduits are $550,000. The contractor is Quality Enterprises, USA, Inc. The project is expected to be complete spring 2017. For further questions, please contact Kris Cella or Brianna Wagner at 239-337-1071. Corkscrew Road: Ajax Paving Industries is doing a lane-widening project on the north side of Corkscrew Road (from a point 450 feet to the east and to the west of 21751 Corkscrew Road). Motorists should use caution, as there will be intermittent lane closures Monday through Friday from 9 a.m. to 4 p.m. Project completion date is May 31, 2017. For further questions relating to this project, contact Garrett Fons, Construction Manager at 239-707-0079 or call Lee County DOT at 239-533-8580. Homestead Road: Homestead Road from south of Sunrise Boulevard to north of Alabama Road: Construction Project: This project consists of widening Homestead Road to four lanes. This work will also improve drainage and install new underground utilities. A six-foot sidewalk will be constructed on both sides of the roadway. Motorists should expect lane closures during daytime hours. Project cost is $14.4 million. The contractor is Stevens and Layton, Inc. The project is expected to be complete by the end of 2019. For further questions, please contact Brianna Wagner at 239-337-1071. Lee County RWA For week of May 29, 2017 Estero Boulevard Construction refresh Estero Boulevard/Waterlines Crescent Street to Madera Road Contractors for Fort Myers Beach and Lee County are installing new water main, and sanitary sewer force main, storm drainage, sidewalk and rebuilding roadway on Estero Boulevard from Crescent Street to Madera Road. Motorists may experience daytime and nighttime intermittent one-lane traffic on Estero Boulevard. Flaggers will alternate traffic frequently, but motorists should expect delays. Crews are expected to work Monday through Friday and most Saturdays. Segment 1 - Crescent Street to Lovers Lane: Two travel lanes will remain open the majority of the time; however, intermittent lane closures may be necessary while crews restore side streets near intersections and properties on Estero Boulevard. Segment 2 - Lovers Lane to Madera Road:

Lovers Lane to Mid Island Drive Southbound traffic is shifted to the center lane while crews pave on the beach side of Estero Boulevard. Mid Island Drive to Gulfview Avenue Southbound traffic is shifted to the center lane while crews install water main on the beach side of Estero Boulevard. Segment 3 Strandview Avenue to Lanark Avenue: Motorists may experience lane shifts while crews survey existing utilities during daytime hours, weather permitting. Motorists should expect delays and use caution as crews work in the roadway. For further questions, please contact Cella Molnar & Associates at 239-337-1071. Page Park Water Main Improvements: Lee County Utilities Page Park Neighborhood from Danley Drive south to IDD Canal, and from Danley Drive/Airport Road east to 6 th Street. Contractors for Lee County Utilities are replacing water mains throughout Page Park. This project will also replace some fire hydrants. Residents can expect detours during construction. Motorists should expect crews to be placing asphalt throughout the project where crossings have been made. The contractor will be restoring sidewalk and driveway aprons throughout the project. These activities are subject to change due to inclement weather and unforeseen underground conditions. Some driveways will be temporarily closed but businesses and residences will have access throughout the project. Some sidewalks may be closed during the project. Crews are working near the roadway. Drivers and pedestrians should use caution. Project completion is expected early 2018. For more information about this project, contact Cella Molnar & Associates, Inc. at 239-337-1071. US 41 Transmission Mains Lee County Utilities Old Gladiolus Drive to Sunrise Boulevard: Contractors for Lee County Utilities are installing new water main and sewer force main on the east side of US 41 from south of Old Gladiolus Drive north to Sunrise Boulevard. Crews are working near the roadway along US 41 completing finish work and connecting water services. Some sidewalk may be closed on the east side of US 41. Drivers and pedestrians should use caution. Project completion is expected spring 2017. For more information about this project, contact Cella Molnar & Associates, Inc. at 239-337-1071.